CN-370000-HW686-DC06CC03.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

Document Summary

This document package comprises Task Assignment Change Orders (TACO) and supporting documentation for a state and local contract indefinite delivery vehicle between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI). The contract, numbered HW686, pertains to environmental remediation and operations and maintenance services at the Custom Commerce site (ERIC_5234) in Florida.

The services include operation and maintenance of a soil vapor extraction (SVE) system, groundwater monitoring for volatile organic hydrocarbons (VOH) and per- and polyfluoroalkyl substances (PFAS), quarterly remedial action summary statements (RASS), project management, and a shutdown evaluation of the SVE system. TACO 2 establishes the base compensation at $63,009.18 for a 245-day period extending from February 28, 2025 to October 31, 2025, comprising $54,369.18 in labor and services costs plus $8,640.00 in utilities on a cost-plus fixed fee basis. TACO 3 increases the total task value to $72,684.42 to reconcile a Work Change Directive authorizing the shutdown evaluation and startup analysis, with a final deliverable due date of August 15, 2025 and task completion by October 31, 2025. Invoicing occurs upon FDEP approval of specific deliverables, including monthly O&M summaries, RASS reports, groundwater monitoring analytical results, and utilities documentation. The contract utilizes fixed unit rate and cost reimbursement payment mechanisms with a completion fee structure.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
CN-370000-HW686-HW008A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC006C 3 HW686

Mary Uribe • Responsibilities o As a Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342

ERIC_5234

Custom Commerce Cleaners

✔ $ 72,684.42 $ 63,009.18

$ 72,684.42 $ 63,009.18 ✔ Completion

Completion 10/31/2025 10/31/2025 0

1 1

Contractor

Digitally signed by Joshua S Newell Date: 2025.06.30 09:10:13-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.06.27 12:44:25 -04'00'

This TACO reconciles a WCD for DC006C-1 to complete a shutdown evaluation and startup analysis.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW686 Task Assignment #: DC006C-CO3

Deliverables:

Deliverable Deliverable Due Date Subtask 2 & 3: FDEP Approval of Email Summary of 1st & 2nd Qtr Monthly O&M (Nov, Dec, Jan & Feb, March, April)

5/20/2024

Subtask 4: FDEP Approval of RASS 5/30/2024 Subtask 5 & 6: FDEP Approval of Email Summary of 3rd & 4th Qtr Monthly O&M (May, June, July & Aug, Sep, Oct) 11/20/2024

Subtask 7: FDEP Approval of RASS 11/30/2024 Subtask 1, 9 & 10: FDEP Approval of Project Management, Field Package & Analytical Results for VOH Groundwater Monitoring & PFAS Groundwater Monitoring, Waste Manifest

5/30/2025

Subtask 8: FDEP Approval of Receipt of Utilities Bill for 12 months (Cost Plus Fixed Fee) Utilities not to exceed $8,640.00, handling fee = $480.00

8/15/2025

Subtask 11: FDEP approval of Shutdown Evaluation 2/20/2025

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Subtask 2 & 3: FDEP Approval of Email Summary of 1st & 2nd Qtr Monthly O&M (Nov, Dec, Jan & Feb, March, April)

15,608.33

Subtask 4: FDEP Approval of RASS 4,793.39 Subtask 5 & 6: FDEP Approval of Email Summary of 3rd & 4th Qtr Monthly O&M (May, June, July & Aug, Sep, Oct) 17,581.79

Subtask 7: FDEP Approval of RASS 6,332.12 Subtask 1, 9 & 10: FDEP Approval of Project Management, Field Package & Analytical Results for VOH Groundwater Monitoring & PFAS Groundwater Monitoring, Waste Manifest

10,177.54

Subtask 8: FDEP Approval of Receipt of Utilities Bill for 12 months (Cost Plus Fixed Fee) Utilities not to exceed $8,640.00, handling fee = $480.00

11,040.00

Subtask 11: FDEP approval of Shutdown Evaluation 7,151.25

TOTAL COST $72,684.42

BWC TAFORM 01/18

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert

Secretary

Memorandum

TO: ERIC_5234

Custom commerce Cleaners

FROM: Mary Uribe, Project Manager

SUBJECT: Negotiation Summary

HW686 DC006C-CO3

DATE: May 2nd, 2025

This summary is for a TACO that reconciles a Work Change Directive performed under DC006C. The WCD enabled PSI to complete a shutdown evaluation for the SVE system at the site at the request of DEP.

Total updated task amount is $72.684.42. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is August 15th, 2025. Task completion date is October 31st, 2025.

F D E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

PS

I)

Da te

5/

/2

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O

M as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw at er as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Jo sh

N ew el l as k

RA

SS

Su bT as k

VO

H Gr ou nd w at er M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

Su bT as k

Sh ut do w n

Ev al

To ta ls

La bo r R at e Ca te go ry $4

8.

Pr oj ec t M an ag

.3

.3

$6 4.

Pr in ci pa l C on su lta nt

, D C

0.

0.

0.

0.

$6

2.

Pr oj ec t E ng in ee r, G R

5.

0.

0.

0.

0.

0.

0.

0.

0.

0.

5.

$6 0.

Se ni or

E ng in ee r, M

R

.0 3.

3.

4.

3.

3.

7.

0.

0.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

6.

0.

0.

0.

0.

0.

0.

0.

3.

3.

0.

$4 0.

Pr oj ec t E ng in ee r, M

K 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

Ce rt ifi ed

In du st ria l H yg ie nt ist 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

6.

Ce rt ifi ed

H az ar do us M at er ia ls

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 7.

Se ni or

G eo lo gi st , M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

3.

Pr oj ec t E ng in ee r, JN

1.

.0

.0

.0

.0

.0

.0

0.

0.

0.

0.

$4 8.

Pr oj ec t E ng in ee r, JN

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

.0

$3 7.

Pr oj ec t G eo lo gi st , S

AM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

Pr oj ec t S ci en tis t, SL

0.

0.

0.

0.

0.

0.

0.

0.

0.

3.

0.

$3

3.

Pr oj ec t S ci en tis t, SB

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

5.

St af f S ci en tis t, RP

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 4.

GI

S Sp ec ia lis t, DG

.0 0.

0.

2.

0.

0.

8.

0.

0.

2.

0.

$2

4.

St af f S ci en tis t, O

G 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

8.

St af f S ci en tis t, RP

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S ci en tis t, M M

5.

.0

.0 0.

.0

.0 0.

0.

0.

0.

.0 $3

0.

En vi ro nm en ta l S pe ci al ist , C

C

.0 0.

0.

0.

0.

0.

0.

0.

.5 5.

0.

$2

8.

En vi ro nm en ta l S pe ci al ist , D

K 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

En vi ro nm en ta l S pe ci al ist , M

P 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

0.

Ad m in ist ra tiv e As sis ta nt , B

M 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

2.

$1

5.

Se cr et ar y 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

3.

.3

.0

.0

.0

.0

.0

.0 0.

.5

.5

.0

Di re ct La bo r

$1 6, 7.

$1

,8

.4

$1 ,8

.4

$1

,8

.9

$1 ,7

.9

$1

,8

.4

$2 ,1

.7

$2

,2

.2

$0 .0

$6

.3

$5

.5

$1

,6

.6

O ve rh ea d

1.

$2

4, 4.

$2 ,8

.9

$2

,7

.7

$2 ,7

.2

$2

,6

.6

$2 ,7

.7

$3

,2

.4

$3 ,4

.2

$0

.0

$9

.1

$8

.7

$2 ,5

.1

Ge n

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or

$4 1, 2.

$4

,7

.4

$4 ,5

.2

$4

,6

.2

$4 ,3

.6

$4

,5

.2

$5 ,3

.1

$5

,7

.4

$0 .0

$1

,6

.5

$1 ,3

.3

$4

,2

.8

R E V

C E F

P S I I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

5/

/2 as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Jo sh

N ew as k

RA

SS

Su bT as k

VO

H Gr ou nd w at er M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

Su bT as k

Sh ut do w n

Ev al

To ta ls

Tr av el Ve hi cl e Re nt al

$1 ,9

.0

$3

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

$2

.0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $1

,9

.0

$3

.0

$3

.0

$0 .0

$3

.0

$3

.0

$0

.0

$0 .0

$2

.0

$0

.0

$2

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m en t)

W l M at er ia ls $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s P ro cu re m

Dr ill in g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Dr ill in g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

La bo ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

Ut ili tie s $1

0, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 0, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $1

0, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 0, 0.

$1

.0

$0

.0

$0 .0

Ha nd lin g Fe e $6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$6

.0

$1

0.

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 1, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

1, 0.

$1

.0

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$6 ,3

.0

$4

.0

$1

,1

.0

$0 .0

$4

.0

$2

,3

.0

$0 .0

$0

.0

$5

.0

$0 .0

$1

,3

.0

Fa st

T ur na ro un d

Ch ar ge s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $6

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $6

,9

.0

$6

.0

$1 ,3

.0

$0

.0

$6

.0

$2 ,4

.0

$0

.0

$0 .0

$5

.0

$0

.0

$1 ,3

.0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$6

.0

$1

.0

$1

.0

$0 .0

$1

.0

$1

.0

$0

.0

$0 .0

$8

0.

$0 .0

$8

0.

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$6 ,7

.0

$1

,3

.0

$1 ,3

.0

$0

.0

$1 ,3

.0

$1

,3

.0

$0 .0

$0

.0

$6

.0

$0 .0

$8

.0

To ta l F ie ld

E xp en se s $7

,4

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$1

,4

.0

$1 ,4

.0

$0

.0

$0 .0

$7

.0

$0

.0

$9

.0

Su bt ot al

$6 8, 8.

$4

,7

.4

$6 ,9

.2

$7

,7

.2

$4 ,3

.6

$6

,9

.2

$9 ,6

.1

$5

,7

.4

$1 1, 0.

$3

,3

.5

$1 ,3

.3

$6

,7

.8

Co m pl et io n

Fe e

$4 ,1

.2

$4

.5

$4

.2

$4

.6

$4

.7

$4

.2

$5

.1

$5

.6

$0

.0

$1

.2

$1

.4

$4

.3

To ta l E st im at ed C os t

$7 2, 4.

$5

,2

.0

$7 ,4

.4

$8

,1

.8

$4 ,7

.3

$7

,4

.4

$1 0, 2.

$6

,3

.1

$1 1, 0.

$3

,5

.7

$1 ,4

.7

$7

,1

.2

R E V

C E F

P S I I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Custom Commerce ERIC_5234 SubTask 2 1st Qtr Monthly O&M

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Staff Scientist, M Mater Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

EQUIPMENT PROCUREMENT RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

TO-15 (VOCs) (infl and eff)

FINAL --7/24/96

Page 4 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 3 2nd Qtr Monthly O&M

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19 Staff Scientist, M Mater Monthly

Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 33

TOTAL LABOR 55

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (4 SVE wells, infl and eff) $200.00 5 $1,000.00

Summa cannisters $33.00 5 $165.00 $1,165.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $1,315.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 5 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 4 RASS

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2

Total hours: 4

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8 Sign and Seal RASS 1

Total hours: 33

CADD / GIS Specialist, D Grove Prepare figures for RASS 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 6 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 5 3rd Qtr Monthly O&M

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4

Total hours: 19

Staff Scientist, M Mater Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 2

Total hours: 32

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (monthly infl and eff, + one event of 4 SVE air samples at beginning of quarter)

Page 7 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 6 4th Qtr Monthly O&M (& shutdown evaluation)

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Quarterly email summary to FDEP 4 Shutdown evaluation 5

Total hours: 24

Staff Scientist, M Mater Month 10 (Shutdown Evaluation) Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly (System re-start) Field preparation 1 Mobilization 3 Conduct O&M, optimize performance, allow one pore volume 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 4 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 4

Total hours: 36

TOTAL LABOR 63

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 10 $2,000.00

Summa cannisters $33.00 10 $330.00 $2,330.00

Shipping, large , overnight $150.00 1 $150.00

TOTAL LAB $2,480.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (infl and eff per Qtr,) + one event to include 4 SVE wells

Page 8 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 7 RASS

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5

Total hours: 7

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8 Sign and Seal RASS 1

Total hours: 37

CADD / GIS Specialist, D Grove Prepare figures for RASS 8

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 9 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 8 Utilities

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson System evaluation 0 Evaluate data 0 Review Email summary and recommendations 0

Total hours 0

Project Engineer, J Newell Provide oversight and technical support (2 hr/monthly) 0 O&M checklists (1 hr/month) 0 Update Tables 0 System review and quarterly email summary to FDEP 0 Generate recommendations based on data review 0

Total hours 0 Staff Scientist, M Mater Shutdown

Field preparation 0 Mobilization 0 Conduct O&M 0 Collect vacuum influence / vacuum flow measurements 0 Monthly recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0

Startup Field preparation 0 Mobilization 0 Conduct O&M 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0 Additional hours to collect vapor analytical samples 0

Total hours 0

Administrative Assistant B MaynardieGenerate invoicing backup for additional months 0 Total hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric $600.00 Month 15 $9,000.00

Century Link Phone $120.00 Month 12 $1,440.00 $10,440.00

Handling fee Electric $20.00 Month 18 $360.00 Handling fee phone $20.00 Month 12 $240.00

$600.00

$0.00

TOTAL $11,040.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 TO-15 (VOCs) (monthly infl and eff) $200.00 0 $0.00 Summa cannisters $33.00 0 $0.00 Shipping, large, overnight $150.00 0 $0.00

$0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction/O&M/Pilot Test Kit $360.00 day 0 $0.00 Construction/O&M supplies $75.00 day 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 10 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 9 VOH Groundwater Monitoring

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark event lab kit request, equipment selection, tenant notification 3 Total hours: 3

Environmental Specialist, CC Field preparation 1 Travel (1 roundtrips for gw sampling) 3 Collect groundwater samples 6 shallow wells @ 1 hour each 6 1 intermediate wells @ 1.5 hrs each 1.5 Documentation of groundwater sampling & measurements 2 Stage Drum 1 Pick-up, / Drop off sample kits 1

Total hours: 15.5

TOTAL LABOR 18.5

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

$0.00

Petrotech Southeast, Inc. IDW transport & disposal 1 $100.00 $100.00 $0.00 $0.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

EPA Method 8260 $73.00 7 1 $584.00 PFAS Analyses to be provided by FDEP

$584.00 $0.00 $0.00

$0.00 $0.00

TOTAL LAB $584.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00

Drum for IDW $100.00 each 1 $580.00 $100.00 $680.00

Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $760.00

Page 11 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 10 PFAS Groundwater Monitoring

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities PFAS Sampling

Environmental Specialist, CC Additional decontamination for PFAS 2 Documentation of PFAS groundwater sampling 1 Inventory cooler, prepare cooler for shipping to FDEP 2.5

Total Hours: 5.5

Project Scientist, S Luth Prepare field deliverable and PFAS analytical results Total Hours: 3

GIS / CAD Specialist, D Grove Create maps, figures Total Hours: 2

Senior Geologist, N Westmark Provide Evaluation and email summary 1 Data review, develop deliverable 2

Total Hours: 3

TOTAL LABOR 13.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$834.20 week 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

55--gallon drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $120.00 day 0 $0.00

$420.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $73.00 0 0 0 $0.00 PFAS Analyses to be provided by FDEP $104.00 0 $0.00

$0.00

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Petrotech IDW drum pickup 0 $125.00 $0.00

TOTAL $0.00

NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025 Page 12 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 11 Shutdown Eval

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson System evaluation 3 Evaluate data 1 Review Email summary and recommendations 1

Total hours 5

Project Engineer, J Newell Provide oversight and technical support (2 hr/monthly) 4 O&M checklists (1 hr/month) 2 Update Tables 2 System review and quarterly email summary to FDEP 6 Generate recommendations based on data review 2

Total hours 16 Staff Scientist, M Mater Shutdown

Field preparation 1 Mobilization 3 Conduct O&M 2 Collect vacuum influence / vacuum flow measurements 1 Monthly recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Startup Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1 Additional hours to collect vapor analytical samples 3

Total hours 22

Administrative Assistant B MaynardieGenerate invoicing backup for additional months 2 Total hours 2

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric $600.00 Month $0.00

Century Link Phone $120.00 Month 0 $0.00 $0.00

Handling fee Electric $20.00 Month $0.00 Handling fee phone $20.00 Month 0 $0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 TO-15 (VOCs) (monthly infl and eff) $200.00 5 $1,000.00 Summa cannisters $33.00 5 $165.00 Shipping, large, overnight $150.00 1 $150.00

$0.00 $0.00

TOTAL LAB $1,315.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M supplies $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

$0.00

TOTAL EQUIPMENT $950.00

Page 13 NEW CO-3 Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

5/

/2 as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Jo sh

N ew as k

RA

SS

Su bT as k

VO

H Gr ou nd w at er M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

Su bT as k

Sh ut do w n

Ev al

To ta ls

La bo r R at e Ca te go ry $4

8.

Pr oj ec t M an

4.

4.

$6 4.

Pr in ci pa l C on su lta nt

, D C

0.

0.

0.

0.

$6

2.

Pr oj ec t E ng in ee r, G R

5.

0.

0.

0.

0.

0.

0.

0.

0.

0.

5.

$6 0.

Se ni or

E ng in ee r, M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 0.

Pr oj ec t E ng in ee r, M

K 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

Ce rt ifi ed

In du st ria l H yg ie nt ist 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

6.

Ce rt ifi ed

H az ar do us M at er ia ls

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 7.

Se ni or

G eo lo gi st , M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

8.

Pr oj ec t E ng in ee r, JN

.0 0.

0.

0.

0.

0.

0.

0.

0.

0.

.0 $3

7.

Pr oj ec t G eo lo gi st

, S

AM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 9.

Pr oj ec t S ci en tis t, SL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 3.

Pr oj ec t S ci en tis t, SB

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S ci en tis t, RP

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

GI

S

Sp ec ia lis t, DG

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 4.

St af f S ci en tis t, O G

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 8.

St af f S ci en tis t, RP

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

5.

St af f S ci en tis t, M

M

.0 0.

0.

0.

0.

0.

0.

0.

0.

0.

.0 $3

0.

En vi ro nm en ta l S pe ci al ist , C

C 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

8.

En vi ro nm en ta l S pe ci al ist , D

K 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

En vi ro nm en ta l S pe ci al ist , M

P 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

0.

Ad m in ist ra tiv e As sis ta nt , B

M 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

2.

$1

5.

Se cr et ar y 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

.6

4.

0.

0.

0.

0.

0.

0.

0.

0.

0.

.0

Di re ct La bo r

$1 ,9

.4

$2

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,6

.6

O ve rh ea d

1.

$2

,8

.5

$3

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

,5

.1

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$4

,7

.9

$5

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$4

,2

.8

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

5/

/2 as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Jo sh

N ew as k

RA

SS

Su bT as k

VO

H Gr ou nd w at er M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

Su bT as k

Sh ut do w n

Ev al

To ta ls

Tr av el Ve hi cl e Re nt al

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

.0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m l M at er ia ls $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s P ro cu re m in g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Dr ill in g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

La bo ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ut ili tie s $1

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $1

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,8

.0

$0

.0

$0 .0

$0

.0

Ha nd lin g

Fe e

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $1

,9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,9

.0

$0

.0

$0 .0

$0

.0

La bo ra yt ic al C os ts

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,3

.0

Fa st T ur na ro un d Ch ar ge s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,3

.0

Fi el d Ex pe on al

P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $8

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$8

0.

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$8

.0

To ta l F ie ld

E xp en se s $9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$9

.0

Su bt ot al

$9 ,1

.9

$5

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,9

.0

$0 .0

$0

.0

$6 ,7

.8

Co m pl et io n Fe e $4

.3

$5

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$4

.3

To ta l E st im at ed C os t

$9 ,6

.2

$6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,9

.0

$0 .0

$0

.0

$7 ,1

.2

R E V

C E F

P S I I n t e r t e k

P a g

SubTask 8 Utilities

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson System evaluation 0 Evaluate data 0 Review Email summary and recommendations 0

Total hours 0

Project Engineer, J Newell Provide oversight and technical support (2 hr/monthly) 0 O&M checklists (1 hr/month) 0 Update Tables 0 System review and quarterly email summary to FDEP 0 Generate recommendations based on data review 0

Total hours 0 Staff Scientist, M Mater Shutdown

Field preparation 0 Mobilization 0 Conduct O&M 0 Collect vacuum influence / vacuum flow measurements 0 Monthly recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0

Startup Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0 Additional hours to collect vapor analytical samples 0

Total hours 0

Administrative Assistant B MaynardieGenerate invoicing backup for additional months 0 Total hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric $600.00 Month 3 $1,800.00

Century Link Phone $120.00 Month 0 $0.00 $1,800.00

Handling fee Electric $20.00 Month 6 $120.00 Handling fee phone $20.00 Month 0 $0.00

$120.00

$0.00

TOTAL $1,920.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 TO-15 (VOCs) (monthly infl and eff) $200.00 0 $0.00 Summa cannisters $33.00 0 $0.00 Shipping, large, overnight $150.00 0 $0.00

$0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction/O&M/Pilot Test Kit $360.00 day 0 $0.00 Construction/O&M supplies $75.00 day 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 3 CO-3 Delta Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

SubTask 11 Shutdown Eval

DATE: 5/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson System evaluation 3 Evaluate data 1 Review Email summary and recommendations 1

Total hours 5

Project Engineer, J Newell Provide oversight and technical support (2 hr/monthly) 4 O&M checklists (1 hr/month) 2 Update Tables 2 System review and quarterly email summary to FDEP 6 Generate recommendations based on data review 2

Total hours 16 Staff Scientist, M Mater Shutdown

Field preparation 1 Mobilization 3 Conduct O&M 2 Collect vacuum influence / vacuum flow measurements 1 Monthly recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Startup Field preparation 1 Mobilization 3 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1 Additional hours to collect vapor analytical samples 3

Total hours 22

Administrative Assistant B MaynardieGenerate invoicing backup for additional months 2 Total hours 2

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric $600.00 Month 0 $0.00

Century Link Phone $120.00 Month 0 $0.00 $0.00

Handling fee Electric $20.00 Month 0 $0.00 Handling fee phone $20.00 Month 0 $0.00

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 TO-15 (VOCs) (monthly infl and eff) $200.00 5 $1,000.00 Summa cannisters $33.00 5 $165.00 Shipping, large, overnight $150.00 1 $150.00

$0.00 $0.00

TOTAL LAB $1,315.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M supplies $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

$0.00

TOTAL EQUIPMENT $950.00

Page 4 CO-3 Delta Custom Commerce ERIC_5234 05523856 Rev 2 5-23-2025

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

/1 3/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm ar k as k

RA

SS

Su bT as k

VO

H

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an

.6

.6 $6

4.

Pr in cip al

C on su lta nt , D

C 0.

0.

0.

$6 0.

Se ni or

E ng in ee r, M

R

.0 3.

3.

4.

3.

3.

7.

0.

0.

0.

$5

8.

Se ni or G eo lo gi st

, N W

6.

0.

0.

0.

0.

0.

0.

0.

3.

3.

$4 0.

Pr oj ec t E ng in ee r, M

K 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

Ce rt ifi ed

In du st ria l H yg ie nt ist 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

6.

Ce rt ifi ed

H az ar do us M at er ia ls

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 7.

Se ni or

G eo lo gi st , M

R 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

3.

Pr oj ec t E ng in ee r, G R

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 3.

Pr oj ec t E ng in ee r, JN

1.

.0

.0

.0

.0

.0

.0 0.

0.

0.

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 9.

Pr oj ec t S cie nt ist

, S L

0.

0.

0.

0.

0.

0.

0.

0.

0.

3.

$3 3.

Pr oj ec t S cie nt ist

, S B

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S cie nt ist , R

P 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

GI

S

Sp ec ia lis t, DG

.0

0.

0.

2.

0.

0.

8.

0.

0.

2.

$2 4.

St af f S cie nt ist , O

G 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

8.

St af f S cie nt ist

, R P

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

St af f S cie nt ist , M

M

3.

.0

.0

0.

.0

.0

0.

0.

0.

0.

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

.0 0.

0.

0.

0.

0.

0.

0.

.5 5.

$2

8.

En vi ro nm en ta l S pe cia lis t, DK

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 9.

En vi ro nm en ta l S pe cia lis t, M P

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ad m in ist ra tiv e

As sis ta nt

, B M

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$1 5.

Se cr et ar y

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

7.

.6

.0

.0

.0

.0

.0

.0

0.

.5

.5

Di re ct La bo r

$1 4, 6.

$1

,6

.7

$1 ,8

.4

$1

,8

.9

$1 ,7

.9

$1

,8

.4

$2 ,1

.7

$2

,2

.2

$0 .0

$6

.3

$5

.5

O ve rh ea d

1.

$2

1, 2.

$2 ,5

.6

$2

,7

.7

$2 ,7

.2

$2

,6

.6

$2 ,7

.7

$3

,2

.4

$3 ,4

.2

$0

.0

$9

.1

$8

.7

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$3

6, 9.

$4 ,1

.3

$4

,5

.2

$4 ,6

.2

$4

,3

.6

$4 ,5

.2

$5

,3

.1

$5 ,7

.4

$0

.0

$1 ,6

.5

$1

,3

.3

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

/1 3/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M sh ut do w n ev al ua tio n)

Si te

Cu st om

C om m er ce E

RI

C_ as k

1s t Q tr M on th ly O as k

RA

SS

Ac tiv ity /P ha se

O

M

, G ro un dw as k

2n d

Q tr

M on th ly

O as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm ar k as k

RA

SS

Su bT as k

VO

H

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

PF

AS

G ro un dw at er M on ito rin g

To ta ls

Tr av el Ve hi cle

R en ta l

$1 ,6

.0

$3

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,6

.0

$3

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m l M at er ia ls

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s P ro cu re m in g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Dr ill in g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

La bo ra to ry $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

Ut ili tie s

$8 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$8

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r S ub to ta l $8

,7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$8 ,6

.0

$1

.0

$0

.0

Ha nd lin g

Fe e

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

$1 0.

$0

.0

To ta l S ub co nt ra ct or C os t

$9 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$9

,1

.0

$1

.0

$0 .0

La bo ra yt ica l C os ts

$5 ,0

.0

$4

.0

$1

,1

.0

$0 .0

$4

.0

$2

,3

.0

$0 .0

$0

.0

$5

.0

$0 .0

Fa st T ur na ro un d Ch ar ge s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $6

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$5 ,6

.0

$6

.0

$1

,3

.0

$0 .0

$6

.0

$2

,4

.0

$0 .0

$0

.0

$5

.0

$0 .0

Fi el d

Ex pe on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $5

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$8 0.

$0

.0

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ica l r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$5

,9

.0

$1 ,3

.0

$1

,3

.0

$0 .0

$1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$6

.0

$0

.0

To ta l F ie ld E xp en se s

$6 ,4

.0

$1

,4

.0

$1 ,4

.0

$0

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$0

.0

$7

.0

$0 .0

Su bt ot al

$5 9, 0.

$4

,1

.3

$6 ,9

.2

$7

,7

.2

$4 ,3

.6

$6

,9

.2

$9 ,6

.1

$5

,7

.4

$9 ,1

.0

$3

,3

.5

$1 ,3

.3

Co m pl et io n Fe e $3

,6

.9

$4

.6

$4

.2

$4

.6

$4

.7

$4

.2

$5

.1

$5

.6

$0 .0

$1

.2

$1

.4

To ta l E st im at ed C os t

$6 3, 9.

$4

,6

.0

$7 ,4

.4

$8

,1

.8

$4 ,7

.3

$7

,4

.4

$1 0, 2.

$6

,3

.1

$9 ,1

.0

$3

,5

.7

$1 ,4

.7

R E V

C E F

P S I I n t e r t e k

P a g

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC006C 2 HW686

Mary Uribe • Responsibilities o As a Professional Service Industries, Inc. (Intertek-PSI)

Joshua Newell 863-712-4342

ERIC_5234

Custom Commerce Laundry

$ 54,369.18 $ 54,369.18

$ 8,640.00 $ 8,640.00

$ 63,009.18 $ 63,009.18

02/28/2025 10/31/2025 245

1 1

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.01.14 13:31:58 -05'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .