This is a Task Assignment (TA) document under Florida Department of Environmental Protection (FDEP) Contract No. HW686, a statewide indefinite delivery contract for Waste Cleanup Program Services. The parties to this Task Assignment are the State of Florida Department of Environmental Protection and Professional Service Industries, Inc. (Intertek-PSI), with Mary Uribe serving as the Department Project Manager and Joshua Newell as the Contractor's Project Manager. The work is located at 4513 Gunn Highway, Tampa, Florida, for the Westwood Cleaners site (ERIC_4706).
The Task Assignment, numbered DC004F with a completion date of January 15, 2027, authorizes PSI to prepare a Conveyance Piping Work Plan and Bid Specifications for addressing punctures in existing Soil Vapor Extraction well conveyance piping at the contaminated site. The total contract value is $8,097.74 on a fixed unit rate basis. Work is structured in four subtasks: Project Management ($913.19), Site Visit and Conveyance Piping Work Plan ($4,798.85, due April 30, 2026), Bid Specification Package ($1,457.93, due June 19, 2026), and County Permitting ($927.77, due August 14, 2026). Invoicing is milestone-based, with payments triggered upon FDEP approval of each deliverable. The underlying contract HW686 establishes the terms and conditions governing performance, with the Scope of Work incorporated by reference as Attachment 1.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW686
DC004F Completion January 15, 2027
Conveyance Piping Work Plan and Bid Specifications
Mary Uribe 850-245-8990 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor
Contractor Joshua Newell Contractor 863-712-4342
ERIC_4706
4513 Gunn Highway Tampa, Florida
Westwood Cleaners
Contractor Contractor
✔ $ 8,097.74
$ 8,097.74
Scope of Work
Professional Service Industries, Inc. (Intertek-PSI) Contractor Douglas Coleman PMP, CHMM, REM
Contract Manager
Douglas Coleman Digitally signed by Douglas Coleman Date: 2026.02.20 11:00:03 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.02.20 10:06:56 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1: Project Management 08/14/2026
Subtask 2:Site Visit and Conveyance Piping Work Plan 04/30/2026
Subtask 3: Bid Specification Package 06/19/2026
Subtask 4: County Permitting 08/14/2026
Subtask 2:DEP Approval of Site Visit and Conveyance Piping Work Plan $ 4,798.85
Subtask 3: DEP approval of Bid Specification Package $ 1,457.93
Subtask 1: DEP approval of Project Management, Subtask 4: DEP approval of County Permitting $ 1,840.96
$ 8,097.74
HW686
DC004F
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins Lt. Governor
Alexis Lambert Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
ERIC_
Cleaners
Mary Uribe, Project Manager
Negotiation Summary
HW686 DC0
PSI will Cleaners, as detailed in the proposal.
Total task amount is $ . PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is
. Task completion date is .
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
P ro fe ss io na l S er vi ce In du st rie s, In c.
(I nt er te k- P
S I)
D at e:
2/
/2
Ta sk ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
W es tw oo d
C le an er s
Ta sk
G
W M on ito rin g
W el l a nd
C on ve ya nc e
P ip in g
W or k P la n
S ub
Ta sk
A ct iv ity
/P ha se
S ub
Ta sk
B id S pe ci fic at io ns
S ub
Ta sk
P ro je ct
M an ag er
D ou g
C ol em an
Ta sk
C ou nt y
P er m itt in g
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $6
4.
PP
ro je ct
M an ag
5.
5.
$6
4.
P ro je ct
M an ag er
, D C
0.
0.
0.
0.
0.
$6
2.
S en io r E ng in ee r, G R
0.
0.
0.
0.
0.
$4
8.
P ro je ct
E ng in ee r, JN
.0
.0
.0
7.
0.
$4
0.
P ro je ct
S ci en tis t, JD
0.
0.
0.
0.
0.
$3
9.
P ro je ct
S ci en tis t, S
L 0.
0.
0.
0.
0.
$3 4.
G
IS
C A
D S pe ci al is t, D
G 0.
0.
0.
0.
0.
$2 0.
A dm in is tra tiv e
A ss is ta nt , B
M 0.
0.
0.
0.
0.
T ot al H ou rs
.1
5.
.0
.0
7.
0.
D ire ct L ab or
$2
,8
.7
$3
.7
$1 ,6
.0
$5
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
1.
$4
,3
.4
$4
.4
$2 ,5
.1
$7
.3
$5
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$7
,2
.1
$8
.1
$4 ,2
.1
$1
,3
.3
$8
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
W or k P la n
RE
V:
2/
CE
F
PS
I In te rt ek Pa ge
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
P ro fe ss io na l S er vi ce In du st rie s, In c.
(I nt er te k- P
I) at e:
2/
/2
Ta sk
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
W es tw oo d
C le an
Ta sk
G
W M on ito rin g
W el l a nd
C on ve ya nc e
P ip in g
W or k P la n
S ub
Ta sk
A ct iv ity
/P ha se
S ub
Ta sk
B id S pe ci fic at io ns
S ub
Ta sk
P ro je ct
M an ag er
D ou g
C ol em an
Ta sk
C ou nt y
P er m itt in g
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
W or k P la n
TT
ra ve l
V eh ic le
R en ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$ $1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0 na
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R eg en es is $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $7
,3
.1
$8
.1
$4 ,3
.1
$1
,3
.3
$8
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$7
.6
$8 3.
$4
.7
$1
.5
$8
4.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $8
,0
.7
$9
.1
$4 ,7
.8
$1
,4
.9
$9
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
PS
I In te rt ek Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Westwood Cleaners SubTask 2 GW Monitoring Well and Conveyance Piping Work Plan
DATE: 2/17/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Groundwater Monitoring Well and Conveyance Piping Work Plan Project Engineer, J Newell Notification to tenant, owner 1
Site Preparation Activities 3 Verification of the Existing Site Access Agreement Utility Location Services Documentation of Existing Site Conditions Site Visit - Conveyance Piping Review 8 Review Existing Monitoring Well Locations and Construction Details 1 Proposed New Monitoring Well Locations 1 Propose New Injection Well Locations 1 Propose Soil Confirmation Sample Locations & Depths 1 Discuss the plan with FDEP, Owner, and Tenant as Applicable 2 Generate Remote Monitoring Well Construction Details 3 Generate Simplified Typical Trenching Cross Section Details 1 Generate a Site Map with Conveyance Piping Layout and Well locations 2 Generate Typical Site Restoration Details 1 Generate a Soil Sampling Plan for Soil Assessment and Pre Injection Sampling 6 Make Adjustments to Figures as requested by FDEP as Applicable 2 Teleconference with FDEP and Site Owner to discuss Site Plans 2
Hours: 35
TOTAL LABOR 35
VEHICLE TYPE RATE UNIT USEAGE
Site Visit Equipment Van / Truck 1 Days $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00 $0.00
TOTAL EQUIPMENT $40.00
FINAL --7/24/96
Page 3 Westwood ERIC_4706 Work Plan Proposal 0552-427520 rev 5 2-11-2026
SubTask 3 Bid Specifications
DATE: 2/17/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Bid Package Generation Project Engineer, J Newell Generate Scopes for Subcontractor Solicitation 6
Meet with solicited subcontractors to review the Bid Scope 1 Review Contractor Bids for Compliance with the Bid Specification 1 Submit a Summary to the FDEP via Email with the next proposed Bid Scope 3
Hours: 11
TOTAL LABOR 11.0
VEHICLE TYPE RATE UNIT USEAGE
$0.00 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
$0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
$0.00
TOTAL EQUIPMENT $0.00
Page 4 Westwood ERIC_4706 Work Plan Proposal 0552-427520 rev 5 2-11-2026
SubTask 4 County Permitting
DATE: 2/17/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Permit Coordination Project Engineer, J Newell Submit Bid Package Drawings for Permit Approval 5
Coordinate permit requirements with Owner, Subcontractor, and FDEP as needed 2
Hours: 7
TOTAL LABOR 7
VEHICLE TYPE RATE UNIT USEAGE
Site Visit Equipment Van / Truck 1 Days $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00 $0.00
TOTAL EQUIPMENT $0.00
Page 5 Westwood ERIC_4706 Work Plan Proposal 0552-427520 rev 5 2-11-2026
PSI Proposal: 0552-427520 Rev 5 February 17, 2026
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Mary Uribe, Environmental Consultant Telephone: (850) 245-8990 Email: Mary.Uribe@FloridaDEP.gov
Mr. James Breck Dalton, PG, Professional Geologist II Telephone: (850) 245-8892 Email: James.B.Dalton@FloridaDEP.gov
Re: Proposal for Conveyance Piping Work Plan and Bid Specifications Westwood Cleaners, ERIC_4706 4513 Gunn Highway Tampa, Florida 33624
Dear Ms. Uribe and Mr. Dalton, Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the Florida Department of Environmental Protection (FDEP) with this proposal to conduct a site visit and prepare a Conveyance Piping Work Plan and Bid Specification package for the Westwood Cleaners site (ERIC_4706) in Tampa, Hillsborough County, Florida. The Work Plan will address reported punctures in the existing SVE well conveyance piping and will include PSI’s standard trenching cross section, a site plan, and a contractor scope of work for bidding and permitting purposes. In addition, the Work Plan will identify soil confirmation sample locations, provide recommendations for Soil Oxygen Demand (SOD) sampling locations, and propose monitoring well locations for Natural Attenuation Default Concentration exceedance delineation in groundwater. Following FDEP approval of the Work Plan, PSI will prepare the Bid Specification package.
Included with this proposal is a brief discussion of project background, proposed scope of work, cost estimate and a proposed schedule for completion.
A Site Access Agreement was signed in August 2017 with the same property owner who is currently listed on the Hillsborough County Property Appraiser’s website.
FDEP –Westwood Cleaners, ERIC_4706
February 17, 2026 www.intertek.com/building
PROJECT BACKGROUND
Westwood Cleaners operated from 1984 to 2003 and occupied a tenant space on the east portion of a multi-tenant commercial shopping center in Tampa, Florida. The cleaners operated one tetrachloroethene (PCE) drycleaning machine and the facility has two floor drains. Based on results from the Site Screening activities in May 1997 showing PCE in the soil at a concentration of 700,000 micrograms per kilogram (μg/kg), the drycleaner business was accepted into the Drycleaning Solvent Cleanup Program. The soil sample was collected near the backdoor of the drycleaner building.
The former Westwood Cleaners tenant space is currently unoccupied, but was most recently a martial arts studio, Carrollwood Tae Kwon Do. The business has been remodeled with an elevated bamboo floor for martial arts training. The tenant space has not been renovated since this tenant ceased operations in July of 2023. No drycleaning equipment remains at the former drycleaners.
A Site Assessment / Interim Source Removal Plan was prepared by PSI for the FDEP and was submitted August 29, 2018, and subsequently approved by the FDEP on May 20, 2019. Of note is the very high PCE concentration detected in the shallow well installed next to the former dryclean machine at 64,000 ug/L in February 2018, 12,000 ug/L in April 2020, and 9,300 ug/L in March 2021. The Interim Source Removal (ISR) Plan consisted of addressing the contaminant mass such that additional contaminant contribution to the surrounding groundwater is minimized using Soil Vapor Extraction (SVE) technology.
An SVE system was transferred from the Hampton Cleaners (also in the Drycleaning Solvent Cleanup Program, ERIC_4713, FDEP Property No. 141948) and installed in October through December 2019 at the Westwood Cleaners facility, with start-up in December 2019.
The system has been operating since December 2019 until December 16 2025 when the system was shut down for a shutdown evaluation in accordance with activities approved in Task Assignment DC004E.
Following system shutdown, FDEP requested that the system not be turned back on due to ongoing conversations with the new site tenant and ongoing interior renovations. The most recent groundwater monitoring event was in June 2023. The SVE system continues to show some contaminant mass recovery, and a general slight declining trend in groundwater contaminant concentrations in the source area which may be attributed to plume migration. NADC exceedances within the source well (MW001s) warrant active remediation however the area with NADC exceedances has not been delineated within 90 linear ft in the downgradient direction. Before a cost-effective remedial strategy can be generated, PSI recommended the installation of additional wells within the building footprint and an additional groundwater sampling event.
As of November 18, 2025, the former Westwood tenant space has a new tenant. Discussions between the Tenant, Owner, FDEP, and PSI have concluded that the tenant intends to renovate the interior of the tenant space and requested changes to the existing system to allow for un-hindered use of the tenant space.
This proposal is to provide the plan by which to execute the above recommendation and provide plans for FDEP approval and permitting purposes for the path forward.
February 17, 2026 www.intertek.com/building
PROPOSED SCOPE OF WORK
1. Project Management
This scope is provided for in the template worksheets.
2. Site Visit and Conveyance Piping Work Plan
PSI will conduct a site visit to review reported punctures in the existing SVE well conveyance piping and evaluate conditions that may affect trenching, piping repair/replacement, and restoration.
Based on the site visit and available site information, PSI will prepare a Conveyance Piping Work Plan for contractor bidding and permitting purposes. The Work Plan will include:
a. A description of the planned site preparation activities and documentation of existing site conditions.
b. A site plan depicting the proposed conveyance piping alignment/repair areas and associated work limits.
c. PSI’s standard trenching cross section and trenching/site restoration details as appropriate for the site.
d. A contractor scope of work to support bidding and permitting.
e. Proposed soil confirmation sample locations and recommended analytical methods (e.g., BTEX + MTBE and/or VOHs) as appropriate.
f. Recommendations for Soil Oxygen Demand (SOD) sampling locations.
g. Proposed monitoring well locations for NADC delineation (conceptual, planning-level locations).
3. Bid Specification Package
Following FDEP approval of the Conveyance Piping Work Plan, PSI will prepare a tabulated Bid Specification package to support contractor bidding. The Bid Specification package will summarize the required scope, bid items, assumptions, and deliverables required for contractor pricing and execution.
4. County Permitting
Upon approval of the Bid Specification Package, PSI will submit approved signed and sealed trenching and cross section drawings with a site map as included in the bid package to Hillsborough County to expedite permit approval for the next Scope of Work. If the County requests revisions beyond PSI’s typical details, PSI may request a change order for any additional effort. At FDEP’s request, the trenching and cross section details will be very simple and not include rebar tie-in details or other structural type details as the drawings are only to convey a Scope of Work and not serve as structural drawings. Deliverable will be a drawing package for permitting with drawings required by Hillsborough County for permitting purposes.
The deliverable and invoice schedule are presented below and are based on receival of a Task Assignment prior to March 15, 2026.
February 17, 2026 www.intertek.com/building
COST ESTIMATE AND SCHEDULE
Westwood Cleaners ERIC_4706 Proposal for Groundwater Well Installation and Sampling Event
Task Proposed Cost
Schedule / Deliverable
Subtask 1 Project Management $ 913.19 Upon task completion Subtask 2 Site Visit and Conveyance
Piping Work Plan $ 4,798.85 April 30, 2026
Subtask 3 Bid Specification Package $ 1,457.93 June 19, 2026 Assumes Work Plan is Reviewed and Approved within 2 weeks. Provides 2 weeks to request bids, 2 weeks for bidder response, and 1 week to review/tabulate results.
Subtask 4 County Permitting $ 927.77 August 14, 2026 Assumes Bid Package Drawings are Reviewed and Approved within 2 weeks. Provides 30 day review period for County.
Total Estimated Cost $ 8,097.74 Period of Service End: December 31, 2026
February 17, 2026 www.intertek.com/building
PSI anticipates receipt of a Task Assignment with approved funding to be provided within 4 weeks of the date of this Cost Estimate. The estimate to prepare the Conveyance Piping Work Plan, Bid Specification package, and related permitting support is shown above and in the supporting fee worksheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW686, Waste Cleanup Program Services, dated December 21, 2021.
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Douglas Coleman PMP, CHMM, REM Joshua S. Newell, PE Environmental Department Manager Senior Engineer / Principal Consultant Contract Manager
Enclosure: Cost Estimate Level of Effort
\\Tampa-fs\projects\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-427520 Westwood Annual GW 2024 Interior Wells\Proposal\Plan Proposal\Westwood Work Plan Proposal 427520 Rev 5 2-17-2026.docx