This Task Assignment (TA HW008A) is a professional services contract executed between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (PSI), an Intertek company. The contract was signed on December 15, 2022, with a completion date of October 27, 2023. The project manager for FDEP is Skylar Schwed, and PSI's project manager is Nana G. Westmark, a Senior Geologist and Principal Consultant. The project is located at Quality Cleaners (ERIC_4771), 14837 North Florida Avenue, Tampa, Hillsborough County, Florida, and operates under the umbrella contract HW686, Waste Cleanup Program Services.
The contract authorizes PSI to conduct PFAS (perfluoroalkyl and polyfluoroalkyl substances) groundwater sampling and monitoring activities at the Quality Cleaners site in accordance with PSI's scope of work, cost estimate, and schedule dated December 7, 2022. The total task assignment value is $1,732.50 on a fixed unit rate basis, comprising 18 labor hours distributed across two subtasks: Project Management (1.3 hours at $181.19) and Groundwater Monitoring/Email Deliverable (16.5 hours at $1,393.81). The scope includes collecting groundwater samples from four anticipated monitor wells (source, two side gradient, and downgradient), managing investigative-derived waste (IDW) in accordance with FDEP and USEPA guidelines, and delivering a summary email with field notes and laboratory results. Invoice payment of the full $1,732.50 is due upon submittal and FDEP approval of the groundwater monitoring email deliverable and project management documentation, with a deliverable due date of August 28, 2023.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
HW008A Completion October 27, 2023
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct PFAS sampling in accordance with the PSI scope of work, cost estimate, and schedule received on December 7th 2022.
Skylar Schwed 850-245-8795 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Professional Service Industries, Inc. (Intertek-PSI)
Professional Service Industries, Inc. (Intertek-PSI)
Nana G. Westmark 813-886-1075
ERIC_4771
14837 North Florida Avenue Tampa, Hillsborough County, Florida
Quality Cleaners
✔ $ 1,732.50
$ 1,732.50
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2022.12.15 11:10:14 -05'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2022.12.15 09:58:03 -05'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 & 2 Groundwater monitoring/ PFAS email deliverable & Project Management 08/28/2023
Subtasks 1 & 2 Submittal and FDEP approval of the Groundwater monitoring/ PFAS email deliverable & Project Management $ 1,732.50
$ 1,732.50
HW686
HW008A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW686 Contract Negotiation File Quality Cleaners Tampa, Hillsborough County, Florida
ERIC_4771
From: Skylar Schwed, Project Manager Date: December 13, 2022 Subject: Negotiation Summary
HW686 HW008A
This Task Assignment authorizes PSI to conduct groundwater monitoring activities in accordance with the December 7, 2022, Scope of Work, and Cost Estimate.
PSI confirmed on December 7, 2022, that an Access Agreement with the current real property owner of the Quality Cleaners (ERIC_4771) site has been executed.
The original Task Assignment totaled $1,732.50 with 18 labor hours but after negotiations and corrections with the contractor costs are reflected below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $1,732.50 with 18 labor hours.
PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 12/7/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Quality Cleaners ERIC_4771 SubTask 2 Groundwater Monitoring / Email Deliverable SubTask 7
Activity/Phase: Groundwater Monitoring - PFAS SubTask 3 SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.99 Project Manager 1 1.3 $0.00 Principal Consultant 0 0.0 0 0 0 0 0 0 0 0
$62.64 Senior Engineer, MR 0 0.0 0 0 0 0 0 0 0 0 $56.99 Senior Geologist, NW 3 3.0 0 0 0 0 0 0 0 0
$0.00 Senior Scientist 0 0.0 0 0 0 0 0 0 0 0 $0.00 Certified Industrial Hygientist 0 0.0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0.0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0.0 0 0 0 0 0 0 0 0 $0.00 Project Manager 0 0.0 0 0 0 0 0 0 0 0
$36.06 Project Engineer 0 0.0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 0 0.0 0 0 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0.0 0 0 0 0 0 0 0 0 $37.02 Project Engineer, SJ 0 0.0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0.0 0 0 0 0 0 0 0 0 $29.86 Project Scientist 0 0.0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0.0 0 0 0 0 0 0 0 0
$0.00 QA Officer 0 0.0 0 0 0 0 0 0 0 0 $31.51 Remediation Specialist, RH 8 7.5 0 0 0 0 0 0 0 0 $29.86 GIS / CAD Specialist, DG 2 2.0 0 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0.0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0.0 0 0 0 0 0 0 0 0
$24.94 Staff Scientist, BW 0 0.0 0 0 0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0.0 0 0 0 0 0 0 0 0 $22.06 Environmental Specialist, MZ 4 4.0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0.0 0 0 0 0 0 0 0 0
$0.00 0 0.0 0 0 0 0 0 0 0 0 $0.00 0 0.0 0 0 0 0 0 0 0 0 $0.00 0 0.0 0 0 0 0 0 0 0 0 $0.00 0 0.0 0 0 0 0 0 0 0 0 $0.00 0 0.0 0 0 0 0 0 0 0 0 $0.00 0 0.0 0 0 0 0 0 0 0 0
Total Hours 18 1 16.5 0 0 0 0 0 0 0 0
Direct Labor $627.44 $72.18 $555.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 151.02% $947.56 $109.01 $838.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $1,575.00 $181.19 $1,393.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 1
FDEP COST ESTIMATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 12/7/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Quality Cleaners ERIC_4771 SubTask 2 Groundwater Monitoring / Email Deliverable SubTask 7
Activity/Phase: Groundwater Monitoring - PFAS SubTask 3 SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $1,575.00 $181.19 $1,393.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $157.50 $18.12 $139.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $1,732.50 $199.31 $1,533.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Quality Cleaners ERIC_4771 SubTask 2 Groundwater Monitoring / Email Deliverable
DATE: 12/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PFAS Sampling Environmental Specialist, M Zilske
Collect groundwater samples 2 shallow wells @ 1 hr each 2 Additional decontamination for PFAS 1 Stage IDW 1
Total Hours: 4
Remediation Specialist, R Hanson Field Event Preparation 1 Collect groundwater samples (2 inter) intermediate wells @ 1.5 hr each 3 Additional decontamination for PFAS 1 Inventory cooler, prepare cooler for shipping to FDEP 2.5
Total Hours: 7.5
CADD/ GIS, D Grove Prepare map with PFAS results Total Hours: 2
Senior Geologist, N Westmark Technical oversight 1 Provide Evaluation and email summary 2
Total Hours: 3
TOTAL LABOR 16.5
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 0 $0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
$0.00 0 $0.00
$0.00 $0.00
$0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
Shallow Groundwater Sampling Kit $290.00 day 0 $0.00
$0.00 Expendables $40.00 day 0 $0.00
TOTAL EQUIPMENT $0.00
Analaytical laboratory services for PFAS provided by FDEP Central Laboratory
FINAL --7/24/96
Page 4 Quality ERIC_4771 0552-388687
PSI Proposal Number: 0552-388687 December 7, 2022
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Attention: Ms. Skylar Schwed, Environmental Specialist II Phone: (850) 245-8705 main, (850) 245-8795 direct Email: Skylar.Schwed@FloridaDEP.gov
Re: Proposal for PFAS Groundwater Sampling and Summary Quality Cleaners ERIC_4771 14837 North Florida Avenue Tampa, Hillsborough County, Florida
Dear Ms. Schwed:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide Groundwater Sampling for Perfluoroalkyl and polyfluoroalkyl substances (PFAS) compounds for the above referenced site. Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion. According to the property appraiser’s website, the entity who is listed as owner in December 2022 is the same as on the Site Access form signed in May 2022.
PROJECT BACKGROUND
The Quality Cleaners is located at 14837 North Florida Avenue, Tampa, and is currently in use as a restaurant, Shelley’s Café. The site is located in Action Plaza on the east side of Florida Avenue approximately 1,500 feet south of Bearss Avenue in Tampa, Hillsborough County, Florida.
According to the current owner of the property, all the dry equipment was removed by 2004.
The FDEP is currently implementing the August 2021 Waste Cleanup Section Dynamic Plan for addressing PFAS which consists of monitoring drycleaning sites with close proximity to public wells. Therefore, we are proposing to conduct a groundwater sampling event for select wells at the referenced site to evaluate the potential presence of PFAS compounds.
mailto:Skylar.Schwed@FloridaDEP.gov
FDEP – Quality Cleaners ERIC_4771
Groundwater Sampling - PFAS
A Work Plan for site assessment activities was recently approved by the FDEP, with the new assessment activities to be initiated within the next 2 months. Based on the schedule, PSI proposes to provide groundwater sampling for four of the proposed monitor wells (to be installed during the upcoming site assessment.) Prior to sampling, PSI will obtain FDEP permission of which wells to sample. The groundwater sampling for PFAS will be conducted concurrently with the assessment, the results of which will be submitted separately due to funding sources. Therefore, the proposal contained herein consists only of the sampling activities and submittal.
PROPOSED SCOPE OF WORK
The proposed groundwater sampling activities will be implemented in general accordance with the FDEP’s Standard Operating Procedures for Field Activities (DEP SOP-001/01) and the site Health and Safety Plan developed for this project with the exception that no blanks or duplicates will be collected.
Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets.
2. Groundwater Sampling
a. Collect the groundwater samples for PFAS analyses by the FDEP laboratory. We anticipate sampling a source well, two side gradient wells, and a downgradient well.
b. All IDW (purge water and wash water) will be handled and disposed of in accordance with FDEP and USEPA guidelines.
c. Provide a deliverable in accordance with WSCS PFAS Screening Plan for Drycleaning Sites, which will include a simple email summary including one figure with text boxes (no isoconcentration contours), field notes/forms, and the final laboratory report.
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the Groundwater Sampling is shown on the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. An invoice and deliverable schedule are presented as follows.
FDEP – Quality Cleaners ERIC_4771
Groundwater Sampling - PFAS
Quality Cleaners ERIC_4771
Deliverables Deliverable Due Date SubTask 1 Project Management August 28, 2023 SubTask 2 Groundwater Monitoring / Email
Deliverable Two days within receipt of FDEP lab data if above PGCTLs
Invoice Schedule
Requirements for Invoice Submittal Amount to be Invoiced SubTasks 1 & 2 - Submittal & approval of Groundwater Monitoring Email Results
$1,732.50
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Ryan Fetter Nana Westmark, PG, CHMM Project Scientist Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552------Quality GW PFAS only\Proposal PFAS\Quality ERIC_4771 0552-388687.docx
| HW008A NEED TO MODIFY.pdf |
| NS.pdf |
| Quality ERIC_4771 0552-388687.pdf |
| Quality ERIC_4771 0552-388687 cost.pdf |
| Cost Estimate |
| Quality ERIC_4771 0552-388687.pdf |
| Quality ERIC_4771 0552-388687 cost.pdf |
| LOE 2 GW |
| Quality ERIC_4771 0552-388687.pdf |
| COST ESTIMATE AND SCHEDULE |
File details come from the government source that posted it. Updated .