This is a Standard Operating Procedure (SOP) document for Ellington Field in Houston, Texas, issued by the United States Air Force, establishing protocols for the inadvertent discovery of cultural materials during ground-disturbing activities. The SOP applies to all installation leadership, contractors, maintenance personnel, and unit commanders who may encounter archaeological resources, human remains, artifacts, or paleontological materials during construction, maintenance, or other field operations. The procedures outlined establish immediate response requirements, including cessation of ground-disturbing activities upon discovery, notification of the Environmental Manager and unit commander, and securing of the discovery location with appropriate buffer areas and weather protection until a proper assessment can be completed.

The SOP references applicable federal statutes including the Native American Graves Protection and Repatriation Act (NAGPRA), the Archaeological Resources Protection Act, and the National Historic Preservation Act, along with corresponding Code of Federal Regulations sections including 42 CFR 10, 32 CFR 229, and 36 CFR Part 800. Key personnel responsibilities are clearly delineated, with the Environmental Manager (CEV) serving as the primary authority for site assessment and direction, the unit commander responsible for initial notification and location security, and coordination requirements with the installation commander, state police if human remains are suspected, the State Historic Preservation Officer (SHPO), the National Park Service Archaeology Assistance Division, and the Public Affairs Office. The document includes a decision-making flowchart for field personnel and emphasizes that no activities may resume at the discovery location until authorized by the CEV or appropriate supervisory personnel.

View the file

Other files

File Type Posted
ESBD_452864_1780091806262_Addendum 4 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1779205491588_Addendum 2 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780091827962_Attachment G.5 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_452864_1780322077414_Addendum 5 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1779913011683_Addendum 3 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1777473605426_Addendum 1 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1774290974494_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_452864_1774290843236_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_452864_1774290920126_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_452864_1774291008049_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_452864_1774290945955_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_452864_1774290623533_ATTACHMENT G.6 FAA Form 7460-1.pdf PDF
ESBD_452864_1774290799347_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_452864_1774290638971_ATTACHMENT G.7 Location Photo Aids.pdf PDF
ESBD_452864_1774291073896_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_452864_1774290857018_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_452864_1774290518021_TMD25-ANG-WJ-24150011 EXTEND BARRIER ACCESS ROADS ELLINGTON AFB.pdf PDF
ESBD_452864_1774290813335_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_452864_1774291091775_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_452864_1774291046904_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_452864_1774290705618_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_452864_1774290672414_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_452864_1774290786162_ATE180~1.PDF PDF
ESBD_452864_1774290738406_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_452864_1774291060898_ATBB18~1.PDF PDF
ESBD_452864_1774290608978_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_452864_1774290574288_ATTACHMENT G.2 Application for Texas Identification Number #_AP_152.pdf PDF
ESBD_452864_1774290993298_ATE420~1.PDF PDF
ESBD_452864_1774290960900_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_452864_1774290592459_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 7.pdf PDF
ESBD_452864_1774290870767_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_452864_1774290899410_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_452864_1774290690863_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_452864_1774290768389_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_452864_1774290933038_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_452864_1774291105912_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (05OCT25).pdf PDF
ESBD_452864_1774291027426_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_452864_1774290754031_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_452864_1774290885606_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_452864_1774290721468_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_452864_1774291122889_ATTACHMENT G.Z - Example of Contractor Cost Estimate 2026.pdf PDF
ESBD_452864_1774290554718_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.I - ELLINGTON FIELD, HOUSTON, TEXAS

STANDARD OPERATING PROCEDURE (SOP) FOR INADVERTENT

DISCOVERY OF CULTURAL MATERIALS

20 Apr 22

Contact: Mr. Mark Garcia, Ellington Field Environmental Manager (CEV) 281-929-2013, mark.garcia.16@us.af.mil

Statutory References:

1. Native American Graves Protection and Repatriation Act

2. Archaeological Resources Protection Act

3. National Historic Preservation Act and its implementing regulations

Regulations:

1. 42 CFR 10

2. 32 CFR 229 - https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-

3. 36 CFR Part 800 - https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

Applies to:

1. Installation leadership

2. Training Site Manager

3. Base Civil Engineer

4. Real Property Office

5. Security Police

6. Public Affairs Office

7. Judge Advocates Office

8. Maintenance, utilities, and grounds crews and foremen

9. Unit commanders and unit/activity personnel

10. Tenants and contractors

Typical Situations: Ground disturbance from construction involving digging, bulldozing, clearing, or grubbing, maintenance or repair activities, off-road traffic, field units on exercise, outdoor recreation, observation of eroded areas.

Typical Triggering Events: Discovery of known or likely human remains, unmarked graves, Native American or historical artifacts, archeological features, and/or paleontological remains

Policy: In the event that an unanticipated discovery of cultural artifacts occurs, activity in the immediate vicinity should cease until an assessment of the materials can be made. The unit commander/supervisor should be notified immediately so the Environmental Manager (CEV) can be contacted.

Procedures: This section describes specific actions to be taken for inadvertent discovery. The flow chart is intended to be used by unit/activity level personnel, unit commanders, and similar personnel as a decision-making guide when inadvertent discoveries are made as described under the applicability section of this Standard Operating Procedure (SOP).

mailto:mark.garcia.16@us.af.mil https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-M/part-229 https://www.wbdg.org/ffc/fed/code-federal-regulations/36-cfr-part-800

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Scenario I: inadvertent discovery of cultural materials.

A. Unit commander, environmental liaison, Public Affairs Office (PAO), Unit/activity personnel

a. Goals: understand the procedure when cultural materials are inadvertently discovered so that the materials can be adequately protected.

b. Tasks:

i. Cease ground-disturbing activity when possible historical artifacts and features, human remains, or burials are observed or encountered.

ii. Unit personnel will report any observations or discoveries of historical artifacts and features, human remains, burials, or features immediately to the unit commander or facility manager and they will in turn notify

CEV immediately. They will await instructions from the CEV.

iii. Secure the discovery location(s). Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure location if needed.

iv. Coordinate with CEV on where activities can resume and give direction to the construction superintendent.

v. If human remains are known or suspected to be present, also promptly notify the CEV. The CEV through coordination with the Wing

Commander shall advise Public Affairs.

c. Environmental Manager

i. Goals: ensure that when each discovery occurs procedures are followed that will protect and properly treat any materials that are discovered.

d. Tasks:

i. Ensure the site location and materials are properly protected.

ii. Provide unit commander with necessary information so they can be protected/avoided, etc.

iii. Ensure that all remains, and artifacts are accounted for and properly labeled and packaged if removed from the ground.

iv. Notify the installation commander.

v. notify the medical examiner if necessary and appropriate.

vi. determine if the objects are NAGPRA related and initiate appropriate consultation if necessary.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

Security Officer secures discovery location with adequate buffer area, protection from vandalism and weather, and immediately notifies

CEV

If suspect human remains, the CEV. PA and ATKW/CC will immediately notify state police. The CEV will also notify the Arch Assistance Division of NPS, SHPO, and

FLOW CHART FOR THE INADVERTENT DISCOVERY OF POTENTIAL CULTURAL RESOURCES

Unit Commander or Supervisor:

secures discovery location with adequate buffer area and notifies CEV or Security

Report observations to the Unit Commander or Supervisor

Cease ground-disturbing activity

Discovery of possible cultural resource or material

Do not resume activities at the discovery location until directed by the CEV

Do not resume activities at the discovery location until directed by the Unit Commander, Supervisor, Security, or CEV