About this file

This is a Base Civil Engineering Work Clearance Request form (AF IMT 103) used by the Air Force, specifically for Ellington Air Force Base. The form is designed to request clearance to proceed with construction or maintenance work that may impact aircraft or vehicular traffic flow, base utility services, fire and intrusion alarm system protection, or routine installation activities. The request requires identification of the work order and contract number, specification of the facility type or work involved (including pavements, drainage systems, railroad tracks, fire detection and protection systems, utilities, aircraft or vehicular traffic flow, security systems, and other infrastructure), and documentation of the area via attached sketch. The clearance must be processed immediately prior to work commencement and must be reprocessed if delays occur or job site conditions change.

The form requires coordination and approval from multiple base departments and functions, including electrical distribution, steam distribution, water distribution, petroleum/oil/lubricants distribution, sewer distribution, environmental services, pavements and grounds, fire protection, zone security, base operations, communications, cable television, commercial utility companies (telephone, gas, and electric), and safety personnel. The approving officer must be either the Chief of Operations Flight or Chief of Engineering Flight, and the form requires detailed remarks describing specific precautionary measures to be taken before and during work accomplishment, including comments concerning the approved excavation method and equipment type (hand-operated or powered). The form serves as a coordination and hazard identification tool to minimize customer inconvenience and prevent accidents during contracted or in-house work activities.

View the file

Other files

File Type Posted
ESBD_452864_1780091827962_Attachment G.5 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_452864_1779205491588_Addendum 2 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1777473605426_Addendum 1 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1779913011683_Addendum 3 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780322077414_Addendum 5 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780091806262_Addendum 4 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1774290608978_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_452864_1774290857018_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_452864_1774290974494_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_452864_1774290754031_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_452864_1774290899410_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_452864_1774290933038_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_452864_1774290960900_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_452864_1774290554718_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_452864_1774290870767_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_452864_1774290993298_ATE420~1.PDF PDF
ESBD_452864_1774290799347_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_452864_1774291008049_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_452864_1774290721468_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_452864_1774290768389_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_452864_1774291105912_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (05OCT25).pdf PDF
ESBD_452864_1774290690863_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_452864_1774290829874_ATF409~1.PDF PDF
ESBD_452864_1774290574288_ATTACHMENT G.2 Application for Texas Identification Number #_AP_152.pdf PDF
ESBD_452864_1774290945955_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_452864_1774290920126_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_452864_1774290843236_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_452864_1774290592459_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 7.pdf PDF
ESBD_452864_1774291027426_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_452864_1774291122889_ATTACHMENT G.Z - Example of Contractor Cost Estimate 2026.pdf PDF
ESBD_452864_1774290885606_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_452864_1774290623533_ATTACHMENT G.6 FAA Form 7460-1.pdf PDF
ESBD_452864_1774290638971_ATTACHMENT G.7 Location Photo Aids.pdf PDF
ESBD_452864_1774290738406_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_452864_1774290786162_ATE180~1.PDF PDF
ESBD_452864_1774290813335_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_452864_1774290705618_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_452864_1774291060898_ATBB18~1.PDF PDF
ESBD_452864_1774291091775_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_452864_1774291046904_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_452864_1774290672414_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_452864_1774290518021_TMD25-ANG-WJ-24150011 EXTEND BARRIER ACCESS ROADS ELLINGTON AFB.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS:
HASNOT:
APPRVD:
DAPPRVD:
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC:
ABC_2:
ABC_3:
D:
E:
F:
OVHA:
OVHB:
UNDGA:
UNDGB:
GHI:
GHI_2:
GHI_3:
OTH:
Enter date as YYYYMMDD.:
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB:
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3:
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC:
REMKE:
COMUTIL:
COMUTIL_2:
COMUTIL_3:
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF:
SignatureStyle1:
SignatureStyle2:

File details come from the government source that posted it. Updated .