CN-370000-HW686-DC005A.pdf
PDF 2 MB Posted
- Contract number
- HW686
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW686 for well abandonment services at the Pure Cleaners facility located at 954 West State Road 434 in Longwood, Seminole County. The task is assigned to Professional Service Industries, Inc. (PSI), an Intertek company, with project management oversight provided by the FDEP. The TA was executed on March 14, 2022, with a completion date of August 31, 2022, and is designated as Task Assignment DC005A with project number ERIC_5494.
The scope of work authorizes PSI to complete the abandonment of 19 monitoring wells in advance of site redevelopment in accordance with Water Management District and FDEP regulations. The project includes two primary subtasks: Subtask 1 comprises project management activities totaling 4 hours, and Subtask 2 encompasses well abandonment oversight and reporting totaling 46 hours. PSI obtained competitive quotes from three licensed drilling contractors and selected Preferred Drilling Services, Inc. at a cost of $7,975.00 as the lowest responsive bid based on availability. The total TA value is $15,206.60 on a fixed unit rate basis, which includes PSI's labor costs of $5,085.54, overhead of $3,059.59, travel expenses of $360.00, subcontractor services of $8,772.50, and field expenses of $480.00. The primary deliverable is a Well Abandonment Report with project management documentation due May 10, 2022, with invoice payment conditioned upon FDEP approval. Funding information shows "N/A" for all budget categories, indicating this work is covered under the existing HW686 contract.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
DC005A Completion August 31, 2022
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to complete well abandonment in advance of site development in accordance with the PSI scope of work, bid documentation, cost estimate, and schedule received on March 10, 2022.
Walsta Jean-Baptiste 850-245-8973 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
PSI
PSI
Nana G. Westmark 813-886-1075
ERIC_5494
954 West State Road 434, Longwood, Seminole County
Pure Cleaners
$ 0.00 ✔ $ 15,206.60
$ 0.00
$ 15,206.60
Scope of Work
Nana G. Westmark
Contract Manager
Nana G Westmark Digitally signed by Nana G Westmark Date: 2022.03.14 11:01:05 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.11 15:26:13 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Well Abandonment Report and Project Management - Subtasks 1 and 2 05/10/2022
FDEP approval of Well Abandonment Report and Project Management - Subtasks 1 and 2 $ 15,206.60
$ 15,206.60
HW686
DC005A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton
Secretary
Memorandum
TO: HW686 Contract File
FROM: Walsta Jean-Baptiste, Contract Manager
SUBJECT: Pure Cleaners DC005A;
Well Abandonment
DATE: March 11, 2022
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to complete well abandonment in advance of site development in accordance with the PSI scope of work, bid documentation, cost estimate, and schedule received on March 10, 2022.
Based on site redevelopment and the property owner’s interest in conditional site closure, PSI is abandoning select wells in development areas. Remaining wells will be used for site monitoring during the evaluation of site closure options.
Preferred Drilling was selected based on availability and cost. While they do not have the lowest cost, their bid is considered the lowest responsive bid based on availability. Their cost is $85 higher than Ambient Technologies (no availability in March 2022).
One hour for vehicle loading was removed from Subtask 2.
The total cost related to this Task Assignment is $15,206.60 with 56 hours.
PSI Proposal Number: 0552-368409 March 10, 2022
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Walsta Jean-Baptiste, PG Professional Geologist II Phone: (850) 245-8705 main, (850) 245-8973 direct Email: Walsta.JeanBaptiste@FloridaDEP.gov
Re: Proposal for Well Abandonment
Pure Cleaners (a.k.a. Cleaners 46), 954 West State Road 434
Longwood, Seminole County, Florida FDEP Facility ID No. 59 9601438 / ERIC_5494
Dear Ms. Jean-Baptiste:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide oversight of monitoring well abandonment in support of a Conditional Closure for the Pure Cleaners (a.k.a Cleaners 46) at 954 West State Road 434, Longwood, Florida. Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
Drycleaning operations at the Pure Cleaners began in the late 1970s or early 1980s. Based on documented impacts from the drycleaner, the facility was deemed eligible for acceptance into the Florida Drycleaning Solvent Cleanup Program in January 1997, and assessment activities commenced in July through October 1997. Contaminated sediments were excavated from a drainage ditch behind the drycleaners, and remediation was performed with Air Sparge/ Soil Vapor Extraction (AS/ SVE). The AS / SVE system operated for approximately 31 months and was deactivated. The business is still in operation as a drycleaner and the site has been under natural attenuation monitoring (NAM) since October 2002.
The most recent groundwater sampling event occurred in December 2020. The results of the sampling activities indicated concentrations of the contaminants of concern (COC) have steadily mailto:Walsta.JeanBaptiste@FloridaDEP.gov
FDEP – Pure Cleaners (aka Cleaners 46) decreased since 2011. Only two wells exhibited an exceedance of the VOH compounds in 2020 (TCE at 9.6 ug/L in MW019, and vinyl chloride detected at 2.4 ug/L in MW026).
The property owner has indicated that they are amenable to working with the Department to obtain a Conditional Closure, per Chapter 62-780, due to the low concentrations of the contaminants of concern and their desire to move quickly towards closure. The property is scheduled for redevelopment and, it’s our understanding that the Department wishes to have most of the monitoring wells abandoned to facilitate the new construction.
Therefore, we are proposing to provide oversight for monitoring well development for most of the wells on the property.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of oversight of monitoring well abandonment according to protocols of the Water Management District and the FDEP. PSI obtained three price quotes from licensed drilling firms to abandon the wells.
Subtask 1. Project Management
This scope is provided for in the template worksheets.
Subtask 2. Well Abandonment and Letter Report
a. PSI solicited price quotes from three licensed well drilling contractors (National
Environmental Technology Inc. (NET), ATI Drilling and Preferred Drilling Services) specifying the abandonment of nineteen one-inch and two-inch diameter monitor wells ranging from approximately 6.0 feet bls to 41 feet in depth. The lowest cost estimate was provided by Preferred Drilling Services and was selected to provide the well abandonment services.
Of the monitoring wells on site, eight are proposed to remain on the site for future monitoring purposes:
Well To Remain for Future Use
MW001 MW016
MW009 MW017
MW010 MW019
MW015 MW026
The wells listed below are proposed for abandonment.
Wells for Abandonment
MW003 MW020
MW004 MW023
MW005 MW027
MW006 MW028
MW008 MW029
MW011 MW030
MW012 AS004
MW013 AS006
MW014 AS012
MW018
Several other wells including MW021, MW022, MW024 are typically under water and will not be abandoned. Well permits will be obtained by the selected water well contractor.
PSI will mobilize to the site and provide oversite for the well abandonment. The licensed well drilling contractor will abandon the wells in accordance with the Water Management District (WMD) requirements, by injecting cement grout in the well casing from the bottom up. The well vaults for the nineteen wells will also be abandoned with clean fill and the concrete pads removed. The discarded concrete will be removed and transported as construction / demolition material. The drilling firm will also submit the proper well abandonment certificate(s) to the WMD and/or other appropriate agencies, if necessary.
The wells proposed for abandonment are located throughout the parking area, near the back door of the former Pure Cleaners, and in the woods near the lake. PSI will coordinate with the tenant or property owner to obtain access to abandon the monitor wells.
b. PSI will submit a brief letter report detailing the above described field activities along with copies of well abandonment permits.
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the well abandonment is shown on the attached Cost Estimate and Level of Effort which includes a brief letter report deliverable. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. We understand that the well abandonment project is time critical in order to allow construction services to proceed with a minimum of schedule changes. The drilling firm to be subcontracted will make every attempt to expedite this service.
We anticipate developing the well abandonment report including permits for submittal within seven to nine weeks.
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Ryan Fetter Nana Westmark, PG, CHMM Project Scientist Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort Drilling Firm Quotes
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552------Pure Cleaners\Proposals\Pure ERIC_5494 Well Abandon 0552-368409.docx
Professional Service Industries, Inc. (Intertek-PSI) Request for Quotation
Facility Name Pure Cleaners (former) (aka Cleaners 46) Facility Location 954 West State Road 434, Longwood, Seminole County Facility ID ERIC_5423 FDEP Drycleaning Solvent Cleanup Program
Units Unit Rate Extended Price
1 575.00$ 575.00$
2 1,515.00$ 3,030.00$
11 85.00$ 935.00$
7 185.00$ 1,295.00$
1 155.00$ 155.00$
19 100.00$ 1,900.00$
65.00$ -$
Per diem -$
TBC TBC
Total: 7,890.00$
Signed PSI Purchase Order is required before working.
All equipment to be decontaminated prior to boring / well installation by steam cleaning.
OSHA HazWOPER trained crew required.
Include per diem in cost, if necessary.
Estimated start date: March 21, 2022 or as early as possible Company Name: Ambient Technologies Inc Address: 4610 Central Ave, St. Pete, FL 33711 Phone: 727 328-0268 Email: marcelo@ambienttech.com Contact: Marcelo Reis Proposal #: 22203010
V.P.
Name, Title.
Permtis
Monitoring Well Abandonment according to Water Management District and FDEP regulations- 19 groundwater monitoring wells
(11 shallow to ~ 12 feet)
(7 intermediate wells to ~29 feet)
(1 deeper well to ~41 feet)
One well to 29 feet is 2 inch diameter
All other wells are between 1/2 inch to 1 inch diamater.
Access is difficult, will need to clear some vegetation and small trees, brush. Track mounted is needed.
Mobilization (lump sum)
Drums (each), if needed
Standard Rig Daily Charge (per day)
Abandonment of 1 deeper well
Abandonment of 11 shallow wells
Removal and disposal of pads and skirts
Abandonment of 7 intermediate wells
Professional Service Industries, Inc. (Intertek-PSI) Request for Quotation
Facility Name Pure Cleaners (former) (aka Cleaners 46) Facility Location 954 West State Road 434, Longwood, Seminole County Facility ID ERIC_5423 FDEP Drycleaning Solvent Cleanup Program
Units Unit Rate Extended Price
1 775.00$ 775.00$
2 475.00$ 950.00$
132 10.00$ 1,320.00$
203 10.00$ 2,030.00$
41 10.00$ 410.00$
19 110.00$ 2,090.00$
Per diem 1 400.00$ 400.00$
Total: 7,975.00$
Signed PSI Purchase Order is required before working.
All equipment to be decontaminated prior to boring / well installation by steam cleaning.
OSHA HazWOPER trained crew required.
Include per diem in cost, if necessary.
Estimated start date: March 21, 2022 or as early as possible Company Name: Preferred Drilling Solution, Inc.
Address: 8820 66th St North, Pinellas Park, FL Phone: 727-561-7477 Email: kevin@pdsflorida.com Contact: Kevin Bonacum, Estimator
Name, Title.
Permtis
Monitoring Well Abandonment according to Water Management District and FDEP regulations- 19 groundwater monitoring wells (11 shallow to ~ 12 feet) (7 intermediate wells to ~29 feet) (1 deeper well to ~41 feet) One well to 29 feet is 2 inch diameter All other wells are between 1/2 inch to 1 inch diamater.
Access is difficult, will need to clear some vegetation and small trees, brush. Track mounted is needed.
Mobilization (lump sum)
Drums (each), if needed
Standard Rig Daily Charge (per day) (Skid Loader)
Abandonment of 1 deeper well
Abandonment of 11 shallow wells
Removal and disposal of pads and skirts
Abandonment of 7 intermediate wells
Kevin Bonacum, Estimator
3/9/22
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 3/10/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Pure Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 Evaluation / Report SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$55.84 Project Manager 4 4.2 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0
$62.64 Senior Engineer, MR 0 0 0 0 0 0 0 0 0 0 $55.84 Senior Geologist, NW 10 6 4 0 0 0 0 0 0 0
$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $36.06 Project Engineer, MM 0 0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 0 0 0 0 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $33.99 Project Engineer, SJ 0 0 0 0 0 0 0 0 0 0 $32.44 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.86 Project Scientist, EL 0 0 0 0 0 0 0 0 0 0 $29.62 Project Scientist, RF 40 40 0 0 0 0 0 0 0 0 $30.59 Remediation Specialist, RH 0 0 0 0 0 0 0 0 0 0 $24.84 GIS / CAD Specialist, CF 2 0 2 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$24.27 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0 $30.30 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $21.21 Environmental Specialist, MZ 0 0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0
Total Hours 56 4 46 6 0 0 0 0 0 0 0
Direct Labor $2,025.95 $233.07 $1,519.84 $273.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 151.02% $3,059.59 $351.98 $2,295.26 $412.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,085.54 $585.05 $3,815.10 $685.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 1
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 3/10/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Pure Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 Evaluation / Report SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $7,975.00 $7,975.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $7,975.00 $7,975.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $797.50 $797.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $8,772.50 $8,772.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,698.04 $585.05 $13,427.60 $685.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $508.56 $58.51 $381.51 $68.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,206.60 $643.56 $13,809.11 $753.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pure Cleaners SubTask 2 Well Abandonment
DATE: 3/10/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark Develop specs for well abandonment 2 Notification to site presenatatives 1 Compile permits and letter report 3
Project Scientist, R Fetter Load / Unload 0 Travel (3 round trip) 12 Stake/flag wells for abandonment 8 Oversight for abandonment of 19 wells 20
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck R Fetter $120.00 day 3 $360.00
$0.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Preferred Drilling Services, Inc. Well Abandonment $7,975.00 $7,975.00 $0.00 $0.00
TOTAL $7,975.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
$0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction/O&M supplies $75.00 day 3 $225.00 Magnetometer $45.00 day 3 $135.00
$360.00 Expendables $40.00 day 3 $120.00
TOTAL EQUIPMENT $480.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pure Cleaners SubTask 3 Evaluation / Report
DATE: 3/10/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist Evaluate spec adherance 1
Compile permits and letter report 3
GIS/CADD Specialist, D Grove Modify figures 2
TOTAL LABOR 6
FINAL --7/24/96
| Pure ERIC_5494 Well Abandon 0552-368409.pdf |
| Pure ERIC_5494 Well Abandon 0552-368409 cost.pdf |
| Cost Estimate |
| Formula Sheet |
| LOE 2 Well Abandon |
| LOE 3 Report |
| Preferred Drilling - Intertek-PSI Pure Cleaners (Former) (Cleaners 46) Longwood FL.pdf |
| Drilling |
| Pure ERIC_5494 Well Abandon.pdf |
| Cost Estimate |
| LOE 2 Well Abandon |
| LOE 3 Report |