This is a specifications document for a 10-12 yard heavy duty construction dump body issued by MaineDOT (Maine Department of Transportation) Fleet Services. The specification details the complete construction requirements for a dump truck body with a 13-foot length and approximately 132-inch California dimension. The body must feature unibody construction with a 10-yard water level capacity, designed for extreme service conditions with AR400 steel longitudinals and bracing, a one-piece 1/4-inch AR400 steel floor, and a 54-inch high headwall. The dump body must include a single piston front telescopic Class 80 NTEA-rated hoist with a minimum 50-degree dump angle, driver-controlled air-operated tailgate, and permanently attached body support for servicing. Additional required components include a grab handle on the driver side, a braced ladder on the right side with steps, mud flaps, and hardwood sideboards measuring 8 inches by 2 inches.
The specification requires all steel surfaces to meet SSPC #6 Commercial Blast standards with a two-part epoxy primer (6-8 mils dry film thickness) and 3.5 Imron Aluminum finish coat. All wiring must be protected by loom or conduit with soldered connections and heat shrink wrap. The vendor must supply and install LED marker and clearance lights and accommodate two stainless steel aerodynamic triple light housings to be welded to the rear posts, with provisions for Whelen strobe/halogen flashers and backup lamps to be installed by Fleet Services. The body hydraulics and controls must be compatible with systems currently in use by Fleet Services/MaineDOT, and the vendor must provide parts and repair manuals. No pricing, award date, response deadline, or contract term information is provided in this specifications document.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10-12 YARD HEAVY DUTY CONSTRUCTION DUMP BODY
Item 4
10-12 YARD HEAVY DUTY CONSTRUCTION DUMP BODY
LENGTH 13' CA Approximately 132”
1. BODY
_____ 1.1 Designed and constructed for extreme service.
_____ 1.2 Unibody construction with no exposed structural or longitudinal cross members. _____ 1.3 Length 13' with 12" overhang past body pivot.
_____1.4 Body pivot point should align with the most rearward vertical point of rear tandem tires.
_____ 1.5 Approximately 42” tailgate.
_____ 1.6 Approximately 36" sides.
_____ 1.7 10 yard water level capacity.
_____ 1.8 Longitudinals shall be 3/16” AR400 steel minimum.
_____ 1.9 Body bracing shall be fabricated of 3/16” AR400 steel minimum.
_____ 1.10 Sides to be braced with 4 -7" (minimum) vertical box braces in addition to a boxed frame for tailgate.
_____ 1.11 3/16" AR400 boxed top rail.
_____ 1.12 Tailgate and tailgate frame box braced.
_____ 1.13 Sloping tailgate braces and body sills.
_____ 1.14 Full width rear apron under tailgate 6" wide bolted on and easily removable.
_____ 1.15 When tailgate is down, tailgate must be even with body floor and gap between tailgate and body floor shall not exceed 1/2".
_____ 1.16 One piece floor of 1/4" AR400 steel.
_____ 1.17 Hardware shall be extra heavy duty with 1 1/4" minimum upper and lower tailgate hinge pins.
_____ 1.18 Grade 70 rated tailgate chains with upper and lower eyes.
_____ 1.19 Body hinge pins shall be designed for positive lubrication, grease fittings shall be located on the inner side of the body hinge pin with grease fitting and grease groove.
_____ 1.20 Continuous welding inside and out.
_____ 1.21 Grab handle shall be provided on the driver side of the body’s headboard.
_____ 1.22 Body must be equipped with adequately braced ladder mounted on the right side, whose first step is 21" above the ground and extends to the top of the sideboards. The right side of the ladder must terminate in a grab handle 8” above the side board.
_____ 1.23 Mud flaps fore and aft of rear wheels and/or tandem.
_____ 1.24 Headwall will be 54” high fabricated from 3/16” AR400 steel.
_____ 1.25 One gusseted step must be provided on the inside of the body adjacent to ladder on the ditch side of the vehicle.
_____ 1.26 Permanently attached body support capable of holding body in raised position for servicing.
_____ 1.27 Cab protector not required.
_____ 1.28 Driver controlled air operated tailgate.
2. HOIST AND SUBFRAME
_____ 2.1 Single piston front telescopic hoist incorporated into the body which shall be designed and will not extend beyond the face of the headboard of the body.
_____ 2.2 Class 80 hoist NTEA rated.
_____ 2.3 Dump angle approximately 50o minimum to rear.
_____ 2.4 Body hydraulics to be compatible with systems currently in use by Fleet Services/MaineDOT.
_____ 2.5 All hoist wear points capable of being lubricated with grease fitting placed in a safe, convenient location for servicing.
_____ 2.6 All fastening hardware to be of highest quality material available.
_____ 2.7 There shall be 2 1/4” diameter greaseable rear hinge pins.
3. GENERAL
_____ 3.1 Steel surface preparation shall be a minimum SSPC #6, Commercial Blast.
_____ 3.2 Epoxy primer, two part system. The dry film thickness shall be between 6-8 mils.
_____ 3.3 Finish coat will be 3.5 Imron Aluminum.
_____ 3.4 Any controls to be compatible with those currently in use by Fleet Services/MaineDOT.
_____ 3.5 Parts and repair manuals as needed.
_____ 3.6 Body up light to be installed in cab.
_____ 3.7 NOTE: CA dimension will accommodate not only body but wing tower and hydraulic assembly for plows approximately 20".
_____ 3.8 All wiring must be protected by wire loom or conduit.
_____ 3.9 Soldered connections and heat shrink wrap must be used on all wire connections.
_____ 3.10 Hardwood sideboards 8" x 2" minimum, wood, painted black must be supplied and installed by vendor.
_____ 3.11 Marker, I.D., clearance lights must be L.E.D.
_____ 3.12 Two stainless steel aerodynamic triple light housings will be supplied by MDOT to be fully welded to the exterior of both the right and left rear post. The box will be mounted in the center of the frame. Adequate holes must be provided through the frame and box to facilitate the installation of wires and connectors for the lights. The box will contain a rectangular Whelen strobe/halogen flasher which Fleet Services will install in the top position. The remaining two lights which will be supplied by Fleet Services will consist of a Whelen back up lamp for the center position and a Whelen stop/tail/turn LED for the lower position that will be installed by the body supplier. Dentsch waterproof connectors must be used on all Whelen lamps.
_____ 3.13 Method or means to secure auto-luber lines to the body cylinder basket adjacent to the long sill.