This is a Sustainable Design Requirements specification attachment for a construction project at Ellington Field in Houston, Texas, issued by the U.S. Air Force. The document establishes mandatory compliance with Leadership in Energy and Environmental Design (LEED) Silver certification standards based on LEED-NC 2009 guidelines. The contractor is responsible for achieving specific LEED construction credits and prerequisites across multiple categories including sustainable sites, materials and resources, indoor environmental quality, and energy performance. The project requires submission of LEED Action Plans within 30 days of the Notice to Proceed, detailing waste management procedures, recycled content materials, regional materials sourcing, certified wood products, construction indoor air quality management, and low-mercury lighting specifications. The contractor must engage a LEED-Accredited Professional to coordinate all LEED requirements and provide concurrent progress reports with each Application for Payment, along with comprehensive documentation submittals demonstrating compliance with each credit requirement.
The specification mandates that 20 percent of building materials by cost contain recycled content (post-consumer plus one-half pre-consumer), 20 percent of materials by cost be sourced regionally within 500 miles of the project site, and 95 percent of wood-based materials by cost be Forest Stewardship Council certified. Low-emitting materials requirements include strict Volatile Organic Compound (VOC) limits for adhesives, sealants, paints, and coatings, with specific formulations restricted from containing hazardous substances. Flooring systems must comply with CRI Green Label Plus for carpet or FloorScore certification for hard surfaces. Construction waste management must achieve diversion targets, and indoor air quality testing or building flush-out procedures must demonstrate compliance with EPA contaminant maximum concentration limits prior to occupancy. Three onsite coordination meetings are required: preconstruction, pre-closeout, and final closeout, with all LEED documentation submitted online through GBCI's LEED Online platform under contractor responsibility, though the owner covers project registration and certification fees.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.U - ELLINGTON AFB (EF) SUSTAINABLE DESIGN
REQUIREMENTS
PART 1 – GENERAL
1. RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract apply to this Section.
2. SUMMARY:
A. Section includes general requirements and procedures for compliance with certain
USGBC LEED® prerequisites and credits needed for Project to obtain LEED
Silver certification based on LEED-NC, 2009.
a. Other LEED prerequisites and credits needed to obtain LEED certification depend on material selections and may not be specifically identified as
LEED requirements. Compliance with requirements needed to obtain
LEED prerequisites and credits may be used as one criterion to evaluate substitution requests and comparable product requests.
b. Additional LEED prerequisites and credits needed to obtain the indicated
LEED certification depend on Architect's design and other aspects of
Project that are not part of the Work of the Contract.
c. The Contractor shall achieve the construction credits as indicated in the
LEED Project checklist attached at the end of this Section.
B. Related Sections: https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All
3. REFERENCES:
A. Forest Stewardship Council (FSC):
a. STD-01-001 - FSC Principles and Criteria for Forest Stewardship.
B. Code of Federal Regulations (CFR):
a. 40 CFR 59, Subpart D - National Volatile Organic Compound Emissions
Standard for Architectural Coatings.
C. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA):
a. IAQ Guideline for Occupied Buildings under Construction.
D. Environmental Protection Agency (EPA):
a. Compendium of Methods for the Determination of Air Pollutants in
Indoor Air.
E. US Green Building Council (USGBC):
a. LEED-NC 2009 - Reference Guide.
F. American Society of Heating, Refrigeration, Air-conditioning Engineers
(ASHRAE):
a. 52.2. - Method of Testing General Ventilation Air-Cleaning Devices for
Removal Efficiency by Particle Size.
4. DEFINITIONS:
G. Chain-of-Custody Certificates: Certificates signed by manufacturers certifying that wood used to make products was obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All https://connect.fsc.org/document-centre/documents/resource/392 https://www.law.cornell.edu/cfr/text/40/part-59 https://webstore.ansi.org/preview-pages/ANSI/preview_SMACNA+008-2007.pdf https://archive.epa.gov/region1/info/testmethods/web/pdf/600490010_epa_compendmethod-indoorairpollutants_p1.pdf https://archive.epa.gov/region1/info/testmethods/web/pdf/600490010_epa_compendmethod-indoorairpollutants_p1.pdf https://insulationinstitute.org/wp-content/uploads/2016/02/N064.pdf https://tpc.ashrae.org/?cmtKey=2eafbbbc-35c9-4d85-8bca-367548cb318e#:~:text=2.2%20The%20method%20of%20testing,of%20particles%20during%20service%20life.
https://tpc.ashrae.org/?cmtKey=2eafbbbc-35c9-4d85-8bca-367548cb318e#:~:text=2.2%20The%20method%20of%20testing,of%20particles%20during%20service%20life.
https://connect.fsc.org/document-centre/documents/resource/392
ELLINGTON FIELD, HOUSTON, TX 21 May 2024 and Criteria for Forest Stewardship." Certificates shall include evidence that manufacturer is certified for chain of custody by an FSC-FSC-accredited certification body.
H. LEED: Leadership in Energy & Environmental Design.
I. GBCI: Green Building Certification Institute.
J. Rapidly Renewable Materials: Materials made from plants that are typically harvested within a 10-year or shorter cycle. Rapidly renewable materials include products made from bamboo, cotton, flax, jute, straw, sunflower seed hulls, vegetable oils, or wool.
K. Regional Materials: Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800 km) of Project site. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.
L. Recycled Content: The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value.
a. "Post-consumer" material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.
b. "Pre-consumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.
5. SUBMITTALS:
A. General: Submit additional LEED submittals required by other specification sections.
B. LEED submittals are in addition to other submittals. If submitted item is identical to that submitted to comply with other requirements, submit duplicate copies as a separate submittal to verify compliance with indicated LEED requirements.
C. Project Materials Cost Data: Provide statement indicating total cost for materials used for Project for https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All only. Costs exclude labor, overhead, and profit. Include breakout of costs for the following categories of items:
a. Furniture.
b. Plumbing.
c. Mechanical.
d. Electrical.
e. Specialty items such as elevators and equipment.
f. Wood-based construction materials.
D. LEED Action Plans: Provide preliminary submittals within 30 days of date established for the Notice to Proceed indicating how the following requirements https://connect.fsc.org/document-centre/documents/resource/392 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs?field_status_value=1&field_division_value_selective=All will be met:
a. Name of individuals on the Contractor's staff responsible for ensuring
LEED credits and prerequisites are earned and responsible for assembling documentation. A responsible LEED Accredited Professional shall be identified for each applicable credit.
b. Credit MR 2.1 and Credit MR 2.2: Waste management plan complying with Attachment G.R - Ellington AFB (EF) EMS Construction Waste
Management and Disposal Part 1 – General.
c. Credit MR 4.1 and Credit MR 4.2: List of proposed materials with recycled content. Indicate cost, post-consumer recycled content, and pre-consumer recycled content for each product having recycled content.
d. Credit MR 5.1 and Credit MR 5.2: List of proposed regional materials.
Identify each regional material, including its source, cost, and the fraction by weight that is considered regional.
e. Credit MR 7: List of proposed certified wood products. Indicate each product containing certified wood, including its source and cost of certified wood products.
f. Credit IEQ 3.1: Construction indoor-air-quality management plan.
g. ID Credit (Low Mercury Lighting): List of proposed lamps. Indicate lamp type, quantity, and mercury content per lamp type (mg/lamp).
E. LEED Progress Reports: Concurrent with each Application for Payment, submit reports comparing actual construction and purchasing activities with LEED action plans for the following:
a. Credit MR 2.1 and Credit MR 2.2: Waste reduction progress reports complying with Ellington AFB (EF) EMS Construction Waste
Management and Disposal Part 1 – General.
b. Credit MR 4.1 and Credit MR 4.2: Recycled content.
c. Credit MR 5.1 and Credit MR 5.2: Regional materials.
d. Credit MR 7: Certified wood products.
e. ID Credit: Low Mercury Lighting.
F. LEED Documentation Submittals:
a. SS Prerequisite 1 (Construction Activity Pollution Prevention): Labeled and date- stamped photos showing implementation of the Erosion and
Sedimentary Control (ESC) Plan, inspection logs and reports/descriptions of corrective action in response to problems, etc.
b. SS Credit 7.2 (Heat Island Effect, Roof): Product data indicating SRI of roofing materials.
c. EA Credit 5 (Measurement & Verification): Product data and wiring diagrams for sensors and data collection system used to provide continuous metering of building energy and water consumption performance over time.
d. MR Credit 2 (Construction Waste Management): Not withstanding
Ellington AFB (EF) EMS Construction Waste Management and Disposal
Part 1 – General ,documentation in accordance with LEED Credit Forms including description of material, name of hauler and quantity of diverted and landfilled waste. Company receipts/tickets required for all items, as well as labeled photos showing implementation.
e. MR Credit 4 (Recycled Content): Product data and certification letter indicating percentages by weight of post-consumer and pre-consumer recycled content for products having recycled content. Include statement indicating cost for each product having recycled content.
f. MR Credit 5 (Regional Materials): Product data for regional materials indicating location and distance from Project of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating cost for each regional material and the fraction by weight that is considered regional.
g. MR Credit 7 (Certified Wood): Product data and chain-of-custody certificates for products containing certified wood. Include statement indicating cost for each certified wood product.
G. IEQ Credit 3.1 (Construction IAQ Management Plan, During Construction):
a. Construction Indoor Air Quality Management Plan in compliance with
SMACNA’s “IAQ Guideline for Occupied Buildings under Construction.”
b. If the Project Manager authorizes use of permanent heating, cooling and ventilation systems during construction: Product data for temporary filtration media indicating no less than MERV 8 at each return air grille and product data for replaced filtration media immediately prior to occupancy.
c. Six photographs at three different times during the construction period, along with a brief description of the SMACNA approach employed, documenting implementation of IAQ management measures, such as protection of on-site stored or installed absorptive materials from moisture damage and protection of ducts.
H. IEQ Credit 3.2 (Construction IAQ Management Plan, Before Occupancy):
a. Signed statement describing the building air flush-out procedures including the dates when flush-out was begun and completed and statement that filtration media was replaced after flush-out.
b. Product data for filtration media used during flush-out and during occupancy.
c. Pending approval of the Project Manager, Contractor may engage indoor-air-quality testing to obtain Credit IEQ 3.2: Provide report from testing and inspecting agency indicating results of indoor-air-quality testing and documentation showing compliance with indoor-air-quality testing procedures and requirements.
I. IEQ Credit 4.1 (Low-Emitting Materials, Adhesives & Sealants): Listing of all adhesives, sealants and sealant primers indicating VOC content (in g/L) and
LEED- allowable VOC content of each field application used inside the weatherproofing system. Include supporting product data.
J. IEQ Credit 4.2 (Low-Emitting Materials, Paints & Coatings): Listing of all paints and coatings indicating VOC content (in g/L) and LEED-allowable VOC content of each field application used inside the weatherproofing system. Include supporting product data.
K. IEQ Credit 4.3 (Low-Emitting Materials, Flooring Systems): Listing of all flooring systems used inside the weatherproofing system:
a. Carpet: Product data indicating carpet meets the testing and product requirements of the Carpet and Rug Institute (CRI) Green Label Plus program. Product data confirming compliance of carpet adhesives with
IEQ Credit 4.1.
b. Hard Surface Flooring (vinyl, VCT, linoleum, laminate flooring, wood flooring, rubber flooring, wall base, etc.): Product data indicating
FloorScore certification.
c. Floor finishes (sealer, stain and finish). Product data confirming compliance with IEQ Credit 4.2.
d. Tile setting adhesives and grout: Product data confirming compliance with
IEQ Credit 4.1.
L. IEQ Credit 4.4 (Low-Emitting Materials, Composite Wood and Agrifiber
Products): Listing of all composite wood and agrifiber products used inside the weatherproofing system and product data that each product (as well as all laminating adhesives, on-site and shop-applied) does not contain added urea-formaldehyde.
M. ID Credit (Low Mercury Lighting): Product data indicating mercury content of all lamps for lighting fixtures. Performance metrics for lamps shall include the following:
a. Lamp type and quantity.
b. Mercury content per lamp type (mg/lamp).
c. Design light output per lamp type (lumens).
d. Manufacturer-rated lamp life per lamp type (hours).
6. QUALITY ASSURANCE:
A. LEED Coordinator: Engage an experienced LEED-Accredited Professional to coordinate LEED requirements. LEED coordinator may also serve as waste management coordinator.
B. This project is registered with GBCI for LEED certification. Contractor is not responsible for registering the project with GBCI or for paying project certification fees. Format and content of all construction documentation must be in accordance with the LEED Reference Guide requirements for supporting data.
Contractor shall be responsible through the LEED AP to access LEED Online and submit all required construction templates online. Construction submission shall be coordinated with the Project Manager. Contractor is required to respond to
GBCI requests for additional construction data in the course of seeking project certification, and pay appeal fees for construction credits if required during GBCI review. Design documentation will be provided by A/E.
PART 2 - PRODUCTS
1. RECYCLED CONTENT OF MATERIALS:
A. Credit MR 4.1 and Credit MR 4.2: Provide building materials with recycled content such that post-consumer recycled content plus one-half of pre-consumer recycled content constitutes a minimum of 20% of cost of materials used for
Project.
a. Cost of post-consumer recycled content of an item shall be determined by dividing weight of post-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.
b. Cost of pre-consumer recycled content of an item shall be determined by dividing weight of pre-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.
c. Do not include furniture, plumbing, mechanical and electrical components, and specialty items such as elevators and equipment in the calculation.
2. REGIONAL MATERIALS:
A. Credit MR 5.1 and Credit MR 5.2: Provide a minimum of 20% of building materials (by cost) that are regional materials.
a. Do not include furniture, plumbing, mechanical and electrical components, and specialty items such as elevators and equipment in the calculation.
3. CERTIFIED WOOD:
A. Credit MR 7: Provide a minimum of 95% (by cost) of wood-based materials that are produced from wood obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship."
a. Wood-based materials include, but are not limited to, the following materials when made from wood, engineered wood products, or wood-based panel products:
i. Rough carpentry.
ii. Miscellaneous carpentry.
iii. Heavy timber construction.
iv. Wood decking.
v. Metal-plate-connected wood trusses.
vi. Structural glued-laminated timber.
vii. Finish carpentry.
viii. Architectural woodwork.
ix. Wood paneling.
x. Wood veneer wall covering.
xi. Wood flooring.
xii. Wood lockers.
xiii. Wood cabinets.
https://www.usgbc.org/credits/new-construction/v20/mrc41-42 https://www.aepspan.com/wp-content/uploads/LEED-v3-MRc_5.1_5.2_Regional-Material.pdf
xiv. Furniture.
4. LOW-EMITTING MATERIALS:
A. Credit IEQ 4.1: For field applications that are inside the weatherproofing system, use adhesives and sealants that comply with South Coast Air Quality
Management District (SCAQMD) Rule #1168. Use aerosol adhesives that comply with Green Seal Standard for Commercial Adhesives GS-36. The following list provides a summary of limits for VOC content when calculated according to 40
CFR 59, Subpart D:
a. Wood Glues: 30 g/L.
b. Metal to Metal Adhesives: 30 g/L.
c. Adhesives for Porous Materials (Except Wood): 50 g/L.
d. Subfloor Adhesives: 50 g/L.
e. Plastic Foam Adhesives: 50 g/L.
f. Carpet Adhesives: 50 g/L.
g. Carpet Pad Adhesives: 50 g/L.
h. VCT and Asphalt Tile Adhesives: 50 g/L.
i. Cove Base Adhesives: 50 g/L.
j. Gypsum Board and Panel Adhesives: 50 g/L.
k. Rubber Floor Adhesives: 60 g/L.
l. Ceramic Tile Adhesives: 65 g/L.
m. Multipurpose Construction Adhesives: 70 g/L.
n. Fiberglass Adhesives: 80 g/L.
o. Contact Adhesive: 80 g/L.
p. Structural Glazing Adhesives: 100 g/L.
q. Wood Flooring Adhesive: 100 g/L.
r. Structural Wood Member Adhesive: 140 g/L.
s. Special Purpose Contact Adhesive (contact adhesive that is used to bond melamine covered board, metal, unsupported vinyl, Teflon, ultra-high molecular weight polyethylene, rubber or wood veneer 1/16 inch or less in thickness to any surface): 250 g/L.
t. Top and Trim Adhesive: 250 g/L.
u. Plastic Cement Welding Compounds: 250 g/L.
v. ABS Welding Compounds: 325 g/L.
w. CPVC Welding Compounds: 490 g/L.
x. PVC Welding Compounds: 510 g/L.
y. Adhesive Primer for Plastic: 550 g/L.
z. Sheet Applied Rubber Lining Adhesive: 850 g/L.
aa. Aerosol Adhesive, General Purpose Mist Spray: 65% by weight.
bb. Aerosol Adhesive, General Purpose Web Spray: 55% by weight.
cc. Special Purpose Aerosol Adhesive (All Types): 70% by weight.
dd. Architectural Sealants: 250 g/L.
ee. Nonmembrane Roof Sealants: 300 g/L.
ff. Single-Ply Roof Membrane Sealants: 450 g/L.
gg. Other Sealants: 420 g/L.
https://www.shupecarboni.com/storage/app/uploads/public/5e1/384/87d/5e138487dc539787854576.pdf https://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1168.pdf https://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1168.pdf https://www.wbdg.org/FFC/GREENSEAL/STDS/GS-36.pdf https://www.law.cornell.edu/cfr/text/40/part-59/subpart-D https://www.law.cornell.edu/cfr/text/40/part-59/subpart-D
hh. Sealant Primers for Nonporous Substrates: 250 g/L.
ii. Sealant Primers for Porous Substrates: 775 g/L.
jj. Other Sealant Primers: 750 g/L.
B. Credit IEQ 4.2: For field applications that are inside the weatherproofing system, use paints and coatings that comply with Green Seal Standard GS-11, Paints. Use anti-corrosive and anti-rust paints that comply with Green Seal Standard GC-03, Anti-Corrosive Paints. Use clear wood finishes, floor coatings, stains, sealers and shellacs that comply with South Coast Air Quality Management District
(SCAQMD) Rule #1113, Architectural Coatings. The following list provides a summary of limits for VOC content when calculated according to 40 CFR 59, Subpart D:
a. Flat Paints, Coatings, and Primers: VOC not more than 50 g/L.
b. Nonflat Paints, Coatings, and Primers: VOC not more than 150 g/L.
c. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.
d. Clear Wood Finishes, Varnishes: VOC not more than 350 g/L.
e. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L.
f. Floor Coatings: VOC not more than 100 g/L.
g. Shellacs, Clear: VOC not more than 730 g/L.
h. Shellacs, Pigmented: VOC not more than 550 g/L.
i. Stains: VOC not more than 250 g/L.
j. Sealers and Undercoaters: VOC not more than 200 g/L.
k. Concrete Curing Compounds: VOC not more than 350 g/L.
l. Waterproofing Sealers: VOC not more than 250 g/L.
m. Waterproofing Concrete/Masonry Sealers: VOC not more than 400 g/L.
n. Wood Preservatives: VOC not more than 350 g/L.
o. Low-Solids Coatings: VOC not more than 120 g/L.
p. Aromatic Compounds: Paints and coatings shall not contain more than
1.0% by weight total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).
C. Restricted Components: Paints and coatings shall not contain any of the following:
a. Acrolein.
b. Acrylonitrile.
c. Antimony.
d. Benzene.
e. Butyl benzyl phthalate.
f. Cadmium.
g. Di (2-ethylhexyl) phthalate.
h. Di-n-butyl phthalate.
i. Di-n-octyl phthalate.
j. 1,2-dichlorobenzene.
k. Diethyl phthalate.
l. Dimethyl phthalate.
m. Ethylbenzene.
n. Formaldehyde.
o. Hexavalent chromium.
p. Isophorone.
q. Lead.
r. Mercury.
s. Methyl ethyl ketone.
t. Methyl isobutyl ketone.
u. Methylene chloride.
v. Naphthalene.
w. Toluene (methylbenzene).
x. 1,1,1-trichloroethane.
y. Vinyl chloride.
D. Credit IEQ 4.3: For flooring systems that are inside the weatherproofing system, use products that comply with the following:
a. Carpet shall meet the testing and product requirements of the Carpet and
Rug Institute (CRI) Green Label Plus program. Carpet cushions shall meet the requirements of CRIGreen Label program. All carpet adhesives shall meet the VOC requirements of IEQ Credit 4.1.
b. Hard Surface Flooring (vinyl, VCT, linoleum, laminate flooring, wood flooring, rubber flooring and wall base) shall be certified as compliant with the FloorScore standard.
c. Floor finishes (sealer, stain and finish) shall meet the VOC requirements of IEQ Credit 4.2.
d. Tile setting adhesives and grout shall meet the VOC requirements of IEQ
Credit 4.1.
E. Credit IEQ 4.4: Do not use composite wood or agrifiber products or adhesives that contain urea-formaldehyde resin.
5. LOW MERCURY LIGHTING:
A. ID Credit: For indoor and outdoor light fixtures, both hard wired and portable fixtures, at least 90% of purchased lamps (as measured by the number of lamps) must comply with the maximum levels of mercury permitted in mercury-containing lamps purchased for the building and associated grounds.
a. The overall average of mercury content in lamps shall not exceed 90 picograms per lumen-hour or less.
b. Lamps containing no mercury, such as LEDs, may be counted toward plan compliance only if they have energy efficiency at least as good as their mercury-containing counterparts.
c. Screw-based, integral compact fluorescent lamps (CFLs) may be excluded from the performance calculation if they comply with the voluntary industry guidelines for maximum mercury content published by the
National Electrical Manufacturers Association (NEMA).
d. Screw-based, integral CFLs that do not comply with the NEMA guidelines must be included in the performance calculation.
e. Performance metrics for lamps shall be included in the calculations and must be derived according to industry standards. Mercury values generated by toxicity characteristic leaching procedure (TCLP) tests do not provide the required mercury information for this LEED credit and cannot be used in the calculation.
PART 3 – EXECUTION
1. FUNDAMENTAL COMMISSIONING OF THE BUILDING ENERGY SYSTEMS:
A. The Contractor shall coordinate commissioning-related activities with the
Commissioning Authority contracted by the Owner.
2. CONSTRUCTION WASTE MANAGEMENT:
A. Credit MR 2.1 and Credit MR 2.2: Comply with Ellington AFB (EF) EMS
Construction Waste Management and Disposal Part 1 – General.
3. CONSTRUCTION INDOOR-AIR QUALITY MANAGEMENT:
A. Credit IEQ 3.1: Comply with SMACNA's "SMACNA IAQ Guideline for
Occupied Buildings under Construction."
a. If Owner authorizes use of permanent heating, cooling, and ventilating systems during construction period as specified in Attachment G.K -
Ellington AFB (EF) Construction Facilities And Temporary Controls, install filter media having a MERV 8 according to ASHRAE 52.2 at each return-air inlet for the air-handling system used during construction.
b. Replace all air filters immediately prior to occupancy.
B. Credit IEQ 3.2: Pending approval from the Project Manager, comply with one of the following requirements:
a. After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush-out by supplying a total volume of
14000 cu. ft. of outdoor air per sq. ft. of floor area while maintaining an internal temperature of at least 60ºF and a relative humidity no higher than
60%.
b. If occupancy is desired prior to flush-out completion, the space may be occupied following delivery of a minimum of 3500 cu. ft. of outdoor air per sq. ft. of floor area to the space. Once a space is occupied, it shall be ventilated at a minimum rate of 0.30 cfm per sq. ft. of outside air or the design minimum outside air rate determined in IEQ Prerequisite 1, whichever is greater. During each day of the flush-out period, ventilation shall begin a minimum of three hours prior to occupancy and continue during occupancy. These conditions shall be maintained until a total of
14000 cu. ft./sq. ft. of outside air has been delivered to the space.
c. Air-Quality Testing:
i. Conduct baseline indoor-air-quality testing, after construction ends and prior to occupancy, using testing protocols consistent with the
EPA's "Compendium of Methods for the Determination of Air
Pollutants in Indoor Air," and as additionally detailed in the
USGBC's "LEED-NC: Reference Guide."
ii. Demonstrate that the contaminant maximum concentrations listed below are not exceeded:
1. Formaldehyde: 27 ppb.
2. Particulates (PM10): 50 micrograms/cu. m.
3. Total Volatile Organic Compounds (TVOC): 500 micrograms/cu. m.
4. 4-Phenylcyclohexene (4-PH): 6.5 micrograms/cu. m.
5. Carbon Monoxide: 9 ppm and no greater than 2 ppm above outdoor levels.
d. For each sampling point where the maximum concentration limits are exceeded, conduct additional flush-out with outside air and retest the specific parameter(s) exceeded to indicate the requirements are achieved.
Repeat procedure until all requirements have been met. When retesting noncomplying building areas, take samples from same locations as in the first test.
e. Air-sample testing shall be conducted as follows:
i. All measurements shall be conducted prior to occupancy but during normal occupied hours, and with building ventilation system starting at the normal daily start time and operated at the minimum outside air flow rate for the occupied mode throughout the duration of the air testing.
ii. Building shall have all interior finishes installed including, but not limited to, millwork, doors, paint, carpet, and acoustic tiles.
Nonfixed furnishings such as workstations and partitions are encouraged, but not required, to be in place for the testing.
iii. Number of sampling locations will vary depending on the size of building and number of ventilation systems. For each portion of building served by a separate ventilation system, the number of sampling points shall not be less than one per 25,000 sq. ft. or for each contiguous floor area, whichever is larger, and shall include areas with the least ventilation and greatest presumed source strength.
iv. Air samples shall be collected between 3 and 6 feet from the floor to represent the breathing zone of occupants, and over a minimum four-hour period.
4. COORDINATION MEETINGS:
A. There will be three onsite coordination meetings. The first will be a preconstruction meeting to review the LEED Action Plans. The second will be a pre-closeout meeting to review LEED documentation for completeness and identify any outstanding issues relating to final score and documentation requirements. The third is a closeout meeting to review the final LEED documentation. All meetings shall be attended by Contractor's designated LEED
AP responsible for LEED documentation, Government representative and
Installation representative. Contractor shall make a set of contract drawings, specifications, and current LEED documentation available for review at weekly construction meetings.