This is a Task Assignment (TA) document executed under Florida Department of Environmental Protection (FDEP) Contract No. HW686 between the State of Florida Department of Environmental Protection and Professional Service Industries, Inc. (Intertek-PSI). The task assignment is designated as DC018C and addresses groundwater and PFAS monitoring services at Hampton Cleaners, located at 5317 Gunn Highway, Citrus Park, Hillsborough County, Florida (ERIC_4713). The agreement was executed on August 27, 2025, with a completion date of November 27, 2026. Key personnel include Mary Uribe as the Department Project Manager and Joshua Newell as the Contractor's Project Manager.

The contracted scope of work comprises quarterly volatile organic hydrocarbon (VOH) groundwater monitoring and annual PFAS (per- and polyfluoroalkyl substances) monitoring at the site. Services include field sampling activities, laboratory analysis via EPA Method 8260 for VOH compounds and DEP Chemistry Lab analysis for PFAS, quarterly email interim deliverables, and a comprehensive annual groundwater monitoring report with engineering recommendations. The total task assignment value is $18,912.81 on a fixed unit rate basis, invoiced upon submittal and approval of deliverables. Invoicing schedule includes $5,964.46 for Q1 VOH and PFAS monitoring (due December 31, 2025), $2,562.94 each for Q2, Q3, and Q4 VOH interim deliverables (due March 30, June 30, and September 30, 2026 respectively), and $5,259.53 for the annual groundwater monitoring report or site rehabilitation completion report (due October 31, 2026). The level of effort and cost estimate worksheets detail labor costs, vehicle mobilization charges of $120 per day, laboratory analytical fees, equipment rental, and subcontractor costs for investigative derived waste disposal.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
CN-370000-HW686-HW008A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW686

DC018C November 27, 2026

Annual Groundwater and PFAS Monitoring with GWMR or SRCR.

Mary Uribe 850-245-8990 Professional Service Industries, Inc. (Intertek-PSI)

Joshua Newell 863-712-4342

ERIC_4713

5317 Gunn Highway Citrus Park, Hillsborough County

Hampton Cleaners

$ 18,912.81

$ 18,912.81

Scope of Work

Professional Service Industries, Inc. (Intertek-PSI)

Douglas Coleman PMP, CHMM, REM

Contract Manager

Douglas Coleman Digitally signed by Douglas Coleman Date: 2025.08.27 16:05:54 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.08.27 14:57:30 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Hampton Cleaners ERIC_4713 SubTask 2 Q1 VOH Monitoring with Email Deliverable DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Project Engineer, J Newell Technical Assistance 2 Waste characterization and profiling 1 Notification to tenants 1

Total Hours 4

Project Scientist, S Luth Travel (2 hour roundtrip) (x1 for VOH) 2 Field event preparation 1 Pickup 6" well cap 1 Collect groundwater elevations from up to 10 wells 1.5 Collect a groundwater sample from: 1.5 Monitoring well - MW010 Stage IDW 1 Pick-up, drop off samples 2

Total Hours 10

Interim Deliverable

Project Engineer, J Newell Collect and review field notes, sampling forms, and lab report 2 Update tables with lab data 1 Make recommendation for Annual Monitoring (VOH>GCTLs) or Qtrly Monitoring (VOH<GCTLs) 1 Generate email deliverable with the above 1

Total Hours 5

TOTAL LABOR 19.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USEAGE

Petrotech Southeast IDW pickup, transport, disposal, water $115.00 per drum 0 $0.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 2 $85.50

$85.50

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 1 $73.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 1 $70.00 Non-Halocarbons by EPA Method 8260 $73.00 1 $73.00 PAH's by EPA Method 8270 $110.00 1 $110.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 1 $91.00 Mercury by EPA Method 7470/7471 $26.00 1 $26.00

TOTAL LAB $443.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 1 $21.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 1 $100.00 Expendables $40.00 day 1 $40.00

TOTAL EQUIPMENT $451.00

FINAL --7/24/96

Page 4 Hampton Cleaners ERIC_4713 GW 0552-444506 rev 3

SubTask 3 PFAS Monitoring DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities PFAS Sampling

Project Engineer, J Newell Request PFAS sample kit via FDEP Lab Form 1

Evaluate PFAS data for inclusion within email for scope determination during the next event 2

Update table with lab data and revised format to include all reported PFAS compounds 2

Prepare final PFAS figure. 2

Total Hours: 7

Project Scientist, S Luth Travel (2 hour roundtrip) (x1 for PFAS) 2

Additional decontamination for PFAS 1

Collect groundwater samples: 6 Monitoring wells RW002, RW004, DMW009, MW010 (w/VOH analysis), and DMW015

Documentation of PFAS groundwater sampling 1

Inventory cooler, prepare cooler for shipping to FDEP 1

Total Hours: 11

GIS/CADD Specialist, D Grove Develop basemap for PE pdf editing. 0

Total Hours: 0

TOTAL LABOR 18

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Petrotech Southeast IDW pickup, transport, disposal, water, $115 per drum $0.00 $0.00

$0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 0 $0.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 0 $0.00 Non-Halocarbons by EPA Method 8260 $73.00 0 $0.00 PAH's by EPA Method 8270 $110.00 0 $0.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 0 $0.00 Mercury by EPA Method 7470/7471 $26.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 0 $0.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 0 $0.00 Expendables $40.00 day 1 $40.00

TOTAL EQUIPMEN $330.00

SubTask 4 Q2 VOH Monitoring with Email Deliverable DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Project Engineer, J Newell Technical Assistance 2 Waste characterization and profiling 0 Notification to tenants 1

Total Hours 3

Project Scientist, S Luth Travel (2 hour roundtrip) (x1 for VOH) 2 Field event preparation 1 Collect groundwater elevations from up to 10 wells 1.5 Collect a groundwater sample from: 1.5 Monitoring well - MW010 Stage IDW 1 Pick-up, drop off samples 2

Total Hours 9

Interim Deliverable

Project Engineer, J Newell Collect and review field notes, sampling forms, and lab report 2 Update tables with lab data 1 Make recommendation for Annual Monitoring (VOH>GCTLs) or Qtrly Monitoring (VOH<GCTLs) 1 Generate email deliverable with the above 1

Total Hours 5

TOTAL LABOR 17.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USEAGE

Petrotech Southeast IDW pickup, transport, disposal, water $115.00 per drum 0 $0.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 0 $0.00

$0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 1 $73.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 0 $0.00 Non-Halocarbons by EPA Method 8260 $73.00 0 $0.00 PAH's by EPA Method 8270 $110.00 0 $0.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 0 $0.00 Mercury by EPA Method 7470/7471 $26.00 0 $0.00

TOTAL LAB $73.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 0 $0.00 Expendables $40.00 day 1 $40.00

TOTAL EQUIPMENT $330.00

Page 6 Hampton Cleaners ERIC_4713 GW 0552-444506 rev 3

SubTask 5 Q3 VOH Monitoring with Email Deliverable DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Project Engineer, J Newell Technical Assistance 2 Waste characterization and profiling 0 Notification to tenants 1

Total Hours 3

Project Scientist, S Luth Travel (2 hour roundtrip) (x1 for VOH) 2 Field event preparation 1 Collect groundwater elevations from up to 10 wells 1.5 Collect a groundwater sample from: 1.5 Monitoring well - MW010 Stage IDW 1 Pick-up, drop off samples 2

Total Hours 9

Interim Deliverable

Project Engineer, J Newell Collect and review field notes, sampling forms, and lab report 2 Update tables with lab data 1 Make recommendation for Annual Monitoring (VOH>GCTLs) or Qtrly Monitoring (VOH<GCTLs) 1 Generate email deliverable with the above 1

Total Hours 5

TOTAL LABOR 17.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USEAGE

Petrotech Southeast IDW pickup, transport, disposal, water $115.00 per drum 0 $0.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 0 $0.00

$0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 1 $73.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 0 $0.00 Non-Halocarbons by EPA Method 8260 $73.00 0 $0.00 PAH's by EPA Method 8270 $110.00 0 $0.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 0 $0.00 Mercury by EPA Method 7470/7471 $26.00 0 $0.00

TOTAL LAB $73.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 0 $0.00 Expendables $40.00 day 1 $40.00

TOTAL EQUIPMENT $330.00

Page 7 Hampton Cleaners ERIC_4713 GW 0552-444506 rev 3

SubTask 6 Q4 VOH Monitoring with Email Deliverable DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Project Engineer, J Newell Technical Assistance 2 Waste characterization and profiling 0 Notification to tenants 1

Total Hours 3

Project Scientist, S Luth Travel (2 hour roundtrip) (x1 for VOH) 2 Field event preparation 1 Collect groundwater elevations from up to 10 wells 1.5 Collect a groundwater sample from: 1.5 Monitoring well - MW010 Stage IDW 1 Pick-up, drop off samples 2

Total Hours 9

Interim Deliverable

Project Engineer, J Newell Collect and review field notes, sampling forms, and lab report 2 Update tables with lab data 1 Make recommendation for Annual Monitoring (VOH>GCTLs) or Qtrly Monitoring (VOH<GCTLs) 1 Generate email deliverable with the above 1

Total Hours 5

TOTAL LABOR 17.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 1 $120.00

$0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USEAGE

Petrotech Southeast IDW pickup, transport, disposal, water $115.00 per drum 0 $0.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 0 $0.00

$0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 1 $73.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 0 $0.00 Non-Halocarbons by EPA Method 8260 $73.00 0 $0.00 PAH's by EPA Method 8270 $110.00 0 $0.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 0 $0.00 Mercury by EPA Method 7470/7471 $26.00 0 $0.00

TOTAL LAB $73.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 55 gallon drum $100.00 each 0 $0.00 Expendables $40.00 day 1 $40.00

TOTAL EQUIPMENT $330.00

Page 8 Hampton Cleaners ERIC_4713 GW 0552-444506 rev 3

SubTask 7 Groundwater Monitoring Report DATE: 5/23/2025 Rev 2

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

GWMP / SRCR Annual Report

Senior Engineer, G Robinson Report Review 4 Total Hours 4

Project Engineer, J Newell OverseeTransport and Disposal of IDW Waste 2 Review and report up to four quarters of VOH Data 2 Update VOH figure with MW010 Analytical Data 2 Update GW Elevation Contours for Shallow and Deep Wells 6 Include PFAS data from interim deliverable in report 2 Make recommendations for continued monitoring of VOH and PFAS or VOH Closure 1 Generate Groundwater Monitoring Report Deliverable summarizing 4 quarters of data 8 Sign and Seal Annual Report 1

Total Hours 24

GIS/CADD Specialist, D Grove Develop basemap for PE editing. 2

Total Hours: 2

TOTAL LABOR 30.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COSTING UNIT USEAGE

Petrotech Southeast IDW pickup, transport, disposal, water $115.00 per drum 1 $115.00 Well Cap, 6" ($39.95 x 1.07 for sales tax) $42.75 each 0 $0.00

$115.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH Sampling $0.00 EPA Method 8260 $73.00 0 $0.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 0 $0.00 Non-Halocarbons by EPA Method 8260 $73.00 0 $0.00 PAH's by EPA Method 8270 $110.00 0 $0.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 0 $0.00 Mercury by EPA Method 7470/7471 $26.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Well Cap, 4" $21.00 each 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 55 gallon drum $100.00 each 0 $0.00 Expendables $40.00 day 0 $0.00

TOTAL EQUIPMENT $0.00

Page 9 Hampton Cleaners ERIC_4713 GW 0552-444506 rev 3

FDEP – Hampton Cleaners ERIC_4713 PSI Proposal 0552-444506 rev 3

July 25, 2025 www.intertek.com/building

PROPOSED SCOPE OF WORK

The proposal contained herein consists of conducting quarterly groundwater monitoring for VOH compounds and annual groundwater monitoring for PFAS compounds. Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets and is detailed in Subtask 1.

2. Quarterly VOH Groundwater Monitoring (Qtr 1) with Email Interim Deliverable

a. Mobilization to the site.

b. Replace caps for RW003 (6-inch), RW005 (6-inch) and RW006 (4-inch).

c. Collect DTW from up to 10 monitoring wells with a minimum of three shallow and three deep monitoring wells. (Proposed: MW004, MW005, MW006, DMW008, DMW009, MW010, MW011, MW013, and DMW015.)

d. Collect a groundwater sample for VOH analysis from shallow monitoring well MW010.

d. Submit groundwater sample to a NELAC-approved laboratory for analysis of VOHs via EPA Method 8260.

e. Develop an interim email deliverable with field notes, sampling forms, updated analytical table, lab report and recommendation for annual monitoring or another groundwater sampling event 90+ days later based on VOH results documented above or below GCTLs.

f. The investigative derived waste (IDW) that will be generated during quarterly groundwater monitoring events is limited to purge water from the monitoring wells which will be containerized in a 55-gallon drum and transported off-site for disposal at an FDEP approved facility, pending waste characterization analytical results. Analysis of IDW with waste profile and characterization is included in this subtask while Transport and Disposal efforts are covered in Subtask 7.

3. Annual PFAS Monitoring

a. Collect groundwater samples for PFAS compounds from the following:

i. Wells RW002, RW004, DMW009, MW010, and DMW015

b. Submit groundwater samples for PFAS to the DEP Chemistry Lab in Tallahassee, FL.

July 25, 2025 www.intertek.com/building

4. Quarterly VOH Groundwater Monitoring (Qtr 2) with Email Interim Deliverable

A minimum of two consecutive sampling events, more than 90 days apart, and with analytical results reported below GCTLs are required to close the site. MW010 has most recently been reported with GCTL exceedances and therefore requires a minimum of two additional quarterly sampling events to close the site. Based on this, PSI is proposing activities from Subtask 2 be duplicated with the exception of IDW waste sampling and characterization and replacement of well caps as provided below.

a. Mobilization to the site.

b. Collect DTW from up to 10 monitoring wells with a minimum of three shallow and three deep monitoring wells. (Proposed: MW004, MW005, MW006, DMW008, DMW009, MW010, MW011, MW013, and DMW015.)

c. Collect a groundwater sample for VOH analysis from shallow monitoring well MW010.

g. Submit groundwater sample to a NELAC-approved laboratory for analysis of VOHs via EPA Method 8260.

h. Develop an interim email deliverable with field notes, sampling forms, updated analytical table, lab report and recommendation for annual monitoring or another groundwater sampling event 90+ days later based on VOH results documented above or below GCTLs.

i. The investigative derived waste (IDW) that will be generated during quarterly groundwater monitoring event is limited to purge water from the monitoring well which will be containerized in a 55-gallon drum and transported off-site for disposal at an FDEP approved facility, pending waste characterization analytical results. Analysis of IDW with waste profile and characterization is included in subtask 2 while Transport and Disposal efforts are covered in Subtask 7.

5. Quarterly VOH Groundwater Monitoring (Qtr 3) with Email Interim Deliverable

In the event that one or both of the first two quarters are reported with GCTL exceedances, an additional sampling event will be required for site closure. At FDEP’s request, PSI is proposing additional quarterly sampling as needed. Efforts proposed in Subtask 5 are a duplicate of Subtask 4.

6. Quarterly VOH Groundwater Monitoring (Qtr 4) with Email Interim Deliverable

In the event that both of the first two quarters are reported with GCTL exceedances, an additional sampling event will be required for site closure. At FDEP’s request, PSI is proposing additional quarterly sampling as needed. Efforts proposed in Subtask 6 are a duplicate of Subtask 4.

July 25, 2025 www.intertek.com/building

7. Annual Groundwater Monitoring Report Deliverable

An annual groundwater monitoring report or site rehabilitation completion report will be provided with engineering recommendations based on results of up to four quarterly sampling events. This report will summarize data provided in Subtask 3 and provide recommendations for continued monitoring or VOH site closure and provide updated analytical summary tables and figures and groundwater elevations contours for shallow and deep aquifers.

The deliverable and invoice schedule are presented below and are based on receipt of a Task Assignment prior to September 15, 2025.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the described services is shown in the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW686, Waste Cleanup Program Services, dated December 21, 2021. An invoice and deliverable schedule are presented as follows:

Hampton Cleaners ERIC_4713

Deliverables Deliverable Due Date SubTask 1 Project Management Upon completion of TA SubTask 2&3 Q1 VOH & PFAS Interim Email Deliverable December 31, 2025 SubTask 4 Q2 VOH Interim Email Deliverable March 30, 2026 SubTask 5 Q3 VOH Interim Email Deliverable June 30, 2026 SubTask 6 Q4 VOH Interim Email Deliverable September 30, 2026 Subtask 7 Annual GWMR or SRCR October 31, 2026

Requirements for Invoice Submittal Amount to be Invoiced

SubTasks 2 & 3 - Submittal & approval of the Q1 Interim Email Deliverable

Subtask 4 - Submittal & approval of the Q2 Interim Email Deliverable

Subtask 5 - Submittal & approval of the Q3 Interim Email Deliverable

Subtask 6 - Submittal & approval of the Q4 Interim Email Deliverable

Subtask 7 & 1 - Submittal & approval of the Annual GWMR or SRCR

Total Proposed Task Assignment Amount

$ 5,964.46

$2,562.94

$2,562.94

$2,562.94

$5,259.53

$18,912.81

04/24/2024 01:44 PM PAGE 1 OF 7

Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry

4600 BROOKPARK ROAD, CLEVELAND,

OHIO, 44134

(216) 642-1311

(216) 642-1474

QUOTE #: 0042802

DATE: 04/24/2024 PROJECT PROPOSAL

CLIENT

JOSH NEWELL

INTERTEK/PSI - PLANT CITY

607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,

33563

P: (863) 712-4342

E-MAIL:JOSHUA.NEWELL@INTERTEK.COM

PROJECT DESCRIPTION

FDEP DRY CLEANING DRUMS

FDEP

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00

LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00

ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00

DISPOSAL SUBTOTAL: $80.00

JOB ESTIMATE: $180.00

ENVIRONMENTAL FEE: $9.00

TOTAL JOB ESTIMATE: $189.00