This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW686 to Professional Service Industries, Inc. (Intertek-PSI) for groundwater monitoring services at the Asian Cleaners facility located at 3846 South Orlando Drive, Sanford, Seminole County, Florida (Project ERIC_5455). The TA was executed by Mubeen Darji, P.E., as authorized representative for FDEP, with Joshua Newell serving as the contractor's project manager and Mary Uribe as the FDEP project manager.
The scope of work encompasses volatile organic compound (VOH) and per- and polyfluoroalkyl substances (PFAS) groundwater monitoring and subsequent reporting activities. The contract consists of three subtasks: (1) Project Management; (2) VOH Groundwater Monitoring including sample collection from five monitor wells (MW004, MW005, MW007, MW009, and MW014), laboratory analysis via EPA Method 8260, and preparation of a groundwater monitoring report; and (3) PFAS Groundwater Monitoring involving sample collection from three wells (MW004, MW005, and MW014) with shipment to FDEP Central Laboratory and reporting. The total contract value is $11,838.11, with invoicing structured as $9,733.17 for Subtasks 1 and 2 and $2,104.94 for Subtask 3, both due by December 31, 2025. The TA completion date is January 28, 2026. Labor costs total $2,527.00 for the VOH monitoring phase, supplemented by equipment, vehicle, laboratory, and subcontractor disposal costs for investigative derived waste management through an approved facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW686
DC026B January 28, 2026
VOH and PFAS groundwater monitoring and subsequent reporting.
Mary Uribe 850-245-8990 Professional Service Industries, Inc. (Intertek-PSI)
Joshua Newell 863-712-4342
ERIC_5455
3846 South Orlando Drive Sanford, Seminole County
Asian Cleaners
$ 11,838.11
$ 11,838.11
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI)
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.05.01 15:52:59 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Asian Cleaners ERIC_5455 SubTask 2 VOH Monitoring and Deliverable
DATE: 3/14/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities
Senior Engineer, G Robinson Technical Assistance 3
Notification to tenants 1
Total Hours: 4
Project Scientist, S Luth Travel (4 hour roundtrip for gw sampling ) x2 8
Field event preparation 1
Collect groundwater elevations at 8 wells 1.5
Collect groundwater samples
5 shallow wells @ 1.5 hr each 7.5
Documentation of groundwater sampling & measurements 1
Label and Stage IDW Drum 1
Pick-up, drop off samples 2
Total Hours: 22
Data Evaluation/ Report Development
Project Engineer, J Newell Evaluate data 2
Make Recommendations for report 6
Sign and seal document 1
Total Hours: 9
Project Scientist, J Daugherty Data reduction/evaluation 5
Preparation of groundwater monitoring report 8
Report - Prepare final tables and figure 5
Total Hours: 18
GIS/CADD Specialist, D Grove Develop maps 2
Total Hours: 2
Administrative Assistant, B Meynardie Finalize report, process invoices 2
Total Hours 2
TOTAL LABOR 57.00
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 2 $240.00
$0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Petrotech Southeast IDW pickup, transport, disposal, water, per drum 2 $115.00 $230.00
Includes 2024 & 2025 Purge water
$0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
$0.00
EPA Method 8260 $73.00 5 $365.00
IDW Sampling
Halocarbons by EPA Method 8260 $73.00 1 $73.00
Non-Halocarbons by EPA Method 8260 $70.00 1 $70.00
PAH's by EPA Method 8270 $110.00 1 $110.00
Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 1 $91.00
Mercury by EPA Method 7470/7471 $26.00 1 $26.00
$365.00 $0.00
TOTAL LAB $735.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
Shallow Groundwater Sampling Kit $290.00 day 2 $580.00
55--gallon drum $100.00 each 1 $100.00
$680.00
Expendables $40.00 day 2 $80.00
TOTAL EQUIPMENT $760.00
FINAL --7/24/96
Page 3 Asian ERIC_5455 GW, PFAS 0552-447206
FDEP Asian Cleaners ERIC_5455 PSI Proposal 0552-447206
March 14, 2025 www.intertek.com/building inspection was requested by the Waste Site Cleanup Section of the FDEP Central District to evaluate current compliance conditions at the Asian Cleaners.
The FDEP has implemented the August 2021 Waste Cleanup Section Dynamic Plan for addressing PFAS which consists of monitoring drycleaning sites in close proximity to public wells. Results from the 2023 PFAS sampling event at Asian Cleaners identified a concentration of PFAS at levels above the 70 nanograms per liter (ng/L) Provisional Groundwater Cleanup Target Level (PGCTL). Therefore, the Department requested we continue to include PFAS compounds during the routine annual groundwater monitoring for VOHs.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of conducting annual groundwater monitoring for VOH and for PFAS compounds. Specifically, the proposed scope of work consists of the following subtasks:
1. Project Management
This scope is provided for in the template worksheets and is detailed in Subtask 1.
2. Groundwater Monitoring - VOH
The field activities for the routine VOH groundwater sampling event will be conducted concurrently with the PFAS sampling. The following activities are proposed.
a. Mobilization to the site.
b. Collect groundwater elevation measurements of all accessible site monitor wells.
c. Collect groundwater samples from the following monitor wells:
i. MW004 Previously reported with VC impacts exceeding GCTLs
ii. MW005 Previously reported with VOH impacts exceeding GCTLs
iii. MW007 Downgradient delineation
iv. MW009 Previously reported with VC impacts exceeding GCTLs
v. MW014 Previously reported with VOH impacts exceeding GCTLs
d. Submit groundwater samples to a NELAC-approved laboratory for analysis of VOHs via EPA Method 8260.
e. Development of a Groundwater Monitoring Report showing current groundwater elevation maps, current groundwater data, and recommendations, as necessary.
f. The investigative derived waste (IDW) generated during the annual groundwater monitoring is limited to purge water from the monitoring wells which will be containerized in a 55-gallon drum and transported off-site for disposal at an approved facility.
FDEP Asian Cleaners ERIC_5455 PSI Proposal 0552-447206
March 14, 2025 www.intertek.com/building
3. Groundwater Monitoring - PFAS
The PFAS groundwater sampling event will be conducted concurrently with the routine VOH sampling but will be addressed through Subtask 3 along with a separate deliverable. Per the FDEP PFAS sampling guidance, as reported concentrations have not been reported above a concentration of 300 ng/L, the same network of wells will continue to be used in future monitoring events.
a. Collect groundwater samples from the following monitoring wells:
vi. MW004
vii. MW005
viii. MW014
b. Preparation of sample coolers and ship to the FDEP Central Laboratory in Tallahassee for analyses for PFAS analyses.
c. Containerize purge water into a 55-gallon drum, then transport off-site for disposal at an approved facility.
d. The results of the PFAS monitoring will be included in the Groundwater Monitoring Report.
The deliverable and invoice schedule are presented below and are based on receival of a Task Assignment prior to May 1, 2025. The last groundwater sampling event occurred in September 2024.
04/24/2024 01:44 PM PAGE 1 OF 7
Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry
4600 BROOKPARK ROAD, CLEVELAND,
OHIO, 44134
(216) 642-1311
(216) 642-1474
QUOTE #: 0042802
DATE: 04/24/2024 PROJECT PROPOSAL
CLIENT
JOSH NEWELL
INTERTEK/PSI - PLANT CITY
607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,
33563
P: (863) 712-4342
E-MAIL:JOSHUA.NEWELL@INTERTEK.COM
PROJECT DESCRIPTION
FDEP DRY CLEANING DRUMS
FDEP
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00
LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00
ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00
DISPOSAL SUBTOTAL: $80.00
JOB ESTIMATE: $180.00
ENVIRONMENTAL FEE: $9.00
TOTAL JOB ESTIMATE: $189.00