CN-370000-HW686-DC09ECO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

Document Summary

This is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) under Contract Number HW686. The change order, dated September 9, 2025, amends Task Assignment DC009E for the Main St Cleaners project located at 1679 Main Street in Sarasota, Sarasota County (Project ERIC_5423). The primary parties are the FDEP, represented by Project Manager Mary Uribe, and the contractor, represented by Joshua Newell and Contract Manager Douglas Coleman. The task completion date remains January 30, 2026.

The change order adds industrial demolition waste (IDW) analytical and disposal costs along with the abandonment of five monitoring wells to the existing scope of work. The amended total task value increased from $16,768.51 to $20,122.71, representing an additional cost of $3,354.20. The work is structured in four subtasks with the following invoice schedule: Subtask 1 (Project Management) at $812.55; Subtask 2 (Demolition, Transport, and Disposal) at $10,428.24; Subtask 3 (Monitoring Well Abandonments) at $6,893.17; and Subtask 4 (Summary of Activities Report) at $1,988.75. All deliverables maintain their original due dates, with final completion scheduled for December 30, 2025. The cost estimate includes labor, subcontractor services (including drilling and environmental services), laboratory analytical costs, travel, equipment, and field expenses. Funding information shows the organization code as N/A.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003E.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC13BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC009E 1 HW686

Mary Uribe 8502458990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342

ERIC_5423

Main St

✔ $ 20,122.71 $ 16,768.51

$ 20,122.71 $ 16,768.51 ✔ Completion

Completion 01/30/2026 01/30/2026 0

1 1

Contractor Douglas Coleman PMP, CHMM, REM

Contract Manager

Douglas Coleman Digitally signed by Douglas Coleman Date: 2025.09.09 16:28:51 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.09 15:43:43 -04'00'

Addition of 5 MW abandonments and IDW analytical/disposal.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC009E

$ 20,122.71

Subtask 1: Project Management

Subtask 2: FDEP approval of Demolition, Transport, and Disposal of Existing Remedial System

Subtask 3: FDEP approval of Monitoring Well Abandonments

Subtask 4: FDEP approval of Summary of Activities Report

Subtask 1: FDEP approval of Project Management

Subtask 3: FDEP approval of Monitoring Well Abandonments

Subtask 4: FDEP approval of Summary of Activities Report

Subtask 2: FDEP approval of Demolition, Transport, and Disposal of Existing Remedial System

12/30/2025

09/30/2025

09/30/2025

12/30/2025

$ 10,428.24

$ 812.55

$ 6,893.17

$ 1,988.75

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jay Collins Lt. Governor

Alexis Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

ERIC_

Cleaners

Mary Uribe, Project Manager

Negotiation Summary

HW686 DC0

Total task amount $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is . Task completion date is .

F D E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-

PS

I) at e:

8/

/2

Ta sk

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Si te

M ai n

St . C le an er s

ER

IC

_5 as k

R em ed ia l S ys te m D em ol iti on

Su bT as k

Ac tiv ity /P ha se

Su bT as k

M on ito rin g W el l A ba nd on m en t

Su bT as k

Pr oj ec t M an ag er

Jo sh

N ew el l as k

Su m m ar y of

A ct iv iti es R ep or t Su bT as k

Su bT as k

Su bT as k

To ta ls

La bo r R at e C at eg or y

$4 8.

Pr oj ec t M an ag er

6.

6.

$6

4.

Pr in ci pa l C on su lta nt 0.

0.

0.

0.

0.

0.

0.

0.

$6 2.

Se ni or

E ng in ee r, G

R

.0

7.

2.

1.

0.

0.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

0.

0.

0.

0.

0.

0.

0.

0.

$4

8.

Pr oj ec t E ng in ee r, JN

.0

0.

0.

.0

0.

0.

0.

0.

$4 0.

Pr oj ec t S ci en tis t, JD

.0

.0

.0

2.

0.

0.

0.

0.

$3 3.

Pr oj ec t S ci en tis t, SB

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

Pr oj ec t S ci en tis t, SL

0.

0.

0.

0.

0.

0.

0.

0.

$3 4.

G

IS

C

AD

S pe ci al is t, D G

0.

0.

0.

0.

0.

0.

0.

0.

$2

5.

St af f S ci en tis t, M

M 0.

0.

0.

0.

0.

0.

0.

0.

$3 0.

En vi ro nm en ta l S pe ci al is t, C

C 0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ad m in is tra tiv e

As si st an t, BM

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

.1

6.

0.

D ire ct L ab or

$2

,5

.8

$2

.2

$9

.9

$6

.4

$7

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$3

,8

.9

$4

.4

$1 ,4

.3

$9

.4

$1

,0

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$6 ,4

.8

$7

.6

$2

,3

.3

$1 ,5

.8

$1

,8

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M W

A ba nd on m en t a nd

S ys te m

D em ol iti on

R E V

C E F

P S I I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-

/2 as k

Pr oj ec t M an ag em en t Su bT as k

Si te

M ai n

St . C le an er s

ER

IC

_5 as k

R em ed ia l S ys te m D em ol iti on

Su bT as k

Ac tiv ity /P ha se

Su bT as k

M on ito rin g W el l A ba nd on m en t

Su bT as k

Pr oj ec t M an ag er

Jo sh

N ew as k

Su m m ar y of

A ct iv iti es R ep or t Su bT as k

Su bT as k

Su bT as k

To ta ls

M W

A ba nd on m en t a nd

S ys te m

D em ol

Tr av el Ve hi cl e R en ta l $2

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$3

.0

$3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

W

D E nv iro nm en ta l

$5 ,6

.0

$5

,6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

N

ET

D ril lin g $4

,5

.0

$0 .0

$4

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$1 0, 8.

$6

,0

.0

$4 ,5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 ,0

.8

$6

.0

$4

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $1

1, 8.

$6 ,6

.0

$4

,9

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d Ex pe ns es

Pe rs on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $8

0.

$4 0.

$4

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$1

.0

$7 5.

$7

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$5

.0

$4

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

$1 9, 0.

$7

.6

$1

0, 5.

$6 ,7

.6

$1

,8

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $6

.0

$7

3.

$2

.9

$1

.4

$1

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$2 0, 2.

$8

.5

$1

0, 8.

$6 ,8

.1

$1

,9

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Main St. Cleaners ERIC_5423 SubTask 2 Remedial System Demolition

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, GR Tenant Notification 1 Technical Oversight; demo permit and followup 6

Total Hours: 7

Project Scientist, JD Travel (1 round trip) 4 Subcontractor Oversight and Documentation 8

Total Hours: 12

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

WD Environmental $5,640.00 $5,640.00 Erwin T&D of 2 IDW water drums and 1 IDW carbon drum $360.00 $360.00

TOTAL $6,000.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

IDW Disposal Spent Carbon

$130.00 1 $130.00 $205.00 1 $205.00

TCLP Semi-volatiles organics by GC/MS $250.00 1 $250.00 Halocarbons $73.00 1 $73.00 Purge Water Halocarbons $73.00 1 $73.00

TOTAL LAB $731.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M supplies $75.00 day 1 $75.00 Expendables $40.00 day 1 $40.00

$100.00 each 3 $300.00

TOTAL EQUIPMENT $415.00

System demolition, Transport, and Disposal

New 55-gallon Drum

TCLP 8 RCRA Metals TCLP Volatile Organics by GC/MS

FINAL --7/24/96

SubTask 3 Monitoring Well Abandonment

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, GR Tenant Notification 1 Technical Oversight 1

Total Hours: 2

Project Scientist, JD Travel (1 round trip) 4 Subcontractor Oversight and Documentation 8

Total Hours: 12

Total Hours: 0

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (Mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

NET Drilling MW Abandonment 1 $4,508.00 $4,508.00

$0.00

TOTAL $4,508.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Construction/O&M supplies $75.00 day 1 $75.00 $75.00

Expendables $40.00 day 1 $40.00

$0.00 $0.00

$115.00TOTAL EQUIPMENT

SubTask 5 Summary of Activities Report

DATE: 8/12/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, GR Review letter report 1

Project Engineer, J Newell Letter report generation 10 Technical oversight 2

Project Scientist, JD Gather report backup (field logs, disposal manifests, photos) 1 Develop photo log 1

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

$0.00 TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00

$0.00TOTAL EQUIPMENT

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-

9/

TA

C

O -1 as k

Pr oj ec t M an ag em en t Su bT as k

Si te

M ai n

St . C le an er s

ER

IC

_5 as k

R em ed ia l S ys te m D em ol iti on

Su bT as k

Ac tiv ity /P ha se

Su bT as k

M on ito rin g W el l A ba nd on m en t

Su bT as k

Pr oj ec t M an ag er

Jo sh

N ew as k

Su m m ar y of

A ct iv iti es R ep or t Su bT as k

Su bT as k

Su bT as k

To ta ls

La bo r R at e C at eg or y

$4 8.

Pr oj ec t M an ag er

0.

0.

$6

4.

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

0.

0.

$6

2.

Se ni or E ng in ee r, G R

0.

0.

0.

0.

0.

0.

0.

$5 8.

Se ni or

G eo lo gi st , N

W

0.

0.

0.

0.

0.

0.

0.

$4

8.

Pr oj ec t E ng in ee r, JN

0.

0.

0.

0.

0.

0.

0.

$4

0.

Pr oj ec t S ci en tis t, JD

0.

0.

0.

0.

0.

0.

0.

$3

3.

Pr oj ec t S ci en tis t, SB

0.

0.

0.

0.

0.

0.

0.

$3

9.

Pr oj ec t S ci en tis t, SL

0.

0.

0.

0.

0.

0.

0.

$3

4.

G

IS

C

AD

S pe ci al is t, D

G

0.

0.

0.

0.

0.

0.

0.

$2

5.

St af f S ci en tis t, M

M

0.

0.

0.

0.

0.

0.

0.

$3

0.

En vi ro nm en ta l S pe ci al is t, C C

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ad m in is tra tiv e

As si st an t, BM

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

0.

0.

D ire ct L

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M W

A ba nd on m en t a nd

S ys te m

D em ol

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

C on tra ct or

Pr of es si on al

S er vi ce

In du st rie s, In c.

(I nt er te k-

9/

TA

C

O -1 as k

Pr oj ec t M an ag em en t Su bT as k

Si te

M ai n

St . C le an er s

ER

IC

_5 as k

R em ed ia l S ys te m D em ol iti on

Su bT as k

Ac tiv ity /P ha se

Su bT as k

M on ito rin g W el l A ba nd on m en t

Su bT as k

Pr oj ec t M an ag er

Jo sh

N ew as k

Su m m ar y of

A ct iv iti es R ep or t Su bT as k

Su bT as k

Su bT as k

To ta ls

M W

A ba nd on m en t a nd

S ys te m

D em ol

Tr av el Ve hi cl e R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

W

D E nv iro nm en ta l

$0 .0

$0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

N

ET

D ril lin g $2

,1

.0

$3

$1 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $2

,1

.0

$3

.0

$1 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$2

.2

$3 6.

$1

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $2

,3

.2

$3

.0

$1 ,9

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

An al yt ic al

C os ts $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$3 ,3

.2

$0

.0

$1 ,4

.0

$1

,9

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$3 ,3

.2

$0

.0

$1 ,4

.0

$1

,9

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g

SubTask 2 Remedial System Demolition

DATE: 9/8/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, GR Tenant Notification 0 Technical Oversight; demo permit and followup 0

Total Hours: 0

Project Scientist, JD Travel (1 round trip) 0 Subcontractor Oversight and Documentation 0

Total Hours: 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

WD Environmental $0.00 $0.00 Erwin T&D of 2 IDW water drums and 1 IDW carbon drum $360.00 $360.00

TOTAL $360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

IDW Disposal Spent Carbon

$130.00 1 $130.00 $205.00 1 $205.00

TCLP Semi-volatiles organics by GC/MS $250.00 1 $250.00 Halocarbons $73.00 1 $73.00 Purge Water Halocarbons $73.00 1 $73.00

TOTAL LAB $731.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M supplies $75.00 day 0 $0.00 Expendables $40.00 day 0 $0.00

$100.00 each 3 $300.00

TOTAL EQUIPMENT $300.00

System demolition, Transport, and Disposal

TCLP 8 RCRA Metals TCLP Volatile Organics by GC/MS

New 55-gallon Drum

SubTask 3 Monitoring Well Abandonment

DATE: 9/8/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, GR Tenant Notification 0 Technical Oversight 0

Total Hours: 0

Project Scientist, JD Travel (1 round trip) 0 Subcontractor Oversight and Documentation 0

Total Hours: 0

Total Hours: 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (Mobilize from Tampa) $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

NET Drilling MW Abandonment -1 $2,756.00 ($2,756.00) NET Drilling MW Abandonment - SOW increase 1 $4,508.00 $4,508.00

$0.00

TOTAL $1,752.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Construction/O&M supplies $75.00 day 0 $0.00 $0.00

Expendables $40.00 day 0 $0.00

$0.00 $0.00

$0.00TOTAL EQUIPMENT

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 8/12/2025

Task #: SubTask 1 Project Management SubTask 6

Site: Main St. Cleaners ERIC_5423 SubTask 2 Remedial System Demolition SubTask 7

Activity/Phase: SubTask 3 Monitoring Well Abandonment SubTask 8

Project Manager: Josh Newell SubTask 4 Summary of Activities Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 Labor Rate Category

$48.00 Project Manager 6.1 6.1 $64.90 Principal Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $62.50 Senior Engineer, GR 10 7.0 2.0 1.0 0.0 0.0 0.0 0.0 0 $58.41 Senior Geologist, NW 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.00 Project Engineer, JN 12 0.0 0.0 12.0 0.0 0.0 0.0 0.0 0 $40.87 Project Scientist, JD 26 12.0 12.0 2.0 0.0 0.0 0.0 0.0 0 $33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $39.42 Project Scientist, SL 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.03 GIS / CAD Specialist, DG 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $25.48 Staff Scientist, MM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $20.81 Administrative Assistant, BM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

Total Hours 54 6.1 19 14 15 0 0 0 0.0 0

Direct Labor $2,557.89 $294.27 $927.94 $615.44 $720.24 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $3,862.93 $444.41 $1,401.37 $929.44 $1,087.71 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,420.82 $738.68 $2,329.31 $1,544.88 $1,807.95 $0.00 $0.00 $0.00 $0.00 $0.00

MW Abandonment and System Demolition

REV: 02/03 CEF PSI-Intertek Page 1

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

Date: 8/12/2025

Task #: SubTask 1 Project Management SubTask 6

Site: Main St. Cleaners ERIC_5423 SubTask 2 Remedial System Demolition SubTask 7

Activity/Phase: SubTask 3 Monitoring Well Abandonment SubTask 8

Project Manager: Josh Newell SubTask 4 Summary of Activities Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9

MW Abandonment and System Demolition

Travel Vehicle Rental $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 WD Environmental $5,640.00 $5,640 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NET Drilling $2,756.00 $0 $2,756.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $8,396.00 $5,640.00 $2,756.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $839.60 $564.00 $275.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $9,235.60 $6,204.00 $3,031.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $150.00 $75.00 $75.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $230.00 $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,126.42 $738.68 $8,768.31 $4,811.48 $1,807.95 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $642.09 $73.87 $232.93 $154.49 $180.80 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,768.51 $812.55 $9,001.24 $4,965.97 $1,988.75 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF PSI-Intertek Page 2

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW686

DC009E January 30, 2026

SVE System Demolition, Disposal, and Monitoring Well Abandonment

Mary Uribe 850-245-8990 Professional Service Industries, Inc. (Intertek-PSI)

Joshua Newell 863-712-4342

ERIC_5423

1679 Main Street Sarasota, Sarasota County

Main St Cleaners

$ 16,768.51

$ 16,768.51

Scope of Work

Professional Service Industries, Inc. (Intertek-PSI)

Douglas Coleman PMP, CHMM, REM

Contract Manager

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.08.19 09:18:36 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .