14 RFIs 11 Feb 2020.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Multi-Facility LED Install Federal contract opportunity
- Solicitation number
- FA487720R0013
About this file
This document contains questions and answers related to a solicitation for an LED fixture replacement project at multiple facilities for the Department of the Air Force Air Combat Command. The solicitation involves replacing lighting fixtures in offices and high bay areas across approximately 1,522,628 square feet of facilities. Site visits are required on 22 January and 31 January 2020, with all questions due by 28 January 2020 and proposals due by 13 February 2020. Award dates are not specified. Pricing terms involve using the Construction Cost Estimate Breakdown spreadsheet (AF 3052) and adhering to specified percentages for bond, overhead, and profit. The incumbent is not stated. Relevant project details involve fixture quantities, controls compatibility, warranty requirements, submittal procedures, and storage provisions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12 DMAFB Design Guide.pdf | ||
| Solicitation Amendment FA487720R00130001 SF 30.pdf | ||
| 13 Site Visit.pdf | ||
| 9 Contractor Environmental Guide (31 May 2018).pdf | ||
| 3 Section M 20 Nov 19.pdf | ||
| 6 List of Existing Fixtures.xls | XLS spreadsheet | |
| 8 AF Form 3052 FBNV18008 10 Dec 19.xlsx | XLSX spreadsheet | |
| 10 Audit (reference only).pdf | ||
| 5 Specification LED Fixture Replacment 2 Jan 20.pdf | ||
| Solicitation - FA487720R0013.pdf | ||
| 11 RFIs 2 Jan 2020.xlsx | XLSX spreadsheet | |
| 2 Section L 20 Dec 19.pdf | ||
| 1 Template of Contractor EAL.xls | XLS spreadsheet | |
| 4 Davis-Bacon Act WD AZ20190032.pdf | ||
| 7 Past Performance Questionnaire.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI | Spec/Solicitation Identifier | answers | |
| 1 | Can the Superintendent, SHSO, and QCM be the same person since this individual is a non-working role? Or are three (3) separate individuals required (one for each position)? | Superintendent and SHSO may be the same individual. QCM must be a different individual. | |
| 2 | The number of battery back-ups is critical to make an apples to apples comparison of cost proposals. Should each bidder assume a certain percentage? Please indicate % so that everyone is bidding the same quantity. | Section 01010 - Summary of Work, Subsection 1.1.3 | Use 5% as a project average. |
| 3 | Since this is a 1 to 1 replacement of lighting fixtures, are as-built drawings in AutoCAD & pdf required since nothing is being relocated? | Section 01010 - Summary of Work, Subsections 3.2.2.a & 3.2.2.b.1 | As-built drawings are not a required delieverable for this contract. However, this does NOT remove any other required deliverables identified in para. 3.2.2, such as O&M manuals, Warranties/Guarantee items, etc. |
| 4 | For Part II, Tab 2 - Product Approach, specification sheets for each type of light fixture proposed are required. However, this most likely exceeds the 12 page limit for Part II. Can specification sheets be exempt from the page count? | Section 1.7 | No. |
| 5 | The Construction Cost Estimate Breakdown spreadsheet (AF 3052) indicates percentages for bond, overhead, and profit. Are ALL bidders required to use those percentages? | Section 1.9 | Yes |
| 6 | We are assuming that ALL bidders must use Table 1 in Section 01010 for the basis of bid. As such, we assume wall sconces, wall mounted lights above vanity in bathrooms and dorms, decorative fixtures, can lights, etc. are NOT to be included in our bids. | Section 01010 | All flourescent tube fixtures SHALL be included, which includes dorm wall-mounted flourescent tubes. For non-dorm buildings, can lights, wall-mounted sconces, or other decorative fixtures are NOT included. |
| 7 | We understand that the facilities must remain operational. However, can we assume that large obstructions will be removed (for example, there will be no planes in the hangar)? Also, in certain areas operations will need to be halted briefly. In those areas, is weekend or after hours work acceptable? | Section 1.7 | Contractor shall submit a building schedule for approval, which will be coordinated with facility managers to deconflict with mission requirements and coordinate the removal of any large movable equipment/vehicles necessary to provide access. Contractor should review the schedule with Govenment personnel on a weekly basis and adjust as necessary to ensure flexibility with mission changes. Weekend work hours are acceptable, subject to prior request and approval by the Government. |
| 8 | Per section 1.1.6 of the Summary of Work document titled Specifications for FBNV 180008, there is a requirement of compatibility with applicable DOD design standards for lighting, could you please provide the website address of the applicable DOD design standards? |
| https://www.wbdg.org/ffc/dod, The Contractor shall propose LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016./ design standards are available from contracting | ||
| 9 | Per section 1.1.6 of the Summary of Work document titled Specifications for FBNV 180008, there is a requirement of compatibility with applicable U. S. Air Force design standards for lighting, could you please provide the website address of the applicable U. S. Air Force design standards? | https://www.wbdg.org/ffc/dod |
| 10 | Per section 1.1.6 of the Summary of Work document titled Specifications for FBNV 180008, there is a requirement of compatibility with applicable Davis Monthan AFB design standards for lighting, could you please provide the website address of the applicable Davis Monthan AFB standards? |
| Please see attachement "12 DMAFB Design Guide" | ||
| 11 | Do you have Square Footage of all individual buildings for total scope of work? | Approximately 1,522,628 SF (Gross). The square foot does not necessarily relate to the number of new fixtures required; use with caution. |
| 12 | Page 11 of 40 in Section H – Special Contract Requirements – States no less than 1 year warranty will be accepted for newly constructed or renovated facilities. Is this the minimum warranty on this lighting project? | No; see UFC 3-530-01 latest version, a five year unconditional warranty is required, see UFC for details on warranties |
| 13 | Do we need to complete AF Form 66? [summary of work 1.4 Submittal Procedures] | Yes as stated in the specification |
| 14 | Are you requiring PROJECT PROGRESS PHOTOGRAPHS – Construction progress (minimum of 20, in JPEG format, 450-1000KB, on Windows Readable CD, taken on or about the first of every month, showing general conditions of the work, as viewed from N, S, E & W. [Summary of work 2.8] | Yes. The intent is for the Contractor to provide sufficient photographic evidence that the required work has been completed for each facility. That does not necessarily mean that four photos of each fixture are required, if the requirement can be met with less photos. |
| 15 | Regarding Specification LED Fixture Replacement 2 Jan 20 Document, item 2.9, There seems to be conflicting information in how our materials can be stored. Are we going to have storage space inside a building or are we to have Fenced Contractor’s Storage yard? | government will provide an empty lot/staging area, contractor will bring whatever protection/fencing needed |
| 16 | Will you entertain editing your own as-built drawings per our written, detailed final scope of work? [summary of work – 3.2.2] |
a. Or, will you eliminate the AutoCAD (dwg) requirement? We would have an easier time editing the plans if you would export the plans, sending to us in PDF and allow us to edit and submit only in PDF.
b. Can this portion be bid after the actual audit is conducted, allowing us to have a better idea of how much space is requiring this service?
| As-built drawings are not a required delieverable for this contract. However, this does NOT remove any other required deliverables identified in para. 3.2.2, such as O&M manuals, Warranties/Guarantee items, etc. | ||
| 17 | Emergency Ballasts – There is conflicting feedback on the RFI regarding how many or what % should be figured as emergency. How would you like those addressed? | Use 5% as a project average. |
| 18 | Are there any specific restrictions on what tools and equipment are able to be brought on base, and do they have to remain on base through the duration of the project? | Yes, there are restrictions to what can be brought on base. "Normal" equipment (i.e. industry standard) for this type of work should not be restricted, however if you are proposing alternative means/methods, it must be provided to contracting for review and determination. |
| 19 | Do the high-bay fixtures require a wire-guard over the light engines? | Yes |
| 20 | Regarding Specification LED Fixture Replacement 2 Jan 20 Document, item 1.1.13, |
a. For initial submittal, how much space do you want to see proof of light levels on?
b. are you specifically referring to photometric layouts?
c. If yes, without provided CAD drawings and fixture locations, how can we possibly provide this?
| This information is not required as part of the initial submittal, however the Contractor is required to provide end-state photometric light readings as proof of compliance with UFC/ASHRAE requirements. | ||
| 21 | Would the government consider lowering the 322 calendar day – government acceptance period for our proposals? Mentions of tariffs, or trade disputes can cause a spike in the cost of fixtures, and these type of scenarios are hard to account for over 300+ days (and required bidders to include contingency funds in our bids). An alternate solution would be for the government to have a 90 day acceptance period. At the end of the 90 days (if funds are not currently available to make an award), the government could allow the bidders to “confirm their pricing” and resubmit their bids if there have been any changes in the market. The prevents the government from paying additional “contingency” in case an award is made quickly, while also protecting the contractor – who can adjust their pricing (as needed) every 90 days. (Most sureties will only guarantee a bid bond for 90 days anyways.) | No |
| 22 | The RFP states: "Define the roles of the contractor management team, to include organization of Project Management, Superintendent, and the overall approach ...". Do we need to name specific personnel besides the PM and Superintendent and are there specific requirements for these individuals? | Not names but roles/titles of each position. |
| 23 | Will we have full access to the hangar/hangars or will it/they be given to us in sections of a half at a time? | The Government will attempt to provide full access, but this will be subject to the approved building schedule and will be on facility-by-facility basis as mission requirements allow. |
| 24 | RFI #24 (#26, #30) indicate that we should assume/estimate the quantity of emergency fixtures/battery backups. Can the government please provide a quantity or assumption for this (at the very least, something similar to the “10% Haz Conditions” assumption provided in RFI #156)? This will ensure pricing can be reviewed for competitiveness and that all bids can be viewed “apples to apples” as an even comparison | use 5% as a project average. |
| 25 | RFI #43 indicates that we should assume/estimate the mixture of switches/controls for the lights. Can the government please provide a quantity or assumption for this (at the very least, something similar to the “10% Haz Conditions” assumption provided in RFI #156)? This will ensure pricing can be reviewed for competitiveness and that all bids can be viewed “apples to apples” as an even comparison. | Information not available. Per UFC 3-530-01, para 2-8.3, replacement fixtures (luminaires) must be compatibile with NEMA SSL 7a dimmers and dimming systems. In the case that the existing controls are non-compatible with proposed fixtures, contractor may seek a contract modification to correct/replace controls or propose an alternate brand fixture that meets all other requirements. |
| 26 | RFI #134.2 (and #136.2) indicate that restroom/stairwell fixtures ARE included in the scope of the contract, but are NOT included in the numbers provided in the SOW. Can the government please clarify or provide an overall quantity for additional fixtures that have not been included in the SOW quantities? This will ensure pricing can be reviewed for competitiveness and that all bids can be viewed “apples to apples” as an even comparison. | Questions 134.2 and 136.2 of the original RFIs were specific to building 1550 and 3500, respectively. For bidding purposes, Contractors should be proposing based on the fixture counts provided in the SOW. Fixture counts/types be verified by the winning bidder. Contractor may seek additional payment for additional fixtures exceeding the total overall fixture count, and the government reserves the right to seek a credit for actual quantities less than those provided in the SOW. |
| 27 | To ensure that all bidders are quoting the same number of fixtures/conditions (and to provide a clearer price comparison between bidders), it would be extremely helpful if the government would provide the quantities we should use for the 4 pricing line items on the AF3052. Due to the number of buildings on this project, and the volume of fixtures involved, minor deviations between bidder assumptions on things such as the number of emergency fixtures required (which the government has told us to assume/estimate) – could result in large differences/deviations in cost. If the government were to clearly indicate the quantities on the AF3052 (and clarify the assumptions/estimates mentioned in the previous RFI’s), all bidders would be providing an “apples to apples” bid which the government could review for competitiveness. | See RFI #26 answer. |
| 28 | Prints of the buildings toured during the walkthrough were provided but not every building in the RFP. |
Question: Could contracting provide prints of all the buildings?
| Floorplans, if available, will be provided to the winning bidder. | |
| 29 | . Reference: In 1.4, Submittal Procedures, part c. of the Specs doc (Summary of Work/SOW), the govt states: c. Submit to the Contracting Officer complete information applicable to the item(s) of equipment and materials called for by the Contract Documents, for approval, prior to installing the relevant item(s) of equipment and material. |
Issue: If the govt is requiring offerors to include a list of equipment WITH cut/spec sheets for each equipment type, then the govt is providing its APPROVAL at time of award. Requiring the contractor to go through another round of the same submittals is redundant and counter-productive (the govt is apparently reserving the right to reject what it has already approved by virtue of making the contract award). a. Question: Would the govt please remove this clause from the Specifications; it is unreasonable for the contractor to risk having its list of materials face line-item rejections prior to and after installation, when the govt will have already approved the LOM at the time of award (beforehand)?
b. Question: Will the govt reimburse the contractor for equipment changes from the LOM established in the proposal and award?
c. Question: Will the govt restrict its rejections to only those equipment items that do not meet USC?
| a-Government will not remove the clauses; b-government will not reimburse the contractor for establishing proposal; c- government will reject all materials/equipments that do not meet the statement of work. | |
| 30 | . Reference: In 1.4, Submittal Procedures, part c. of the Specs doc (SOW), the govt also states: If unapproved item(s) of equipment or material are installed, the Contracting Officer, at his sole discretion and option, may reject the installed equipment and material. If rejected, the Contracting Officer may then pursue, again in his sole discretion and option, remedies including but not limited to the removal and reinstallation of approved item(s) of equipment or material at the Contractor’s expense, extended warranties, and other remedies as may be deemed appropriate and applicable to that portion of the construction. |
Issue 1: Respectfully, this reads like a govt escape clause. By this definition, “unapproved” can mean anything that the contractor installs before the govt has re-approved, or possibly having rejected what was already contractually approved, and then, even when the contractor has a signed contract that includes a list of approved materials/equipment, the govt can later reject those items after the contractor has installed them. This also seems to run counter to the purpose of “firm fixed” price.
A. Question: Would the govt please revise SOW 1.4.c to state that if the govt requires a change to the list of materials at any time after award, then the govt will negotiate the new requirements with the contractor and issue a modification to the contract accordingly?
B. Question: Will the govt approve all submittal items prior to installation?
| As stated in the speficiation, Contracting Officer may reject "unapproved" equipments/materials are installed. A- Government will not revise the specification; b-yes, government will approve all submittal items prior to installation. Otherwise, governmemt will provide justification why rejected. | |
| 31 | . Reference Q/A #44: “provide a lighting study for each work area to show the lighting requirements are being meet for the work being done in the area”. |
a. Question: Please clarify “lighting study”; is the govt referring to inventory, M&V testing, or investment grade audit, or combination thereof?
b. Question: Does the govt require offerors to perform a full audit on 100% of existing fixtures in the specified facilities prior to installation, or will the 2016 & 2018 audits referred to in the Q&As and specifications document be acceptable instead?
c. Question: Would the govt specify a minimum required sample size for the lighting study (e.g., 10%)?
| The Government does not require an audit of existing fixtures prior to installation; the requirement is for the Contractor to show proof of UFC/ASHRAE compliance with the end-state, newly installed fixtures. | |
| 32 | . Reference: PPQs. |
Question: If an offeror’s PPQ POCs submitted completed PPQs for the predecessor DMAFB LED Lighting Replacement solicitation (that was canceled and is now reissued), would the govt accept those already on file for this solicitation? (Please consider the burden that PPQs put on our customers, and that the current PPQs are identical in content/format.)
| Leave to CONS | |
| 33 | Question: Should the following be treated as separate fixtures or an add on to fixtures already listed in other lines items? |
4,000 Replace sockets in linear fluorescent Fixture (per lamp) 500 Replace Broken or Yellowed 2x2 Lens Lay-in fixture 200 Replace Broken or Yellowed 2x4 Lens Lay-in fixture 2,000 Replace 4' Wrap Lens
| Answer 150 on the Dec RFI should be "NO". All fixtures should be replace by entirely new fixtures - no retrofit kits or surface mount kits are allowed. | ||
| 34 | What are the mounting heights for the high bay fixtures, types and difficulty? | Information not available |
| 35 | High Bay 6 Lamp F54 T5 HO • Type of existing fixture? Height? |
High Bay 8 Lamp F42 • Type of existing fixture? Height?
HPS-70W • Type of existing fixture? Height?
MH 1000W • Type of existing fixture? Height?
MH 400W • Type of existing fixture? Height?
MH 250W • Type of existing fixture? Height?
etc ??
LED High Bay Fixture Type of existing fixture? Height?
| Information not available | ||
| 36 | Please confirm electronic submitted (emailed) proposals will be accepted? | As stated in the section M, only electionc submission will be accepted. |
| 37 | Existing controls for each space need to be provided in order to provide a accurate estimate. a. Some controls may not be compatible with certain manufactured fixtures. |
b. Depending on the types and certain installations of controls, the fixture price can be increased significantly.
| Detailed list of controls not available. In the case that the existing controls are non-compatible with proposed fixtures, contractor may seek a contract modification to correct/replace controls or propose an alternate brand fixture that meets all other requirements. | |
| 38 | Will new photometric drawings need to be provided per the contract. a. If so, would they need to be provided before or after the installation or both? |
| As-built photometric drawings are not a required delieverable for this contract. However, this does NOT remove any other required deliverables identified in para. 3.2.2, such as O&M manuals, Warranties/Guarantee items, etc. | ||
| 39 | Can subcontractors be non-SBE’s? If so, is there a limitation to what percentage of work can be performed by a non-SBE? | minimum of 50% |
| 40 | Can a subcontractor post the necessary surety bonds for the SBE? | No |