Cost Sheet.docx
DOCX document 52 KB Posted
- Attached to
- Cloud-Based Vital Records Management System
- Solicitation number
- 120277 O3 REBID
- Issued by
- Douglas County, Nebraska
About this file
This Cost Sheet is a pricing template for Request for Proposal (RFP) Number 120277 O3 REBID issued by the Nebraska Department of Health and Human Services (DHHS) for a cloud-based Vital Records Management System. The solicitation encompasses a comprehensive software solution designed to manage vital records including births, deaths, marriages, dissolutions, fetal deaths, and induced terminations of pregnancy, with capacity for up to 5,000 users and 1,000 concurrent users. The RFP requires vendors to submit detailed pricing across four primary components: Part I covering project implementation deliverables with specific percentage allocations for Project Initiation (5%), Design and Configuration (10%), Development and Testing (20%), Data/File Migration (10%), Training (5%), Implementation (40%), and Post-Implementation (10%); Part II addressing Support, Maintenance, and Operations on a quarterly basis for Years Two through Five of the initial contract term; Part III for an optional five-year renewal period with annual pricing; and Part IV for miscellaneous enhancements and custom programming. The initial contract term spans five years with a targeted go-live date within 15 months of project kick-off, and vendors must ensure all pricing is inclusive of associated costs, fees, and subscription costs without reference to additional undisclosed charges.
The Cost Sheet requires bidders to provide a Total Overall Cost representing the sum of Part I and Part II pricing only, with Part III and Part IV explicitly excluded from cost evaluation. Bidders must complete all yellow-highlighted fields and maintain the prescribed format, though additional line items may be inserted if identified as essential to meet RFP requirements and remain within stated percentage allocations. The pricing structure specifies that Part II compensation for Support, Maintenance, and Operations will be calculated on a monthly basis for 12 months across each contract year, with no compensation payable until all Burn-In Period requirements are satisfied. Additionally, bidders must provide hourly rates for miscellaneous support and maintenance roles including Software Engineer, IT Business Analyst, Project Manager, and other positions as needed to address custom programming requests and emerging needs that may arise during the contract term.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Sheet
RFP 120277 O3 REBID
Vital Records Management System Bidder Name: ________________________________
Important Instructions: Bidders are to complete all fields highlighted in yellow.
Do not alter existing format or content within the Cost Sheet. However, if Bidder identifies that other items are essential in Part I and/or Part II to create full functionality, and meet the requirements as outlined in the RFP document and any related attachments, then additional lines may be inserted as needed. Such additional lines must be included in Part I and Part II pricing and be reflected in the Total Overall Cost. Any inclusion of additional lines must still conform within the stated percentages as outlined in Part I and follow the prescribed format as shown. Important: In case of a mathematical error in extension of price, unit price shall govern.
Please indicate the “Total Overall Cost” for the Vital Records Management System $ _______________ This amount shall equal the sum of the Total for both Part I and Part II. Do not include any costs for Part III and Part IV in the “Total Overall Cost”, as these sections are not included in the cost evaluation.
Part I: Project section requirements as outlined in Section (VI)(A) of the Request for Proposal (RFP) document and any related attachments. Bidder to provide pricing for each of the project deliverable categories listed. The sum of all projects deliverable categories listed directly below constitutes the Part I – Total. Important: Bidders are to ensure that allocation of their percentages are based on the % provided for each category and that the total of all categories within Part I does not exceed 100%.
| Description |
| % Breakdown by Category for |
Part I
| Number of Units |
| Unit of Measure (UOM) |
| Cost |
(Unit Price)
| Project Initiation: Includes creation, review, and acceptance of each of the following items. The total cost for this category shall be 5% of the total for Part I. Reference section VI.A.4.c |
| Project Initiation: |
Items i. through vii. shall equal 5% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Kick-off Event, Documentation, Review and Approval
ii. Develop a Detailed Project Plan
iii. Develop a Risk Management Plan
iv. Develop a Communication Plan
v. Develop a Staffing Management Plan
vi. Develop a Change Management Plan
vii. Develop an Issue Management Plan
| Design and Configuration: The total cost for this category shall be 10% of the total for Part I. Reference section VI.A.4.d. |
| Design and Configuration: |
Items i. through x. shall equal 10% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Establish Review and Acceptance Process
ii. Develop a Requirements Traceability Matrix (RTM)
iii. Coordinate and Facilitate On-Site Requirements Gathering Session(s)
iv. Develop and Submit an Application for Configuration and Maintenance Plan
v. Establish and Utilize a Deliverable Review and Acceptance Process
vi. Configure Environments for Development, Testing, Training and Production
vii. Complete Standard System Configuration
viii. Assist the Unit with Configuration of System
ix. Assist the Unit with User Role Determination
x. Obtain Acceptance from Unit on Design and System Configuration
| Development and Testing: The total cost for this category shall be 20% of the total for Part I. Reference section VI.A.4.f. |
| Development and Testing: |
Items i. through viii. shall equal 20% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Complete all Necessary Custom Development
ii. Complete all Necessary Reports
iii. Complete all Necessary Integrations (Interfaces, Imports, and Exports)
iv. Develop a Testing Plan
v. Execute and Evaluate Testing
vi. Document Testing Results
vii. Assist the Unit with User Acceptance Testing (UAT)
viii. Obtain Acceptance from the Unit on Testing Results
Part I – Categories are continued on the next page
| Data/File Migration: The total cost for this category shall be 10% of the total for Part I. Reference section VI.A.4.f. |
| Data/File Migration: |
Items i. through v. shall equal 10% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Develop a Data/File Conversion and Migration Plan
ii. Develop a Conversion Mapping Guide
iii. Perform the Data/File Conversion and Migration
iv. Provide a Data/File Conversion and Migration Results Report
v. Obtain Acceptance from the Unit on Data/File Conversion and Migration Results
| Training: The total cost for this category shall be 5% of the total for Part I. Reference section VI.A.4.g. |
| Training: |
Items i. through iii. shall equal 5% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Coordinate and facilitate On-site Training Instruction
ii. Provide Online Reference Training Materials for Administrator and User Manuals
iii. Obtain Acceptance from the Unit on Training Results
| Implementation: The total cost for this category shall be 40% of the total for Part I. Reference section VI.A.4.h. |
| Implementation: |
Items i. through iv. shall equal 40% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Perform and Complete all Aspects of the Implementation
ii. Go-live
iii. Assist the Unit with On-site Implementation Assistance for Go-Live Week
iv. Obtain Acceptance from the Unit on Implementation Results
| Post-Implementation: The total cost for this category shall be 10% of the total for Part I. Reference section VI.A.4.i. |
| Post-Implementation: |
Items i. through v. shall equal 10% of the total cost for Part I
| 1 |
| Each |
| $ |
i. Burn-in Period (90 calendar days)
ii. Coordinate and Facilitate Post-Implementation Review Teleconference Meeting
iii. Provide a Plan for Enhancement Requests
iv. Provide a Transition Plan from Implementation to Support, Maintenance, and Operations
v. Obtain Final Sign-off
| Part I – Total |
| $ |
Part II – Support, Maintenance, and Operations -reference Section VI.A.4.j.
(Note: These items would be paid on a quarterly basis)
Bidder’s price for Support, Maintenance, and Operations shall include all associated costs or fees (including but not limited to subscriptions costs). Important: Do not include statements in the RFP proposal submittals, attachments, etc. indicating that there will be additional fees which are not included in the table below. The sum of the extended cost (Number of Units x Unit Price) constitutes the Part II – Total.
| Description |
| Contract Term |
| Unit of Measure (UOM) |
| Number of Units |
| Cost |
(Unit Price) Extended Cost
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) - Post Burn-in period (90 calendar days) |
| Year Two of the Initial Term* |
| Monthly |
| 12 |
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Year Three of the Initial Term |
| Monthly |
| 12 |
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Year Four of the Initial Term |
| Monthly |
| 12 |
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Year Five of the Initial Term |
| Monthly |
| 12 |
| $ |
| $ |
| Part II - Total |
| $ |
*No Support, Maintenance, and Operations compensation shall be paid until all requirements of the Burn-In Period have been satisfied.
Optional Services
Part III – Optional Renewal for Support, Maintenance, and Operations Reference section VI.A.4.k (Note: These items would be paid on an annual basis)
(Do not include these amounts in the Total Overall Cost associated with Part I and Part II)
Optional Five (5) Year Renewal Period
| Description |
| Contract Term |
| Unit of Measure (UOM) |
| Number of Units |
| Cost |
(Unit Price) Extended Cost
| Support, Maintenance, Operations and any additional costs or fees (including but not limited to subscriptions) |
| Renewal Year One (1) |
Monthly
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Renewal Year Two (2) |
Monthly
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Renewal Year Three (3) |
| Monthly |
| 12 |
| $ |
| $ |
| Support, Maintenance, Operations, and any additional costs or fees (including but not limited to subscriptions) |
| Renewal Year Four (4) |
| Monthly |
| 12 |
| $ |
| $ |
| Support, Maintenance, aOperations, and any additional costs or fees (including but not limited to subscriptions) |
| Renewal Year Five (5) |
| Monthly |
| 12 |
| $ |
| $ |
| Part III - Total Cost for Optional Five (5) Year Renewal Period |
| $ |
Part IV – Optional Services Miscellaneous Enhancements (Do not include these amounts in the Total Overall Cost associated with Part I and Part II)
Custom Programming and Additional Features Work may be needed that was not originally delineated in this RFP but considered within the scope of work (i.e., Custom Programming). This additional work may stem from legislative mandates, emerging technologies, secondary research and/or data integration solutions not otherwise addressed in this RFP or known at the time this RFP was issued. If additional work is needed, the Contractor must submit a detailed Scope of Work and detailed pricing to include items such as, but not limited to, Title/Role(s), number of hours, unit of measure, and due dates/deliverables for DHHS review and approval. The bidder shall provide hourly pricing for any current and future custom programming needs to meet specific requirements for the Vital Records Management System as requested and mutually agreed upon by the bidder and DHHS.
Hourly Rates for Miscellaneous Support/Maintenance (beyond RFP/Contract requirements) The Bidder should provide the Title/Role with each respective hourly rate to perform additional services*.
| Title / Role such as, but not limited to: |
| Hourly Rate |
| Software Engineer |
| $ |
| IT Business Analyst |
| $ |
| Project Manager |
| $ |
*Bidder may add additional lines as needed.
File details come from the government source that posted it. Updated .