Task Assignment Summary

This Task Assignment (TA) DC013D is issued by the State of Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (Intertek-PSI) under Master Contract HW686 for waste site cleanup services. The assignment pertains to annual groundwater monitoring activities at the Palm Dry Cleaners facility located at 14616 Livingston Avenue, Lutz, Hillsborough County, Florida (ERIC_4721). The TA was executed on September 18-19, 2025, with a completion date of February 27, 2026. Key personnel include Mary Uribe as the Department Project Manager and Joshua Newell and Douglas Coleman representing the contractor.

The scope of work encompasses annual groundwater monitoring and reporting services, including sampling of 16 monitoring wells for volatile organic halocarbons (VOH) using EPA Method 8260, groundwater elevation measurements, data analysis, and preparation of a comprehensive groundwater monitoring report. The total contract value is $15,119.74 on a fixed unit rate basis, divided into two subtasks: SubTask 1 (Project Management) at $1,231.23 and SubTask 2 (Groundwater Monitoring and Report) at $13,888.51. The primary deliverable, the Annual Groundwater Monitoring Report, is due by January 30, 2026. Costs include labor ($9,729.31), travel and vehicle rental ($720.00), laboratory analytical services ($1,611.00), field equipment and expendables ($1,960.00), subcontractor IDW management ($126.50), and a completion fee ($972.93).

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW686

DC013D Completion February 27, 2026

Annual Groundwater Monitoring: VOH Sampling of 16 wells and subsequent report.

Mary Uribe 850-245-8990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Joshua Newell Contractor 863-712-4342

ERIC_4721

14616 Livingston Avenue Lutz, Hillsborough County

Palm Dry Cleaners

Contractor Contractor

✔ $ 15,119.74

$ 15,119.74

Scope of Work

Professional Service Industries, Inc. (Intertek-PSI) Contractor Douglas Coleman PMP, CHMM, REM

Contract Manager

Douglas Coleman Digitally signed by Douglas Coleman Date: 2025.09.19 09:27:23 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.18 15:26:12 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

SubTasks 1 & 2 - Groundwater Monitoring Report 01/30/2026

SubTask 1 Project Management $ 1,231.23

SubTask 2 Groundwater Monitoring and Report $ 13,888.51

$ 15,119.74

HW686

DC013D

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jay Collins Lt. Governor

Alexis Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

ERIC_

Cleaners

Mary Uribe, Project Manager

Negotiation Summary

HW686 DC0

PSI will perform Cleaners, as detailed in the proposal.

Total task amount is $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is

. Task completion date is .

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

P ro fe ss io na l S er vi ce

In du st rie s, In c.

(I nt er te k-

P S

I)

D at e:

9/

/2

Ta sk ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

S ub Ta sk

G ro un dw at er

M on ito rin g an d R ep or t S ub Ta sk

A ct iv ity

/P ha se

G ro un dw at er

M on ito rin g

Ta sk

S ub Ta sk

P ro je ct

M an ag er

Jo sh N ew el l, P

E

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $4

8.

PP

ro je ct

M an ag er

9.

$6 2.

S en io r E ng in ee r, G

R

$4

8.

P ro je ct

E ng in ee r, JN

$4 0.

P ro je ct S ci en tis t, JD

.0

$3 4.

G

IS

C A

D S pe ci al is t, D

G

$2

0.

A dm in is tra tiv e A ss is ta nt

, B M

$3 9.

P ro je ct S ci en tis t, S L

.0

T ot al

H ou rs

D ire ct L ab or

$3

,8

.9

$4

.9

$3 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$5

,8

.4

$6

.4

$5 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab

$9

,7

.3

$1 ,1

.3

$8

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ra ve l

V eh ic le

R en ta l

$7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P al m D ry C le an er s

E R

IC

_4

RE

V:

2/

CE

F

AR

CA

DI

S Pa ge

FD

C O

ST

E

ST

IM

A

TE

C on tra ct or

P ro fe ss io na l S er vi ce

In du st rie s, In c.

(I nt er te k-

P

I) at e:

9/

/2

Ta sk

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

S ub Ta sk

G ro un dw at er

M on ito rin g an d R ep or t S ub Ta sk

A ct iv ity

/P ha se

G ro un dw at er

M on ito rin g

Ta sk

S ub Ta sk

P ro je ct

M an ag er

Jo sh N ew el l, E

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

P al m D ry C le an er s

E R

IC

_4

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$ $7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

1.

$1 1.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$1

.5

$1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$1 ,6

.0

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or at or y

$1 ,6

.0

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$1 ,7

.0

$1

,7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al F ie ld

E xp en se s $1

,9

.0

$1 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $1

4, 6.

$1 ,1

.3

$1

3, 7.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$9

.9

$1

.9

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al E st im at ed

C os t $1

5, 9.

$1 ,2

.2

$1

3, 8.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

AR

CA

DI

S Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Palm Dry Cleaners ERIC_4721 SubTask 2 Groundwater Monitoring and Report

DATE: 9/16/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Engineer, G Robinson Event lab kit request, equipment selection 2

Tenant / owner notification 1 Technical oversight 1

Total Hours 4

Project Scientist, J Daugherty Prepare for field event 1 Mobilize to site (2 hour round trip x 3) 6 Obtain DTW from 9 wells 1 Collect 8 groundwater samples from existing wells 12 Documentation of groundwater sampling & measurements 2 Pick-up, drop off samples 2

Total Hours 24.0

Project Scientist, S Luth Mobilize to site (2 hour round trip x 3) 6 Obtain DTW from 10 wells 1 Collect 8 groundwater samples from existing wells 12 Documentation of groundwater sampling & measurements 2 Stage IDW drum 1

Total Hours 22.0

Report Project Scientist, J Daugherty Prepare tables and draft maps 13

Data reduction / evaluation, prepare report 8 Total Hours 21.0

Project Engineer, J Newell Provide evaluation and edits to report 8 Sign and seal GW monitoring report 1

Total Hours 9.0

Administrative Assistant, B Meynardie Finalize report, process invoices 2 Total Hours 2.0

TOTAL LABOR 82

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (mobilize from Plant City) $120.00 day 3 $360.00 Equipment Van / Truck (mobilize from Tampa) $120.00 day 3 $360.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USEAGE

Petrotech Southe $115.00 LS 1 $115.00

TOTAL $115.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

VOH Sampling Halocarbons Via EPA Method 8260 $73.00 17 $1,241.00 IDW Sampling Halocarbons by EPA Method 8260 $70.00 1 $70.00 Non-Halocarbons by EPA Method 8260 $73.00 1 $73.00 PAH's by EPA Method 8270 $110.00 1 $110.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 1 $91.00 Mercury by EPA Method 7470/7471 $26.00 1 $26.00

TOTAL LAB $1,611.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit (1 kit per scientist/day) $290.00 day 6 $1,740.00 Drum $100.00 each 1 $100.00 Expendables $40.00 day 3 $120.00

$120.00

TOTAL EQUIPMENT $1,960.00

IDW management, treatment, disposal

FINAL --7/24/96

PSI Proposal: 0552-445313r1 September 16, 2025

MMMM DD,

www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Ms. Mary Uribe, Environmental Consultant

(850) 245-8705 main, (850) 245-8990 direct Email: Mary.Uribe@FloridaDEP.gov

Re: Proposal for Annual Groundwater Monitoring Palm Dry Cleaners 14616 Livingston Avenue Lutz, Hillsborough County, Florida FDEP Facility ID# 29/9501168 / ERIC_4721

Dear Ms. Uribe:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide Annual Groundwater Monitoring Services for Volatile Organic Halocarbons (VOH) for the Palm Dry Cleaners at 14616 Livingston Avenue, Lutz, Florida. Included with this proposal is a discussion of project history to date, proposed scope of work, cost estimate and a proposed work schedule. A Site Access Agreement for the property under monitoring was signed by “Skipper Palms Plaza, LLC” in May 2022 and per the Hillsborough County Property Appraiser website (Feb. 2025), the site has not been sold since December 2007.

PROJECT BACKGROUND

Drycleaning operations at the Palm Dry Cleaners began circa 1984 shortly after construction of the Skipper Palms Shopping Plaza was completed. Though no records exist for the type of drycleaning equipment present at the site before 1997, drycleaning solvent impacts were detected from the soil at this site in 1996. A perchloroethene dry-to-dry machine was installed at the facility in 1997. The perchloroethene equipment remained on site until it was documented as having been removed by the FDEP in 2003.

In the Site Screening Report dated August 23, 1996, identified PCE in three soil samples at concentrations that exceeded the groundwater soil cleanup target level (SCTL) and ranged from 1.6 mg/kg to 1.98 mg/kg.

A DSCP Program Application was submitted to the FDEP Hazardous Waste Cleanup Section in October 1996, and the FDEP determined the site was eligible for the Drycleaning Solvent Cleanup Program in June 1997 with a site score of 88.

PSI Proposal 0552-445313r1 FDEP – Palm Dry Cleaners, ERIC_4721

September 16, 2025 www.intertek.com/building

A Rapid Risk Screening Assessment was conducted at this site in October 2011 and identified an on-site irrigation well located at the northwest corner of the property approximately 600 feet west of the former drycleaner. PSI conducted an initial Site Assessment for the property owner in 1999 which consisted of groundwater screenpoint sampling, soil sample collection and analysis, monitoring well installation and groundwater sampling. The results of that assessment revealed VOH impacts to the soil which exceeded commercial direct exposure levels (SCTLs) beneath and directly north of the drycleaning facility, as well as VOH impacts to the groundwater which exceeded the natural attenuation default criteria (NADC). PSI issued a Remedial Alternatives Analysis (RAA) in January 2000, which recommended shallow zone source removal by Multi-Phase Extraction (MPE) followed by in-situ chemical oxidation. No subsequent remediation of the VOH impacts were implemented at Palm Dry Cleaners as a result of this RAA.

PSI submitted a Site Assessment Work Plan for Palm Dry Cleaners in August 2022 which recommended similar work methods as the aforementioned initial site assessment, as well as a MAGS survey. Following the site assessment field work, the site assessment report was issued in October 2023 which recommended monitoring groundwater to evaluate if additional vertical assessment was warranted. PSI was also tasked with groundwater sampling and analysis for PFAS compounds, which were conducted in September 2023. During that investigation, none of the tested wells contained PFAS compounds above the FDEP Provisional Groundwater Cleanup Target Level (GCTL).

The proposal contained herein consists of conducting groundwater sampling and analysis for VOH parameters for the routine annual groundwater monitoring, along with one deliverable. The results will be used to evaluate current groundwater quality conditions. Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Annual Groundwater Sampling and Analysis, and Groundwater Monitoring Report

a. Mobilization to the site.

b. Collect groundwater elevation measurements of 18 monitoring wells.

c. Collect groundwater samples from the following monitoring wells for analyses by EPA Method 8260 for VOHs:

i. Shallow wells: MW-1, MW001A, MW-3, MW-5, MW-6, MW-07A, MW-08A, MW-

010A, MW-011A, MW-012A

ii. Intermediate Wells: MW-1D, MW-6D, MW-09B, MW-012B

iii. Deep Wells: MW-1DD, MW-012C

The groundwater samples will be submitted to a National Environmental Laboratory Accreditation Conference (NELAC) approved laboratory for analysis.

PSI Proposal 0552-445313r1 FDEP – Palm Dry Cleaners, ERIC_4721

September 16, 2025 www.intertek.com/building

d. Containerize purge water into a 55-gallon drum, label appropriately, and upon waste characterization, have transported to a DEP approved facility for treatment. The manifest will be submitted to the Department upon receipt.

e. Evaluation of data and develop an Annual Groundwater Monitoring Report to include current groundwater elevation maps, and current groundwater quality data. Conclusions and recommendations will be made which will include any modifications to the proposed annual groundwater sampling event.

The deliverable and invoice schedule are presented below and are based on receival of a Task Assignment prior to September 30, 2025. The last groundwater sampling event occurred in July 2023.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the described services is shown in the attached Cost Estimate. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW686, Waste Cleanup Program Services, dated December 21, 2021. An invoice and deliverable schedule is presented as follows:

Palm Cleaners ERIC_4721 Deliverables Deliverable Due Date

SubTask 1 Project Management Upon completion of Task Assignment

SubTask 2 Groundwater Monitoring and Report January 30, 2026

Invoice Schedule Amount to be Invoiced SubTasks 1 & 2 - Submittal & approval of Groundwater Monitoring Report $15,119.74

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Josh Newell, PE John Daugherty, CES Senior Engineer, Principal Consultant Environmental Project Scientist

Douglas Coleman PMP, CHMM, REM Environmental Department Manager Contract Manager

Enclosure: Cost Estimate, Level of Effort, IDW Bids

PS

I -

In te rt ek

R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te

(I D

W ) I

D W

P ic k-up

, t ra ns po rt , D is po sa l a nd T re at m en t

PR

O

JE

C

T B

ID

T

AB

U

LA

TI

O N

S

ID

W

Fa ci lit y

N am e Va rio us

D ry cl ea ni ng

S ite s un de r F

D

EP

D ry cl ea ni ng

S ol ve nt

C le an up

P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us

Fa ci lit y

ID

Va rio us

D es cr ip tio n of S er vi ce

Ta m pa A re a

O rla nd o

- C en tr al

Fl id a Ja ck so nv ill e Ar ea

N or th F lo rid a

So ut h Fl or id a (M ia m i, Fo rt

M ye rs , N ap le

s) Fl or id a Pa nh an dl e w at er $1

.0

$1

.0

N

/A N

/A N

/A so il $1

.0

$1

.0

N

/A N

/A N

/A lo w v ol um e fe e N

/A N

/A N

/A Pi ck -u p fe e $0

.0

$0 .0

N

/A N

/A N

/A

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

1.

P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt

, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.

2.

PS

I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te

5.

W as te is c on si de re d no t h az ar do us

6.

An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N

EL

AP

-a pp ro ve d la bo ra to ry

7.

A

PS

I P ur ch as e

O rd er re fe re nc in g Te rm s

C on di tio ns

(a tta ch ed

) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck

-u p.

es cr ip tio n

-G al lo n D ru m

P ic k-up

Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.

St at e of

F lo rid a

3.

W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e

FD

Th e

G en er at or is th e

Fl or id a

D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir

St on e R oa d, T al la ha ss ee

, F L

M S o r 4

5.

4.

PS

I i s un de r c on tr ac t w ith F

D

EP

fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of

F D

EP

, B ur ea u of

W as te C le an up ,H az ar do us

W as te C le an up S ec tio n.

Pe tro te ch

S ou th ea st Q uo te $1

/w at er d ru m

Lo w

B id

W

IN

N

IN

G

B

PS

I -

In te rt ek

R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te

(I D

W ) I

D W

P ic k-up

, t ra ns po rt , D is po sa l a nd T re at m en t

PR

O

JE

C

T B

ID

T

AB

U

LA

TI

O N

S

W

Fa ci lit y

N am e Va rio us

D ry cl ea ni ng

S ite s un de r F

D

EP

D ry cl ea ni ng

S ol ve nt

C le an up

P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us

Fa ci lit y

ID

Va rio us

D es cr ip tio n of S er vi ce

Ta m pa A re a

O rla nd o

- C en tr al

Fl id a Ja ck so nv ill e Ar ea

N or th F lo rid a

So ut h Fl or id a (M ia m i, Fo rt

M ye rs , N ap le

s) Fl or id a Pa nh an dl e w at er $1

.0

$1

.0

$1

.0

$2

.0

$1

.0 so il $1

.0

$1

.0

$1

.0

$2

.0

$1

.0 lo w v ol um e fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pi ck

-u p fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr of ile F ee

.0

0.

T he re is o ne fe e pe r g en er at or th at a llo w s m ul tip le lo ca tio ns c on tig en t o n th e m at er ia l.

Ad m in is tra tio n Fe e:

p er In vo ic e

$2

.0

$0 .0

$2

.0

$4

.0

$2

.0

1.

P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt

, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.

2.

PS

I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te

5.

W as te is c on si de re d no t h az ar do us

6.

An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N

EL

AP

-a pp ro ve d la bo ra to ry

7.

A

PS

I P ur ch as e

O rd er re fe re nc in g Te rm s

C on di tio ns

(a tta ch ed

) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck

-u p.

es cr ip tio n

-G al lo n D ru m

P ic k-up

Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.

St at e of

F lo rid a

3.

W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e

FD

Th e

G en er at or is th e

Fl or id a

D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir

St on e R oa d, T al la ha ss ee

, F L

M S o r 4

5.

4.

PS

I i s un de r c on tr ac t w ith F

D

EP

fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of

F D

EP

, B ur ea u of

W as te C le an up ,H az ar do us

W as te C le an up S ec tio n.

G C

VT

Q uo te

$1

/d ru m

H ig h Bi d

04/24/2024 01:44 PM PAGE 1 OF 7

Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry

4600 BROOKPARK ROAD, CLEVELAND,

OHIO, 44134

(216) 642-1311

(216) 642-1474

QUOTE #: 0042802

DATE: 04/24/2024 PROJECT PROPOSAL

CLIENT

JOSH NEWELL

INTERTEK/PSI - PLANT CITY

607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,

33563 P: (863) 712-4342

E-MAIL:JOSHUA.NEWELL@INTERTEK.COM

PROJECT DESCRIPTION

FDEP DRY CLEANING DRUMS

FDEP

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00

LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00

ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00

DISPOSAL SUBTOTAL: $80.00

JOB ESTIMATE: $180.00

ENVIRONMENTAL FEE: $9.00

TOTAL JOB ESTIMATE: $189.00

$189/drum - High Bid