ESBD_452864_1774290754031_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf

PDF 108 KB Posted

Attached to
EXTEND BARRIER ACCESS ROADS ELLINGTON AFB
Solicitation number
TMD25-ANG-WJ-24150011
Issued by
Harris County, Texas

About this file

This is an environmental compliance specification document for Ellington Field in Houston, Texas, establishing hazardous material (HM) management procedures for contractors. The contractor must implement a Hazardous Material Pharmacy (HAZMART) program complying with Federal, state, and local environmental standards including ISO 14001:2015. Prior to work commencement, contractors shall register with the installation HAZMART, submit a complete Contractor HM Identification Form listing all proposed hazardous materials and quantities, and provide Safety Data Sheets (SDS) for each material in both physical binder and electronic formats. The Project Manager will verify that only approved HM is used on-site, and the contractor must establish a construction-specific HM storage and distribution location subject to approval by the base environmental manager before work begins.

Monthly reports tracking material delivery, usage, and removal must be submitted to the Project Manager throughout the contract term, with final inventory and removal completed prior to contract close-out and government acceptance of beneficial occupancy. The contractor is required to accompany the Project Manager and installation Environmental Manager on the final project close-out inspection to ensure complete removal of all used and unused hazardous materials from the installation. Hazardous materials covered under this specification include petroleum-based liquids and gases, adhesives, volatile solvents, paints, sealants, epoxies, and chemical cleaners. Attachments G.F.1 and G.F.2 provide supplementary forms for Contractor Hazardous Material Usage Data and close-out procedures.

View the file

Other files

File Type Posted
ESBD_452864_1780091827962_Attachment G.5 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_452864_1779205491588_Addendum 2 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1777473605426_Addendum 1 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1779913011683_Addendum 3 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780322077414_Addendum 5 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780091806262_Addendum 4 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1774290608978_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_452864_1774290857018_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_452864_1774290974494_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_452864_1774290899410_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_452864_1774290933038_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_452864_1774290960900_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_452864_1774290554718_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_452864_1774290870767_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_452864_1774290993298_ATE420~1.PDF PDF
ESBD_452864_1774290799347_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_452864_1774291008049_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_452864_1774290721468_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_452864_1774290768389_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_452864_1774291105912_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (05OCT25).pdf PDF
ESBD_452864_1774290690863_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_452864_1774290829874_ATF409~1.PDF PDF
ESBD_452864_1774290574288_ATTACHMENT G.2 Application for Texas Identification Number #_AP_152.pdf PDF
ESBD_452864_1774290945955_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_452864_1774290920126_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_452864_1774290843236_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_452864_1774290592459_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 7.pdf PDF
ESBD_452864_1774291027426_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_452864_1774291122889_ATTACHMENT G.Z - Example of Contractor Cost Estimate 2026.pdf PDF
ESBD_452864_1774290885606_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_452864_1774290623533_ATTACHMENT G.6 FAA Form 7460-1.pdf PDF
ESBD_452864_1774290638971_ATTACHMENT G.7 Location Photo Aids.pdf PDF
ESBD_452864_1774291073896_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_452864_1774290738406_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_452864_1774290786162_ATE180~1.PDF PDF
ESBD_452864_1774290813335_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_452864_1774290705618_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_452864_1774291060898_ATBB18~1.PDF PDF
ESBD_452864_1774291091775_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_452864_1774291046904_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_452864_1774290672414_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_452864_1774290518021_TMD25-ANG-WJ-24150011 EXTEND BARRIER ACCESS ROADS ELLINGTON AFB.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.F - ELLINGTON AFB (EF) EMS HAZARDOUS

MATERIAL PROCEDURES

PART 1 – GENERAL

1. SUMMARY OF WORK

A. A key element to the Pollution Prevention program at Ellington Field is the control of

Hazardous Material (HM) office. To control HM use, a Hazardous Materials

Pharmacy (HAZMART) program has been fully implemented within Ellington Field.

The HAZMART focuses on source reduction as the preferred method of pollution prevention. Control of HM includes reducing the number of types and amounts of

HM used, and controlling its proper distribution, storage, use, and disposal. The

Contractor shall comply with all Federal, state, and local Environmental Management

System (EMS) environmental standards (ISO 14001:2015, the standard that we use as a management system for all environmental actions).

B. Contractor shall establish Hazardous Material (HM) storage and distribution system when HM is to be used. Hazard materials can represent many different chemicals used in a construction project. Flammables, Corrosives, adhesives, paints, etc.

a. All HM required to support the contract shall be reported to the Hazardous

Material Pharmacy (HMP) office using the Contractor HM Identification

Form attached. The Form may be altered to improve tracking. This listing will be provided prior to work beginning and will strictly be enforced by the

Project Manager. The form shall constitute a materials submittal in the form of a quarterly report being submitted to the Base Environmental Officer throughout the course of the project.

b. Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting.

c. Additional HM needed by the Contractor shall be identified to the Project

Manager’s Representative for approval by the HMMP. (See Attachment X)

C. Contractor shall register with the installation HMMP prior to start of work using HM to support the installation’s compliance with Executive Order 12856, Federal

Compliance with Right-to-Know Laws and Pollution Prevention Requirements.

D. Contractor shall maintain a Contractor HM Identification Form for all HM on the job site for inspection/verification.

E. Project Manager will verify that the HM identified to the HMMP is the only HM in use on the job site.

F. Contractor shall provide the following to the HMMP:

a. A list of each material and quantity of material for all proposed HM.

Hazardous Material (HM) shall be construed to mean any item that is:

i. A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).

ii. Regulated in its disposal by federal Environmental Protection Agency

(EPA) under 40 CFR.

iii. Hazardous as defined by federal Texas Department of Transportation

(TXDOT) regulations under 49 CFR.

iv. Hazardous as defined by the Dangerous Goods Regulations of the

International Air Transport Association.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

b. A binder containing all Safety Data Sheets (SDS) for each item on the HM list. Safety Data Sheets are provide information on hazards of working with a chemical and procedures that should be used to ensure safety. This listing shall also be provided electronically by individual SDS for processing prior to work beginning. These SDS shall also be maintained in a Binder within the

Job Trailer or wherever the construction project is headquartered out of.

c. Examples of hazardous materials used on the job site include, but are not limited to:

i. Petroleum based liquids/gases (gasoline, kerosene, diesel, propane, butane, acetylene, etc.).

ii. Adhesives and glues.

iii. Shot charges for anchor systems.

iv. Volatile solvents (such as PVC cleaner and glues, paint thinners).

v. Non-water-based paints.

vi. Liquid sealants.

vii. Epoxies and coating systems.

viii. Acidic or alkali cleaners.

G. Contractor shall establish a construction-specific HM storage and issue location that fully complies with federal, state and local environmental regulations. Once established, the contractor is required to notify the Project Manager so that the base environmental manager can visit the site and approved the storage location and inventory control of materials.

a. Materials issued shall be tracked for quantities used.

b. Unused materials shall be inventoried and removed from Base property prior to close-out of the contract or expiration date of the HM.

c. Reports of materials delivered, used and removed from the installation shall be submitted to the Project Manager monthly and prior to contract close-out.

H. Contractor shall accompany the Project Manager and the installation Environmental

Manager (CEV) on project close-out inspection to ensure all used and unused HM has been removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the government accepting beneficial occupancy of the facility or construction item.

2. SUPPLEMENTS

A. The supplements listed below are part of this specification.

a. Attachment G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage

Data

b. Attachment G.F.2 - Ellington AFB (EF) Contractor Hazardous Material

Identification Form Close-Out Procedures.