Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) for environmental remediation services at the former Main Street Cleaners site located at 1679 Main Street, Sarasota, Sarasota County, Florida. The original Task Assignment (TA) DC009D was established under Contract HW686. The TACO, effective June 25, 2025, reconciles Work Change Directive (WCD-1) costs and extends the project timeline to accommodate additional operational and maintenance activities.

The amended task value increased from $76,095.51 to $77,595.12, representing a $1,499.61 increase. The additional costs comprise one month of utilities (FPL Electric at $450 per month and Century Link Phone at $120 per month, plus handling fees totaling $560) and associated labor costs of $254.20 for project management and administrative support. The project completion date was extended from July 25, 2025 to September 26, 2025, providing a 63-day extension. Services under the contract include operation and maintenance of an existing soil vapor extraction system, development of two Remedial Action System Status Reports, groundwater monitoring, and project management. The original cost structure comprised $69,255.51 in fixed unit rates and $6,840.00 in cost reimbursement for utilities, with deliverables due at specified quarterly intervals through June 2025.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC009D 1 HW686

Mary Uribe • Responsibilities o As a Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342

ERIC_5423

Main St Cleaners

✔ $ 77,595.12 $ 76,095.51

$ 77,595.12 $ 76,095.51 Completion

✔ Completion 07/25/2025 09/26/2025 63

1 1

Contractor

Digitally signed by Joshua S Newell Date: 2025.06.25 11:58:37-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.06.25 11:30:42 -04'00'

TACO to Reconcile DC009D - WCD 1, additional month of utilities, and time extension.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC009D

$ 77,595.12

Subtask 2: 1st Quarter O&M

Subtask 3 & 4 : 2nd Quarter O&M and

Subtask 5: 3rd Quarter O&M

Subtask 6: 4th Quarter O&M

Subtask 8: Utilities

Subtask 1, 7, and 9: Project Management, RASSR, and GW Monitoring

Subtask 2: DEP approval of 1st Quarter O&M

Subtask 5: DEP approval of 3rd Quarter O&M

Subtask 6: DEP approval of 4th Quarter O&M

Subtask 1, 7, and 9: DEP approval of Project Management, RASSR, and GW Monitoring

Subtask 8: DEP approval of Utilities

Subtask 3 & 4 : DEP approval of 2nd Quarter O&M and

08/20/2024

12/02/2024

02/20/2025

05/20/2025

06/06/2025

07/30/2025

$ 14,285.02

$ 10,072.34

$ 11,620.34

$ 9,027.49

$ 8,540.00

$ 24,049.93

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

ERIC_

Cleaners

Mary Uribe, Project Manager

Negotiation Summary

HW686 DC0

Total task amount is $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate.

The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is . Task completion date is

F D E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

PS

I)

Da te

2/

9/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si

M ai n

St re et C le an er s E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm ar k as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an ag er

.0

.0 $6

4.

Pr in cip al

C on su lta nt , D

C 0.

0.

$6

0.

Se ni or E ng in ee r, M R

.0

3.

3.

5.

3.

3.

8.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

3.

0.

0.

0.

0.

0.

0.

0.

3.

$6

2.

Se ni or E ng in ee r, GR

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er 0.

0.

0.

0.

0.

0.

0.

0.

0.

$6 0.

Se ni or

G eo lo gi st , M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 8.

Pr oj ec t E ng in ee r, JN

8.

.0

.0

.0

.0

.0

.0 0.

0.

$3 9.

Pr oj ec t S cie nt ist

, S L

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

0.

Pr oj ec t S cie nt ist , J

D

6.

.0

.0

0.

.0

.0

0.

0.

.0

$3

3.

Pr oj ec t S cie nt ist , S

B 0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 4.

GI

S Sp ec ia lis t, DG

.0 0.

0.

2.

0.

0.

8.

0.

0.

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S cie nt ist , M

M

.5 0.

0.

0.

0.

0.

0.

0.

.5

$2 8.

En vi ro nm en ta l S pe cia lis t, DK

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ad m in ist ra tiv e

As sis ta nt

, B M

0.

0.

0.

0.

0.

0.

2.

0.

0.

$1

5.

Se cr et ar y 0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

5.

.0

.0

.0

.0

.0

.0

.0

0.

.5

Di re ct La bo r

$1 8, 0.

$2

,1

.2

$2 ,4

.7

$2

,3

.8

$1 ,9

.0

$2

,4

.7

$2 ,3

.8

$2

,7

.8

$0 .0

$1

,8

.5

$0 .0

O ve rh ea d

1.

$2

7, 2.

$3 ,1

.8

$3

,6

.9

$3 ,6

.2

$2

,8

.5

$3 ,6

.9

$3

,6

.2

$4 ,0

.4

$0

.0

$2 ,8

.6

$0

.0

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$4

5, 3.

$5 ,2

.1

$6

,1

.6

$6 ,0

.0

$4

,7

.5

$6 ,1

.6

$6

,0

.0

$6 ,8

.3

$0

.0

$4 ,7

.2

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

2/

9/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M ai n

St re et C le an er s E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cle

R en ta l

$1 ,8

.0

$3

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$3

.0

$0 .0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$3

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$3

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

W el l M at er ia ls

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s P ro cu re m

Dr ill in g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Dr ill in g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

La bo ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$6

.0

$0

.0

Ut ili tie s

$7 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$7

,9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $8

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$7 ,9

.0

$6

.0

$0

.0

Ha nd lin g

Fe e

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$5

.0

$6 0.

$0

.0

To ta l S ub co nt ra ct or C os t

$9 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$8

,5

.0

$6

.0

$0 .0

La bo ra to ry

An al yt ica l C os ts

$6 ,8

.0

$1

,3

.0

$4

.0

$0 .0

$2

,7

.0

$4

.0

$0 .0

$0

.0

$1 ,6

.0

$0

.0

Fa st

T ur na ro un d

Ch ar ge s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$7

.0

$1

.0

$1

.0

$0 .0

$3

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $7

,5

.0

$1 ,5

.0

$6

.0

$0

.0

$3 ,0

.0

$6

.0

$0

.0

$0 .0

$1

,6

.0

$0 .0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $6

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

Eq ui pm en t (

Dr ill in g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ica l r el at ed

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$7 ,9

.0

$1

,3

.0

$1 ,3

.0

$0

.0

$1 ,3

.0

$1

,3

.0

$0 .0

$0

.0

$2 ,7

.0

$0

.0

To ta l F ie ld E xp en se s

$8 ,5

.0

$1

,4

.0

$1 ,4

.0

$0

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$0

.0

$2 ,8

.0

$0

.0

Su bt ot al

$7 3, 3.

$5

,2

.1

$9 ,4

.6

$8

,4

.0

$4 ,7

.5

$1

1, 7.

$8 ,4

.0

$6

,8

.3

$8 ,5

.0

$1

0, 2.

$0 .0

Co m pl et io n Fe e $4

,5

.3

$5

.2

$6

.6

$6

.4

$4

.9

$6

.6

$6

.4

$6

.2

$0 .0

$4

.8

$0

.0

To ta l E st im at ed C os t

$7 7, 5.

$5

,8

.3

$1 0, 2.

$9

,0

.4

$5 ,2

.5

$1

1, 0.

$9 ,0

.4

$7

,4

.5

$8 ,5

.0

$1

0, 6.

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Main Street Cleaners ERIC_5423 SubTask 2 1st Qtr Monthly O&M

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Project Scientist, J Daugherty Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 33

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 6 $1,200.00

Summa cannisters $33.00 6 $198.00 $1,398.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $1,548.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

EQUIPMENT PROCUREMENT RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

TO-15 (VOCs) (Qtr infl and eff, + 4 SVE air samples)

FINAL --7/24/96

Page 4 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 3 2nd Qtr Monthly O&M

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Project Scientist, J Daugherty Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr) $200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 5 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 4 RASS

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2 Sign and Seal RASS 1

Total hours: 5

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8

Total hours: 32

CADD / GIS Specialist, D Grove Prepare figures for RASS 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 6 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 5 3rd Qtr Monthly O&M

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 33

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 12 $2,400.00

Summa cannisters $33.00 12 $396.00 $2,796.00

Shipping, large, overnight $150.00 2 $300.00

TOTAL LAB $3,096.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (infl and eff, + 4 SVE air samples)

Page 7 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 6 4th Qtr Monthly O&M

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr,) $200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large , overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 8 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 7 RASS

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5 Sign and Seal RASS 1

Total hours: 8

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8 Shutdown Evaluation 3 Discussion of additional run time in RASS for WCD and TACO submittals 1

Total hours: 40

CADD / GIS Specialist, D Grove Prepare figures for RASS 8 Administrative Assistant, BM Backup generation 2

TOTAL LABOR 58

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 9 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 8 Utilities

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

FPL Electric $450.00 Month 14 $6,300.00

Century Link Phone $120.00 Month 14 $1,680.00 $7,980.00

Handling fee Electric $20.00 Month 14 $280.00 Handling fee phone $20.00 Month 14 $280.00

$560.00

$0.00

TOTAL $8,540.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 10 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

SubTask 9 Groundwater Monitoring

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark event lab kit request, equipment selection, tenant notification 3

Project Scientist, J Daugherty Field preparation 1 Travel (3 roundtrips for gw sampling) 9 Collect groundwater samples 8 shallow wells @ 1 hour each 8 2 intermediate wells @ 1.5 hrs each 3 2 deep well @ 2 hours each 4 Documentation of groundwater sampling & measurements 1

Total hours: 26

Staff Scientist, M Matar Travel (3 roundtrips for gw sampling) 9 Collect groundwater samples 7 shallow wells @ 1 hour each 7 1 intermediate wells @ 1.5 hr each 1.5 2 deep well @ 2 hours each 4 stage IDW drum 1 pickup, drop off sample kits 2 Documentation of groundwater sampling & measurements 1

Total hours: 25.5

TOTAL LABOR 54.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

$0.00

Petrotech Southeast, LLC IDW transport & disposal 6 $100.00 $600.00 $0.00 $0.00

TOTAL $600.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

EPA Method 8260 $73.00 22 1 $1,679.00

$1,679.00 $0.00 Sample Shipping, Large, Overnight $150.00 0 $0.00

$0.00 $0.00

TOTAL LAB $1,679.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Shallow Groundwater Sampling Kit $290.00 day 3 $870.00 Deep Groundwater Sampling Kit $415.00 day 3 $1,245.00 Drum for IDW $100.00 each 6 $2,115.00 $600.00

$2,715.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $2,835.00

Page 11 Main St ERIC_5423 DC009D WCD-1 TACO-1 Final 6-23-2025

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

2/

9/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M ai n

St re et C le an er s E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an ag er

0.

0.

$6

4.

Pr in cip al

C on su lta nt , D

C 0.

0.

$6

0.

Se ni or E ng in ee r, M R

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

0.

0.

0.

0.

0.

0.

0.

0.

0.

$6

2.

Se ni or E ng in ee r, GR

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er 0.

0.

0.

0.

0.

0.

0.

0.

0.

$6 0.

Se ni or

G eo lo gi st , M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 8.

Pr oj ec t E ng in ee r, JN

1.

0.

0.

0.

0.

0.

1.

0.

0.

$3

9.

Pr oj ec t S cie nt ist , S

L 0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 0.

Pr oj ec t S cie nt ist

, J D

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

3.

Pr oj ec t S cie nt ist , S

B 0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 4.

GI

S Sp ec ia lis t, DG

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S cie nt ist , M

M 0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 8.

En vi ro nm en ta l S pe cia lis t, DK

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ad m in ist ra tiv e

As sis ta nt

, B M

0.

0.

0.

0.

0.

0.

2.

0.

0.

$1

5.

Se cr et ar y 0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs 3.

0.

0.

0.

0.

0.

0.

3.

0.

0.

Di re ct La bo r

$1

.2

$1 1.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$8 9.

$0

.0

$0 .0

$0

.0

O ve rh ea d

1.

$1

.9

$1

7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.3

$0

.0

$0 .0

$0

.0

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$2

.2

$2

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

.9

$0

.0

$0 .0

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

2/

9/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M ai n

St re et C le an er s E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cle

R en ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

Co st s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

W el l M at er ia ls

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s P ro cu re m

Dr ill in g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Dr ill in g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

La bo ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ut ili tie s

$1 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,1

.0

$0

.0

$0 .0

Ha nd lin g Fe e $8

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$8 0.

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $1

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,2

.0

$0

.0

$0 .0

La bo ra to ry

An al yt ica l C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

Ch ar ge s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ica l r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$1 ,4

.2

$2

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

.9

$1

,2

.0

$0 .0

$0

.0

Co m pl et io n

Fe e

$2 5.

$2

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

2.

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$1 ,4

.6

$3

2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

.4

$1

,2

.0

$0 .0

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g

SubTask 7 RASS

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 0 Review Final RASS/ Groundwater Report 0 Sign and Seal RASS 0

Total hours: 0

Project Engineer, J Newell Data reduction/evaluation 0 Preparation of remediation/ groundwater monitoring report 0 Create Final figures 0 Report - Prepare final tables and figure 0 Shutdown Evaluation 0 Discussion of additional run time in RASS for WCD and TACO submittals 1

Total hours: 1

CADD / GIS Specialist, D Grove Prepare figures for RASS 0 Administrative Assistant, BM Backup generation 2

TOTAL LABOR 3

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 3 Main St ERIC_5423 DC009D WCD-1 TACO-1 Delta 6-23-2025

SubTask 8 Utilities

DATE: 2/9/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

FPL Electric $450.00 Month 2 $900.00

Century Link Phone $120.00 Month 2 $240.00 $1,140.00

Handling fee Electric $20.00 Month 2 $40.00 Handling fee phone $20.00 Month 2 $40.00

$80.00

$0.00

TOTAL $1,220.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 4 Main St ERIC_5423 DC009D WCD-1 TACO-1 Delta 6-23-2025

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW686

DC009D Completion July 25, 2025

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to provide remediation system Operation and Maintenance (O&M), develop two Remedial Action System Status Reports (RASS), and groundwater monitoring at former Main Street Cleaners. There is a cost reimbursement of $6,840.00 (utilities).

Mubeen Darji 850-245-8965 Contractor Professional Service Industries, Inc. (PSI) Contractor

Contractor Nana Westmark Contractor 813-886-1075

ERIC_5423

1679 Main Street, Sarasota, Sarasota County

Former Main Street Cleaners

Contractor Contractor

$ 69,255.51

$ 6,840.00

$ 76,095.51

Scope of Work

Professional Service Industries, Inc. (PSI) Contractor Nana Westmark

Digitally signed by Joshua S Newell Date: 2024.03.25 10:43:00-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.03.19 13:20:48 -04'00'

N/A

Joshua S Newell

2024.04.04 08:20:36-04'00'

File details come from the government source that posted it. Updated .