Task Assignment Summary

This Task Assignment (TA) is a state and local contract document executed between the State of Florida Department of Environmental Protection (FDEP) and Intertek PSI under the underlying indefinite delivery vehicle Contract Number HW686 (Waste Cleanup Program Services). The task was assigned on March 19, 2024, with a completion date of June 28, 2024, for groundwater sampling activities at the Shamron Beach Condominium (ERIC_18494) located at 7650 Estero Blvd, Fort Myers Beach, Florida 33930. Sydney Rodetsky serves as the FDEP Project Manager, while Josh Newell is the Contractor's Project Manager.

Intertek PSI will conduct shallow groundwater sampling activities including temporary monitor well installation, sample collection, and analytical testing for volatile organic compounds and polycyclic aromatic hydrocarbons, with deliverables consisting of a Groundwater Monitoring Report and project management documentation. The total task value is $8,541.75 on a fixed unit rate basis, with payment contingent upon FDEP approval of the Groundwater Monitoring Report for Subtasks 1 and 2. The final deliverable is due May 20, 2024, with an invoice schedule milestone linked to submission and approval of the completed report. The cost estimate reflects labor ($4,080.68), subcontractor drilling services ($3,300.00), laboratory analytical costs ($183.00), equipment and field expenses ($330.00), and a completion fee ($408.07).

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003E.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC13BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW686

SA302 June 28, 2024

Intertek PSI will conduct groundwater sampling activities at Shamron Beach Condominium (ERIC_18494), as detailed on the February 29, 2024, PSI proposal. Activities will include shallow groundwater sampling. PSI will provide a Groundwater Monitoring Report (GMR) as a deliverable.

Sydney Rodetsky (850) 245-8916 Intertek PSI

Josh Newell (813) 886-1075

ERIC_18494

7650 Estero Blvd, Fort Myers Beach, Fl 33930

Shamron Beach Condominium

$ 0.00

$ 8,541.75

$ 0.00

$ 8,541.75

Scope of Work

Intertek PSI

Josh Newell

Dave Phillips Digitally signed by Dave Phillips Date: 2024.03.19 10:00:06 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO:

FROM:

SUBJECT: Negotiation Summary

DATE:

Total task amount is $8,541.75. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable is due , 2024.The task completion date is June 28, 2024.

F D

E P

C O

S T

E S

T

IM

A T

E C on tr ac to r:

P ro fe ss io na l S er vi ce

In du st ri es , I nc

In te rt ek

-P S

I) at e:

3/ 8/

R ev is ed

T as k ub T as k

P ro je ct M an ag em en t S ub T as k

S ite

S ub T as k

W el l I nt al l, S am pl in g

S ub

T as k

A ct iv ity

/P ha se

G W

W el l I ns ta ll, S am pl in g S ub T as k

S ub T as k

P ro je ct

M an ag er

N an a

W es tm ar k S ub T as k

S ub T as k

S ub

T as k

S ub

T as k

T o ta ls

L ab o r

R at e C at eg o ry

$5 8.

P ro je ct M an ag er

3.

$0 .0

P ri nc ip al

C on su lta nt

0.

$6 0.

S en io r E ng in ee r, M R

0.

$5 8.

S en io r G eo lo gi st

, N W

6.

0.

$0 .0

S en io r S ci en tis t

0.

0.

$0 .0

C er tif ie d

In du st ri al H yg ie nt is t

0.

0.

$0 .0

C er tif ie d

H az ar do us M at er ia ls

M an ag er

0.

0.

$0 .0

F lo ri da L ic en se d

A sb es to s C on su lta nt

0.

0.

$0 .0

P ro je ct M an ag er

0.

0.

$3 6.

P ro je ct E ng in ee r

0.

0.

$3 8.

P ro je ct E ng in ee r, J N

0.

0.

0.

$3 0.

P ro je ct E ng in ee r, G R

0.

0.

0.

$3 7.

P ro je ct E ng in ee r, M K

0.

0.

0.

$4 0.

P ro je ct S ci en tis t, JD

0.

0.

0.

$3 9.

P ro je ct S ci en tis t, S L

.0

.0

0.

$3 3.

P ro je ct S ci en tis t, S B

0.

0.

0.

$0 .0

Q

A O ffi ce r 0.

0.

0.

$3 1.

R em ed ia tio n S pe ci al is t, R

H 0.

0.

0.

$3 4.

G

IS

C A

D S pe ci al is t, D

G 1.

1.

0.

$0 .0

S ta ff

E ng in ee r 0.

0.

0.

$0 .0

S ta ff

G eo lo gi st 0.

0.

0.

$2 5.

S ta ff

S ci en tis t, M

M 0.

0.

0.

$3 0.

E nv ir on m en ta l S pe ci al is t, C C

0.

0.

0.

$2 8.

E nv ir on m en ta l S pe ci al is t, D K

0.

0.

0.

$2 0.

A dm in is tr at iv e A ss is ta nt

, B M

0.

0.

0.

T o ta l H o u rs

.7 3.

.5 0.

D ir ec t L ab or

$1

,6

.6

$1

.0

$1 ,4

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$2

,4

.0

$2

.4

$2 ,1

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F ri ng e

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l L ab o r $4

,0

.6

$4

.4

$3 ,6

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ha m ro n C on do

F A

C

ID

6-

R E V

C E F

I n t e r t e k P S I

P a g e

F

E P

C O

S T

E S

T

IM

A T

E C on tr ac to r:

P ro fe ss io na l S er vi ce

In du st ri es , I nc

In te rt ek

-P S

I)

D at e:

3/ 8/

R ev is ed

T as k ub T as k

P ro je ct M an ag em en t S ub T as k

S ite

S ub T as k

W el l I nt al l, S am pl in g

S ub

T as k

A ct iv ity

/P ha se

G W

W el l I ns ta ll, S am pl in g S ub T as k

S ub T as k

P ro je ct

M an ag er

N an a

W es tm ar k S ub T as k

S ub T as k

S ub

T as k

S ub

T as k

T o ta ls

S ha m ro n C on do

F A

C

ID

6-

T ra ve l

V eh ic le

R en ta l

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir

F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al T ra ve l $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S u b co n tr ac to r (E q u ip m en t

P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta lS u b co n tr ac to r

C o st $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S u b co n tr ac to r (S er vi ce s

P ro cu re m en t)

D ri lli ng

C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ri lli ng

N on -c on ve nt io na l)

$3 ,0

.0

$3

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$3 ,0

.0

$3

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g F ee $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l S u b co n tr ac to r

C o st $3

,3

.0

$3 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

L ab o ra to ry

A na ly tic al C os ts

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F as t T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l L ab o ra to ry $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

F ie ld E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$4 0.

$4

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ri lli ng r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

A na ly tic al r el at ed

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

O th er

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l F ie ld

E xp en se s $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S u b to ta l

$8 ,1

.6

$4

.4

$7

,6

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C o m p le ti o n

F ee

$4

.0

$4 6.

$3

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l E st im at ed

C o st $8

,5

.7

$5

.4

$8 ,0

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

I n t e r t e k P S I

P a g e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Shamron Condo FAC ID 36-9501786 SubTask 2 Well Intall, Sampling DATE: 3/8/2024 Revised

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist, N Westmark Technical Assistance 3 Notification to tenants 1

Well Installation Project Scientist, S Luth Travel (7 hour roundtrip for well install) 7

Field event preparation 1 Provide oversight for well installation 2

Groundwater Sampling Project Scientist, S Luth Travel (7 hour roundtrip for sampling) 7

Collect groundwater samples 1 Oversight during well abandonment 2 Pick-up, drop off samples 1

Data Evaluation/ Report Development

Senior Geologist, N Westmark Evaluate data 1 Make Recommendations for report 1 Sign and seal document 0.5

Total Hours 6.5

Project Scientist, S Luth Preparation of groundwater monitoring report 5

Total Hours 26

GIS/CADD Specialist, D Grove Develop maps 1

TOTAL LABOR 33.50

VEHICLE TYPE RATE UNIT USEAGE

$0.00 Equipment Van / Truck $120.00 day 2 $240.00

$0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

JAEE Drilling 1 $3,000.00 $3,000.00

$3,000.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00 EPA Method 8260 $73.00 1 0 $73.00 EPA Method 8270 $110.00 1 $110.00

$183.00 $0.00 $0.00

TOTAL LAB $183.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 $290.00

Expendables $40.00 day 1 $40.00

TOTAL EQUIPMEN $330.00

FINAL --7/24/96

Page 4 Rev 1 Shamron Condo GW 0552-419986

PSI Proposal: 0552-419986-R February 29, 2024, revised March 8, 2024

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building

Florida Department of Environmental Protection Site Investigation Section 2600 Blair Stone Road, MS 4515 Tallahassee, Florida 32399-2400

Attention: Ms. Sydney Rodetsky, Environmental Specialist II

(850) 245-8705, Direct: 850-245-8916 Sydney.Rodetsky@FloridaDEP.gov

Re: Proposal for Groundwater Well Installation and Sampling Services – Revision 1 Shamron Condominium 7650 Estero Blvd Fort Myers Beach, Florida 33931

FDEP FAC ID: 36-9501786

Dear Ms. Rodetsky:

Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to provide the following proposal for Temporary Monitor Well Installation, Groundwater Sampling, and Analytical Services for the above referenced project, on behalf of the Florida Department of Environmental Protection (FDEP), Site Investigation Section (SIS). The purpose of the study is to evaluate groundwater quality at the above referenced site. It is our understanding that the FDEP and its consultants have access to the property.

Presented herein is a proposed scope of services, schedule, and proposed costs associated with these services.

PROPOSED SCOPE OF WORK

A Request for Assistance was transmitted to the FDEP Site Investigation Section from the FDEP Southwest District to provide groundwater sampling services at the Shamron Condominium, on Fort Myers Beach, Lee County, Florida. According to documentation from the FDEP OCULUS website, petroleum impact was discovered from a temporary well installed in the middle of the former tank vault during removal of a 500-gallon diesel generator underground storage tank (UST). Subsequently, a Discharge Reporting Form was filed on June 8, 1995, based on elevated concentrations of Total Volatile Organic Aromatics (VOA) and Polynuclear Aromatic Hydrocarbons (PAH) above their respective Groundwater Cleanup Target Levels (GCTL) in Chapter 62-777, FAC. No additional assessment of petroleum impact has been completed.

It is our understanding that the Southwest District requests groundwater sampling in the former tank vault area to evaluate current groundwater quality. PSI has, therefore, prepared this scope of work and cost estimate to address the groundwater quality.

Shamron Condominium, FDEP FAC ID 36-9501786

February 29, 2024, revised March 8, 2024 www.intertek.com/building

The following scope of services consists of the following:

1. Coordinate resources and activities for temporary monitor well installation. PSI has solicited price quotes from drilling companies, and based on price and previous experience, we have selected JAEE Environmental Service to provide the well installation services. PSI will provide oversight during on-site activities.

The monitor well will be of pre-pack construction and will be temporary in nature. We anticipate the groundwater table to be approximately 5 feet below land surface, therefore, the well is planned to be about 12 feet deep with 2 feet of PVC riser. The well will be allowed to equilibrate for at least 24 hours prior to sampling. Upon sample collection, the temporary well will be removed and abandoned according to Water Management District protocols.

2. Collection of a groundwater sample from the temporary well using methods in accordance with the FDEP Standard Operating Procedures (DEP-SOP001/01) for groundwater sampling (Section FS 2200).

The groundwater sample will be analyzed by an analytical laboratory using National Environmental Laboratory Accreditation Conference (NELAC) protocols.

The sample will be analyzed for the following constituents:

BTEX and MTBE by EPA Method 8260 (including chlorobenzene) PAH compounds by EPA Method 8270 (including1-methylnaphthalene, 2-methylnaphthalene, naphthalene, and phenanthene)

Purge water from the well will be poured onto the pavement and allowed to evaporate. No Investigative Derived Waste (IDW) will be containerized. The groundwater sample will be transferred for shipment to the laboratory for analysis. PSI will prepare the samples and re-ice the coolers prior to shipment.

3. Provide the Task Assignment Deliverable which will consist of brief letter describing the field activities and comparison of the laboratory results to standards in Chapter 62-777, FAC, field notes, chain of custody documentation, and photographs of field activities.

Shamron Condominium, FDEP FAC ID 36-9501786

February 29, 2024, revised March 8, 2024 www.intertek.com/building

COST ESTIMATE AND SCHEDULE

A Cost Estimate spreadsheet and Level of Effort to provide the above-described services is attached for your consideration. All PSI services will be conducted in accordance with the terms and conditions contained within the DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. Depending on drillers’ availability, we anticipate the well installation and sampling results to be complete as shown below.

Shamron Condo FAC ID 36-9501786 Deliverables Deliverable Due Date SubTask 1 Project Management Upon completion of Task Assignment SubTask 2 Well Install, Sampling May 20, 2024

End of Task June 28, 2024 Requirements for Invoice Submittal Amount to be Invoiced

SubTasks 1 & 2 - Submittal & approval of Groundwater Monitoring Report

$8,541.75

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075 or (813) 267-2519.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Christopher Cummins, PG Nana Westmark, PG, CHMM Senior Geologist Senior Geologist / Contract Manager

Enclosure: Cost Estimate Level of Effort Drill Bids

Z:\552-Env\FDEP HW 686 Site Investigation\Shamron Condo\Proposal\Rev 1 Shamron Condo GW 0552-419986.docx

Contractor: Intertek Proposal No.: 22402031

Contact Name: Nana Westmark Contact Phone: Date: 2/29/2024

Contact Email: nana.westmark@intertek.com Site Address: FDEP ID#:

PROPOSED SCOPE OF WORK: Estimator: MR

Direct Push Rig Daily Rate - (maximum 10 hours) day $1,600.00 1 $1,600.00

Prepack Well Screen (includes all materials) Length 5ft ID __1_"____ each $75.00 2 $150.00

Well Riser (includes all materials) ID-1" 5' Length each $55.00 1 $55.00 per well $100.00 1 $100.00

LS $1,300.00 1 $1,300.00

Borehole clearance using geophysics (GPR and Electronics) LS $0.00

Mobilization (one rig) Miles round trip: 300 round trip $650.00 1 $650.00

Daily travel- Automatic when travel distances are 100 to 150 miles round trip day $80.00 $0.00

Per Diem - Automatic when field work is longer than 9hr/day or round trip over 150 miles per crew/night $480.00 $0.00

DOT Approved 55-gal Drum - SOIL each $65.00 1 $65.00

Special Order Closed Top Drums- WATER each $95.00 $0.00

Permits 2 (Drilling and abandonment only; cost according to WMD & Local Municipalities) LS $200.00 1 $200.00

Pre-drilling conference call- 30 minutes LS included

Extra hour rate 5 hour $275.00 $0.00

Use of a concrete saw or concrete core bit -To open asphalt or concrete for SB/MW each $75.00 Included

TOTAL QUOTE PRICE $4,120.00

NOTES: This proposal is only valid for this specific scope of work. Any changes, prices shall be revised. Actual field days, materials and hours will be invoiced

Days to Complete Scope of Work: approx. 1/2 day(s) (depends on access, client sampling time or other restrictions) "

Subcontractor Company Name: ATI Companies, LLC

Subcontractor Mailing Address: 5709 First Av. S. St. Petersburg FL 33707

Signature:___________________________ Reviewer:____________________________ Date: 2/29/2024

NOTE: to schedule work, contact 727-328-0268 Bid Valid for 90 Days

Payment terms: Net 60 days

This proposal acceptance includes ATI's standard Terms and Conditions

Name of Firm:__________________________________________________ Date: ______________

Signature of Representative: _________________________________________

Print name of signing Representative:________________________________

NOTE: This proposal needs to be signed once job is awarded to ATI Companies, LLC

7650 Estero Blvd, Ft Myers Beach, FL

Client is responsible for any ROW or access permits and MOT for the work to be performed, if needed.

macrocore to TD for soil samples (if needed).

SAFETY

DRILLING DOUBLE CASED WELL

ABANDONMENT

DRILLING ACTIVITIES

6. A perdiem will automatically be charged when field work is longer than 9hr/day or round trip over 150 miles

1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, steam cleaning decon, well development, and grouting.

MISCELLANEOUS

2. Well Permits -Requires 5 days Notice to Water Management District - Actual cost only.

3. Utility Clearance - Requires 72 Hour Notice Prior to Drilling. ATI will complete notification to Sunshine State One Call (Sunshine) prior to initiating drilling. Sunshine will not perform locates on private property (only right of ways and easements). It is the client and/or owners responsibility to provide information from private property. Damage repairs (time and materials) caused to any underground utilities on private property is client responsibility. ATI will review information provided regarding underground utilities to confirm clearance at boring locations. As another safety precaution, ATI will perform hand clear to approximately 5 feet below ground surface to check for utilities prior to drilling. If the client anticipates the potential for multiple utilities underground but has no information on location, we can provide private utility locating services at an additional cost. Please advise us of your needs prior to date of drilling.

4. Price assumes no rock will be encountered in the depth of penetration.

5. DPT Daily and Half-Day Rate: Hours over Half-day and Full Day Rate - $275 / hour

MW abandonment- per SOW

Temp. Well Completion (incl. sand pack, seal, development, locking cap)

DATE: 2/28/2024

ESTIMATE #: 224067

Shamron Condominimum 7650 Estero Blvd.

ID QTY Unit Rate TOTAL

1 2 each 1,200.00$ 2,400.00$

2 night 300.00$ -$

3 DPT Rig and Crew 1 day 1,250.00$ 1,250.00$

4 Materials: Soil Sample Liners If Needed each 3.00$ -$

5 Materials: 1.5" PVC Well Installation (Includes Stick Up) 14 foot 6.00$ 84.00$

6 Materials: (2) 1.5" x 5' PVC .010 Prepack Screen, 3" Exp Point 1 each 210.00$ 210.00$

7 1.5" Well Abandonment after Client Sampling 1 each 200.00$ 200.00$

8 Drums (Soils) As Needed each 65.00$ -$

9 Drums (Development Water) each 65.00$ -$

10 -$

Completion: Subtotal 4,144.00$

Todd Hodgson

Todd Hodgson

TOTAL 4,144.00$

Partner

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

CUSTOMER

Fort Myers Beach, Lee County, Florida

PROJECT

"Utility locates on Private Property are the responsibility of the client"

Nana Westmark, PG, CHMM Intertek

Tampa, Florida

DESCRIPTION

Mobilization / Demobilization/ Return to Abandon

THANK YOU FOR YOUR BUSINESS!

***Damages to utilities on private property Clearance are the responsibility of the client***

Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.

Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.

Per Diem - 2 Man Crew Est. (Hotel Cost + $50/per man)

"Actual quantities & days onsite will be invoiced"

Permits: (Lee County - N/A for Temp Well)

1/2 day

As Needed

Location Must be Accessible w/Track Mounted DPT Rig

5801 Benjamin Center Drive, Ste. 112

PROJECT DESCRIPTION:

(813) 886-1075

(1) 1.5" x 12' Temp Well w/10' of .010 Slot Prepack Screen, 2' PVC Stick Up, No Completion. 3" DPT. DPT Sampling to Depth.

DPT Well Installation

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

From: Ross Chinander To: Nana Westmark Subject: [External] RE: request for id for one well in Ft Myers Beach Date: Wednesday, February 28, 2024 2:28:42 PM Attachments: image001.png

Good after, Nana:

Thanks for sending this bid over! Unfortunately, Fort Myers is outside of our operating range. Sorry for the inconvenience, Ross

From: Nana Westmark <nana.westmark@intertek.com> Sent: Wednesday, February 28, 2024 1:14 PM To: netross@tampabay.rr.com Cc: Nana Westmark <nana.westmark@intertek.com> Subject: request for id for one well in Ft Myers Beach

Good Afternoon – PSI requests a bid for a small project in Fort Myers Beach. And if you are interested, please let me know approximately when you could do this.

Site: Shamron Condominium 7650 Estero Blvd Fort Myers Beach, Lee County, Fl

FDEP FAC #: 36-9501786

One temp well to 12 feet, 10 foot screen. Pre-pack.

Site is literally about 150 feet from Gulf of Mexico and is in sand.

Condo is beachfront and had damage from Hurricane Ian. I’m attaching photos of where the well will go.

After PSI samples the groundwater after 2 days, the well will need to be abandoned with grout according to the WMD regulations.

Kind Regards, Nana Westmark, PG, CHMM Senior Geologist / Principal Consultant Building & Construction Intertek-PSI

Please Note: My email address has changed to: Nana.Westmark@intertek.com.

Mobile 813 - 267 - 2519 Office 813 – 886 – 1075 Email Nana.Westmark@intertek.com Skype Nana.Westmark.Intertek www.intertek.com/building [gcc02.safelinks.protection.outlook.com] [gcc02.safelinks.protection.outlook.com]

Intertek-PSI 5801 Benjamin Center Drive, Suite 112 Tampa, Florida 33634

Total Quality. Assured.

CONFIDENTIALITY NOTICE

This email may contain confidential or privileged information, if you are not the intended recipient, or the person responsible for delivering the message to the intended recipient then please notify us by return email immediately. Should you have received this email in error then you should not copy this for any purpose nor disclose its contents to any other person.

http://www.intertek.com

This message is from an EXTERNAL SENDER - please be CAUTIOUS, particularly with links and attachments.

File details come from the government source that posted it. Updated .