CN-370000-HW686-DC021A.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW686|26652fe61cf76d14a6798f2369f5dddb
Contract number
HW686
Issued by
Florida

About this file

Task Assignment DC021A - Coastal Cleaners ISRP Implementation

This Task Assignment (TA) DC021A is executed between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (PSI), an Intertek company, for implementation of an Interim Source Removal Plan at the Coastal Cleaners facility located at 2166 Main Street, Dunedin, Pinellas County, Florida (ERIC_5272). The underlying master contract is HW686, the Florida Department of Environmental Protection Waste Cleanup Program Services contract dated December 21, 2021. Skylar Schwed serves as the FDEP Project Manager, while Nana G. Westmark serves as PSI's Project Manager.

The Task Assignment authorizes PSI to implement the Interim Source Removal Plan with installation of a Soil Vapor Extraction (SVE) system and includes six subtasks: Project Management, System Installation (preconstruction and construction activities), System Start-up, Construction Completion Report, Utilities setup, and one month of Operation and Maintenance. The Total TA Value is $180,217.65, comprising a Fixed Unit Rate of $179,068.65 and Cost Reimbursement of $1,149.00. Deliverables are scheduled through December 10, 2023, with the final one-month O&M deliverable due November 20, 2024. PSI invoices will be submitted in phases tied to deliverable completion, with labor estimated at 471.5 hours across multiple labor categories. Subcontracted services include WD Environmental Services Inc. for remedial construction ($107,625.00), Duke Energy for electrical power drop ($1,005.29), and Petrotech Southeast for investigative derived waste disposal ($750.00).

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW686

DC021A Completion March 14, 2024

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to implement the Interim Source Removal Plan, with the installation of a Soil Vapor Extraction in accordance with the PSI scope of work, cost estimate, and schedule received on February 10 2023.

Skylar Schwed 850-245-8795 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Professional Service Industries, Inc. (Intertek-PSI)

Professional Service Industries, Inc. (Intertek-PSI)

Nana G. Westmark 813-886-1075

ERIC_5272

2166 Main Street Dunedin, Pinellas County, Florida 34698

Coastal Cleaners

✔ $ 179,068.65 ✔ $ 1,149.00

$ 180,217.65

Scope of Work

Nana Westmark

Senior Geologist / Principal Consultant

Nana G Westmark Digitally signed by Nana G Westmark Date: 2023.03.21 08:11:10 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.03.17 09:32:32 -04'00'

3/17/2023

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask2 : Initial System installation documentation submittal 09/30/2023

Subtask 3: System start up field notes 10/10/2023

Subtasks 1,4,&6: Construction completion report AND 1 month O&M check list AND Project Management 11/20/2023

Subtask 5: utilities 1 month 12/10/2023

Submittal and FDEP approval of the Initial System installation documentation Subtask 2 $ 155,549.51

Submittal and FDEP approval of the System start up field notes Subtask 3 $ 6,968.81

Submittal and FDEP approval of the Construction completion report AND 1 month O&M check list AND Project Management Subtasks 1,4,&6 $ 16,060.33

Upon receipt of Paid Utility Invoices: Subtask 5 Utilities (Cost Plus Fixed Fee): not to exceed $1149.00 Handling Fee: $490.00

$ 1,639.00

$ 180,217.65

HW686

DC021A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW686 Contract Negotiation File Classic Cleaners Dunedin, Pinellas County

ERIC_5272

From: Skylar Schwed, Project Manager Date: March 14, 2023 Subject: Negotiation Summary

HW686 DC021A

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to implement the Interim Source Removal Plan, with the installation of a Soil Vapor Extraction in accordance with the PSI scope of work, cost estimate, and schedule received on February 10, 2023.

PSI confirmed February 10, 2023, that an Access Agreement with the current real property owner of the Classic Cleaners (ERIC_4750) site has been executed.

The original Task Assignment totaled $180,625.34 with 485.8 labor hours but after negotiations and corrections with contractor costs are reflected as below:

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $180,217.65 with 471.5 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: /20/2023 Revised 3/14/2023

Task #: SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7:

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$56.99 Project Manager 35 35.0 $64.90 Principal Consultant, DC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $40.87 Project Engineer, MK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.99 Senior Geologist, NW 8 8.0 0.0 0.0 0.0 0 0 0 0 0 $60.00 Senior Engineer, MR 13 0.0 5.0 5.0 0.0 3 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $57.69 Senior Geologist, MR 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $43.27 Project Engineer, JN 97 46.0 14.0 31.0 0.0 6 0 0 0 0 $37.00 Project Geologist, SAM 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $29.86 GIS Specialist, DG 6 0.0 0.0 6.0 0.0 0 0 0 0 0 $24.04 Staff Scientist, OG 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $28.85 Staff Scientist, RP 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $31.51 Remediation Coordinator, RH 301 261.5 18.0 0.0 0.0 21 0 0 0 0 $30.91 Environmental Specialist, CC 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $22.06 Environmental Specialis, MZ 10 10.0 0.0 0.0 0.0 0 0 0 0 0 $21.26 Environmental Specialist,DK 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $20.81 Administrative Assistant, BM 2 0.0 0.0 2.0 0.0 0 0 0 0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0 0 0 0 0

Total Hours 471.5 35.0 325.5 37.0 44.0 0.0 30 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $17,337.87 $1,994.62 $10,906.81 $1,472.96 $1,862.15 $0.00 $1,101.33 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $26,183.65 $3,012.28 $16,471.46 $2,224.46 $2,812.22 $0.00 $1,663.23 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $43,521.52 $5,006.90 $27,378.27 $3,697.42 $4,674.37 $0.00 $2,764.56 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $866.90 $99.73 $545.34 $73.65 $93.11 $0.00 $55.07 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,600.00 $2,880.00 $480.00 $0.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00

SVE Install, Startup, CCR & O&M

REV: 02/03 CEF_PSI.XLS Page 1

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: /20/2023 Revised 3/14/2023

Task #: SUBTASK 1: Project Management SUBTASK 6: 1 Month O&M

Site: Coastal Cleaners ERIC_52 SUBTASK 2: System Installation SUBTASK 7:

Activity/Phase: SUBTASK 3: Start-up SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: CCR SUBTASK 9:

SUBTASK 5: Utilities SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

SVE Install, Startup, CCR & O&M

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $1,149.00 $0.00 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00 WD Environmental $107,625.00 $107,625.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Duke Energy $1,005.29 $1,005.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110,529.29 $109,380.29 $0.00 $0.00 $1,149.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $9,546.78 $9,056.78 $0.00 $0.00 $490.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $120,076.07 $118,437.07 $0.00 $0.00 $1,639.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,211.00 $881.00 $1,398.00 $0.00 $0.00 $932.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $1,000.00 $840.00 $80.00 $0.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,090.00 $1,350.00 $870.00 $0.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $4,590.00 $2,690.00 $950.00 $0.00 $0.00 $950.00 $0.00 $0.00 $0.00 $0.00

Subtotal $175,865.49 $5,106.63 $152,811.68 $6,599.07 $4,767.48 $1,639.00 $4,941.63 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,352.16 $500.69 $2,737.83 $369.74 $467.44 $0.00 $276.46 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $180,217.65 $5,607.32 $155,549.51 $6,968.81 $5,234.92 $1,639.00 $5,218.09 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Coastal Cleaners ERIC_5272 SUBTASK 2: System Installation DATE: 1/20/2023 Revised 3/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Evaluate final permit submittal 3.0 (N. Westmark) Provide notices to tenant / owner 3.0

Evaluate final construction drawings for submittal 2.0

Total Hours: 8.0 Project Engineer Travel (roundtrip), preconstruction meeting 3.0 (J. Newell) Preconstruction Meeting 2.0

Update Construction Drawings 3.0 Professional Engineer site review 8.0 Provide technical support to the field crew 10.0 On-Site construction to develop as-builts 10.0 On-site oversight 10.0

Total Hours: 46.0

Remediation Specialist, R Hanson (R. Hanson) Permitting Assistance, Notice of Commencement 5.0

Develop a Site Specific Health and Safety Plan 1.0 Travel (roundtrip) for clean fill sample at borrow pit 3.0 Collect soil sample for clean fill analysis 0.5 Travel (roundtrip) for site visit for layout 3.0 Site visit for layout development 2.0 Develop construction logistics, staging, vehicular access, material storage 8.0 vendors oversee, site owner, place orders, schedule construction commencement Field event preparation 4.0 Travel (roundtrip) for preconstruction meeting 3.0 Preconstruction Meeting 2.0 Transport system to site, set-up 10.0 Cleanup, troubleshoot old system 8.0 Oversite of Construction activities (10 hrs/day x 20 days) 200.0 Oversite of Electrical Contractor (10 hr/day x 1day) 10.0 stage IDW drums, label, 2.0

Total Hours: 261.5

Environmental Specialist, M Zilske Transport system to site, set-up 10.0

TOTAL LABOR 325.5

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction Construction/O&M Kit $75.00 day 2 $150.00

$300.00 week 4 $1,200.00

Drums $100.00 each 5 $500.00 Expendables $40.00 per day 21 $840.00

TOTAL EQUIPMENT $2,690.00

Page 3 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

SUBTASK 2: System Installation DATE: 1/20/2023 Revised 3/14/2023

VEHICLE TYPE RATE UNIT USAGE

Travel to Borrow Pit for Clean Fill Sample Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Transport to Site Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Site Layout Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Pre construction Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Transport System to Site Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00 Equipment Van / Truck / Flat bed (Environmental Specialist) $120.00 day $0.00

Construction Equipment Van / Truck (Staff Scientist) $97.00 day 0 $0.00 Equipment Van / Truck (Remediation Specialist) $480.00 week 4 $1,920.00 Equipment Van / Truck (Remediation Specialist) $120.00 day 1 $120.00

Equipment Van / Truck (Project Engineer) $120.00 day 2 $240.00

TOTAL VEHICLE $2,880.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM -$

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs, by EPA Method 8260 $73.00 3 $219.00

Clean Fill Sample Semi-volatiles, PAH Method 8270 (solid) $110.00 1 $110.00 Base/Neutral/Acid Extractables, Method 8270 (solid) $240.00 1 $240.00 Arsenic, Method 6010 (solid) $13.00 1 $13.00 Barium, Method 6010 (solid) $13.00 1 $13.00 Cadmium, Method 6010 (solid) $13.00 1 $13.00 Chromium, Method 6010 (solid) $13.00 1 $13.00 Lead, Method 6010 (solid) $13.00 1 $13.00 Mercury, Method 7471 (solid) $28.00 1 $28.00 Selenium, Method 6010 (solid) $13.00 1 $13.00 Silver, Method 6010 (solid) $13.00 1 $13.00 Pesticides, Organochlorine Method 8081 (solid) $105.00 1 $105.00 FL-PRO (solid) $88.00 1 $88.00

TOTAL LAB $881.00

SUBCONTRACTOR COSTS

NAME PURPOSE

Services WD Environmental Remedial Construction Contractor per quote $107,625.00

(includes system install, fence, electrical sub)

Duke Energy Power Drop per quote #REF! $1,005.29

Petrotech Southeast IDW 5 $150.00 $750.00

TOTAL SUBCONTRACTOR $109,380.29

Page 4 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

SUBTASK 3: Start-up DATE: 1/20/2023 Revised 3/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Download telemetry software and troubleshoot communication 3.0 Provide technical support to the field crew from the office 2.0

Total Hours: 5.0 Remediation Specialist, R Hanson Travel (roundtrip) 3.0

Field Event Preparation 1.0 Conduct system startup, optimize performance, troubleshoot operation 6.0 Collect vacuum/flow measurements 2.0 Collect vapor samples for PID screening 2.0 Collect vapor analytical samples 2.0 Pick-up / drop-off samples 2.0

Total Hours: 18.0

Project Engineer, J Newell Travel (roundtrip) 3.0 Conduct system startup, optimize performance, troubleshoot system 6.0 Collect vacuum/flow measurements 2.0 Collect vapor samples for PID screening 2.0 Collect vapor analytical samples 1.0

Total Hours: 14.0

TOTAL LABOR 37.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M supplies $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $950.00

VEHICLE TYPE RATE UNIT USAGE

Equipment Van / Truck (staff scientist) $120.00 day 2 $240.00 Equipment Van / Truck (project engineer) $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (4 SVE wells, effluent and influent) 200.00$ 6 0 1,200.00$ Summa Cannisters 33.00$ 6 198.00$

1,398.00$

TOTAL LAB 1,398.00$

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

Page 5 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

SUBTASK 4: CCR

DATE: 1/20/2023 Revised 3/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Review construction drawings, data 4.0 sign & seal CCR 1.0

Total Hours: 5.0

Project Engineer, J Newell Prepare CCR 20.0 Input data into tables 4.0 Develop construction drawings 6.0 Develop photo logs 1.0

Total Hours: 31.0

GIS / CADD Specialist, D Grove Update drawings 6.0

Administrative Assistance, B Meynardie Compile report into pdf 2.0

TOTAL LABOR 44.0

Page 6 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

SUBTASK 5: Utilities DATE: 1/20/2023 Revised 3/14/2023

SUBCONTRACTOR COSTS

NAME PURPOSE COST

(Electric - Duke Energy)Electric $850.00 Month 1 $850.00 Setup Utility connection / hook up fee $225.00 one time 1 $225.00

Sensophone - AT&T cellular subscription $299.00 1 $299.00 Setup Utility Connection/hook up fee $225.00 one time 1 $225.00

$1,149.00

Handling fee Electric $20.00 Month 1 $20.00

Handling fee Monthly Invoice fee ($20/month) $20.00 Month 1 $20.00

$490.00

TOTAL $1,639.00

Total Utility

Page 7 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

SUBTASK 6: 1 Month O&M DATE: 1/20/2023 Revised 3/14/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, M Rothenburg Provide oversight and technical support 1.0 System evaluation/optimization 2.0

Total Hours: 3.0 Week 1 Visit Remediation Specialist, R Hanson Field event preparation 1.0

Travel (roundtrip) 3.0 Conduct O&M, optimize performance 2.0 Collect vacuum influence / vacuum flow measurements 1.0 Collect vapor samples for PID screening 1.0 Pick-up / Drop-off lab samples 2.0

Project Engineer, J Newell Telemetry check (3 times per week) 3.0 Monthly preparation, recording of system data to ongoing operational tables 3.0

Total Hours: 6.0

Month 1 Visit Remediation Specialist, R Hanson Field event preparation 1.0

Travel (roundtrip) 3.0 Conduct O&M, optimize performance 2.0 O&M checklists (1 hr/month) 1.0 Collect vacuum influence / vacuum flow measurements 1.0 Collect vapor samples for PID screening 1.0 Pick-up / Drop-off lab samples 2.0

Total Hours: 21.0

TOTAL LABOR 30.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Construction/O&M/Pilot Test Kit $360.00 day 2 $720.00 Construction/O&M suppElectric $75.00 day 2 $150.00

$870.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMEN $950.00

VEHICLE STAFF RATE UNIT USAGE

Equipment Van / Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 (VOCs) (influent and effluent, week 1 & month 1) $200.00 4 0 $800.00 Summa Cannisters $33.00 4 $132.00

$932.00

TOTAL LAB $932.00

Page 8 Rev 3 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement

PSI Proposal: 0552-391270 January 20, 2023, revised February 10, 2023 www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Ms. Skylar Schwed Environmental Specialist III / Contract Manager Email: Skylar.Schwed@FloridaDEP.gov

Re: Proposal for Interim Source Removal Plan (SVE System) Implementation – Revised Feb 10, 2023 Coastal Cleaners 2166 Main Street Dunedin, Pinellas County, Florida 34698 FDEP Facility ID# 52 9500686 / ERIC_5272

Dear Ms. Schwed:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the revised proposal contained herein to implement the Interim Source Removal Plan, with the installation of a Soil Vapor Extraction (SVE) system at the Coastal Cleaners at 2166 Street, in Dunedin, Florida. Included with this proposal is the project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

The Coastal Cleaners is located at 2166 Main Street, in the Coastal Plaza Shopping Center on the northeast corner of Main Street (State Road 580) and Heather Ridge Boulevard, in Dunedin, Pinellas County, Florida.

The Coastal Plaza Shopping Center is roughly shaped like a “L” with the cleaners occupying the elbow of the “L”. The cleaner is in an end tenant space with a drive-through window which is covered with overhead canopy and is adjacent to the drycleaners.

The Coastal Cleaners began drycleaning operations utilizing PCE in December 1991 or February 1992. The drycleaner is still in business but switched from a Miraclean 35 pound Dry-to-Dry machine to a Union L 840 U2000 unit in 2004 and included secondary containment. The drycleaner now uses a DF 2000 unit which is a non-PERC unit.

A Site Screening Report, dated June 18, 1996, was conducted which identified PCE in three soil samples at 6.8 mg/kg, 1.24 mg/kg and 8.2 mg/kg, all surrounding the dryclean machine. The Screening Report also listed a potable water supply well located within one mile of the site, identified as Well No. 6 for the City of Dunedin, with a permitted capacity of >100,000 gallons per day. The site became eligible for DSCP in March 27, 1998.

A petroleum program site is located within the Coastal Plaza Shopping Center, Coastal Plaza, Facility ID mailto:Skylar.Schwed@FloridaDEP.gov

Coastal Cleaners, ISRP Implementation www.intertek.com/building

52/8515358 which has documented groundwater and soil contamination. The site underwent under active remediation using air sparge / soil vapor extraction (AS/SVE) for two quarters in 2020 – 2021 and has now transitioned to Post Active Remediation Monitoring.

PSI prepared a Site Assessment Work Plan on January 17, 2020 and initiated Site Assessment activities in April 2020 which revealed low levels of VOH compounds in the groundwater at the site. Nineteen of the petroleum assessment wells were sampled and analyzed for VOHS by PSI in April 2020 which revealed low levels of VOH compounds in the intermediate and deeper wells. Additional intermediate and deep wells were then installed by PSI.

Elevated concentrations of air samples collected during the MAGS study (33.9 mg/m3, 11.8 mg/m3, 10.6 mg/m3, 1.02 mg/m3, 0.606 mg/m3 and 0.124 mg/m3) in April and May 2020 indicative of a contaminant mass under the building, near the former PCE dryclean machine. Based on these levels, an Interim Source Removal Plan to consist of an SVE system to address the soil impact was recommended.

PSI designed and submitted an Interim Source Removal Plan in February 2021, with revisions in May of 2021, June of 2021, June of 2022, and July of 2022 due to owner requested design changes. The ISRP was approved by the FDEP on June 23, 2021. Revised Construction Figures & SVE Pressure Drop Calculations – June 14, 2022 and Revised Pressure Drop Calculation – July 14, 2022 was approved by the FDEP on July 14, 2022.

PSI is proposing to implement the ISRP by installing an SVE system along with one month of Operation & Maintenance (O&M).

PROPOSED SCOPE OF WORK

1. Project Management

This scope is provided for in the template Level of Effort worksheets.

2. System Installation – Preconstruction and Construction Activities

Pre-Construction

1. Develop a Site-Specific Health and Safety Plan (HASP) for the proposed construction activities.

2. Obtain permits and notice(s) of commencements for construction.

3. Review the FDEP’s equipment inventory to identify a suitable SVE system for use at this site.

4. Evaluate and repair/modify the selected SVE system, as needed.

5. Transport the SVE system to the site.

6. PSI will conduct an on-site pre-construction meeting with the construction foreman, site owner representative, and FDEP personnel, if available, to review the scope of work, health and safety plans, and schedule for installation. The selected remediation contractor is WD Environmental Inc.

7. Electrical engineering services, including system startup assistance, will also be provided by WD Environmental, Inc.

Construction Activities

Construction will be conducted generally during normal working hours Monday through Friday, though work inside the building may be restricted based on tenant needs. A photographic log of construction activities will be maintained. Personnel working at the exposed areas of the site must be OSHA 40 Hour HAZWOPER certified. All applicable local, state and federal health and safety codes will be adhered to, including OSHA CFR Part 1910 (standards for general industry) and 1926 (standards for construction).

Contractor must maintain worker safety.

Construction activities will commence and consist of the following:

1. Collect clean fill sample at local borrow pit and submit to laboratory for the parameters outlined in the Departments Guidelines for Quality Assurance of Sites Undergoing Excavation to ensure the material that is backfilled after trenching is free from the constituents of concern (as needed).

2. Transport the SVE system to the Coastal Cleaners project site. Stage and position new system in median in front of the former drycleaner.

3. Schedule delivery of the vapor phase granular activated carbon (GAC) vessel and install the vessel to the system.

4. Install the poly tank for moisture water separator collection to the system.

5. Install three (3) vapor monitoring points (VMP) wells, SVE conveyance piping, and system compound fencing.

6. In order to minimize impacts to the parking lot, underground piping will be installed using directional drilling from the median to the building. Based on site conditions, directional drilling will begin at either the SVE treatment system pad, or from a trench on the north end of the median which contains the SVE system and terminated at the building’s exterior.

7. One (3-inch) pipe will be used to connect the treatment system to the system manifold located on the building’s exterior.

8. Seven (7) individual pipe legs will then disperse through the building to connect the manifold to the individual well heads.

9. Any soils generated during installation of VMP wells and conveyance piping will be drummed in 55-gallon containers, labeled, and sampled for waste characterization purposes. Upon receipt of the laboratory results and acceptance by an approved disposal facility, the drums will be transported off-site for treatment/disposal at the approved disposal facility.

10. Mobilize the Electrical Contractor to install a step-up transformer, if needed, and provide the electrical service connections.

11. Mobilize the local electric utility provider, Duke Energy, to provide the power drop to the system electrical connection point.

12. PSI will provide oversight of all site activities and will verify conformance with construction plans and specifications; verify on-site material, equipment, and supplies; identify any field changes;

and track changes for as-built drawings as needed.

13. Commission start-up test of new system.

In the event that deviations from the approved ISRP are required based on field conditions, the FDEP will be contacted for approval of major deviations. PSI will address minor deviations in the field but will not deviate from the Drawings without prior written approval and/or coordination with Engineer of Record and the FDEP.

3. System Start-up

PSI will mobilize to the site for the initial system startup. System startup will consist of the following activities:

1. Optimize vacuum and air flow readings from the SVE wells.

2. Collect vacuum influence readings from VMPs.

3. Collect OVA-PID screening data from SVE wells, and the system influent and effluent.

4. Collect baseline samples utilizing Summa canisters from the SVE wells and the system influent and effluent (6 samples). Submit the samples for laboratory analysis of VOCs by Method TO-15.

5. Document system readings on the site-specific O&M checklist.

4. Construction Completion Report

Develop the Construction Completion Report (CCR) which will summarize the construction activities, equipment specifications, operational parameters compared to design and include photo-documentation.

An explanation of all troubleshooting methods used to optimize the system startup will also be summarized, as well as details of all system operational parameters and any problems encountered during startup. As-built drawings will be provided in the CCR to document site conditions and final construction.

The CCR will be signed and sealed by a registered State of Florida Professional Engineer.

5. Utilities

The utilities will be set-up to establish service for the SVE system to include:

a. Set-up fee for utilities.

b. Electrical and sensaphone service for one month.

6. One Month System Operation and Maintenance

PSI will mobilize to the site for the first monthly O&M event which will consist of the following activities:

1. Optimize system performance as necessary to enhance system operation.

2. Collect monthly vacuum and air flow readings from the SVE wells.

3. Collect monthly PID readings from SVE wells and system effluent.

4. Collect first week air samples utilizing Summa canisters from the system influent and effluent

(2 samples). Submit the samples for laboratory analysis of VOCs by EPA Method TO-15.

5. Collect first month influent and effluent air samples in Summa canisters for analysis of VOCs by

Method TO-15. It may be possible to disconnect the vapor-phase granular activated carbon vessel after at least 30 days of operation depending on the influent air concentrations.

6. Document system readings in the site -specific O&M checklist; this checklist also serves as the monthly deliverable.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the above-described services is shown on the attached Cost Estimate and associated Level of Efforts forms. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021.

A schedule of activities and invoicing is presented below.

Coastal Cleaners ERIC_5272

Deliverables

Deliverable Due Date SUBTASK 1: Project Management Upon completion of Task Assignment

SUBTASK 2: System Installation September 30, 2023

SUBTASK 3: Start-up October 10, 2023

SUBTASK 4: CCR November 12, 2023

SUBTASK 5: Utilities December 10, 2023

SUBTASK 6: 1 Month O&M November 20, 2024

Requirements for Invoice Submittal Amount to be Invoiced

SUBTASK 1: Project Management $5,631.75

SUBTASK 2: System Installation documentation $154,047.35

SUBTASK 3: Start up Field Notes $6,968.81

SUBTASK 4: CCR $5,234.92

SUBTASK 5: Utilities $1,639.00

SUBTASK 6: 1 Month O&M checklist $5,583.01

Total: $179,104.84

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Joshua S. Newell, PE Nana G. Westmark, PG, CHMM Senior Engineer / Project Manager Senior Geologist / Contract Manager

Doug Coleman, PMP, CHMM, REM Department Manager

Enclosures: Cost Estimate Level of Effort Contractor Bids

Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-----Coastal SVE Implementation\Proposal\Revised Jan 26, 2023\Rev 1 Coastal Cleaners ERIC_5272 0552-391270 ISRP Implement.docx

Unit Quantity Rate Total Lump Sum 1 $ 1,800.00 $ 1,800.00 Lump Sum 1 $ 13,500.00 $ 13,500.00 Lump Sum 1 $ 1,000.00 $ 1,000.00 Lump Sum 1 $ 1,500.00 $ 1,500.00 Lump Sum 1 $ 1,000.00 $ 1,000.00

Per well 7 $ 750.00 $ 5,250.00 Per foot 185 $ 50.00 $ 9,250.00 Per foot 120 $ 125.00 $ 15,000.00 Per foot 220 $ 25.00 $ 5,500.00 Per foot 1300 $ 25.00 $ 32,500.00

Lump Sum 1 $ 500.00 $ 500.00 Per square foot 250 $ 12.00 $ 3,000.00 cy 0 $ 75.00 $ - Lump Sum 1 $ 13,500.00 $ 13,500.00

Lump Sum 1 $ 6,500.00 $ 6,500.00

TOTAL $ 109,800.00

Contractors Name and Address

Telephone, and email

I certify that I am authorized to contract in the name of the company.

Signature Date 1/19/2023

Name and Title Josh Pryor - Construction Division Manager All items listed herein reference the Request for Quotation for Coastal Cleaners, PSI Revised January 3, 2023.

All construction personnel to be OSHA trained in accordance with 29 CFR 1910 and 1926 No deviations from RFQ unless authorized by PSI. A copy of PSI’s general conditions is included in Attachment C.

813-909-0040 E: josh.pryor@actn.com

Install fencing including materials, labor, and signage Electrical services (including wiring to control panel from utility/point of compliance)

Action Environmental 3007 N. 50th St.

Tampa, FL 33619

Time required to complete task (Monday - Friday, 8 - 10 hours per day): 20 to 25

BID SUMMARY

SVE System Installation and Startup

Coastal Cleaners ERIC_5272

2166 Main Street

Dunedin, Pinellas County, Florida 34698

PSI Project Number: 05522983 Coastal Cleaners, ERIC_5272 RFQ – Contractor Services- Revision 4

Permits, notice of commencement Mobilization Safety Barricades Utility Locate Connect System Treatment Trailer (Anchor) Install (4) SVE wells and (3) VMP wells, including sample ports, manholes, skirts Directional drilling from building to treatment system trench Install trenching, backfill with clean fill, compaction

Install system PVC piping from system to all SVE wells Pressure testing of system piping, with PSI oversight Resurface trenches with like material Excavate, transport, dispose of contaminated soil

Install overhead piping, including anchoring to walls, ceiling

Description

Description Unit Quantity Rate Total Permits, notice of commencement Lump Sum 1 $1,500.00 $1,500.00 Mobilization Lump Sum 1 $3,000.00 $3,000.00 Safety Barricades Lump Sum 1 $800.00 $800.00 Utility Locate Lump Sum 1 $2,370.00 $2,370.00 Connect System Treatment Trailer (Anchor) Lump Sum 1 $3,000.00 $3,000.00 Install (4) SVE wells and (3) VMP wells, including sample ports, manholes, skirts Per well 7 $275.00 $1,925.00 Directional drilling from building to treatment system trench Per foot 185 $60.00 $11,100.00 Install trenching, backfill with clean fill, compaction Per foot 120 $99.00 $11,880.00 Install overhead piping, including anchoring to walls, ceiling Per foot 220 $55.00 $12,100.00 Install system PVC piping from system to all SVE wells Per foot 1300 $35.00 $45,500.00 Pressure testing of system piping, with PSI oversight Lump Sum 1 $1,500.00 $1,500.00 Resurface trenches with like material Per square foot 250 $15.00 $3,750.00 Excavate, transport, dispose of contaminated soil Per cubic yard or 55-gallon drum 0 $400.00 $0.00

Lump Sum 1 $5,400.00 $5,400.00

Install fencing including materials, labor, and signage Lump Sum 1 $3,800.00 $3,800.00

Total: $107,625.00 Time required to complete task (Monday - Friday, 8 - 10 hours per day)

Contractors Name and Address WD Environmental Services Inc 1013 Briarwood Drive Wauchula, FL 33863

Telephone, and email 8634483038 wdenviro@gmail.com

I certify that I am an officer of the company and authorized to contract in the name of the company.

Signature Name and Title Dane Terrell VPresident

All items listed herein reference the Request for Quotation for Coastal Cleaners, PSI Revised January 3, 2023.

All construction personnel to be OSHA trained in accordance with 29 CFR 1910 and 1926 No deviations from RFQ unless authorized by PSI. A copy of PSI’s general conditions is included in Attachment C.

Electrical services (including wiring to control panel from utility/point of compliance)

BID SUMMARY

SVE System Installation and Startup

Coastal Cleaners

ERIC_5272

2166 Main Street Dunedin, Pinellas County, Florida 34698

From: Don Polanis To: Joshua Newell Cc: Nana Westmark Subject: [External] RE: Coastal Cleaners ERIC_5272 Remedial System Construction RFQ Date: Wednesday, January 4, 2023 7:10:11 AM Attachments: image001.png

Good morning Josh, based on our work backlog DPS will not be submitting a bid on this project.

Thank you

Donald R. Polanis, CGC, PSSC, CJC Sr. Project Manager DPS Corp.

352-588-2811 office 352-212-4446 cell http://dps-corp.com/ [dps-corp.com]

From: Joshua Newell <joshua.newell@intertek.com> Sent: Tuesday, January 3, 2023 9:51 AM To: Don Polanis <dpolanis@dps-corp.com> Cc: Nana Westmark <nana.westmark@intertek.com> Subject: Coastal Cleaners ERIC_5272 Remedial System Construction RFQ

Good morning Don, Please see the attached RFQ detailing Remedial Construction Services being requested. If you have any questions, please do not hesitate to reach out. We look forward to your response and to working with you in the future.

Happy New Year, Josh Newell, P.E.

Senior Engineer Building & Construction Intertek-PSI

Mobile +1 863-712-4342 Direct +1 813-580-5974 Email joshua.newell@intertek.com mailto:dpolanis@dps-corp.com mailto:joshua.newell@intertek.com mailto:nana.westmark@intertek.com https://urldefense.com/v3/__http://dps-corp.com/__;!!Ie6nUkZk!r4hvx-osiyOT8dWT_0sO7oc6YhUk5TuOCldf1hBP5a5MVN2WCvLbDMHqIO8zUcbOPyxainfOswjAhPBRncQM2QQ$ mailto:joshua.newell@intertek.com http://www.intertek.com/building

Intertek-PSI, 607 South Alexander Street, Ste. 210, Plant City, FL 33563

[bbeb.com]

Total Quality. Assured.

CONFIDENTIALITY NOTICE

This email may contain confidential or privileged information, if you are not the intended recipient, or the person responsible for delivering the message to the intended recipient then please notify us by return email immediately. Should you have received this email in error then you should not copy this for any purpose nor disclose its contents to any other person.

http://www.intertek.com

This message is from an EXTERNAL SENDER - please be CAUTIOUS, particularly with links and attachments.

https://urldefense.com/v3/__https://www.bbeb.com/__;!!Ie6nUkZk!r4hvx-osiyOT8dWT_0sO7oc6YhUk5TuOCldf1hBP5a5MVN2WCvLbDMHqIO8zUcbOPyxainfOswjAhPBRRL6-mZc$ https://urldefense.com/v3/__https://www.bbeb.com/__;!!Ie6nUkZk!r4hvx-osiyOT8dWT_0sO7oc6YhUk5TuOCldf1hBP5a5MVN2WCvLbDMHqIO8zUcbOPyxainfOswjAhPBRRL6-mZc$ http://www.intertek.com/

This invoice is for installation of a pedestal at the base of a pole to be used as point of delivery for remediation system at 2166 Main St. in Dunedin FL

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

Advantage Environmental IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $235.00 $235.00 --- --- ---soil $235.00 $235.00 --- --- ---low volume fee (< 6 drums) --- --- --- Pick-up fee --- --- --- Per diem --- --- --- ---

Water, per drum $235.00 $235.00 --- --- --- Soil, per drum $235.00 $235.00 --- --- ---

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

State of Florida

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Page 1 of 3 PSI IDW Quotes 3-29-2022

&ƌŽŵ͗�ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ ^ĞŶƚ͗�dŚƵƌƐĚĂLJ͕�:ĂŶƵĂƌLJ�Ϯϳ͕�ϮϬϮϮ�ϭ͗Ϭϭ�WD dŽ͗�EĂŶĂ�tĞƐƚŵĂƌŬ ^ƵďũĞĐƚ͗�Z�͗��džƚĞƌŶĂů�Z�͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ� dŚĞ�ůŽǁ�ǀŽůƵŵĞ�ƉŝĐŬ�ƵƉ�ŝƐ�ƚŚĞ�ΨϮϯϱ�ŝƚ�ŝŶĐůƵĚĞƐ�ƐƚŽƉ�ĐŚĂƌŐĞ�ĂŶĚ�ůŽǁ�ǀŽůƵŵĞ

&ƌŽŵ͗ EĂŶĂ�tĞƐƚŵĂƌŬ�фŶĂŶĂ͘ǁĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵх� ^ĞŶƚ͗tĞĚŶĞƐĚĂLJ͕�:ĂŶƵĂƌLJ�Ϯϲ͕�ϮϬϮϮ�ϲ͗ϱϵ��D dŽ͗ ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ �Đ͗ ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ ^ƵďũĞĐƚ͗ Z�͗��džƚĞƌŶĂů�Z�͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ�

'ŽŽĚ�DŽƌŶŝŶŐ�ʹ tĂƐŶ͛ƚ�ƐƵƌĞ�ŝĨ�LJŽƵ�ǁĂŶƚĞĚ�ƚŽ�ĐůĂƌŝĨLJ�ƚŚŝƐ͍

WůĞĂƐĞ�ůĞƚ�ŵĞ�ŬŶŽǁ͘ dŚĂŶŬƐ

EĂŶĂ

EĂŶĂ�tĞƐƚŵĂƌŬ͕�W'͕��,DD ^ĞŶŝŽƌ�'ĞŽůŽŐŝƐƚ�ͬ�WƌŝŶĐŝƉĂů��ŽŶƐƵůƚĂŶƚ �ƵŝůĚŝŶŐ�Θ��ŽŶƐƚƌƵĐƚŝŽŶ /ŶƚĞƌƚĞŬͲW^/

WůĞĂƐĞ�EŽƚĞ͗ �Ɛ�ŽĨ�KĐƚŽďĞƌ�ϭϮ͕�ϮϬϭϴ͕�ŵLJ�ĞŵĂŝů�ĂĚĚƌĞƐƐ�ǁŝůů�ĐŚĂŶŐĞ�ƚŽ͗ EĂŶĂ͘tĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵ͘�

�ŝƌĞĐƚ ϴϭϯ�ʹ ϴϴϲ�ʹ ϭϬϳϱ��džƚ�Ϯϭϵ DŽďŝůĞ ϴϭϯ�Ͳ Ϯϲϳ�Ͳ Ϯϱϭϵ KĨĨŝĐĞ ϴϭϯ�ʹ ϴϴϲ�ʹ ϭϬϳϱ �ŵĂŝů EĂŶĂ͘tĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵ ^ŬLJƉĞ EĂŶĂ͘tĞƐƚŵĂƌŬ͘/ŶƚĞƌƚĞŬ ǁǁǁ͘ŝŶƚĞƌƚĞŬ͘ĐŽŵͬďƵŝůĚŝŶŐ

^ĞŶƚ�ĨƌŽŵ�DĂŝů�ŐŽ͘ŵŝĐƌŽƐŽĨƚ͘ĐŽŵ ĨŽƌ�tŝŶĚŽǁƐ

&ƌŽŵ͗ EĂŶĂ�tĞƐƚŵĂƌŬ�фŶĂŶĂ͘ǁĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵх ^ĞŶƚ͗DŽŶĚĂLJ͕�:ĂŶƵĂƌLJ�ϭϳ͕�ϮϬϮϮ�ϰ͗Ϯϳ͗ϯϲ�WD dŽ͗ ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ фƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵх �Đ͗ ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ фŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵх ^ƵďũĞĐƚ͗ Z�͗��džƚĞƌŶĂů�Z�͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ� dŚĂŶŬ�LJŽƵ�ĨŽƌ�ƌĞƐƉŽŶĚŝŶŐ�ƐŽ�ƋƵŝĐŬůLJ͘

:ƵƐƚ�ƚŽ�ĐůĂƌŝĨLJ͗

/Ĩ�ǁĞ�ŚĂǀĞ�ŽŶĞ�ĚƌƵŵ�ŽĨ�/�t�ƐŽŝů�ŽŶ�Ă�ƐŝƚĞ�ǁŝƚŚ�ϭ�ĚƌƵŵ�ŽŶůLJ͕�ƚŚĞ�ĐŽƐƚ�ĨŽƌ�ƚŚĞ�ĐŽŵƉůĞƚĞ�ƉŝĐŬͲƵƉ͕�ƚƌĂŶƐƉŽƌƚ͕� ĂĚ�ĚŝƐƉŽƐĂů�ǁŽƵůĚ�ďĞ͗

ΨϭϱϬ�Ͳ ƐŽŝů� ΨϮϯϱ�ʹ ůŽǁ�ǀŽůƵŵĞ�ĨĞĞ ΨϭϭϬ�ʹ ƉŝĐŬͲƵƉ�ĨĞĞ dŽƚĂů�ĨŽƌ�ŽŶĞ�ĚƌƵŵ͗ Ψϰϵϱ͍ dŚĂŶŬƐ

EĂŶĂ�

^ĞŶƚ�ĨƌŽŵ�DĂŝů�ŐŽ͘ŵŝĐƌŽƐŽĨƚ͘ĐŽŵ ĨŽƌ�tŝŶĚŽǁƐ

&ƌŽŵ͗�ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ ^ĞŶƚ͗�DŽŶĚĂLJ͕�:ĂŶƵĂƌLJ�ϭϳ͕�ϮϬϮϮ�ϰ͗ϭϯ�WD dŽ͗�EĂŶĂ�tĞƐƚŵĂƌŬ �Đ͗�ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ ^ƵďũĞĐƚ͗��džƚĞƌŶĂů�Z�͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ�

'ŽŽĚ�ĂĨƚĞƌŶŽŽŶ͘�WůĞĂƐĞ�ĨŝŶĚ�ĂƚƚĂĐŚĞĚ�ŽƵƌ�ƉƌŝĐĞƐ�ĨŽƌ�ƚƌĂŶƐ�ĂŶĚ�ĚŝƐƉŽƐĂů�ŽĨ�LJŽƵƌ�ŶŽŶͲŚĂnjĂƌĚŽƵƐ�Ěƌŝůů� ĐƵƚƚŝŶŐƐ͘�/Ĩ�LJŽƵ�ŚĂǀĞ�ĂŶLJ�ƋƵĞƐƚŝŽŶƐ͕�ƉůĞĂƐĞ�ůĞƚ�ŵĞ�ŬŶŽǁ͘� tĞ�ůŽŽŬ�ĨŽƌǁĂƌĚ�ƚŽ�ǁŽƌŬŝŶŐ�ǁŝƚŚ�LJŽƵ�ŽŶ�ƚŚŝƐ�ƉƌŽũĞĐƚ͘ dŚĂŶŬ�LJŽƵ͕ dĞƌĞƐĂ�EŝdžŽŶ ͮ�WƌŽũĞĐƚ��ŝƌĞĐƚŽƌ �ĚǀĂŶƚĂŐĞ��ŶǀŝƌŽŶŵĞŶƚĂů�^ĞƌǀŝĐĞƐ͕�/ŶĐ͘ ϮϯϮϱ�ϱƚŚ �ǀĞŶƵĞ�EŽƌƚŚ ͮ�^ƚ͘�WĞƚĞƌƐďƵƌŐ͕�&ůŽƌŝĚĂ�ͮ�ϯϯϳϭϯͮ K͗ ϳϮϳ͘ϯϮϯ͘ϭϵϬϮ ͮ�D͗ ϴϭϯ͘ϵϭϴ͘ϵϱϳϲ ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ ƌĞƐƚŽƌŝŶŐ͘ƚŽŵŵŽƌŽǁ͘ƚŽĚĂLJ �ĞƌƚŝĨŝĞĚ�DŝŶŽƌŝƚLJ��ƵƐŝŶĞƐƐ

ͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲͲ

7KH�LQIRUPDWLRQ�FRQWDLQHG�LQ�WKLV�HPDLO�PD\�EH�FRQILGHQWLDO�DQG�RU�OHJDOO\�SULYLOHJHG��,W�KDV�EHHQ�VHQW�IRU�WKH�VROH�XVH�RI�WKH� LQWHQGHG�UHFLSLHQW�V���,I�WKH�UHDGHU�RI�WKLV�PHVVDJH�LV�QRW�DQ�LQWHQGHG�UHFLSLHQW��\RX�DUH�KHUHE\�QRWLILHG�WKDW�DQ\�XQDXWKRUL]HG UHYLHZ��XVH��GLVFORVXUH��GLVVHPLQDWLRQ��GLVWULEXWLRQ��RU�FRS\LQJ�RI�WKLV�FRPPXQLFDWLRQ��RU�DQ\�RI�LWV�FRQWHQWV��LV�VWULFWO\�SURKLELWHG��

,I�\RX�KDYH�UHFHLYHG�WKLV�FRPPXQLFDWLRQ�LQ�HUURU��SOHDVH�UHSO\�WR�WKH�VHQGHU�DQG�GHVWUR\�DOO�FRSLHV�RI�WKH�PHVVDJH��7R�FRQWDFW�XV�

GLUHFWO\��VHQG�WR�VDOHV#DHVHQY�FRP��7KDQN�\RX��

&ƌŽŵ͗ EĂŶĂ�tĞƐƚŵĂƌŬ�фŶĂŶĂ͘ǁĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵх� ^ĞŶƚ͗ dŚƵƌƐĚĂLJ͕�:ĂŶƵĂƌLJ�ϭϯ͕�ϮϬϮϮ�ϯ͗Ϭϴ�WD dŽ͗ ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ �Đ͗ ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ ^ƵďũĞĐƚ͗ Z�͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ�

/ƚ�ũƵƐƚ�ŽĐĐƵƌƌĞĚ�ƚŽ�ŵĞ�ƚŚĂƚ�ŝƚ�ŵŝŐŚƚ�ďĞ�ĞĂƐŝĞƌ�ŝĨ�/�ƐĞŶĚ�LJŽƵ�ƚŚĞ�ƐƉƌĞĂĚƐŚĞĞƚ͘ dŚĂŶŬƐ

^ĞŶƚ�ĨƌŽŵ�DĂŝů�ŐŽ͘ŵŝĐƌŽƐŽĨƚ͘ĐŽŵ ĨŽƌ�tŝŶĚŽǁƐ

&ƌŽŵ͗�EĂŶĂ�tĞƐƚŵĂƌŬ ^ĞŶƚ͗�dŚƵƌƐĚĂLJ͕�:ĂŶƵĂƌLJ�ϭϯ͕�ϮϬϮϮ�ϴ͗Ϯϳ��D dŽ͗�ŶƐŚŝŶŐůĞΛĂĞƐĞŶǀ͘ĐŽŵ �Đ͗�ƚŶŝdžŽŶΛĂĞƐĞŶǀ͘ĐŽŵ͖�EĂŶĂ�tĞƐƚŵĂƌŬ ^ƵďũĞĐƚ͗��ŶŶƵĂů�/�t�ƉƌŝĐĞƐ�ĨŽƌ�&��W��ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚ�ĨŽƌ�W^/�dĞĂŵ�

'ŽŽĚ�DŽƌŶŝŶŐ�EĂƚŚĂŶ�ʹ dŚĂŶŬ�LJŽƵ�ĨŽƌ�ƐƉĞĂŬŝŶŐ�ǁŝƚŚ�ŵĞ�ƚŚŝƐ�ŵŽƌŶŝŶŐ͘ dŚĞ�W^/�dĞĂŵ�;W^/�ĂŶĚ��ŚĂƐƚĂŝŶ�^ŬŝůůŵĂŶͿ�ŚĂǀĞ�ďĞĞŶ�ĂǁĂƌĚĞĚ�ŽŶĞ�ŽĨ�ƚŚĞ�&��W�͞�ƌLJĐůĞĂŶŝŶŐ��ŽŶƚƌĂĐƚƐ͟� ĂŶĚ�ǁĞ�ĂƌĞ�ĂŶdžŝŽƵƐ�ƚŽ�ŐĞƚ�ƐƚĂƌƚĞĚ͘ tĞ�ĂƌĞ�ŝŶǀŝƚŝŶŐ�LJŽƵƌ�Ĩŝƌŵ�ƚŽ�ƉƌŽǀŝĚĞ�ĐŽƐƚƐ�ĨŽƌ�ƉŝĐŬͲƵƉ͕�ƚƌĂŶƐƉŽƌƚ͕�ĂŶĚ�ĚŝƐƉŽƐĂů�ƚŽ�ĂŶ�ĂƉƉƌŽǀĞĚ�ĨĂĐŝůŝƚLJ�ŽĨ� /ŶǀĞƐƚŝŐĂƚŝŽŶͲ�ĞƌŝǀĞĚ�tĂƐƚĞ�;/�tͿ�ŽŶ�Ă�ƉĞƌ�ϱϱͲŐĂůůŽŶ�ĚƌƵŵ�ďĂƐŝƐ�ĨƌŽŵ�ĚƌLJĐůĞĂŶŝŶŐ�ƐŝƚĞƐ�ĂŶĚ�ƐƚĂƚĞ� ĨƵŶĚĞĚ�ƐŝƚĞƐ͕�ĂŶĚ�ƐŝƚĞ�ŝŶǀĞƐƚŝŐĂƚŝŽŶ�ƐŝƚĞƐ�ƚŚĂƚ�ĂƌĞ�ŝŶ�ƚŚĞ�ƉƌŽŐƌĂŵƐ͘

/Ĩ�LJŽƵ�ĂƌĞ�ŝŶƚĞƌĞƐƚĞĚ�ŝŶ�ƉƌŽǀŝĚŝŶŐ�Ă�ƋƵŽƚĞ͕�ǁĞ�ǁŽƵůĚ�ĂƉƉƌĞĐŝĂƚĞ�ŝƚ͘ /�Ăŵ�ĂƚƚĂĐŚŝŶŐ�Ă�ĨŽƌŵ�ŝŶ�ǁŚŝĐŚ�ƚŽ� ƐƵďŵŝƚ�ďĂĐŬ�ƚŽ�ƵƐ͕�ĂůŽŶŐ�ǁŝƚŚ�ƚŚĞ�'ĞŶĞƌĂů��ŽŶĚŝƚŝŽŶƐ͘

/Ĩ�LJŽƵ�ĐŽƵůĚ�ƉƌŽǀŝĚĞ�ƚŚĞƐĞ�ƉƌŝĐĞƐ�ƚŽ�ƵƐ�ďLJ�:ĂŶƵĂƌLJ�Ϯϭ͕�ϮϬϮϮ͕�ǁĞ�ǁŽƵůĚ�ĂƉƉƌĞĐŝĂƚĞ�ŝƚ͘ dŚĂŶŬ�LJŽƵ͕

EĂŶĂ

EĂŶĂ�tĞƐƚŵĂƌŬ͕�W'͕��,DD ^ĞŶŝŽƌ�'ĞŽůŽŐŝƐƚ�ͬ�WƌŝŶĐŝƉĂů��ŽŶƐƵůƚĂŶƚ �ƵŝůĚŝŶŐ�Θ��ŽŶƐƚƌƵĐƚŝŽŶ /ŶƚĞƌƚĞŬͲW^/

WůĞĂƐĞ�EŽƚĞ͗ �Ɛ�ŽĨ�KĐƚŽďĞƌ�ϭϮ͕�ϮϬϭϴ͕�ŵLJ�ĞŵĂŝů�ĂĚĚƌĞƐƐ�ǁŝůů�ĐŚĂŶŐĞ�ƚŽ͗ EĂŶĂ͘tĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵ͘�

�ŝƌĞĐƚ ϴϭϯ�ʹ ϴϴϲ�ʹ ϭϬϳϱ��džƚ�Ϯϭϵ DŽďŝůĞ ϴϭϯ�Ͳ Ϯϲϳ�Ͳ Ϯϱϭϵ KĨĨŝĐĞ ϴϭϯ�ʹ ϴϴϲ�ʹ ϭϬϳϱ �ŵĂŝů EĂŶĂ͘tĞƐƚŵĂƌŬΛŝŶƚĞƌƚĞŬ͘ĐŽŵ ^ŬLJƉĞ EĂŶĂ͘tĞƐƚŵĂƌŬ͘/ŶƚĞƌƚĞŬ ǁǁǁ͘ŝŶƚĞƌƚĞŬ͘ĐŽŵͬďƵŝůĚŝŶŐ

^ĞŶƚ�ĨƌŽŵ�DĂŝů�ŐŽ͘ŵŝĐƌŽƐŽĨƚ͘ĐŽŵ ĨŽƌ�tŝŶĚŽǁƐ ďďĞď͘ĐŽŵ

7RWDO�4XDOLW\��$VVXUHG��

&21),'(17,$/,7<�127,&(�

7KLV�HPDLO�PD\�FRQWDLQ�FRQILGHQWLDO�RU�SULYLOHJHG�LQIRUPDWLRQ��LI�\RX�DUH�QRW�WKH�LQWHQGHG�UHFLSLHQW��RU�WKH�SHUVRQ�UHVSRQVLEOH�IRU� GHOLYHULQJ�WKH�PHVVDJH�WR�WKH�LQWHQGHG�UHFLSLHQW�WKHQ�SOHDVH�QRWLI\�XV�E\�UHWXUQ�HPDLO�LPPHGLDWHO\��6KRXOG�\RX�KDYH�UHFHLYHG�WKLV� HPDLO�LQ�HUURU�WKHQ�\RX�VKRXOG�QRW�FRS\�WKLV�IRU�DQ\�SXUSRVH�QRU�GLVFORVH�LWV�FRQWHQWV�WR�DQ\�RWKHU�SHUVRQ�

KWWS���ZZZ�LQWHUWHN�FRP

ĂǀĂƐƚ͘ĐŽŵ dŚŝƐ�ĞŵĂŝů�ŚĂƐ�ďĞĞŶ�ĐŚĞĐŬĞĚ�ĨŽƌ�ǀŝƌƵƐĞƐ�ďLJ��ǀĂƐƚ�ĂŶƚŝǀŝƌƵƐ� ƐŽĨƚǁĂƌĞ͘� ǁǁǁ͘ĂǀĂƐƚ͘ĐŽŵ�ĂǀĂƐƚ͘ĐŽŵ dŚŝƐ�ŵĞƐƐĂŐĞ�ŝƐ�ĨƌŽŵ�ĂŶ��yd�ZE�>�^�E��Z�Ͳ ƉůĞĂƐĞ�ďĞ���hd/Kh^͕�ƉĂƌƚŝĐƵůĂƌůLJ�ǁŝƚŚ�ůŝŶŬƐ�ĂŶĚ� ĂƚƚĂĐŚŵĞŶƚƐ͘

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

Clark Environmental Inc. IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $60.00 $60.00 $60.00 $60.00 $60.00 soil $80.00 $80.00 $80.00 $80.00 $80.00 low volume fee (< 6 drums) $50.00 $50.00 $50.00 $50.00 $200.00 Pick-up fee $30.00 $30.00 $40.00 $40.00 $50.00 Per diem --- --- --- --- 200.00$

Water $140.00 $140.00 $150.00 $150.00 $510.00 Soil $160.00 $160.00 $170.00 $170.00 $530.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Page2 of 3 PSI IDW Quotes 3-29-2022

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

IDW

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Various

Petrotech Southeast

Facility Name Facility Location Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $125.00 $125.00 soil $150.00 $150.00 low volume fee (< 6 drums) Pick-up fee Per diem --- --- --- ---

Water, per drum $125.00 $125.00 $0.00 $0.00 $0.00 Soil, per drum $150.00 $150.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

State of Florida

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Page 3 of 3 PSI IDW Quotes 3-29-2022

Nana Westmark

From: Natacha Jackson <natacha.jackson@petrotechse.com> Sent: Wednesday, January 26, 2022 10:15 AM To: Nana Westmark Subject: [External] Re: Annual IDW prices for FDEP Drycleaning Contract for PSI Team Attachments: PSI IDW Quotes Response 01.26.22.pdf

Good Morning, Here you go, I was waiting on the final OK from Jason..

On Wed, Jan 26, 2022 at 7:03 AM Nana Westmark <nana.westmark@intertek.com> wrote:

Good Morning Natacha – Wasn’t sure if you received this.

Are you interested in providing a quote for our annual contract?

Thanks

Nana

Sent from Mail [go.microsoft.com] for Windows

From: Nana Westmark Sent: Thursday, January 13, 2022 3:08 PM To: Natacha Jackson Subject: RE: Annual IDW prices for FDEP Drycleaning Contract for PSI Team

It just occurred to me that it might be easier if you had the spreadsheet!

Thanks

From: Nana Westmark Sent: Thursday, January 13, 2022 8:14 AM To: Natacha Jackson Cc: Greg Lassi Subject: Annual IDW prices for FDEP Drycleaning Contract for PSI Team

Good Morning Natacha – Hope you are doing well these days.

The PSI Team (PSI and Chastain Skillman) have been awarded one of the FDEP “Drycleaning Contracts” and we are anxious to get started.

W…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .