About this file

This document is a safety policies and procedures attachment for a construction contract at Ellington Field, Houston, Texas, issued by the Texas Air National Guard (TXANG). The attachment establishes comprehensive safety requirements that contractors must follow during all work activities at the installation. Contractors are required to submit a Statement of Qualification for a land surveyor or civil engineer, a health and safety plan, a construction hazard plan, and a temporary utility plan for approval by the Contracting Officer prior to work commencement. A qualified, OSHA-trained safety representative must be designated and present on-site whenever work is in progress, and all employees must receive training and certification in 29 CFR 1926 procedures appropriate to their job duties. The contractor must develop and present a Job Hazard Analysis and Job Safety and Health Plan at a preconstruction conference, with weekly safety briefings documented for all personnel.

The Health and Safety Plan must meet fourteen minimum requirements, including written site-specific hazard analyses for each task and operation, personal protective equipment specifications, medical surveillance provisions, air and environmental monitoring protocols, site control programs, decontamination procedures for chemical materials, emergency response plans, confined space entry procedures, and spill containment measures coordinated with the installation. A qualified safety and health supervisor meeting 29 CFR 1926 training requirements must provide written verification of plan adherence, with deficiencies corrected immediately upon discovery in consultation with the Project Manager and Contracting Officer. Additionally, contractors must maintain Safety Data Sheets on-site for all materials, submit a temporary utility hookup plan for coordination and approval, and conduct monthly safety meetings with all personnel, documenting attendance and meeting minutes for submission at progress meetings.

View the file

Other files

File Type Posted
ESBD_452864_1780091827962_Attachment G.5 HUB Subcontracting Plan (HSP).pdf PDF
ESBD_452864_1779205491588_Addendum 2 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1777473605426_Addendum 1 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1779913011683_Addendum 3 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780322077414_Addendum 5 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1780091806262_Addendum 4 - TMD25-ANG-WJ-24150011.pdf PDF
ESBD_452864_1774290608978_ATTACHMENT G.4 Mandatory Pricing Schedule.xlsx XLSX spreadsheet
ESBD_452864_1774290857018_ATTACHMENT G.J.1 - Ellington AFB (EF) Maintenance Summary Form.pdf PDF
ESBD_452864_1774290974494_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_452864_1774290754031_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_452864_1774290899410_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_452864_1774290933038_ATTACHMENT G.N.1 - Ellington Field (EF) Manufacturer’s Certificate Of Proper Installation.pdf PDF
ESBD_452864_1774290960900_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_452864_1774290554718_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_452864_1774290870767_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_452864_1774290993298_ATE420~1.PDF PDF
ESBD_452864_1774290799347_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_452864_1774291008049_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_452864_1774290721468_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_452864_1774290768389_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_452864_1774291105912_ATTACHMENT G.Y - Ellington AFB (EF) Form 17 - Visitor Contractor Pass Request (05OCT25).pdf PDF
ESBD_452864_1774290690863_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_452864_1774290829874_ATF409~1.PDF PDF
ESBD_452864_1774290574288_ATTACHMENT G.2 Application for Texas Identification Number #_AP_152.pdf PDF
ESBD_452864_1774290945955_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_452864_1774290920126_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_452864_1774290843236_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_452864_1774290592459_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 7.pdf PDF
ESBD_452864_1774291027426_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_452864_1774291122889_ATTACHMENT G.Z - Example of Contractor Cost Estimate 2026.pdf PDF
ESBD_452864_1774290885606_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_452864_1774290623533_ATTACHMENT G.6 FAA Form 7460-1.pdf PDF
ESBD_452864_1774290638971_ATTACHMENT G.7 Location Photo Aids.pdf PDF
ESBD_452864_1774291073896_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_452864_1774290786162_ATE180~1.PDF PDF
ESBD_452864_1774290813335_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_452864_1774290705618_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_452864_1774291060898_ATBB18~1.PDF PDF
ESBD_452864_1774291091775_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_452864_1774291046904_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_452864_1774290672414_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_452864_1774290518021_TMD25-ANG-WJ-24150011 EXTEND BARRIER ACCESS ROADS ELLINGTON AFB.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.E - ELLINGTON AFB (EF) SAFETY POLICIES AND

PROCEDURES

PART 1 – GENERAL

1. SECTION INCLUDES

A. Statement of Qualification (SOQ) for land surveyor or civil engineer.

B. Contractor required health and safety plan.

C. Contractor required construction hazard plan.

D. Contractor required temporary utility plan.

2. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract apply to this section.

B. The publication listed below is a part of this specification to the extent referenced.

The publication is referred to in text by the basic designation only.

a. OSHA 1926 R.E.G. – 29 CFR, OSHA, 1926.

3. SUBMITTALS

A. Submittals the following items for KO approval:

a. Designation of safety representative: the contractor shall submit in writing a qualified employee OSHA trained in 29 CFR 1926 (1926 | Occupational

Safety and Health Administration (osha.gov)) responsible for the overall supervision of all accident prevention activities. Duties shall include ensuring applicable safety requirements are incorporated into work methods and inspecting the jobsite to ensure that safety measures and instruction are being applied. The person shall be always on site that work is in progress.

b. The contractor shall be trained/certified in 29 CFR 1926 procedures. All employees performing work will meet 29 CFR 1926 training requirements for their job capacity.

c. Records shall be kept of all weekly safety briefings and who was in attendance.

B. Submittal for information only: The following items shall be contractor certified:

a. Job Hazard Analysis: Contractor shall develop a job hazard analysis for presentation at the preconstruction conference. The Contractor’s job hazard analysis shall list potential hazards that could arise during the work.

b. Job Safety and Health Plan:

i. The Contractor shall develop a Job Safety and Health Plan for presentation at the preconstruction conference. The Contractor’s

Safety Plan shall make whatever provision are necessary to conduct his work in accordance with current OSHA standards.

c. The following are minimum requirements for the Health and Safety Plan:

i. Safety Plans: Safety Plans will be the responsibility of the Contractor for construction areas identified by the installation and /or TXANG as areas of known hazards only. These plans are required by 29 CFR

1926 and are the responsibility of the Contractor. This requirement shall be coordinated with the Health and Safety Program of the

Military installation by the Contractor.

https://osha-safety-training.net/product/1926-osha-construction-industry-regulations-2024-edition/?utm_term=&utm_campaign=Sales-Performance+Max-New-Best-Performers&utm_source=adwords&utm_medium=ppc&hsa_acc=8236925820&hsa_cam=20512594485&hsa_grp=&hsa_ad=&hsa_src=x&hsa_tgt=&hsa_kw=&hsa_mt=&hsa_net=adwords&hsa_ver=3&gad_source=1&gclid=CjwKCAjw65-zBhBkEiwAjrqRMP7E8ru73uFwonCkyc5WuI5maWCG8keup2kQJj8Q05xzvLRcYu3vkBoCbSUQAvD_BwE

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

ii. Minimum requirements for the Health and Safety Plan are as follows:

1. Must be kept on site and must be written.

2. Will contain a hazard analysis (safety and health risk) for each site task and operation.

3. Will include employee training and weekly safety update briefings (record kept on each employee and subcontractor)

4. Will include personal protective equipment to be used by employees for each of the site tasks and operations.

5. Will include provisions for medical surveillance.

6. Will include frequency and type of air monitoring, personal monitoring, environmental sampling instruments being used if required.

7. Will include a site control program to be coordinated with the installation.

8. Will include a decontamination procedure for the anticipated types of chemical materials to be used in the project

9. Will include an emergency response plan.

10. Will include a confines space entry procedure and pre-entry briefings.

11. Will include provisions for spill containment, to be coordinated with installation.

12. Will include telephone notifications for accidents and follow-on procedures for written reports of the accidents.

13. Written verification of adherence to the Plan by a safety and health supervisor is required (the supervisor must meet 29 CFR

1926 training requirements for supervisors).

14. Deficiencies will be corrected immediately upon discovery and after consultation with the Project Manager, KO as required.

d. Hazard Response Plan: The plan unplanned or non-predicted discovery of such hazards as transite pipe, contaminated soils, and other possible hazards will be addressed within an Emergency Response Plan (EMR) by all contractors. This requirement will be coordinated through the Health and

Safety Program of the Project Manager by the Contractor. Safety Data Sheets

(SDS) shall be maintained at the site for all materials in use.

e. Temporary Utility Plan: The Contractor shall submit a temporary utility hook up plan to be coordinated and approved by the Project Manager. The plan shall describe electrical, water, sanitary facilities, telephone/fax and/or gas.

4. MONTHLY SAFETY MEETINGS

A. The Contractor shall schedule subsequent safety meetings with all personnel, employees and subcontractor personnel on a monthly basis or as required by the

Project Manager. Minutes of the safety meetings shall be prepared and signed by the

Contractor. The meeting notes shall have a roll signed by all members present. This document shall be submitted to the Project Manager at each progress meeting and be a part of the itinerary.