This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI), modifying an existing task assignment under Contract Number HW686. The change order amends the scope of work for site remediation activities at Pugh's Dry Cleaners (ERIC_4814), located at 215 South Bay Street, Lake County, Florida. The project manager for FDEP is Mary Uribe, and the contractor's project manager is Joshua Newell.
The change order modifies Subtasks 6 and 7 of the original task assignment, which involves site remediation, maintenance and operations, groundwater monitoring, and a Remedial Action Summary and Support (RASS) report. Subtask 6 amendments include measuring the distance from soil vapor extraction (SVE) wells to interior walls. Subtask 7 amendments include generating a new basemap with updated legend, overlaying SVE wells on soil boring figures based on interior measurements, generating a Region of Interest (ROI) figure contrasting with the soil contaminant plume, and adding supporting text. The amended total task value is $88,538.94, with a fixed unit rate of $77,818.94 and cost reimbursement of $10,720.00 for utilities. The task completion date remains July 31, 2025, with the final deliverable due May 30, 2025. All amendments were made at FDEP's request, and PSI's time, labor, and subcontractor costs have been reviewed as reasonable for the scope of services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
DC003E 1 HW686
Mary Uribe • Responsibilities o As a Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Joshua Newell Contractor 863-712-4342
ERIC_4814
Pugh's Dry Cleaners
✔ $ 77,818.94 $ 76,493.29
$ 10,720.00 $ 10,720.00
$ 88,538.94 $ 87,213.29 ✔ Completion
Completion 07/31/2025 07/31/2025 0
1 1
Contractor
Digitally signed by Joshua S Newell Date: 2025.05.19 09:10:25-04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.05.09 18:22:21 -04'00'
ST 7 RASS update: adding ROI test and data overlays on revised figures.
ST 6 O&M update: adding SVE distance .measurements
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW686
DC003E
$ 88,538.94
Subtask 2: 1st Qtr Monthly O&M with system repairs
Subtasks 3 and 4: 2nd qtr monthly O&M and RASS
Subtask 5: 3rd qtr monthly O&M
Subtask 6: 4th qtr monthly O&M
Subtasks 1, 7, and 9: Project management, RASS, groundwater monitoring
Subtask 8: Paid utility invoices - utilities not to exceed $8,800.00, telemetry not to exceed &1,920.00, handling fee not to exceed $640.
Subtask 2: DEP approval of 1st Qtr Monthly O&M with system repairs
Subtask 5: DEP approval of 3rd qtr monthly O&M
Subtask 6: DEP approval of 4th qtr monthly O&M
Subtask 8: DEP approval of Paid utility invoices - utilities not to exceed $8,800.00, telemetry not to exceed &1,920.00, handling fee not to exceed $640.
Subtasks 1, 7, and 9: DEP approval of Project management, RASS, groundwater monitoring
Subtasks 3 and 4: DEP approval of 2nd qtr monthly O&M and RASS
07/20/2024
10/30/2024
01/20/2025
04/20/2025
05/30/2025
04/30/2025
$ 16,705.97
$ 16,010.40
$ 9,591.74
$ 11,561.29
$ 23,309.54
$ 11,360.00
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert
Secretary
Memorandum
TO: ERIC_4814
Pugh’s Dry Cleaners
FROM: Mary Uribe, Project Manager
SUBJECT: Negotiation Summary
HW686 DC003E CO 1
DATE: April 29th, 2025
This summary is for Change Order DC003E-1. The tasking includes amendments to Subtask 6 and 7. The amendment for subtask 6 includes measuring the distance from the SVE wells to the interior walls. The amendments for subtask 7 include generating a new basemap with an updated legend, overlaying SVE wells on SB figures based on interior measurements, generating an ROI figure in contrast to the soil contaminant plume, and including additional text to reference the data. All amendments have been made at the request of FDEP.
Total updated task amount is $88,538.94. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is 05/30/2025 and has not changed. Task completion date is July 31st, 2025 and has not changed.
F D E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
PS
I)
Da te
3/
5/
Ta sk
Su bT as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha se as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm ar k as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 8.
Pr oj ec t M an ag er
.1
$6 4.
Pr in cip al C on su lta nt
, D C
$6 0.
Se ni or
E ng in ee r, M
R
$5
8.
Se ni or G eo lo gi st
, N W
$6 2.
Se ni or
E ng in ee r, GR
$3 4.
Ce rt ifi ed In du st ria l H yg ie nt ist
$5 6.
Ce rt ifi ed H az ar do us
M at er ia ls M an ag er
$6
0.
Se ni or G eo lo gi st
, M R
$5 8.
Pr oj ec t M an ag er
$4 8.
Pr oj ec t E ng in ee r, JN
$3
7.
Pr oj ec t G eo lo gi st
, S
AM
$3 9.
Pr oj ec t S cie nt ist
, S L
$3 3.
Pr oj ec t S cie nt ist
, S B
$4 0.
Pr oj ec t S cie nt ist
, J D
$3
4.
GI
S
Sp ec ia lis t, DG
$2 5.
St af f S cie nt ist , M
M
$2
8.
St af f S cie nt ist
, R P
$3 1.
Re m ed ia tio n Co or di na to r, RH
$3 0.
En vi ro nm en ta l S pe cia lis t, CC
$2
2.
En vi ro nm en ta l S pe cia lis
, M Z
$2 8.
En vi ro nm en ta l S pe cia lis t, DK
$2
0.
Ad m in ist ra tiv e As sis ta nt , B
M
$1
5.
Se cr et ar y
$0
.0
$0 .0
$0
.0
$0 .0
To ta l H ou rs
Di re ct La bo r
$2 1, 0.
$2
,4
.6
$4 ,5
.2
$2
,6
.9
$1 ,9
.0
$2
,6
.1
$2 ,7
.8
$2
,8
.2
$0 .0
$1
,5
.0
$0 .0
O ve rh ea d
1.
$3
2, 8.
$3 ,7
.5
$6
,8
.2
$4 ,0
.2
$2
,8
.5
$3 ,9
.8
$4
,1
.0
$4 ,3
.5
$0
.0
$2 ,4
.3
$0
.0
Ge n
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$5
3, 8.
$6 ,1
.2
$1
1, 9.
$6 ,7
.2
$4
,7
.5
$6 ,5
.0
$6
,8
.8
$7 ,1
.8
$0
.0
$4 ,0
.4
$0
.0
R E V
C E F
P S I I n t e r t e k
P a g e
E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
3/
5/ as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
Tr av el Ve hi cle
R en ta l
$1 ,8
.0
$4
.0
$3
.0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$2
.0
$0 .0
M ile ag e Co st s
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ai r F ar e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pe r d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$1 ,8
.0
$4
.0
$3
.0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$2
.0
$0 .0
Su bc on tr ac to r
(E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pr oc ur em en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(S er vi ce s P ro cu re m
Dr ill in g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Dr ill in g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile La bo ra to ry
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su rv ey in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
Ut ili tie s $1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 0, 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$1 0, 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
0, 0.
$1
.0
$0 .0
Ha nd lin g Fe e $6
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$6
.0
$1
2.
$0 .0
To ta l S ub co nt ra ct or
C os t $1
1, 7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 1, 0.
$1
.5
$0
.0
La bo ra to ry
An al yt ica l C os ts $7
,2
.0
$4
.0
$2 ,0
.0
$0
.0
$4
.0
$2 ,0
.0
$0
.0
$0 .0
$2
,0
.0
$0 .0
Fa st T ur na ro un d Ch ar ge s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $7
.0
$1
.0
$1
.0
$0
.0
$1
.0
$1
.0
$0 .0
$0
.0
$1
.0
$0 .0
To ta l L ab or at or y $7
,9
.0
$6
.0
$2 ,2
.0
$0
.0
$6
.0
$2 ,2
.0
$0
.0
$0 .0
$2
,2
.0
$0 .0
Fi el d
Ex pe ns es
Pe rs on al P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ex pe nd ab le s $6
.0
$2
.0
$1
.0
$0
.0
$1
.0
$1
.0
$0 .0
$0
.0
$8 0.
$0
.0
Eq ui pm en t ( Dr ill in g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
An al yt ica l r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( O th er
$7
,6
.0
$2 ,1
.0
$1
,3
.0
$0 .0
$1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$1
,5
.0
$0 .0
To ta l F ie ld
E xp en se s $8
,2
.0
$2 ,3
.0
$1
,4
.0
$0 .0
$1
,4
.0
$1 ,4
.0
$0
.0
$0 .0
$1
,5
.0
$0 .0
Su bt ot al
$8 3, 2.
$6
,1
.2
$1 4, 0.
$1
0, 4.
$4 ,7
.5
$8
,9
.0
$1 0, 6.
$7
,1
.8
$1 1, 0.
$8
,2
.9
$0 .0
Co m pl et io n Fe e $5
,3
.8
$6
.4
$1 ,1
.9
$6
.2
$4
.9
$6
.7
$6
.4
$7
.9
$0
.0
$4
.1
$0 .0
To ta l E st im at ed C os t
$8 8, 8.
$6
,7
.6
$1 6, 0.
$1
1, 8.
$5 ,2
.5
$9
,5
.7
$1 1, 1.
$7
,9
.8
$1 1, 0.
$8
,6
.0
$0 .0
R E V
C E F
P S I I n t e r t e k
P a g
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pugh's Drycleaners ERIC_4814 SubTask 2 1st Qtr Monthly O&M w/System Repairs
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Research, order, and obtain new motor starter, power supply, intrensic relays, and blower bearings 8 Review and submit quarterly deliverable 4
Total hours: 27
Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Mobilizations (2) - Remove blower, then return to reinstall blower and parts. 10 Install motor starter, power supply, and intrinsic relays 2 Disassemble blower from system 5 Rebuild blower with new bearings 16 Re-install blower into the SVE system 5
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 1
Total hours: 75
TOTAL LABOR 105
VEHICLE TYPE RATE UNIT USEAGE
$0.00 Equipment Van / Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 5 $1,800.00 Construction/O&M supplies $75.00 day 5 $375.00
$2,175.00 Expendables $40.00 day 5 $200.00
TOTAL EQUIPMENT $2,375.00
TO-15 (VOCs) (Qtr infl and eff)
FINAL --7/24/96
Page 4 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 3 2nd Qtr Monthly O&M
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4
Total hours: 19
Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 3
Total hours: 39
TOTAL LABOR 61
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00
Summa cannisters $33.00 9 $297.00 $2,097.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $2,247.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
Page 5 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 4 RASS
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2 Sign and Seal RASS 1
Total hours: 5
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8
Total hours: 32
CADD / GIS Specialist, D Grove Prepare figures for RASS 2
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
$0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 6 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 5 3rd Qtr Monthly O&M
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4
Total hours: 19
Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Additional hours to collect vapor analytical samples 1
Total hours: 37
TOTAL LABOR 59
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$200.00 2 $400.00
Summa cannisters $33.00 2 $66.00 $466.00
Shipping, large, overnight $150.00 1 $150.00
TOTAL LAB $616.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
TO-15 (VOCs) (infl and eff)
Page 7 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 6 4th Qtr Monthly O&M
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3
Total hours: 3
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4
Total hours: 19
Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1
Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1 Measure SVE wells from interior walls 1
Additional hours to collect vapor analytical samples 3
Total hours: 40
TOTAL LABOR 62
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00
Summa cannisters $33.00 9 $297.00 $2,097.00
Shipping, large , overnight $150.00 1 $150.00
TOTAL LAB $2,247.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00
$1,305.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $1,425.00
Page 8 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 7 RASS
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5 Sign and Seal RASS 1
Total hours: 8
Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8 Generate new basemap with updated legend 2 Overlay SVE wells on SB figure based on reconciled interior measurements 2 Generate ROI figure in contrast to soil contaminant plume 1 Include additional text to reference the data and support prior requests by the FDEP 3
Total hours: 44
CADD / GIS Specialist, D Grove Prepare figures for RASS, Groundwater 8
TOTAL LABOR 60
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 9 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 8 Utilities
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Duke Energy Electric December 2023 - March 2025 $550.00 Month 16 $8,800.00
Century Link Phone December 2023 - March 2025 $120.00 Month 16 $1,920.00 $10,720.00
Handling fee Electric December 2023 - March 2025 $20.00 Month 16 $320.00 Handling fee phone December 2023 - March 2025 $20.00 Month 16 $320.00
$640.00
$0.00 $0.00 $0.00
TOTAL $11,360.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 10 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
SubTask 9 Groundwater Monitoring
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark Technical Oversight 3
Project Scientist, J Daugherty Field preparation 1 Travel (2 roundtrips for gw sampling) 10 Collect groundwater samples 1 shallow wells @ 1 hour each 1 3 deep well @ 2 hours each 6 Documentation of groundwater sampling & measurements 2 stage IDW drum 1
Total hours: 21
Staff Scientist, M Matar Travel (2 roundtrips for gw sampling) 10 Collect groundwater samples 7 intermediate wells @ 1.5 hr each 11 pickup, drop off sample kits 1
Total hours: 22
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 2 $240.00
$0.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST
$0.00
Petrotech Southeast, Inc. IDW transport & disposal 1 $125.00 $125.00 $0.00 $0.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
$0.00
EPA Method 8260 $73.00 11 1 $876.00 Sulfate, EPA Method 300.0 $21.00 3 $63.00 TDS by EPA Method 2011 $16.00 3 $48.00 Iron by EPA Method 6020, ICP / MS $15.00 3 $45.00 Sodium by EPA Method 6020, ICP / MS $15.00 3 $45.00 Manganese by EPA Method 6020, ICP / MS $15.00 3 $45.00 TRPH by FL-PRO $88.00 11 $968.00
$2,090.00 $0.00 Sample Shipping, Large, Overnight $150.00 1 $150.00
$0.00 $0.00
TOTAL LAB $2,240.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Deep Groundwater Sampling Kit $415.00 day 2 $830.00 Drum for IDW $100.00 each 1 $1,410.00 $100.00
$1,510.00 Expendables $40.00 day 2 $80.00
TOTAL EQUIPMENT $1,590.00
Page 11 Final Pugh's ERIC_4814 0552-419229 TACO1 Final
E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
3/
5/ as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 8.
Pr oj ec t M an
0.
$6 4.
Pr in cip al C on su lta nt
, D C
$6 0.
Se ni or
E ng in ee r, M
R
$5
8.
Se ni or G eo lo gi st
, N W
$6 2.
Se ni or
E ng in ee r, GR
$3 4.
Ce rt ifi ed In du st ria l H yg ie nt ist
$5 6.
Ce rt ifi ed H az ar do us
M at er ia ls M an ag er
$6
0.
Se ni or G eo lo gi st
, M R
$5 8.
Pr oj ec t M an ag er
$4 8.
Pr oj ec t E ng in ee r, JN
$3 7.
Pr oj ec t G eo lo gi st , S
AM
$3
9.
Pr oj ec t S cie nt ist , S
L
$3
3.
Pr oj ec t S cie nt ist , S
B
$4
0.
Pr oj ec t S cie nt ist , J
D
$3
4.
GI
S
Sp ec ia lis t, DG
$2 5.
St af f S cie nt ist , M
M
$2
8.
St af f S cie nt ist
, R P
$3 1.
Re m ed ia tio n Co or di na to r, RH
$3 0.
En vi ro nm en ta l S pe cia lis t, CC
$2
2.
En vi ro nm en ta l S pe cia lis
, M Z
$2 8.
En vi ro nm en ta l S pe cia lis t, DK
$2
0.
Ad m in ist ra tiv e As sis ta nt , B
M
$1
5.
Se cr et ar y
$0
.0
$0 .0
$0
.0
$0 .0
To ta l H ou rs
Di re ct La bo r
$4
.1
$5 5.
$0
.0
$0 .0
$0
.0
$0 .0
$4
0.
$3
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
1.
$7
.0
$8
3.
$0 .0
$0
.0
$0 .0
$0
.0
$6 1.
$5
.9
$0
.0
$0 .0
$0
.0
Ge n
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$1
,2
.1
$1
.6
$0 .0
$0
.0
$0 .0
$0
.0
$1
.5
$9
.9
$0 .0
$0
.0
$0 .0
R E V
C E F
P S I I n t e r t e k
P a g
E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
3/
5/ as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
Tr av el Ve hi cle
R en ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
Co st s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ai r F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pe r d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(E qu ip m en t P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pr oc ur em en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(S er vi ce s P ro cu re m in g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Dr ill in g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile La bo ra to ry
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su rv ey in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ut ili tie s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ha nd lin g
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra yt ica l C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d Ch ar ge s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
Ex pe on al P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ex pe nd ab le s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
Dr ill in g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( An al yt ica l r el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bt ot al
$1 ,2
.1
$1
.6
$0
.0
$0 .0
$0
.0
$0 .0
$1
.5
$9
.9
$0
.0
$0 .0
$0
.0
Co m pl et io n
Fe e
$1
.5
$1 3.
$0
.0
$0 .0
$0
.0
$0 .0
$1
0.
$9 6.
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$1 ,3
.6
$1
.5
$0
.0
$0 .0
$0
.0
$0 .0
$1
.8
$1
,0
.3
$0 .0
$0
.0
$0 .0
R E V
C E F
P S I I n t e r t e k
P a g
SubTask 6 4th Qtr Monthly O&M
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 0
Total hours: 0
Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 0 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 0 O&M checklists (1 hr/month) 0 review and submit quarterly deliverable 0
Total hours: 0
Project Scientist, J Daugherty Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0
Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0
Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0 Measure SVE wells from interior walls 1
Additional hours to collect vapor analytical samples 0
Total hours: 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 0 $0.00
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 0 $0.00
Summa cannisters $33.00 0 $0.00 $0.00
Shipping, large , overnight $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Construction/O&M/Pilot Test Kit $360.00 day 0 $0.00 Construction/O&M supplies $75.00 day 0 $0.00
$0.00 Expendables $40.00 day 0 $0.00
TOTAL EQUIPMENT $0.00
Page 3 Delta Pugh's ERIC_4814 0552-419229 TACO1 Delta
SubTask 7 RASS
DATE: 3/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Evaluate data 0 Review Final RASS/ Groundwater Report 0 Sign and Seal RASS 0
Total hours: 0
Project Engineer, J Newell Data reduction/evaluation 0 Preparation of remediation/ groundwater monitoring report 0 Create Final figures 0 Report - Prepare final tables and figure 0 Generate new basemap with updated legend 2 Overlay SVE wells on SB figure based on reconciled interior measurements 2 Generate ROI figure in contrast to soil contaminant plume 1 Include additional text to reference the data and support prior requests by the FDEP 3
Total hours: 8
CADD / GIS Specialist, D Grove Prepare figures for RASS, Groundwater 0
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 4 Delta Pugh's ERIC_4814 0552-419229 TACO1 Delta
E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
3/
5/ as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 8.
Pr oj ec t M an
.2
$6 4.
Pr in cip al C on su lta nt
, D C
$6 0.
Se ni or
E ng in ee r, M
R
$5
8.
Se ni or G eo lo gi st
, N W
$6 2.
Se ni or
E ng in ee r, GR
$3 4.
Ce rt ifi ed In du st ria l H yg ie nt ist
$5 6.
Ce rt ifi ed H az ar do us
M at er ia ls M an ag er
$6
0.
Se ni or G eo lo gi st
, M R
$5 8.
Pr oj ec t M an ag er
$4 8.
Pr oj ec t E ng in ee r, JN
$3
7.
Pr oj ec t G eo lo gi st
, S
AM
$3 9.
Pr oj ec t S cie nt ist
, S L
$3 3.
Pr oj ec t S cie nt ist
, S B
$4 0.
Pr oj ec t S cie nt ist
, J D
$3
4.
GI
S
Sp ec ia lis t, DG
$2 5.
St af f S cie nt ist , M
M
$2
8.
St af f S cie nt ist
, R P
$3 1.
Re m ed ia tio n Co or di na to r, RH
$3 0.
En vi ro nm en ta l S pe cia lis t, CC
$2
2.
En vi ro nm en ta l S pe cia lis
, M Z
$2 8.
En vi ro nm en ta l S pe cia lis t, DK
$2
0.
Ad m in ist ra tiv e As sis ta nt , B
M
$1
5.
Se cr et ar y
$0
.0
$0 .0
$0
.0
$0 .0
To ta l H ou rs
Di re ct La bo r
$2 0, 0.
$2
,4
.4
$4 ,5
.2
$2
,6
.9
$1 ,9
.0
$2
,6
.1
$2 ,6
.9
$2
,4
.2
$0 .0
$1
,5
.0
$0 .0
O ve rh ea d
1.
$3
1, 3.
$3 ,6
.1
$6
,8
.2
$4 ,0
.2
$2
,8
.5
$3 ,9
.8
$4
,0
.2
$3 ,7
.6
$0
.0
$2 ,4
.3
$0
.0
Ge n
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$5
2, 3.
$6 ,0
.6
$1
1, 9.
$6 ,7
.2
$4
,7
.5
$6 ,5
.0
$6
,7
.2
$6 ,2
.9
$0
.0
$4 ,0
.4
$0
.0
R E V
C E F
P S I I n t e r t e k
P a g
E P
C O S T
E S T I M A T E
Co nt ra ct or
Pr of es sio na l S er vi ce In du st rie s, In c.
(I nt er te k-
3/
5/ as k
Pr oj ec t M an ag em en t
Su bT as k
4t h Q tr M on th ly O
M
Si te
Pu gh 's
Dr yc le an er s E
RI
C_ as k
1s t Q tr M on th ly O
M w /S ys te m R ep ai rs Su bT as k
RA
SS
Ac tiv ity /P ha as k
2n d
Q tr
M on th ly
O
M Su bT as k
Ut ili tie s
Pr oj ec t M an ag er
Na na
W es tm as k
RA
SS
Su bT as k
Gr ou nd w at er
M on ito rin g
Su bT as k
3r d Q tr M on th ly O
M
Su bT as k
To ta ls
Tr av el Ve hi cle
R en ta l
$1 ,8
.0
$4
.0
$3
.0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$2
.0
$0 .0
M ile ag e Co st s
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ai r F ar e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pe r d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$1 ,8
.0
$4
.0
$3
.0
$0
.0
$3
.0
$3
.0
$0 .0
$0
.0
$2
.0
$0 .0
Su bc on tr ac to r
(E qu ip m en t P ro cu re m
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pr oc ur em en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(S er vi ce s P ro cu re m in g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Dr ill in g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile La bo ra to ry
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su rv ey in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1
.0
$0 .0
Ut ili tie s $1
0, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 0, 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r S ub to ta l
$1 0, 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$1
0, 0.
$1
.0
$0 .0
Ha nd lin g Fe e $6
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$6
.0
$1
2.
$0 .0
To ta l S ub co nt ra ct or
C os t $1
1, 7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$1 1, 0.
$1
.5
$0
.0
La bo ra yt ica l C os ts $7
,2
.0
$4
.0
$2 ,0
.0
$0
.0
$4
.0
$2 ,0
.0
$0
.0
$0 .0
$2
,0
.0
$0 .0
Fa st T ur na ro un d Ch ar ge s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $7
.0
$1
.0
$1
.0
$0
.0
$1
.0
$1
.0
$0 .0
$0
.0
$1
.0
$0 .0
To ta l L ab or at or y $7
,9
.0
$6
.0
$2 ,2
.0
$0
.0
$6
.0
$2 ,2
.0
$0
.0
$0 .0
$2
,2
.0
$0 .0
Fi el d
Ex pe on al P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ex pe nd ab le s $6
.0
$2
.0
$1
.0
$0
.0
$1
.0
$1
.0
$0 .0
$0
.0
$8 0.
$0
.0
Eq ui pm en t ( Dr ill in g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
An al yt ica l r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( O th er
$7
,6
.0
$2 ,1
.0
$1
,3
.0
$0 .0
$1
,3
.0
$1 ,3
.0
$0
.0
$0 .0
$1
,5
.0
$0 .0
To ta l F ie ld
E xp en se s $8
,2
.0
$2 ,3
.0
$1
,4
.0
$0 .0
$1
,4
.0
$1 ,4
.0
$0
.0
$0 .0
$1
,5
.0
$0 .0
Su bt ot al
$8 1, 6.
$6
,0
.6
$1 4, 0.
$1
0, 4.
$4 ,7
.5
$8
,9
.0
$1 0, 4.
$6
,2
.9
$1 1, 0.
$8
,2
.9
$0 .0
Co m pl et io n Fe e $5
,2
.3
$6
.5
$1 ,1
.9
$6
.2
$4
.9
$6
.7
$6
.2
$6
.5
$0
.0
$4
.1
$0 .0
To ta l E st im at ed C os t
$8 7, 3.
$6
,6
.1
$1 6, 0.
$1
1, 8.
$5 ,2
.5
$9
,5
.7
$1 1, 8.
$6
,8
.4
$1 1, 0.
$8
,6
.0
$0 .0
R E V
C E F
P S I I n t e r t e k
P a g
Scope of Work
The scope of work consists of amendments to Subtask 6 and 7. The amendment for subtask 6 includes measuring the distance from the SVE wells to the interior walls. The amendments for subtask 7 include genera ng a new basemap with an updated legend, overlaying SVE wells on SB figures based on interior measurements, genera ng an ROI figure in contrast to the soil contaminant plume, and including addi onal text to reference the data. All amendments have been made at the request of FDEP.