This document is a Task Assignment (TA) under Contract HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI). The task assignment, designated DC009B, authorizes PSI to conduct twelve months of operations and maintenance, remedial action system status reporting, and groundwater monitoring for the former Main Street Cleaners site (ERIC_5423) located at 1679 Main Street in Sarasota, Sarasota County, Florida. The project is being managed by Skylar Schwed for FDEP and Nana G. Westmark for PSI, with a completion date of July 30, 2024.

The scope of work consists of nine subtasks including project management, quarterly operations and maintenance of the soil vapor extraction system, two remedial action system status reports, annual groundwater monitoring, and utilities for system operation. The total contract value is $66,185.40, comprised of $59,345.40 in fixed unit rate costs and $6,840.00 in cost reimbursement for utilities. Invoicing is structured in three phases: the first invoice for $21,740.15 upon receipt of first and second quarter deliverables, the second for $37,125.25 upon receipt of third and fourth quarter deliverables and annual reports, and the third for $7,320.00 upon receipt of utility invoices. Deliverables are scheduled quarterly with final reports due by May 30, 2024, and work is to be performed in accordance with the terms and conditions of the underlying contract and the attached scope of work received on April 10, 2023.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003E.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC13BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW686

DC009B Completion July 30, 2024

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct 12 months of Operations and Mantienence in accordance with the PSI scope of work, cost estimate, and schedule received on April 10 2023.

Skylar Schwed 850-245-8795 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Professional Service Industries, Inc. (Intertek-PSI)

Professional Service Industries, Inc. (Intertek-PSI)

Nana G. Westmark 813-886-1075

ERIC_5423

1679 Main Street Sarasota, Sarasota County, Florida

Main Street Cleaners

✔ $ 59,345.40 ✔ $ 6,840.00

$ 66,185.40

Scope of Work

Nana Westmark

Senior Geologist / Principal Consultant

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.06.14 14:28:22 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.06.14 13:06:30 -04'00'

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW686 Task Assignment #: DC009B

Deliverables:

Deliverable Deliverable Due Date Q1 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 2

8/20/2023

Q2 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 3

11/20/2023

Remedial Action Status Report - Subtask 4 11/30/2023

Q3 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 5

2/20/2024

Q4 - Quarterly operation and maintenance (O&M) email submittal including field documentation, laboratory reports, and tables - Subtask 6

5/20/2024

Annual Remedial Action Status Report with GWM report & PM Subtasks 1, 7 & 9

5/30/2024

Subtask 8 utility invoices for 12 months; Utilities (Cost Plus Fixed Fee) = not to exceed $6,840; Utilities Handling Fee = $480 6/30/2024

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Q1 and Q2 - Quarterly O&M email submittals including field documentation, laboratory reports, and tables - Subtasks 2 and 3; AND Remedial Action Status Report - Subtask 4 $21,740.15

Q3 and Q4 - Quarterly O&M email submittals including field documentation, laboratory reports, and tables - Subtasks 5 and 6; AND Remedial Action Status Report with GWM Reprort - Subtask 7& 9 AND PM Subtask 1

$37,125.25

FDEP receipt of utility invoices for 12 months; Utilities (Cost Plus Fixed Fee) = not to exceed $6,840; Utilities Handling Fee = $480 - Subtask 8

$7,320.00

TOTAL COST $66,185.40

BWC TAFORM 01_18

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW686 Contract Negotiation File Main Street Cleaners ERIC_5423 1679 Main Street Sarasota, Sarasota County, Florida Skylar Schwed, Project Manager May 31, 2023

Subject: Negotiation Summary

HW686 DC009B

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct 12 months of operation and maintenance in accordance with the PSI scope of work, cost estimate, and schedule received on April 10th, 2023.

PSI confirmed on April 10th, 2023 that an Access Agreement with the current real property owner of the Main Street Cleaners (ERIC_5423) site has been executed.

The original Task Assignment totaled $66,196.40 with 394.9 labor hours but after negotiations and corrections with contractor costs are reflected as below:

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $66,185.40 with 394.9 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 4/10/2023

Task #: SubTask 1 Project Management SubTask 6 4th Qtr Monthly O&M

Site: Main Street Cleaners ERIC_5423 SubTask 2 1st Qtr Monthly O&M SubTask 7 RASS

Activity/Phase: SubTask 3 2nd Qtr Monthly O&M SubTask 8 Utilities

Project Manager: Nana Westmark SubTask 4 RASS SubTask 9 Groundwater Monitoring

SubTask 5 3rd Qtr Monthly O&M SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.99 Project Manager 31.4 31.4 $64.90 Principal Consultant, DC 0.0 0 0 0 0 0 0 0 0.0 0 $60.00 Senior Engineer, MR 25.0 3.0 3.0 5.0 3.0 3.0 8.0 0.0 0.0 0 $56.99 Senior Geologist, NW 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0 $40.87 Project Engineer, MK 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.62 Certified Industrial Hygientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $56.50 Certified Hazardous Materials Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $57.69 Senior Geologist, MR 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $43.27 Project Engineer, IK 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $43.27 Project Engineer, JN 144.0 19.0 19.0 32.0 19.0 19.0 36.0 0.0 0.0 0 $37.00 Project Geologist, SAM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.77 Project Scientist, RF 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $33.74 Project Scientist, SB 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $25.00 Staff Scientist, QH 25.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 25.5 0 $29.86 GIS Specialist, DG 10.0 0.0 0.0 2.0 0.0 0.0 8.0 0.0 0.0 0 $24.04 Staff Scientist, OG 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $28.85 Staff Scientist, RP 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $31.51 Remediation Coordinator, RH 156.0 33.0 32.0 0.0 33.0 32.0 0.0 0.0 26.0 0 $30.91 Environmental Specialist, CC 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $22.06 Environmental Specialis, MZ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $21.26 Environmental Specialist, DK 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $20.81 Administrative Assistant, BM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.50 Secretary 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

Total Hours 394.9 31.4 55.0 54.0 39.0 55.0 54.0 52.0 0.0 54.5 0

Direct Labor $15,541.47 $1,787.96 $2,041.96 $2,010.45 $1,744.36 $2,041.96 $2,010.45 $2,276.60 $0.00 $1,627.73 $0.00

Overhead 151.02% $23,470.73 $2,700.18 $3,083.77 $3,036.18 $2,634.33 $3,083.77 $3,036.18 $3,438.12 $0.00 $2,458.20 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $39,012.20 $4,488.14 $5,125.73 $5,046.63 $4,378.69 $5,125.73 $5,046.63 $5,714.72 $0.00 $4,085.93 $0.00

REV: 02/03 CEF PSI-Intertek Page 1

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 4/10/2023

Task #: SubTask 1 Project Management SubTask 6 4th Qtr Monthly O&M

Site: Main Street Cleaners ERIC_5423 SubTask 2 1st Qtr Monthly O&M SubTask 7 RASS

Activity/Phase: SubTask 3 2nd Qtr Monthly O&M SubTask 8 Utilities

Project Manager: Nana Westmark SubTask 4 RASS SubTask 9 Groundwater Monitoring

SubTask 5 3rd Qtr Monthly O&M SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel Vehicle Rental $1,800.00 $360.00 $360.00 $0.00 $360.00 $360.00 $0.00 $0.00 $360.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,800.00 $360.00 $360.00 $0.00 $360.00 $360.00 $0.00 $0.00 $360.00 $0.00

Subcontractor (Equipment Procurement) Well Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100.00 $0.00

Utilities $6,840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,840.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $6,940.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,840.00 $100.00 $0.00 Handling Fee $490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $480.00 $10.00 $0.00 Total Subcontractor Cost $7,430.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,320.00 $110.00 $0.00

Laboratory Analytical Costs $5,407.00 $1,398.00 $466.00 $0.00 $1,398.00 $466.00 $0.00 $0.00 $1,679.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 $150.00 $150.00 $0.00 $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6,007.00 $1,548.00 $616.00 $0.00 $1,548.00 $616.00 $0.00 $0.00 $1,679.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $600.00 $120.00 $120.00 $0.00 $120.00 $120.00 $0.00 $0.00 $120.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $7,435.00 $1,305.00 $1,305.00 $0.00 $1,305.00 $1,305.00 $0.00 $0.00 $2,215.00 $0.00 Total Field Expenses $8,035.00 $1,425.00 $1,425.00 $0.00 $1,425.00 $1,425.00 $0.00 $0.00 $2,335.00 $0.00

Subtotal $62,284.20 $4,488.14 $8,458.73 $7,447.63 $4,378.69 $8,458.73 $7,447.63 $5,714.72 $7,320.00 $8,569.93 $0.00 Completion Fee $3,901.20 $448.81 $512.57 $504.66 $437.87 $512.57 $504.66 $571.47 $0.00 $408.59 $0.00

Total Estimated Cost $66,185.40 $4,936.95 $8,971.30 $7,952.29 $4,816.56 $8,971.30 $7,952.29 $6,286.19 $7,320.00 $8,978.52 $0.00

REV: 02/03 CEF PSI-Intertek Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Main Street Cleaners ERIC_5423 SubTask 2 1st Qtr Monthly O&M

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Remediation Coordinator, R Hanson Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 33

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 6 $1,200.00

Summa cannisters $33.00 6 $198.00 $1,398.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $1,548.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

EQUIPMENT PROCUREMENT RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

TO-15 (VOCs) (Qtr infl and eff, + 4 SVE air samples)

FINAL --7/24/96

Page 3 Main St ERIC_5423 0552-397343

SubTask 3 2nd Qtr Monthly O&M

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Remediation Coordinator, R Hanson Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr) $200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 4 Main St ERIC_5423 0552-397343

SubTask 4 RASS

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2 Sign and Seal RASS 1

Total hours: 5

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8

Total hours: 32

CADD / GIS Specialist, D Grove Prepare figures for RASS 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 5 Main St ERIC_5423 0552-397343

SubTask 5 3rd Qtr Monthly O&M

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19

Remediation Coordinator, R Hanson Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 33

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 6 $1,200.00

Summa cannisters $33.00 6 $198.00 $1,398.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $1,548.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (infl and eff, + 4 SVE air samples)

Page 6 Main St ERIC_5423 0552-397343

SubTask 6 4th Qtr Monthly O&M

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19

Remediation Coordinator, R Hanson Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr,) $200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large , overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 7 Main St ERIC_5423 0552-397343

SubTask 7 RASS

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5 Sign and Seal RASS 1

Total hours: 8

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8

Total hours: 36

CADD / GIS Specialist, D Grove Prepare figures for RASS 8

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 8 Main St ERIC_5423 0552-397343

SubTask 8 Utilities

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

FPL Electric $450.00 Month 12 $5,400.00

Century Link Phone $120.00 Month 12 $1,440.00 $6,840.00

Handling fee Electric $20.00 Month 12 $240.00 Handling fee phone $20.00 Month 12 $240.00

$480.00

$0.00

TOTAL $7,320.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 9 Main St ERIC_5423 0552-397343

SubTask 9 Groundwater Monitoring

DATE: 4/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark event lab kit request, equipment selection, tenant notification 3

Remediation Coordinator, R Hanson Field preparation 1 Travel (3 roundtrips for gw sampling) 9 Collect groundwater samples 8 shallow wells @ 1 hour each 8 2 intermediate wells @ 1.5 hrs each 3 2 deep well @ 2 hours each 4 Documentation of groundwater sampling & measurements 1

Total hours: 26

Staff Scientist, Q Haydon Travel (3 roundtrips for gw sampling) 9 Collect groundwater samples 7 shallow wells @ 1 hour each 7 1 intermediate wells @ 1.5 hr each 1.5 2 deep well @ 2 hours each 4 stage IDW drum 1 pickup, drop off sample kits 2 Documentation of groundwater sampling & measurements 1

Total hours: 25.5

TOTAL LABOR 54.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

$0.00

Petrotech Southeast, Inc. IDW transport & disposal 1 $100.00 $100.00 $0.00 $0.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

EPA Method 8260 $73.00 22 1 $1,679.00

$1,679.00 $0.00 Sample Shipping, Large, Overnight $150.00 0 $0.00

$0.00 $0.00

TOTAL LAB $1,679.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Shallow Groundwater Sampling Kit $290.00 day 3 $870.00 Deep Groundwater Sampling Kit $415.00 day 3 $1,245.00 Drum for IDW $100.00 each 1 $2,115.00 $100.00

$2,215.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $2,335.00

Page 10 Main St ERIC_5423 0552-397343

PSI Proposal: 0552-397343 April 10, 2023

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Ms. Skylar Schwed

Environmental Specialist III Email: Skylar.Schwed@FloridaDEP.gov

Re: Proposal for 12 Months O&M / RASS Report / Groundwater Monitoring Main Street (Current Courtesy Cleaners on Main)

1679 Main Street Sarasota, Sarasota County, Florida

FDEP Facility ID No. 58 9500336 / ERIC_5423

Dear Ms. Schwed:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide remediation system Operation & Maintenance (O&M) services for twelve

(12) months, summary updates via email on a quarterly basis, documentation of the remediation system performance with the development of two Remedial Action System Status Reports, and annual groundwater monitoring for the former Main Street Cleaners located at 1679 Main Street, Sarasota, Florida. Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion. A table is attached following the Level of Efforts presenting schedules for completion, per subtask. In addition, Main Street ERIC_5423 has a signed Site Access agreement with the property owner.

PROJECT BACKGROUND

The former Main Street Cleaners (now known as Courtesy Cleaners on Main) is a pickup/drop-off drycleaning business in Sarasota, Florida. The former Main Street Cleaners was accepted in the State of Florida Drycleaning Solvent Cleanup Program in May 1997 and received a priority list scoring of 112.

The subject site is located at 1679 Main Street, on the north side of Main Street, approximately 700 feet east of the intersection of Main and Orange Avenue and within the downtown area of Sarasota. The subject site houses a standalone building that abuts a building immediately adjacent to the east. The mailto:Skylar.Schwed@FloridaDEP.gov

FDEP – Main Street Cleaners subject property was a former gasoline service station from 1930s until 1976. The building is remodeled, but the canopy, pump island, and former service bays are still visible.

The former Main Street Cleaners property is owned by the First Baptist Church of Sarasota, who also owns the property to the west across King Court, where the main sanctuary building is located. A pre-kindergarten school is located at the church property directly north of the drycleaner building.

The Limited Site Assessment / Interim Source Removal Plan conducted under the Drycleaning Solvent Cleanup Program identified drycleaning solvents in vadose zone soils and shallow groundwater on-site.

Off-site assessment of groundwater was not completed at that time. A remedial strategy for the unsaturated zone soil consisting of an SVE system was designed and implemented. The SVE system start-up occurred in August 2015. Since that time, the SVE system has been operational. Several shutdown evaluations have occurred at the Main Street Cleaners which demonstrates consistent contaminant rebound during the re-start operation.

Supplemental Assessment activities were performed in January and February 2022, and February 2023, consisting of soil sampling, monitoring well installation and sampling. The results revealed the groundwater contaminant plume has migrated further off-site, and an Off-Site Notice was filed with the FDEP in April 2022. Current plans include additional plume definition to the south.

PSI recommends continuing with the SVE operation, annual groundwater monitoring, and development of RASS reports for submittal to the FDEP.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of monthly O&M events and two Remedial Action System Status Report deliverable for the existing SVE system, and annual groundwater monitoring.

Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Three Months of O&M (First Quarter)

Operations and Maintenance will be conducted on the SVE system. The work will be conducted as follows:

a. Mobilization to the site on a monthly basis.

b. Collect monthly vacuum and air flow readings from the SVE wells.

c. Collect monthly PID readings from SVE wells and system effluent.

d. Optimize system performance and recollect system readings as necessary to confirm enhanced system operation. Based on FDEP’s recommendation, we will continue to operate SVE003, SVE004, SVE005, and SVE006 and close SVE001 and SVE002.

e. Collect quarterly system influent and effluent samples, and samples from the four operating SVE wells for analysis by Method TO-15.

f. Document system readings in the site-specific O&M checklist.

g. The system will be cycled on a 100% duty cycle as recommended by the FDEP.

h. Quarterly update via email to the FDEP on system operation.

The Level of Effort is detailed in Subtask 2.

3. Three Months of O&M (Second Quarter)

O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted via email to the FDEP each quarter.

The Level of Effort is detailed in Subtask 3.

4. Semi-Annual RASS Report

A Semi-Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance.

Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.

Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.

The Level of Effort is detailed in Subtask 4.

5. Three Months of O&M (Third Quarter)

O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and four of the SVE wells at the end of the third quarter of the year and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.

The Level of Effort is detailed in Subtask 5.

6. Three Months of O&M (Fourth Quarter)

O&M will be conducted once a month for three months as specified above. Air samples will be collected from the influent and effluent and analyzed by TO-15. A summary of system conditions will be submitted quarterly via email to the FDEP.

The Level of Effort is detailed in Subtask 6.

7. Annual RASS Report

An Annual Remedial Action System Status Report will be developed which will include an evaluation of the collected information and data for the entire year. The report will detail and summarize the monthly O&M information, along with summary tables, figures and a graphical depiction of the system performance as well as groundwater sampling and analysis. Vapor sampling results will be submitted in the RASS report. The report will be prepared in accordance with the Technical Worksheets or similar guidance documents, developed by the FDEP Drycleaning Solvent Cleanup Program.

Conclusions and recommendations will be made, which will include a summary of modifications made to the system to enhance the recovery rates or decrease system time to achieve targeted goals. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient cleanup endpoints. We understand that the Department’s goal is to achieve aggressive contaminant reduction in an efficient and cost-effective method.

The Level of Effort is detailed in Subtask 7.

8. Utilities for remediation system operation

PSI used the previous utility costs from this system as well as similar equipment at other sites as a basis for the utility costs. We are currently running the system at 100% due to the recommendations by the

FDEP.

The Level of Effort for utilities is detailed in Subtask 8.

9. Groundwater Monitoring and Reporting

PSI will conduct the annual groundwater monitoring to evaluate current groundwater quality at the site.

The following will be conducted to facilitate the groundwater evaluation.

a. Mobilization to the site.

b. Collect groundwater elevation measurements at the wells proposed for sampling.

c. Collect groundwater samples from monitor wells:

i. Shallow wells: MW001S, MW002S, MW003S, MW005S, MW006S, MW007S, MW008S, MW009S, MW010S, MW011S, MW012S, and MW013S, and the 3 new proposed shallow wells (to be installed under a separate TA).

ii. Intermediate: MW003I, MW005I, and MW006I.

iii. Deep: MW003D, MW008D, MW009D, and MW010D.

d. Submit groundwater samples to a NELAC approved laboratory for analysis of VOHs via EPA Method 8260.

e. Incorporate groundwater analytical data, physical parameters and groundwater elevation data into the RASS report.

The investigative derived waste (IDW) that will be generated during the annual groundwater monitoring includes the purge water from the monitoring wells which will be containerized in a 55-gallon drum(s) for transport and disposal at a licensed facility by an approved subcontractor.

Of note is that the recent memorandum (March 2, 2022, “Variances and Clarifications from Sampling Standard Operating Procedures Relative to the Collection/Analysis of Quality Control Samples for WSCS Sites”) clarified the FDEP guidance for collecting field blanks and duplicates. The Department will no longer require field blanks, duplicates, or travel blanks for Waste Site Cleanup Section sites, unless specifically requested by the FDEP Project Manager.

The Level of Effort for Groundwater Monitoring is detailed in Subtask 9.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the O&M for twelve months along with two RASS report deliverables, email summaries, and groundwater monitoring is shown on the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. The services will be completed on a monthly basis upon authorization.

The O&M will start in May 2023 and continue for 12 months until April 2024 with the quarterly brief summaries as a deliverable. One RASS report will be submitted at the end of November 2023 (for the months May through October 2024) and the Annual RASS report will be submitted at the end of May 2024 (months November 2023 through April 2024). Groundwater monitoring will occur in February / March 2024 with the results incorporated into the May 2024 RASS report.

The schedule is presented as follows.

Main Street Cleaners ERIC_5423 Task Proposed

Cost Schedule / Deliverable

SubTask

Project Management

$4,936.95 May 30, 2024

SubTask

1st Qtr Monthly O&M

$8,971.30 July 20, 2023 - Email Summary of 1st Qtr O&M (April, May, June)

SubTask

2nd Qtr Monthly O&M

$7,952.29 October 20, 2023 - Email Summary of O&M 2nd Qtr (July, Aug, Sept)

SubTask

RASS $4,816.56 October 30, 2023 - RASS (for 1st and 2 Qtr)

SubTask

3rd Qtr Monthly O&M

$8,971.30 January 20, 2024 - Email Summary of 3rd O&M (Oct, Nov, Dec)

SubTask

4th Qtr Monthly O&M

$7,952.29 April 20, 2024 - Email Summary of 4th Qtr O&M (Jan, Feb, March )

SubTask

RASS $6,286.19 April 30, 2024 - RASS

SubTask

Utilities $7,320.00 May 30, 2024 - Utility Invoices

SubTask

Groundwater Monitoring

$8,989.52 April 30, 2024 - results incorporated into RASS

Total Estimated Cost: $66,196.40

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Josh Newell, PE Nana Westmark, PG, CHMM Project Engineer Senior Geologist / Contract Manager

Enclosure: Cost Estimate Level of Effort IDW Bids

Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-3517 Main Street Cleaners\Proposals\2023-2024 O&M Continuation\Main St ERIC_5423 0552-397343.docx

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $148.00 $148.00 $148.00 $148.00 soil $148.00 $148.00 $148.00 $148.00 low volume fee (< 6 drums) $50.00 $50.00 $50.00 $50.00 Pick-up fee Per diem

Price Per 55-gallon drum Water $198.00 $198.00 $198.00 $198.00 Soil $198.00 $198.00 $198.00 $198.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

price upon request

Environ-Serve (formerly Clark Environmental) Mulberry, FL

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4520 or 4505.

03/24/2023 12:55 PM PAGE 1 OF 7

Scope of Work

Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required

TCLP Benzene and 4 Metals with Completed Profile required for each site

Drum Pickup /Transportation/Disposal

Drums North Florida - *Tallahassee to Panhandle not included (Pan Handle) - South Miami to Key West additional costs apply.

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0034574

DATE: 03/24/2023 PROJECT PROPOSAL

CLIENT

NANA WESTMARK

INTERTEK

5801 BENJAMIN CENTER DR, SUITE 112, TAMPA, FLORIDA, 33634

P: (813) 886-1075

PROJECT DESCRIPTION

DRUM PICKUP

VARIOUS SITES CENTRAL FLORIDA

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION 55 GAL DRUMS

NOTES:SUBJECT TO FUEL SURCHARGE,

1.00 $50.00 DRUM $50.00

STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GALLON NON HAZ DRUM

NOTES: Drum DOT Shippable Drum accessible on hard Surface

80.00 $1.00 EACH $80.00

ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00

DISPOSAL SUBTOTAL: $98.00

TOTAL JOB ESTIMATE: $198.00

03/24/2023 12:55 PM PAGE 2 OF 7

Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.

Time and Material Rates shall be charged portal to portal.

Please note that surcharges shall apply for off specification materials.

Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.

Durations and Quantities are estimated only, actual fees shall be charged as incurred.

Minimum disposal amounts may apply to bulk disposal.

Tolls are not included in transportation rates

E-manifest fees will apply to hazardous waste manifests

Demurrage charged after one hour loading & unloading

Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.

Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.

The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.

Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.

EnviroServe - Mulberry, FL facility: Energy Surcharge shall be applied to entire bill. (Currently 10%)

03/24/2023 12:55 PM PAGE 3 OF 7

Conclusions

Our services will be accordingly limited to those activities herein listed unless specific changes, additions or deletions to the scope of work are submitted in writing to this office. If there is any misunderstanding or if you have any questions, please contact the undersigned. Please note that this proposal is valid for 60 days. Pricing is subject to change without notice.

This proposal is not final until the waste stream has been properly characterized, profiled, and accepted by the disposal site.

All services to be performed in accordance with EnviroServe's standard terms and conditions.

Sincerely, STEVE HARRIS

STEPHENHARRIS2@ENVIROSERVE.COM

(863) 559-1452

ENVIROSERVE

ACCEPTANCE

ISSUANCE OF A PURCHASE ORDER BY CLIENT AND/OR INITIATION OF SERVICES BY ENVIROSERVE FOR THIS PROJECT CONSTITUTES

ACCEPTANCE OF ALL TERMS AND CONDITIONS CONTAINED HEREIN, AS WELL AS AUTHORIZATION FOR THE ABOVE NAMED

ENVIROSERVE REPRESENTATIVE, UNDER CLIENT’S INSTRUCTION AND DIRECTION, TO SIGN WASTE PROFILES, SHIPPING MANIFESTS, AND LDR FORMS ON BEHALF OF SAID NAMED GENERATOR COMPANY.

I HAVE READ AND UNDERSTAND THIS DOCUMENT IN ITS ENTIRETY AND AGREE TO ALL TERMS AND CONDITIONS CONTAINED HERE IN:

BY:

SIGNATURE DATE

TYPED/PRINTED NAME TITLE

PURCHASE ORDER #______________________

INTERTEK

QUOTE #: 0034574

03/24/2023 12:55 PM PAGE 4 OF 7

EnviroServe Inc. Terms and Conditions

The following terms and conditions apply to all materials sold and services provided by EnviroServe Inc. (“Contractor”) to the Client named on the face sheet of this Agreement and are applicable to any subsidiary and/or affiliate of Client that Contractor sells materials to or provides services on such Client’s behalf.

1. Entire and Sole Agreement: These terms and conditions, along with any terms contained on the face sheet of this Agreement, shall constitute the entire and sole agreement (“Agreement”) between Contractor and Client as to the goods sold and/or services provided, and shall supersede all prior oral or written agreements by and between Contractor and Client. These terms and conditions may not be modified, altered or canceled without the express written agreement signed by both Contractor and Client. In the case of any inconsistency between these terms and conditions and any other terms, conditions, or provisions, then the terms and conditions set forth herein shall expressly control. Client expressly waives all provisions contained in any correspondence or forms involved in this transaction which negate, limit, extend or conflict with the terms and conditions stated herein. Client agrees that it has not been induced to enter into this Agreement by any oral or written representation, guaranty or warranty made by Contractor, its employees, agents or representatives other than as expressly set forth herein or on the face sheet hereof. If any portion of this

Agreement is deemed to be illegal or unenforceable by a court of law, then the validity of the remaining portions or provision shall not be affected and shall remain in full force and effect. Notwithstanding the preceding sentence, if Contractor in its sole discretion determines that the absence of the eliminated provision is contrary to the original intention of the parties, then Contractor shall have the right to terminate this Agreement.

2. Governing Law:The validity, performance, and construction of this Agreement shall be governed in accordance with the laws of the State of Ohio. The parties agree that should any claim be made by and against the parties hereto which seeks to recover a sum less than

$25,000.00, then that claim shall be decided exclusively through the processes of the American Arbitration Association (“AAA”), and any such AAA hearing shall be conducted in Cuyahoga County, Ohio. Should any claim be made by and against the parties hereto, which seeks to recover a sum in excess of $25,000.00, the parties agree to the exclusive jurisdiction and venue to resolve such claim in the courts located in Cuyahoga County, Ohio.

3. Independent Contractor: Contractor shall be an independent contractor and shall determine the method, details, and needs for performing the job(s) covered by this Agreement. Contractor is not now, nor shall it ever become, an employee, partner, agent, or principal of Client while this Agreement is in effect. Contractor is not entitled to the rights or benefits afforded to the Client’s employees. Contractor’s review or supervision of work prepared or performed by other individuals or entities retained by others shall not relieve such individuals or entities of complete and sole responsibility for the adequacy of their work, for which such other individual and/or entity shall remain completely liable to Client and

Contractor.

4. Changes:The Client, without invalidating this Agreement, may request changes within the general scope of the services required by the initial contract between it and Contractor. Any change proposed by Client shall not become effective unless and until Contractor consents, in writing, to such change in accordance with Paragraph 1, above.Should any change result in additional cost and/or increase the time of Contractor to perform said services, then Client agrees to compensate Contractor for such additional cost and time, including, without limitation, any overhead and profit margin associated with such cost and time as solely determined by Contractor.

5.Termination:

A.)By Contractor:

Contractor may immediately terminate this agreement in the event of Client’s breach or threatened breach of any term or provision of this Agreement, including but not limited to failure to pay on a timely basis, or if Client becomes insolvent, the subject of an order for relief in bankruptcy, receivership, reorganization, dissolution, or similar law, or makes an assignment for the benefit of its creditors, or if Clients actions or inactions causes increased risk, exposure, cost or liability, or if Contractor deems itself insecure as to payment or other matters (“Default”). Notice of termination shall be in writing and deemed given when delivered in person or by certified mail, postage prepaid, return receipt requested. In the event Contractor terminates this

Agreement for Client’s Default, then Contractor, in addition to being entitled to payment for work already performed, is entitled to liquidated damages, which are not in the way of a penalty, in the amount of 15% of the total contract covered by this Agreement, including any changes approved by

Contractor through the date of termination, and reasonable attorney fees and costs of collection. Client acknowledges that the actual damage to

Contractor in the event of termination is difficult to fix or prove, and the foregoing liquidated damages amount is reasonable and commensurate with the anticipated loss to Contractor resulting from such termination and is an agreed upon fee and is not imposed as a penalty.Collection of liquidated damages by Contractor shall be in addition to any rights or remedies available to Contractor under this Agreement or at law. Contractor shall not be liable for loss or damage caused by termination of its performance.

B.)By Client:

The Client may terminate this Agreement in whole or in part at any time by written notice. On receipt of such notice, Contractor shall, except as otherwise directed in said notice, immediately discontinue services and shall, if required, make reasonable efforts to procure termination of subcontracts to which Contractor is a party.