This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract HW686 with Professional Service Industries, Inc. (Intertek-PSI), dated December 18, 2023. The assignment authorizes PSI to conduct a Modified Active Gas Survey (MAGS) well installation and testing project at the former Touch of Quality Cleaners facility located at 1128 Sterling Road, Inverness, Citrus County, Florida (ERIC_4254). The Department Project Manager is Patrick McGrane, and the Contractor's Project Manager is Nana G. Westmark. The task completion date is July 26, 2024.
The scope of work comprises four subtasks: (1) Project Management; (2) MAGS Well Installation involving thirteen wells at varying depths (six shallow wells at 8 feet, three intermediate wells at 25 feet, three deep wells at 50 feet, and one deep well at 45 feet); (3) MAGS Testing using a regenerative blower and generator with vapor samples collected via SUMMA canisters for EPA Method TO-15 analysis; and (4) preparation of a Supplemental Site Assessment Report with professional engineer or geologist signatures. The total contract value is $64,480.90, payable as a fixed unit rate upon completion and FDEP approval of the deliverables and IDW manifest. The primary deliverable due date is June 28, 2024, with final invoice submission due upon project completion. Subcontractor costs include drilling services ($26,762.00), laboratory analysis ($3,179.00), equipment rental and field expenses ($4,840.00), and travel costs ($1,440.00), with direct labor comprising $22,817.90 including overhead and 151.02% markup.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC022A Completion July 26, 2024
This Task Assignment authorizes PSI to conduct MAGS Well Installation and Testing at the former Touch of Quality Cleaners in accordance with the October 25, 2023 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Nana G. Westmark Contractor 813-886-1075
ERIC_4254
1128 Sterling Road Inverness, Citrus County, Florida
Touch of Quality (currently known as Pronto Cleaners)
Contractor Contractor
✔ $ 64,480.90
$ 64,480.90
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI) Contractor Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.12.18 14:39:35 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.12.18 13:19:10 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1, 2, 3, & 4 - Project Management; MAGS Well Installation; MAGS Testing;
Supplemental Site Assessment Report (MAGS study) 06/28/2024
Subtasks 1, 2, 3, & 4 - Project Management; Submittal and FDEP approval of Supplemental Site Assessment Report; IDW Manifest $ 64,480.90
$ 64,480.90
HW686
DC022A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette NNuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File
Iverness, Citrus County Touch of Quality (currently Pronto Cleaners)
ERIC_4254
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC022A (HW686)
DATE: Dec 14, 2023
This Task Assignment authorizes Professional Service Industries, Inc. (Intertek-PSI) to conduct a MAGS
Well Installation / Test and develop a Supplemental Site Assessment Report at and for the former Touch of Quality Cleaners. The total cost for this project is $64,480.90 with 227.5 total labor hours.
Subtask 1:
Project Manager is automatically calculated as a percentage of total labor in accordance with Contract
HW686.
Subtask 2:
PSI will oversee the installation of thirteen (13) MAGS wells in the approved locations as seen in the
October 25th, 2023, Scope of Work figure. The 13 wells are divided as follows:
Six shallow wells (8 ft bls)
Three intermediate wells (25 ft bls)
Three deep wells (50 ft bls)
One deep well (45 bls)
Subtask 3:
PSI will conduct a deep zone MAGS test utilizing the newly installed wells using a regenerative blower and generator. Vapor samples will be collected at the end of testing using SUMMA canisters for analysis of
VOCs using EPA Method TO-15.
Subtask 4:
PSI will prepare and submit and Supplemental Site Assessment – Deep MAGS Report for the MAGS installation and testing event. The Supplemental Site Assessment report will include conclusions and recommendations with the appropriate Professional Engineer or Professional Geologist signatures.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P S
I)
D at e:
Ta sk ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
To uc h of Q ua lit y E
R
IC
_4
Ta sk
M
A G
S W el l I ns ta lla tio n S ub Ta sk
A ct iv ity
/P ha se
M A
G S
D ee p
Zo ne
Ta sk
M A
G S
T es tin g
S ub
Ta sk
P ro je ct
M an ag er
N an a
W es tm ar k
Ta sk
S up pl em en ta l S ite A ss es sm en t R ep or t -
M A
G S
S tu dy S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $5
8.
PP
ro je ct
M an ag er
.9
$0 .0
P rin ci pa l C on su lta nt
$6 0.
S en io r E ng in ee r, M
R
.5
8.
$5
8.
S en io r G eo lo gi st
, N W
$6 0.
S en io r S ci en tis t, M
R
$0
.0
C er tif ie d In du st ria l H yg ie nt is t
$0
.0
C er tif ie d H az ar do us
M at er ia ls M an ag er
$0
.0
Fl or id a
Li ce ns ed
A sb es to s C on su lta nt
$0 .0
P ro je ct M an ag er
$4
3.
P ro je ct
E ng in ee r, JN
$4 3.
P ro je ct E ng in ee r, G R
$4 2.
P ro je ct E ng in ee r, M K
$3 9.
P ro je ct S ci en tis t, S L
$3 3.
P ro je ct S ci en tis t, S B
$2 9.
P ro je ct S ci en tis t
$2 9.
P ro je ct S ci en tis t, R P
$0 .0
Q
A O ffi ce r
$3
1.
R em ed ia tio n
S pe ci al is t, R H
$3 4.
G
IS
C A
D S pe ci al is t, D
G
$0
.0
S ta ff E ng in ee r
$0 .0
S ta ff
G eo lo gi st
$2
5.
S ta ff S ci en tis t, M M
$3 0.
E nv iro nm en ta l S pe ci al is t, C
C
$2
8.
E nv iro nm en ta l S pe ci al is t, D K
$2 0.
A dm in is tra tiv e
A ss is ta nt , B
M
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
7.
.5
D ire ct L ab or
$9
,0
.0
$1 ,0
.7
$2
,2
.6
$3 ,8
.4
$1
,9
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
1.
$1
3, 7.
$1 ,5
.3
$3
,3
.1
$5 ,8
.2
$2
,9
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or
$2 2, 7.
$2
,6
.0
$5 ,5
.7
$9
,7
.6
$4 ,8
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
/2
5/
RE
V:
2/
CE
F In te rt ek -P
SI
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
P ro fe ss io na l S er vi ce
In du st rie s, In c.
(I nt er te k-
P
I) at e:
Ta sk
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
To uc h of Q ua lit y E
R
IC
_4
Ta sk
M
A G
S W el l I ns ta lla tio n S ub Ta sk
A ct iv ity
/P ha se
M A
G S
D ee p
Zo ne
Ta sk
M A
G S
T es tin g
S ub
Ta sk
P ro je ct
M an ag er
N an a
W es tm ar k
Ta sk
S up pl em en ta l S ite A ss es sm en t R ep or t -
M A
G S
S tu dy S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
/2
5/
TT
ra ve l
V eh ic le
R en ta l
$1 ,4
.0
$4
.0
$9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$ $1 ,4
.0
$4
.0
$9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$2 6, 2.
$2
6, 2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$2 7, 2.
$2
7, 2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $2
,7
.2
$2 ,7
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$2 9, 2.
$2
9, 2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$3 ,0
.0
$0
.0
$3 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$3 ,1
.0
$0
.0
$3 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
.0
$2
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$4
,4
.0
$1 ,3
.0
$3
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$4 ,8
.0
$1
,5
.0
$3 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $6
2, 9.
$2 ,6
.0
$3
7, 3.
$1 7, 9.
$4
,8
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$2 ,2
.8
$2
.5
$5
.1
$9
.0
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $6
4, 0.
$2 ,8
.5
$3
8, 2.
$1 8, 2.
$5
,3
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F In te rt ek -P
SI
Pa ge
Formula Sheet
Project Management Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10
Labor Costs $1,045.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $240.00 $510.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$292.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,600.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,298.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,931.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $136.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $891.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,143.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dol $1,045.54 $2,223.63 $3,876.46 $1,944.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Project Management $8,044.31 = sum of Direct Labor Costs from Subtasks 2 through 10 $1,045.76 =13% of Direct Labor Costs (Project Management)
17.904 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Service Fee $2,676.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$44.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,720.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Touch of Quality ERIC_4254 SubTask 2 MAGS Well Installation
DATE: 10/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark Technical Assistance 4 Notification to tenants 1
Total Hours: 5
Project Scientist, S Luth Field preparation 2 Travel (5 hr roundtrip) 15 Provide oversight for MAGS well installation 30 Stage IDW 2
Total Hours: 49
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 0 $0.00 $480.00 week 1 $480.00
$0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Groundwater Protection Well installation 1 $26,762.00 $26,762.00
Petrotech Southeast 4 $110.00 $440.00
$0.00
TOTAL $27,202.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
$0.00 0 $0.00
$0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
Well installtion kit $325.00 day 0 $0.00 $1,300.00 week 1 $1,300.00
$1,300.00 Expendables $40.00 day 5 $200.00
TOTAL EQUIPMENT $1,500.00
IDW pickup, transport, disposal, water, per drum
FINAL --7/24/96
Page 4 Touch of Quality ERIC_4254 Deep MAGS 0552-411171
SubTask 3 MAGS Testing
DATE: 10/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Technical Assistance 3 Notification to tenants 1
Total Hours: 4
Environmental Specialist, C Cummins Travel (3 roundtrip) 15 Set up existing system for MAGS 3 Well head assembly set-up 1 Operate MAGS event (1 hrs - 13 points) 13 Collect measurements from other wells 5
Total Hours: 37 Staff Scientist, M Mater
Travel (3 roundtrip) 15 Set up existing system for MAGS 3 Well head assembly set-up 1 Operate MAGS event (1 hrs - 13 points) 13 Site Restoration outside building 3
Total Hours: 35
Project Engineer, J Newell Travel (3 roundtrip) 15 Technical review of data during testing 3 Operate MAGS event (1 hrs - 13 points) 13 Dismantle MAGS equipment 2 Written documentation of data collection 4
Total Hours: 37
TOTAL LABOR 113
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck Environmental Specialist $120.00 day 0 $0.00 $480.00 week 1 $480.00
Equipment Van / Truck Project Engineer $120.00 day 0 $0.00 $480.00 week 1 $480.00
$0.00
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
TO-15 $200.00 13 $2,600.00
Summa Canister $33.00 13 $429.00
$3,029.00 $0.00 Sample Shipping Large, overnight $150.00 1 $150.00
$0.00
TOTAL LAB $3,179.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
Construction Pilot Test Kit $360.00 day 0 $0.00 $1,440.00 week 1 $1,440.00
Portable Generator $70.00 day 0 $0.00 $280.00 week 1 $280.00
Regen Blower $180.00 day 0 $0.00 $720.00 week 1 $720.00
GPS $175.00 day 0 $0.00 $700.00 week 1 $2,440.00 $700.00
$3,140.00 Expendables $40.00 day 5 $200.00
TOTAL EQUIPMENT $3,340.00
Page 5 Touch of Quality ERIC_4254 Deep MAGS 0552-411171
SubTask 4 Supplemental Site Assessment Report - MAGS Study
DATE: 10/25/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 6 Make Recommendations for report 2 Sign and seal document 0.5
Total Hours: 8.5
Project Engineer, J Newell Data reduction/evaluation 15 Preparation of Supplemental Assessment report 10 Report - Prepare final tables and figures 5
Total Hours: 30
GIS/CADD Specialist, D Grove Develop maps 4
TOTAL LABOR 42.5
VEHICLE TYPE RATE UNIT USEAGE
$0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 6 Touch of Quality ERIC_4254 Deep MAGS 0552-411171
PSI Proposal: 0552-411171 October 25, 2023 www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Kelly Crain, Environmental Administrator Phone: (850) 245-8705 main, (850) 245-8953 direct Email: Kelly.Crain@FloridaDEP.gov
Re: Proposal for Supplemental Site Assessment - Deep MAGS Touch of Quality (currently known as Pronto Cleaners) 1128 Sterling Road Inverness, Citrus County, Florida
ERIC_4254
Dear Ms. Crain:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide a Supplemental Site Assessment to consist of a Modified Active Gas Survey (MAGS) for the predominately deeper vadose zone for the Touch of Quality at 1128 Sterling Road, Inverness, Florida. Included with this proposal is a discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion. A Site Access Agreement for Pronto Cleaners was signed by Mr. Robert Riley in May 2021, who is listed as the registered agent for the current property owner, Marke Cleaners, according to the Citrus County Property Appraiser’s website.
PROJECT BACKGROUND
PCE drycleaning operations began August 1, 1989 at the Touch of Quality Cleaners. In July 1997, the FDEP received the application for the Drycleaning Solvent Cleanup Program for the Touch of Quality Cleaners which was determined to be eligible for state funded cleanup in January 1999. The drycleaner business has ceased drycleaning operations on site and the equipment has been moved. The business now operates as Pronto Cleaners and is a drop-off only business.
In August 1999, WRS completed assessment work at the Touch of Quality Cleaners and recommended SVE for soil remediation and dual-phase extraction (DPE) for the groundwater remedy. In June 2001, the Remedial Action Plan was submitted and the DPE commenced operations in April 2002.
FDEP – Touch of Quality ERIC_4254
October 25, 2023 www.intertek.com/building
A Remedial Action Plan Modification Two, Revision I (consisting of adding more SVE wells) was submitted in January 2008 which was subsequently approved in February 2008. Then in March 2008, the dual phase recovery system was turned off due to low recovery rates (estimated at 1.35 lbs of VOCs). The system was removed from the site and scrapped in January 2012.
Groundwater monitoring has been conducted at the site since 2008. The groundwater monitoring was previously conducted with passive diffusion bag (PDB) samplers which have proven to be successful in evaluating groundwater quality conditions. Based on the 2018 sampling event where standard sampling protocols were used, PDBs appear to produce laboratory results lower than those produced by standard sampling protocols. Nevertheless, since the VOH concentrations are close to GCTLs and the state requires standard sampling procedures to achieve site closure, PSI recommended switching from PDBs to standard sampling protocols for monitoring in the future.
As the site was converted from an active drycleaning plant to a drop off- location, confirmation soil sampling and a MAGS study was performed in May 2019 by PSI. The results revealed that although soil analytical samples at seven locations indicated no SCTL exceedances, the air samples from the MAGS survey were elevated, (PCE was detected in all seven air samples at concentrations ranging 2.83 to 3.93 mg/m3). The highest soil vapor PCE concentrations were detected in the samples collected from the exterior extraction wells (MAGS005, MAGS006 and MAGS007), all located behind the facility.
Additional discussions were held with the FDEP Waste Site Cleanup Section’s engineering group and PSI regarding a path forward for reaching closure. It was decided to conduct a Deeper MAGS study to evaluate if the soil continues to serve as a contaminant source. PSI submitted suggested locations of proposed MAGS wells and screen depths, which were approved by the FDEP in a conference call.
PSI recommends performing the Deeper MAGS study, and the proposed scope of work is contained herein.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of installing MAGS wells at select location and conducting a MAGS test at the Touch of Quality Cleaners. The results will be used to confirm current soil quality conditions and to evaluate if a contaminant mass is located in the vadose zone at deeper areas. Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. MAGS Well Installation
PSI will provide oversight of a licensed water well contractor to install thirteen (13) MAGS wells. The MAGS are proposed to be installed and tested at the locations presented in the attached site sketch with the following specifications.
October 25, 2023 www.intertek.com/building
a. Six (6) shallow wells 8 foot deep, screened from 1 - 8 feet bls
b. Three (3) intermediate wells - 25 feet deep, screened from 15 - 25 feet bls.
c. Three (3) deep wells - 50 feet deep, screened from 35 - 50 feet bls.
d. One (1) deep well - 45 feet deep, screened from 30 - 45 feet bls.
The proposed MAGS wells will be constructed of 2- inch diameter Schedule 40 PVC, with similar riser. A filter pack and bentonite seal will be emplaced, and the well will be constructed with a 10 – 12-inch manhole cover with an approximate 4 to 6 - inch clearance space between the grout and the manhole cover to allow a compression fitting to conduct the MAGS test. Once the MAGS wells are installed, a MAGS test will be conducted to evaluate potential contaminant sources.
Three drilling firms (Cascade, Groundwater Protection, and Preferred Drilling) were solicited for price proposals to install the wells, which are attached. Groundwater Protection (a division of DrillPro) was selected to perform the work based on price and our previous experience with the firm.
The wells will be constructed such that the MAGS wells may be converted to Soil Vapor Extraction (SVE) wells in the event that an SVE remediation strategy is necessary. Any investigative derived waste (IDW) will be containerized in 55-gallons drums, labeled for date of generation, and transported off-site for disposal at an approved facility.
3. MAGS Test
PSI will conduct a deep zone MAGS test using the newly installed wells to evaluate the extent of soil contamination and contaminant source identification. A regenerative blower and generator will be utilized to conduct the MAGs test. Flexible hose will be brought on-site to allow for the extraction of each MAGs point by the system. A high-speed peristaltic pump will be connected to the vapor sampling point to allow for continuous vapor screening with a MiniRAE 3000 OVA-PID or equivalent.
During each MAG point test, flow rate, well-head vacuum, and vacuum influence (measured from other MAG points, existing vacuum monitoring points and the horizontal SVE wells) will be measured at select time intervals.
The vacuum will be varied at the well head, starting from a low applied vacuum and incrementally increasing the vacuum. During each applied vacuum, the vapor flow rate will be measured for the purpose of determining the relationship of applied vacuum to flow rate. During this test, at each vacuum level, the vacuum influence will be measured from the nearby MAGs points to assess the Radius of Influence
(ROI).
Vapor samples will be collected using SUMMA® canisters for analysis of volatile organic compounds using EPA Method TO-15. It is anticipated that one vapor sample will be collected for each well head test. The samples will be collected at the end of the test.
October 25, 2023 www.intertek.com/building
4. Data Evaluation and Report Development
A Supplemental Site Assessment – Deep MAGS Report will be generated for the MAGS well installation and testing event. The data generated from the above described services will be tabulated and inserted onto maps at each specific test point. Tables will be generated summarizing the data collected from each MAG point and monitoring well. Conclusions and recommendations will be provided for the next appropriate action. The reports will be signed and sealed by a Professional Engineer or Professional Geologist certified in the State of Florida.
The deliverable and invoice schedule is as follows.
Touch of Quality ERIC_4254 Deliverables
Deliverables Deliverable Due Date SubTask 1 Project Management Upon completion of Task Assignment SubTask 2 MAGS Well Installation May 25, 2024 SubTask 3 MAGS Testing May 25, 2024 SubTask 4 Supplemental Site Assessment Report - MAGS Study May 25, 2024
Invoice Schedule
Requirements for Invoice Submittal Amount to be Invoiced
SubTasks 1, 2, 3, & 4- Submittal & approval of SSA-2, & IDW manifest $64,480.90
October 25, 2023 www.intertek.com/building
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the MAGS Well Installation and Test is shown on the attached Cost Estimate and Level of Effort sheets, which includes the report deliverable. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW686, Bureau of Waste Cleanup, dated December 21, 2021. We anticipate performing the MAGS well installation and testing in January 2023, depending on driller availability and the tenant schedule, and a report deliverable will be provided in March 2023. The IDW manifest copy will be provided upon receipt.
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075 or (813) 267-2519.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Michael Rothenburg, PE, CIH Nana Westmark, PG, CHMM Senior Engineer Senior Geologist / Contract Manager
Enclosures: Cost Estimate Level of Effort Site Sketch of Proposed MAGS Wells Drilling Bids
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-------Touch of Quality Deep MAGS\Proposal\Touch of Quality ERIC_4254 Deep MAGS 0552-411171.docx
Intertek PSI 10/5/2023
PN231004-129292
Inverness FL
Nana Westmark 1128 Sterling Street nana.westmark@intertek.com Inverness
813.267.2519 Florida
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Subtotal Mobe/Demobe 1 lump sum 3,000.00$ 3,000.00$ GPR Services no bid Rig Charge (per day) 10 day 4,600.00$ 46,000.00$ Gas Wells (Materials & Install) 318 foot 18.00$ 5,724.00$ Vault Construction 13 each 225.00$ 2,925.00$ 55-gallon DOT drums 18 each 100.00$ 1,800.00$
Pre-Tax Total Tax Percentage Taxes Quote Total
Contact Name Project Address Email Project City Phone Project State
Shallow Wells: Drill 6 borings with 4"x6" sonic to 8'. Install 2" Sch40 PVC well with 7' of regular .010-slot screen. Sand pack will be placed to top of the screen and a 6" seal of bentonite chips will be placed on the sand pack. No grout will be installed.
Intermediate Wells: Drill 3 borings with 4"x6" sonic to 25'. Install 2" Sch40 PVC well with 10' of regular .010-slot screen. Sand pack will be placed to 2' above the top of the screen and sealed with 2'-thick layer of bentonite chips. After 1 hour of hydration, the remaining annular space will be filled with bentonite-cement grout to within 1' of the surface.
Deep Wells: Drill 3 borings 4"x6" sonic to 50' and 1 boring with 4"x6" sonic to 45'. Install 2" Sch40 PVC well with 15' of regular .010-slot screen. Sand pack will be placed to 2' above the top of the screen and sealed with 2'-thick layer of bentonite chips. After 1 hour of hydration, the remaining annular space will be filled with bentonite-cement grout to within 1' of the surface.
If borings are backfilled with bentonite-chips to a shallower depth for well installation, the backfill will be charged at the Gas Wells (Materials & Install) rate provided below.
Complete all wells with 2'x2' concrete pads and 12" flushmount manhole cover. Install a well ID label. All pads are expected to be build in asphalt-paved areas. No development is expected.
No union/prevailing wages or additional training is expected.
Work schedule will be 10/4 rotations with daily work hours of 7am - 5pm including lunch and safety meetings.
Level D PPE is expected.
Cascade estimates 10 days to complete this project. All quantities are estimates. Actual accrued totals will be invoiced. Day rate includes a crew of 2. Additional crew at the site will require additional charges. Standby, if accrued, is included in the day rate (including hydration or curing time ). Cascade will offer no-bid on the GPR Services. This service will need to be provided by a utility-locate subcontractor separate from Cascade.
Description
$59,449.00
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Number
Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator
This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig
Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade.
Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials.
Florida: 5785 SW 6TH PL STE 101, OCALA FL 34474 ♦ (352) 237-1995
$59,449.00
Intertek PSI 10/5/2023
PN231004-129292
Inverness FL
Nana Westmark 1128 Sterling Street nana.westmark@intertek.com Inverness
813.267.2519 Florida
Cascade Rep Contact Information
Contact Name Project Address Email Project City Phone Project State
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Number
Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator
Signature of Authorized Cascade Representative
Name & Title of Authorized Cascade Representative
Date Date
Signature of Client/Owner Authorized Representative
Cascade will perform the Work as described in this proposal subject to the terms and conditions posted at https://cascade-env.com/resources/other/terms-and-conditions/ unless MSA is already established between Cascade and Client in which case MSA takes precedence over the aforementioned terms and conditions. By signing this proposal, Client agrees that this proposal together with the terms and conditions referenced above constitute a Subcontract. Client acknowledges that
Client has received and agrees with all such documents in the form provided by Cascade. Terms and Conditions are posted and accessible at the website location set forth above.
Name & Title of Authorized Representative and Company
Units
Phone: 727-561-7477 Email: kevin@pdsflorida.com Contact: Kevin Bonacum
Name, Title. Kevin Bonacum, Director of Safety & Business Development Page 1 of 3 Touch of Quality ERIC_ 4254
Estimated start date: Provide a tentative schedule.
Company Name: Preferred Drilling Solutions, Inc.
Address: 8820 66th Street North, Pinellas Park, FL 33782
All equipment to be decontaminated prior to boring / well installation.
OSHA HazWOPER trained crew required.
Include per diem in cost, if necessary.
Facility is a drycleaners laundromat, no actual drycleaning, parking is tight.
Asphalt surface.
Signed PSI Purchase Order with General Conditions (attached) is required before working.
55-gallon DOT approved drums (each) $ 75.00
Total:
Gas Wells (Materials and Install), per foot $ 65.00
Vault Construction $ 300.00
Ground Penetrating Radar utility locate (clear well locations only) $ 1,500.00
Rig Charge (per day) $ -
Unit Rate
Mobilization (lump sum) $ 2,750.00
Touch of Quality Cleaners (operating as Pronto Cleaners) 1128 Sterling Street, Inverness, Citrus County
ERIC_4254
Proposed Scope of Work: Sonic Drilling Required Installation of thirteen (13) MAGS Wells (vapor monitoring wells).
1. Six (6) shallow wells 8 foot deep, screened from 1 - 8 feet bls
2. Three (3) intermediate wells - 25 feet deep, screened from 15 - 25 feet bls.
3. Three (3) deep wells - 50 feet deep, screened from 35 - 50 feet bls.
4. One (1) deep well - 45 feet deep, screened from 30 - 45 feet bls.
5. All wells will be two inch diameter, with Schedule 40 PVC, with filter pack and bentonite seal.
6. Deep wells are to be installed approximately one foot above water table if water table is encountered (not likely).
7. Water table estimated at ~60 - 70 feet bls.
8. Needs 12" manhole cover.
9. Leave 6 inch clearance between grout and manhole cover (so that a compression fitting can be installed later)
10. Install well pipe in the center of manhole to allow room to modify later. .
11. Provide ID label on well.
Professional Service Industries, Inc. (PSI) Request for Quotation
Facility Name Facility Location Facility ID FDEP Drycleaning Solvent Cleanup Program
0552628
DJG
OFFICE BUILDING
Proposed MAGS well - intermediate 15 - 5 feet screen bis
• -$- MW01J
Proposed MAGS well - 35 - 50 feet screen, except for one from 30 - 45 feet screen LIGHT POLE¢- <>
LIGHT POLE
MW012
-$-IMW015
(22.74)
WATER \
METERS
LEGEND
-$- MONITOR WELL LOCATION UMVI IJUY MDNI IDR WlLL
IMW - INTERMEDIATE MOIIITOR WELL
,IW MONITOR VIELL
H- MISSING / DESTROYC:D INVERNESS
AN1MAL
HOSPITAL
DU .L 01IAS[ R[COVrnY WELL LOCATION (DRW)
.& VAPOR P7ASE RECCVERY WELL LOCATION (VRW) (22.49) APFRCXIMATE GROUNDWATER ELEVATION (FT)
---- GROUNDWATER FLOW DIRECTION
-22.60 APFRCXIMATE LINE OF EQUAL GROUl,DWATER r lLlVAIIDN (r I.)
NCTE SITE PLAN PROVIDED BY WRS COMPASS
IM•W023
-$- MW024 Proposed MAGS Wells int<?rt<?k•
0 50 100
AP"ROXIMATE SCALE IN FEET
INTERMED
TOUCH OF QUA
1128 STERLING ST
FDEP ID No. ERIC_
4122121
SCALE 1"=50'
OFFICE BUILDIDDDD NG
d MAGS well - intermediate 15 - 5 feet screen bis
-$- MW01J
om 30 - 45
(22.74)
RNESS
WATERATERATATATERATATATERATATER ELELEELEELELELEELEVATEVATEEVATEVATVEVATEV ION IONONIOONONIOOIOON (FT)(((FT)((FT) ooooooooooooooooppppppppppppppppppppppppppppposseed
4 Deep MAGS install bid spec
$ 1,875.00
$ 30,695.00
$ 20,670.00
$ 3,900.00
$ 1,500.00
Extended Price
$ 2,750.00
Sonic Auger DPT Injection Well Abandonment
REVISED DATE: 10/10/2023
ESTIMATE #: 1023023
Intertek
ID QTY Unit Rate TOTAL
1 1 each 1,000.00$ 1,000.00$
2 3 night 450.00$ 1,350.00$
3 Sonic Rig and Crew 3 day 4,250.00$ 12,750.00$
3a Sonic Rig and Crew (If Needed) 1 1/2 day 2,000.00$ 2,000.00$
4 Materials: 2" Sch 40 PVC Well Installation 318 foot 14.00$ 4,452.00$
5 2' x 2' Concrete Pad w/12" BD Completion 13 each 250.00$ 3,250.00$
6 Well Development (Up to 1/2 hour with pump) each 75.00$ -$
7 Refurbished Drums (Soil) Estimate 4 each 65.00$ 260.00$
8 Refurbished Drums (Water) As Needed each 65.00$ -$
9 Bobcat Loader for IDW and Tooling Management 1 each 1,000.00$ Included
10 Water Meter Rental and Use 1 each 500.00$ 500.00$
11 1 each 1,200.00$ 1,200.00$
12 Permits (SWFLWMD-N/A for FDEP Sites) -$
Subtotal 26,762.00$
TTodd Hodgson Todd Hodgson TOTAL 26,762.00$ Partner
Tampa, Florida Inverness, Citrus County, Florida5801 Benjamin Drive, Ste 112
(813) 886-1075 Sonic Well Installation
PROJECT
Touch of Quality Cleaners 1128 Sterling Street
CUSTOMER
Nana Westmark
THANK YOU FOR YOUR BUSINESS!
DESCRIPTION
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
Project Description:
Borehole Clearance to 5’ bgs >20 minutes will require a change order for additional time and costs.
(3) 2" x 25 PVC Well w/10' of .010 Screen 2' x 2' Pad w/12" BD Completion. No Soil Sampling
(6) 2" x 8' PVC Well w/7' of .010 Screen 2' x 2' Pad w/12" BD Completion. No Soil Sampling
ROW Permits and MOT Responsibility of the Client
(3) 2" x 50' PVC Well w/15' of .010 Screen 2' x 2' Pad w/12" BD Completion. No Soil Sampling
(1) 2" x 45' PVC Well w/15' of .010 Screen 2' x 2' Pad w/12" BD Completion. No Soil Sampling
Per Diem - Est. 3 Man Crew Est. (Hotel Cost + $50/per man)
Vapor Extraction Wells - No Well Development
"Actual quantities used and days onsite will be invoiced"
Completion: 3 to 3.5 Days
Mobilization
Locations must be accessible with track mounted DPT Rig
Damage to utilities on private property are the responsibility of the client Utility Locates on Private Property are the responsibility of the client
GPR Study Prior to Mobilization
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586