This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI), modifying an existing task assignment under Contract Number HW686. The change order amends the scope of work for site remediation activities at Pugh's Dry Cleaners (ERIC_4814), located at 215 South Bay Street, Lake County, Florida. The project manager for FDEP is Mary Uribe, and the contractor's project manager is Joshua Newell.

The change order modifies Subtasks 6 and 7 of the original task assignment, which involves site remediation, maintenance and operations, groundwater monitoring, and a Remedial Action Summary and Support (RASS) report. Subtask 6 amendments include measuring the distance from soil vapor extraction (SVE) wells to interior walls. Subtask 7 amendments include generating a new basemap with updated legend, overlaying SVE wells on soil boring figures based on interior measurements, generating a Region of Interest (ROI) figure contrasting with the soil contaminant plume, and adding supporting text. The amended total task value is $88,538.94, with a fixed unit rate of $77,818.94 and cost reimbursement of $10,720.00 for utilities. The task completion date remains July 31, 2025, with the final deliverable due May 30, 2025. All amendments were made at FDEP's request, and PSI's time, labor, and subcontractor costs have been reviewed as reasonable for the scope of services.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC003E 1 HW686

Mary Uribe • Responsibilities o As a Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342

ERIC_4814

Pugh's Dry Cleaners

✔ $ 77,818.94 $ 76,493.29

$ 10,720.00 $ 10,720.00

$ 88,538.94 $ 87,213.29 ✔ Completion

Completion 07/31/2025 07/31/2025 0

1 1

Contractor

Digitally signed by Joshua S Newell Date: 2025.05.19 09:10:25-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.05.09 18:22:21 -04'00'

ST 7 RASS update: adding ROI test and data overlays on revised figures.

ST 6 O&M update: adding SVE distance .measurements

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW686

DC003E

$ 88,538.94

Subtask 2: 1st Qtr Monthly O&M with system repairs

Subtasks 3 and 4: 2nd qtr monthly O&M and RASS

Subtask 5: 3rd qtr monthly O&M

Subtask 6: 4th qtr monthly O&M

Subtasks 1, 7, and 9: Project management, RASS, groundwater monitoring

Subtask 8: Paid utility invoices - utilities not to exceed $8,800.00, telemetry not to exceed &1,920.00, handling fee not to exceed $640.

Subtask 2: DEP approval of 1st Qtr Monthly O&M with system repairs

Subtask 5: DEP approval of 3rd qtr monthly O&M

Subtask 6: DEP approval of 4th qtr monthly O&M

Subtask 8: DEP approval of Paid utility invoices - utilities not to exceed $8,800.00, telemetry not to exceed &1,920.00, handling fee not to exceed $640.

Subtasks 1, 7, and 9: DEP approval of Project management, RASS, groundwater monitoring

Subtasks 3 and 4: DEP approval of 2nd qtr monthly O&M and RASS

07/20/2024

10/30/2024

01/20/2025

04/20/2025

05/30/2025

04/30/2025

$ 16,705.97

$ 16,010.40

$ 9,591.74

$ 11,561.29

$ 23,309.54

$ 11,360.00

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert

Secretary

Memorandum

TO: ERIC_4814

Pugh’s Dry Cleaners

FROM: Mary Uribe, Project Manager

SUBJECT: Negotiation Summary

HW686 DC003E CO 1

DATE: April 29th, 2025

This summary is for Change Order DC003E-1. The tasking includes amendments to Subtask 6 and 7. The amendment for subtask 6 includes measuring the distance from the SVE wells to the interior walls. The amendments for subtask 7 include generating a new basemap with an updated legend, overlaying SVE wells on SB figures based on interior measurements, generating an ROI figure in contrast to the soil contaminant plume, and including additional text to reference the data. All amendments have been made at the request of FDEP.

Total updated task amount is $88,538.94. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is 05/30/2025 and has not changed. Task completion date is July 31st, 2025 and has not changed.

F D E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

PS

I)

Da te

3/

5/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha se as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm ar k as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an ag er

.1

$6 4.

Pr in cip al C on su lta nt

, D C

$6 0.

Se ni or

E ng in ee r, M

R

$5

8.

Se ni or G eo lo gi st

, N W

$6 2.

Se ni or

E ng in ee r, GR

$3 4.

Ce rt ifi ed In du st ria l H yg ie nt ist

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er

$6

0.

Se ni or G eo lo gi st

, M R

$5 8.

Pr oj ec t M an ag er

$4 8.

Pr oj ec t E ng in ee r, JN

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S cie nt ist

, S L

$3 3.

Pr oj ec t S cie nt ist

, S B

$4 0.

Pr oj ec t S cie nt ist

, J D

$3

4.

GI

S

Sp ec ia lis t, DG

$2 5.

St af f S cie nt ist , M

M

$2

8.

St af f S cie nt ist

, R P

$3 1.

Re m ed ia tio n Co or di na to r, RH

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

$2

2.

En vi ro nm en ta l S pe cia lis

, M Z

$2 8.

En vi ro nm en ta l S pe cia lis t, DK

$2

0.

Ad m in ist ra tiv e As sis ta nt , B

M

$1

5.

Se cr et ar y

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

Di re ct La bo r

$2 1, 0.

$2

,4

.6

$4 ,5

.2

$2

,6

.9

$1 ,9

.0

$2

,6

.1

$2 ,7

.8

$2

,8

.2

$0 .0

$1

,5

.0

$0 .0

O ve rh ea d

1.

$3

2, 8.

$3 ,7

.5

$6

,8

.2

$4 ,0

.2

$2

,8

.5

$3 ,9

.8

$4

,1

.0

$4 ,3

.5

$0

.0

$2 ,4

.3

$0

.0

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$5

3, 8.

$6 ,1

.2

$1

1, 9.

$6 ,7

.2

$4

,7

.5

$6 ,5

.0

$6

,8

.8

$7 ,1

.8

$0

.0

$4 ,0

.4

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

3/

5/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cle

R en ta l

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s P ro cu re m

Dr ill in g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Dr ill in g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile La bo ra to ry

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

$0 .0

Ut ili tie s $1

0, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 0, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$1 0, 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

0, 0.

$1

.0

$0 .0

Ha nd lin g Fe e $6

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$6

.0

$1

2.

$0 .0

To ta l S ub co nt ra ct or

C os t $1

1, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 1, 0.

$1

.5

$0

.0

La bo ra to ry

An al yt ica l C os ts $7

,2

.0

$4

.0

$2 ,0

.0

$0

.0

$4

.0

$2 ,0

.0

$0

.0

$0 .0

$2

,0

.0

$0 .0

Fa st T ur na ro un d Ch ar ge s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $7

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

To ta l L ab or at or y $7

,9

.0

$6

.0

$2 ,2

.0

$0

.0

$6

.0

$2 ,2

.0

$0

.0

$0 .0

$2

,2

.0

$0 .0

Fi el d

Ex pe ns es

Pe rs on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $6

.0

$2

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$8 0.

$0

.0

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ica l r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$7

,6

.0

$2 ,1

.0

$1

,3

.0

$0 .0

$1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$1

,5

.0

$0 .0

To ta l F ie ld

E xp en se s $8

,2

.0

$2 ,3

.0

$1

,4

.0

$0 .0

$1

,4

.0

$1 ,4

.0

$0

.0

$0 .0

$1

,5

.0

$0 .0

Su bt ot al

$8 3, 2.

$6

,1

.2

$1 4, 0.

$1

0, 4.

$4 ,7

.5

$8

,9

.0

$1 0, 6.

$7

,1

.8

$1 1, 0.

$8

,2

.9

$0 .0

Co m pl et io n Fe e $5

,3

.8

$6

.4

$1 ,1

.9

$6

.2

$4

.9

$6

.7

$6

.4

$7

.9

$0

.0

$4

.1

$0 .0

To ta l E st im at ed C os t

$8 8, 8.

$6

,7

.6

$1 6, 0.

$1

1, 8.

$5 ,2

.5

$9

,5

.7

$1 1, 1.

$7

,9

.8

$1 1, 0.

$8

,6

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Pugh's Drycleaners ERIC_4814 SubTask 2 1st Qtr Monthly O&M w/System Repairs

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), 3 Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 Research, order, and obtain new motor starter, power supply, intrensic relays, and blower bearings 8 Review and submit quarterly deliverable 4

Total hours: 27

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Mobilizations (2) - Remove blower, then return to reinstall blower and parts. 10 Install motor starter, power supply, and intrinsic relays 2 Disassemble blower from system 5 Rebuild blower with new bearings 16 Re-install blower into the SVE system 5

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 1

Total hours: 75

TOTAL LABOR 105

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 5 $1,800.00 Construction/O&M supplies $75.00 day 5 $375.00

$2,175.00 Expendables $40.00 day 5 $200.00

TOTAL EQUIPMENT $2,375.00

TO-15 (VOCs) (Qtr infl and eff)

FINAL --7/24/96

Page 4 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 3 2nd Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 3

Total hours: 39

TOTAL LABOR 61

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00

Summa cannisters $33.00 9 $297.00 $2,097.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $2,247.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 5 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 4 RASS

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS 2 Sign and Seal RASS 1

Total hours: 5

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation report 8 Create figures 4 Report - Prepare final tables and figure 8

Total hours: 32

CADD / GIS Specialist, D Grove Prepare figures for RASS 2

TOTAL LABOR 39

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 6 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 5 3rd Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Additional hours to collect vapor analytical samples 1

Total hours: 37

TOTAL LABOR 59

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$200.00 2 $400.00

Summa cannisters $33.00 2 $66.00 $466.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $616.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

TO-15 (VOCs) (infl and eff)

Page 7 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 6 4th Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 3

Total hours: 3

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 6 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 6 O&M checklists (1 hr/month) 3 review and submit quarterly deliverable 4

Total hours: 19

Project Scientist, J Daugherty Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1

Monthly Field preparation 1 Mobilization 5 Conduct O&M, optimize performance 2 Collect vacuum influence / vacuum flow measurements 1 Collect vapor samples for PID screening 1 Monthly preparation, recording of system data to ongoing operational tables 1 O&M checklists (1 hr/month) 1 Measure SVE wells from interior walls 1

Additional hours to collect vapor analytical samples 3

Total hours: 40

TOTAL LABOR 62

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 3 $360.00

$0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 9 $1,800.00

Summa cannisters $33.00 9 $297.00 $2,097.00

Shipping, large , overnight $150.00 1 $150.00

TOTAL LAB $2,247.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 3 $1,080.00 Construction/O&M supplies $75.00 day 3 $225.00

$1,305.00 Expendables $40.00 day 3 $120.00

TOTAL EQUIPMENT $1,425.00

Page 8 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 7 RASS

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 2 Review Final RASS/ Groundwater Report 5 Sign and Seal RASS 1

Total hours: 8

Project Engineer, J Newell Data reduction/evaluation 12 Preparation of remediation/ groundwater monitoring report 12 Create Final figures 4 Report - Prepare final tables and figure 8 Generate new basemap with updated legend 2 Overlay SVE wells on SB figure based on reconciled interior measurements 2 Generate ROI figure in contrast to soil contaminant plume 1 Include additional text to reference the data and support prior requests by the FDEP 3

Total hours: 44

CADD / GIS Specialist, D Grove Prepare figures for RASS, Groundwater 8

TOTAL LABOR 60

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 9 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 8 Utilities

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Duke Energy Electric December 2023 - March 2025 $550.00 Month 16 $8,800.00

Century Link Phone December 2023 - March 2025 $120.00 Month 16 $1,920.00 $10,720.00

Handling fee Electric December 2023 - March 2025 $20.00 Month 16 $320.00 Handling fee phone December 2023 - March 2025 $20.00 Month 16 $320.00

$640.00

$0.00 $0.00 $0.00

TOTAL $11,360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 10 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

SubTask 9 Groundwater Monitoring

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical Oversight 3

Project Scientist, J Daugherty Field preparation 1 Travel (2 roundtrips for gw sampling) 10 Collect groundwater samples 1 shallow wells @ 1 hour each 1 3 deep well @ 2 hours each 6 Documentation of groundwater sampling & measurements 2 stage IDW drum 1

Total hours: 21

Staff Scientist, M Matar Travel (2 roundtrips for gw sampling) 10 Collect groundwater samples 7 intermediate wells @ 1.5 hr each 11 pickup, drop off sample kits 1

Total hours: 22

TOTAL LABOR 46

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

$0.00

Petrotech Southeast, Inc. IDW transport & disposal 1 $125.00 $125.00 $0.00 $0.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

EPA Method 8260 $73.00 11 1 $876.00 Sulfate, EPA Method 300.0 $21.00 3 $63.00 TDS by EPA Method 2011 $16.00 3 $48.00 Iron by EPA Method 6020, ICP / MS $15.00 3 $45.00 Sodium by EPA Method 6020, ICP / MS $15.00 3 $45.00 Manganese by EPA Method 6020, ICP / MS $15.00 3 $45.00 TRPH by FL-PRO $88.00 11 $968.00

$2,090.00 $0.00 Sample Shipping, Large, Overnight $150.00 1 $150.00

$0.00 $0.00

TOTAL LAB $2,240.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 Deep Groundwater Sampling Kit $415.00 day 2 $830.00 Drum for IDW $100.00 each 1 $1,410.00 $100.00

$1,510.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $1,590.00

Page 11 Final Pugh's ERIC_4814 0552-419229 TACO1 Final

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

3/

5/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an

0.

$6 4.

Pr in cip al C on su lta nt

, D C

$6 0.

Se ni or

E ng in ee r, M

R

$5

8.

Se ni or G eo lo gi st

, N W

$6 2.

Se ni or

E ng in ee r, GR

$3 4.

Ce rt ifi ed In du st ria l H yg ie nt ist

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er

$6

0.

Se ni or G eo lo gi st

, M R

$5 8.

Pr oj ec t M an ag er

$4 8.

Pr oj ec t E ng in ee r, JN

$3 7.

Pr oj ec t G eo lo gi st , S

AM

$3

9.

Pr oj ec t S cie nt ist , S

L

$3

3.

Pr oj ec t S cie nt ist , S

B

$4

0.

Pr oj ec t S cie nt ist , J

D

$3

4.

GI

S

Sp ec ia lis t, DG

$2 5.

St af f S cie nt ist , M

M

$2

8.

St af f S cie nt ist

, R P

$3 1.

Re m ed ia tio n Co or di na to r, RH

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

$2

2.

En vi ro nm en ta l S pe cia lis

, M Z

$2 8.

En vi ro nm en ta l S pe cia lis t, DK

$2

0.

Ad m in ist ra tiv e As sis ta nt , B

M

$1

5.

Se cr et ar y

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

Di re ct La bo r

$4

.1

$5 5.

$0

.0

$0 .0

$0

.0

$0 .0

$4

0.

$3

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$7

.0

$8

3.

$0 .0

$0

.0

$0 .0

$0

.0

$6 1.

$5

.9

$0

.0

$0 .0

$0

.0

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$1

,2

.1

$1

.6

$0 .0

$0

.0

$0 .0

$0

.0

$1

.5

$9

.9

$0 .0

$0

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

3/

5/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cle

R en ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

Co st s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s P ro cu re m in g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Dr ill in g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile La bo ra to ry

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ut ili tie s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ha nd lin g

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra yt ica l C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d Ch ar ge s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

Dr ill in g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ica l r el at ed

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bt ot al

$1 ,2

.1

$1

.6

$0

.0

$0 .0

$0

.0

$0 .0

$1

.5

$9

.9

$0

.0

$0 .0

$0

.0

Co m pl et io n

Fe e

$1

.5

$1 3.

$0

.0

$0 .0

$0

.0

$0 .0

$1

0.

$9 6.

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$1 ,3

.6

$1

.5

$0

.0

$0 .0

$0

.0

$0 .0

$1

.8

$1

,0

.3

$0 .0

$0

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

SubTask 6 4th Qtr Monthly O&M

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg System evaluation (1 hr/month), review and submittal 0

Total hours: 0

Project Engineer, J Newell Telemetry check (3 times per week = 2 hours per month) 0 Provide oversight and technical support (2 hr/monthly, 6 hrs/quarterly) 0 O&M checklists (1 hr/month) 0 review and submit quarterly deliverable 0

Total hours: 0

Project Scientist, J Daugherty Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0

Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0

Monthly Field preparation 0 Mobilization 0 Conduct O&M, optimize performance 0 Collect vacuum influence / vacuum flow measurements 0 Collect vapor samples for PID screening 0 Monthly preparation, recording of system data to ongoing operational tables 0 O&M checklists (1 hr/month) 0 Measure SVE wells from interior walls 1

Additional hours to collect vapor analytical samples 0

Total hours: 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Equipment Van / Truck $120.00 day 0 $0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (infl and eff per Qtr, 7 SVE wells) $200.00 0 $0.00

Summa cannisters $33.00 0 $0.00 $0.00

Shipping, large , overnight $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 0 $0.00 Construction/O&M supplies $75.00 day 0 $0.00

$0.00 Expendables $40.00 day 0 $0.00

TOTAL EQUIPMENT $0.00

Page 3 Delta Pugh's ERIC_4814 0552-419229 TACO1 Delta

SubTask 7 RASS

DATE: 3/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Evaluate data 0 Review Final RASS/ Groundwater Report 0 Sign and Seal RASS 0

Total hours: 0

Project Engineer, J Newell Data reduction/evaluation 0 Preparation of remediation/ groundwater monitoring report 0 Create Final figures 0 Report - Prepare final tables and figure 0 Generate new basemap with updated legend 2 Overlay SVE wells on SB figure based on reconciled interior measurements 2 Generate ROI figure in contrast to soil contaminant plume 1 Include additional text to reference the data and support prior requests by the FDEP 3

Total hours: 8

CADD / GIS Specialist, D Grove Prepare figures for RASS, Groundwater 0

TOTAL LABOR 8

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

Page 4 Delta Pugh's ERIC_4814 0552-419229 TACO1 Delta

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

3/

5/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 8.

Pr oj ec t M an

.2

$6 4.

Pr in cip al C on su lta nt

, D C

$6 0.

Se ni or

E ng in ee r, M

R

$5

8.

Se ni or G eo lo gi st

, N W

$6 2.

Se ni or

E ng in ee r, GR

$3 4.

Ce rt ifi ed In du st ria l H yg ie nt ist

$5 6.

Ce rt ifi ed H az ar do us

M at er ia ls M an ag er

$6

0.

Se ni or G eo lo gi st

, M R

$5 8.

Pr oj ec t M an ag er

$4 8.

Pr oj ec t E ng in ee r, JN

$3

7.

Pr oj ec t G eo lo gi st

, S

AM

$3 9.

Pr oj ec t S cie nt ist

, S L

$3 3.

Pr oj ec t S cie nt ist

, S B

$4 0.

Pr oj ec t S cie nt ist

, J D

$3

4.

GI

S

Sp ec ia lis t, DG

$2 5.

St af f S cie nt ist , M

M

$2

8.

St af f S cie nt ist

, R P

$3 1.

Re m ed ia tio n Co or di na to r, RH

$3 0.

En vi ro nm en ta l S pe cia lis t, CC

$2

2.

En vi ro nm en ta l S pe cia lis

, M Z

$2 8.

En vi ro nm en ta l S pe cia lis t, DK

$2

0.

Ad m in ist ra tiv e As sis ta nt , B

M

$1

5.

Se cr et ar y

$0

.0

$0 .0

$0

.0

$0 .0

To ta l H ou rs

Di re ct La bo r

$2 0, 0.

$2

,4

.4

$4 ,5

.2

$2

,6

.9

$1 ,9

.0

$2

,6

.1

$2 ,6

.9

$2

,4

.2

$0 .0

$1

,5

.0

$0 .0

O ve rh ea d

1.

$3

1, 3.

$3 ,6

.1

$6

,8

.2

$4 ,0

.2

$2

,8

.5

$3 ,9

.8

$4

,0

.2

$3 ,7

.6

$0

.0

$2 ,4

.3

$0

.0

Ge n

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$5

2, 3.

$6 ,0

.6

$1

1, 9.

$6 ,7

.2

$4

,7

.5

$6 ,5

.0

$6

,7

.2

$6 ,2

.9

$0

.0

$4 ,0

.4

$0

.0

R E V

C E F

P S I I n t e r t e k

P a g

E P

C O S T

E S T I M A T E

Co nt ra ct or

Pr of es sio na l S er vi ce In du st rie s, In c.

(I nt er te k-

3/

5/ as k

Pr oj ec t M an ag em en t

Su bT as k

4t h Q tr M on th ly O

M

Si te

Pu gh 's

Dr yc le an er s E

RI

C_ as k

1s t Q tr M on th ly O

M w /S ys te m R ep ai rs Su bT as k

RA

SS

Ac tiv ity /P ha as k

2n d

Q tr

M on th ly

O

M Su bT as k

Ut ili tie s

Pr oj ec t M an ag er

Na na

W es tm as k

RA

SS

Su bT as k

Gr ou nd w at er

M on ito rin g

Su bT as k

3r d Q tr M on th ly O

M

Su bT as k

To ta ls

Tr av el Ve hi cle

R en ta l

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

M ile ag e Co st s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$4

.0

$3

.0

$0

.0

$3

.0

$3

.0

$0 .0

$0

.0

$2

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s P ro cu re m in g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Dr ill in g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile La bo ra to ry

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

$0 .0

Ut ili tie s $1

0, 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 0, 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r S ub to ta l

$1 0, 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$1

0, 0.

$1

.0

$0 .0

Ha nd lin g Fe e $6

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$6

.0

$1

2.

$0 .0

To ta l S ub co nt ra ct or

C os t $1

1, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 1, 0.

$1

.5

$0

.0

La bo ra yt ica l C os ts $7

,2

.0

$4

.0

$2 ,0

.0

$0

.0

$4

.0

$2 ,0

.0

$0

.0

$0 .0

$2

,0

.0

$0 .0

Fa st T ur na ro un d Ch ar ge s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sa m pl e Sh ip pi ng $7

.0

$1

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

To ta l L ab or at or y $7

,9

.0

$6

.0

$2 ,2

.0

$0

.0

$6

.0

$2 ,2

.0

$0

.0

$0 .0

$2

,2

.0

$0 .0

Fi el d

Ex pe on al P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ex pe nd ab le s $6

.0

$2

.0

$1

.0

$0

.0

$1

.0

$1

.0

$0 .0

$0

.0

$8 0.

$0

.0

Eq ui pm en t ( Dr ill in g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

An al yt ica l r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$7

,6

.0

$2 ,1

.0

$1

,3

.0

$0 .0

$1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$1

,5

.0

$0 .0

To ta l F ie ld

E xp en se s $8

,2

.0

$2 ,3

.0

$1

,4

.0

$0 .0

$1

,4

.0

$1 ,4

.0

$0

.0

$0 .0

$1

,5

.0

$0 .0

Su bt ot al

$8 1, 6.

$6

,0

.6

$1 4, 0.

$1

0, 4.

$4 ,7

.5

$8

,9

.0

$1 0, 4.

$6

,2

.9

$1 1, 0.

$8

,2

.9

$0 .0

Co m pl et io n Fe e $5

,2

.3

$6

.5

$1 ,1

.9

$6

.2

$4

.9

$6

.7

$6

.2

$6

.5

$0

.0

$4

.1

$0 .0

To ta l E st im at ed C os t

$8 7, 3.

$6

,6

.1

$1 6, 0.

$1

1, 8.

$5 ,2

.5

$9

,5

.7

$1 1, 8.

$6

,8

.4

$1 1, 0.

$8

,6

.0

$0 .0

R E V

C E F

P S I I n t e r t e k

P a g

Scope of Work

The scope of work consists of amendments to Subtask 6 and 7. The amendment for subtask 6 includes measuring the distance from the SVE wells to the interior walls. The amendments for subtask 7 include genera ng a new basemap with an updated legend, overlaying SVE wells on SB figures based on interior measurements, genera ng an ROI figure in contrast to the soil contaminant plume, and including addi onal text to reference the data. All amendments have been made at the request of FDEP.