This document contains a cost estimate breakdown for a construction contract and details of a related federal contract opportunity for LED lighting repair and replacement. The construction cost estimate form provides a line item breakdown for interior LED fixtures of various types to be installed at Davis-Monthan Air Force Base in Arizona, including troffers, recessed mounts, high bays, and elevated fixtures. Labor rates are included but total costs are left blank, suggesting this is a template.
The associated federal contract opportunity is a solicitation to provide LED fixture replacement services for offices and high bay areas at multiple facilities. Interested vendors must attend a mandatory site visit on January 22nd and submit any questions by January 31st. Proposals are due February 13th. The solicitation is issued by the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14 RFIs 11 Feb 2020.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA487720R00130001 SF 30.pdf | ||
| 12 DMAFB Design Guide.pdf | ||
| 13 Site Visit.pdf | ||
| 7 Past Performance Questionnaire.docx | DOCX document | |
| 9 Contractor Environmental Guide (31 May 2018).pdf | ||
| 5 Specification LED Fixture Replacment 2 Jan 20.pdf | ||
| 3 Section M 20 Nov 19.pdf | ||
| 10 Audit (reference only).pdf | ||
| 6 List of Existing Fixtures.xls | XLS spreadsheet | |
| Solicitation - FA487720R0013.pdf | ||
| 1 Template of Contractor EAL.xls | XLS spreadsheet | |
| 2 Section L 20 Dec 19.pdf | ||
| 11 RFIs 2 Jan 2020.xlsx | XLSX spreadsheet | |
| 4 Davis-Bacon Act WD AZ20190032.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | LED Lighting Repair and Replacement | PROPOSED TOTAL CONTRACT PRICE | 0 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV180008 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | Interior LED, including lamps, mounting hardware and connections, troffer, recess mounted | 0.00 | 0.00 | 0.00 | ||||||
| 2 | Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high | 0.00 | 0.00 | 0.00 | ||||||
| 3 | Interior LED fixtures, including lamps, mounting hardware, and connections, high bay, surface | 0.00 | 0.00 | 0.00 | ||||||
| 4 | Interior LED fixtures, including lamps, mounting hardware, and connections, high bay elevated elevation | 0.00 | 0.00 | 0.00 | ||||||
| 0.00 | 0.00 | 0.00 |
| LINE TOTALS OVERALL | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL OVERALL (15.00%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD | 0.00 | |||
| PROFIT TOTAL OVERALL (10%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT | 0.00 | |||
| TAX OVERALL ____% | 0.00 | |||
| BOND OVERALL (2.5%) | 0.00 | |||
| TOTAL OVERALL PROJECT PRICE | 0.00 |