CN-370000-HW686-DC002E.pdf
PDF 1 MB Posted
- Contract number
- HW686
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI), operating under Contract Number HW686. The task assignment is designated DC002E with an effective date of February 9, 2024, and a completion date of June 20, 2025. The contract is managed by Nicole Knutson (FDEP) and Nana Westmark (PSI), with the project location at the Lakeland Storage Facility on State Road 33 in Polk County, Florida.
PSI will provide facility management and equipment oversight services for the FDEP's Bureau of Waste Cleanup Equipment Storage Facility for one year (April 2024 through March 2025). Services include remediation equipment inspections, chain of custody documentation, monthly motor testing, equipment transfer coordination with other contractors, and quarterly Equipment Storage Status Reports. The total contract value is $45,380.42, structured on a fixed unit rate basis with quarterly deliverables: Subtask 2 (Quarter 2) invoiced at $10,761.99; Subtask 3 (Quarter 3) at $10,761.99; Subtask 4 (Quarter 4) at $10,761.99; and Subtasks 1 & 5 combined (Project Management and Quarter 1) at $13,094.45. Deliverables are due quarterly (July 20, 2024; October 20, 2024; January 20, 2025; and April 20, 2025), with FDEP approval required before invoice payment. The service costs include labor, equipment storage rental, vehicle expenses, expendables, and a completion fee.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
DC002E Completion June 20, 2025
This task assignment authorizes PSI to perform maintenance activities at the Lakeland Storage Facility for one year (April 2024 through March 2025).
Nicole Knutson 850-245-8763 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Professional Service Industries, Inc. (Intertek-PSI)
Professional Service Industries, Inc. (Intertek-PSI)
Nana Westmark 813-886-1075 Multiple Sites
State Road 33 Lakeland, Polk County, Florida
Lakeland Storage Facility
✔ $ 45,380.42
$ 45,380.42
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
Nana G Westmark Digitally signed by Nana G Westmark Date: 2024.02.12 08:43:40 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.02.09 13:55:17 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Equipment Storage Status Report (Quarter 2) 07/20/2024
Subtask 3: Equipment Storage Status Report (Quarter 3) 10/20/2024
Subtask 4: Equipment Storage Status Report (Quarter 4) 01/20/2025
Subtasks 1 & 5:Equipment Storage Status Report (Quarter 1) & PM 04/20/2025
FDEP Approval of Subtask 2: Equipment Storage Status Report (Quarter 2) $ 10,761.99
FDEP Approval of Subtask 3: Equipment Storage Status Report (Quarter 3) $ 10,761.99
FDEP Approval of Subtask 4: Equipment Storage Status Report (Quarter 4) $ 10,761.99
FDEP Approval of Subtasks 1 & 5:Equipment Storage Status Report (Quarter 1) &
PM $ 13,094.45
$ 45,380.42
HW686
DC002E
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Multiple Sites
Lakeland Storage Facility
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW686 DC002E
DATE: February 9, 2024
This task assignment authorizes PSI to perform maintenance activities at the Lakeland Storage Facility for one year (April 2024 through March 2025). These maintenance activities include, but are not limited to, equipment inspections, completing chain of custody forms, and spinning equipment motors.
Total task amount is $45,380.42. PSI’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is April 20, 2025.
Task completion date is June 20, 2025.
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 2/8/2024
Task #: SubTask 1 Project Management SubTask 6
Site: Equipment Storage Facility SubTask 2 Qtr 2 - Equipment Storage Management SubTask 7
Activity/Phase: SubTask 3 Qtr 3 - Equipment Storage Management SubTask 8
Project Manager: Nana Westmark SubTask 4 Qtr 4 - Equipment Storage Management SubTask 9
SubTask 5 Qtr 1 - Equipment Storage Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$58.41 Project Manager 15 14.5 $64.90 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $60.00 Senior Engineer, MR 0 0 0 0 0 0 0 0 0 0 $58.41 Senior Geologist, NW 24 6 6 6 6 0 0 0 0 0 $60.61 Senior Geologist, MR 0 0 0 0 0 0 0 0 0 0
$0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0
$58.41 Project Manager 0 0 0 0 0 0 0 0 0 0 $48.00 Project Engineer, JN 0 0 0 0 0 0 0 0 0 0 $62.50 Project Engineer, GR 0 0 0 0 0 0 0 0 0 0 $42.09 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $37.74 Project Geologist, SAM 0 0 0 0 0 0 0 0 0 0 $39.42 Project Scientist, SL 0 0 0 0 0 0 0 0 0 0 $33.74 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.77 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0
$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0 $0.00 Remediation Specialist, RH 0 0 0 0 0 0 0 0 0 0
$34.03 GIS / CAD Specialist, DG 0 0 0 0 0 0 0 0 0 0 $25.48 Staff Scientist, MM 200 50 50 50 50 0 0 0 0 0 $25.00 Staff Scientist, QH 0 0 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, OG 0 0 0 0 0 0 0 0 0 0 $30.91 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $28.39 Environmental Specialist, DK 0 0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 239 15 56 56 56 56 0 0 0 0 0
Direct Labor $7,342.56 $844.72 $1,624.46 $1,624.46 $1,624.46 $1,624.46 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 151.02% $11,088.74 $1,275.70 $2,453.26 $2,453.26 $2,453.26 $2,453.26 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF PSI Intertek Page 1
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 2/8/2024
Task #: SubTask 1 Project Management SubTask 6
Site: Equipment Storage Facility SubTask 2 Qtr 2 - Equipment Storage Management SubTask 7
Activity/Phase: SubTask 3 Qtr 3 - Equipment Storage Management SubTask 8
Project Manager: Nana Westmark SubTask 4 Qtr 4 - Equipment Storage Management SubTask 9
SubTask 5 Qtr 1 - Equipment Storage Management SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $18,431.30 $2,120.42 $4,077.72 $4,077.72 $4,077.72 $4,077.72 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,920.00 $480.00 $480.00 $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,920.00 $480.00 $480.00 $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment Storage rental $19,260.00 $4,815.00 $4,815.00 $4,815.00 $4,815.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $19,260.00 $4,815.00 $4,815.00 $4,815.00 $4,815.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,926.00 $481.50 $481.50 $481.50 $481.50 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $21,186.00 $5,296.50 $5,296.50 $5,296.50 $5,296.50 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $800.00 $200.00 $200.00 $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,200.00 $300.00 $300.00 $300.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,000.00 $500.00 $500.00 $500.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $43,537.30 $2,120.42 $10,354.22 $10,354.22 $10,354.22 $10,354.22 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,843.12 $212.04 $407.77 $407.77 $407.77 $407.77 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $45,380.42 $2,332.46 $10,761.99 $10,761.99 $10,761.99 $10,761.99 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF PSI Intertek Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Equipment Storage Facility SubTask 2 Quarter 1 - Equipment Storage Management
DATE: 2/8/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1
Total Hours: 6 Staff Scientist Quarterly site visits Total Hours: 50
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00
TOTAL $4,815.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction / O&M Supplies $75.00 day 0 $0.00
$300.00 weekly 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $500.00
FINAL --7/24/96
Page 3 Rev 1 PSI Equipment Storage 0552-418094
SubTask 3 Qtr 3 - Equipment Storage Management
DATE: 2/8/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1
Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00
TOTAL $4,815.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction / O&M Supplies $75.00 day 0 $0.00
$300.00 weekly 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $500.00
Page 4 Rev 1 PSI Equipment Storage 0552-418094
SubTask 4 Qtr 4 - Equipment Storage Management
DATE: 2/8/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1
Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00
TOTAL $4,815.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction / O&M Supplies $75.00 day 0 $0.00
$300.00 week 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $500.00
Page 5 Rev 1 PSI Equipment Storage 0552-418094
SubTask 5 Qtr 1 - Equipment Storage Management
DATE: 2/8/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist Compile equipment list, photographs 5 Submit current equipment list to FDEP 1
Total Hours 6 Remediation Specialist Quarterly site visits Total Hours: 50
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Truck, site visit $120.00 day 0 $0.00 $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
Equipment Storage rental 3 monthly $1,605.00 $4,815.00 $0.00
TOTAL $4,815.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction / O&M Supplies $75.00 day 0 $0.00
$300.00 week 1 $300.00 Expendables 0 0 $40.00 day 5 0 $200.00
$0.00 $0.00 $0.00
TOTAL EQUIPMENT $500.00
Page 6 Rev 1 PSI Equipment Storage 0552-418094
PSI Proposal: 0552-418094
February 8, 2024 www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Mr. Benjamin Grubbs, Environmental Consultant Phone: (850) 245-8705 main, or (850) 245-8992 Email: Benjamin.Grubbs@FloridaDEP.gov
Re: Proposal for FDEP Bureau of Waste Cleanup Equipment Storage Facility Management State Road 33 Lakeland, Polk County, Florida Contract No. HW686
Dear Mr. Grubbs:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide for management of the Florida Department of Environmental Protection’s Bureau of Waste Cleanup (FDEP BWC) Equipment Storage Facility in Lakeland, Florida. Included with this proposal is a discussion of the proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
PSI understands that the FDEP BWC routinely houses remediation equipment for use under the Drycleaning Solvent Cleanup Program and other state funded programs. Various remediation equipment is stored at an existing facility located off State Road 33, in Lakeland, which is maintained and housed on behalf of the FDEP. The property is owned by the Fountain RV Park, which is located adjacent to the FDEP BWC Lakeland Equipment Storage Facility. The property is enclosed with a padlocked fence and currently has no utilities connected to the property (i.e., no power or water is available on-site). The FDEP requests that the facility be manned approximately five days per quarter to allow other contractors under the Waste Cleanup Program to test the remediation equipment and to access, collect and transport that equipment to various cleanup sites.
PSI proposes to provide yard/equipment management services to the FDEP and assumes the following:
mailto:Benjamin.Grubbs@FloridaDEP.gov
FDEP – Equipment Storage Facility
1. The FDEP Equipment Storage Facility property is approximately 1 – 2-acre property and is owned by the Fountain RV Park. The property is surrounded by a 6-foot chain link fence and locked padlock.
2. No power, water, or office trailer is available on-site.
3. Mowing or keeping vegetation down is the responsibility of others.
4. PSI will be available with an approximate one-week notification to receive incoming equipment and allow contractors to return FDEP-owned equipment as directed by the BWC.
5. Contractors will arrange with PSI to visit the site and inspect existing FDEP-owned remediation equipment.
6. PSI will spin the motors upon receiving equipment using manual (screwdriver or similar) means to determine if motors are free spinning.
7. PSI will spin the motors on all stored equipment monthly with a screwdriver.
8. No repairs of any equipment in the Storage Yard are required to be conducted by PSI.
9. PSI assumes no liability for stolen property or vandalism.
10. PSI will pay rent fee as outlined in the FDEP Task Assignment to property owner.
11. PSI will provide the following Deliverables on a quarterly basis.
a. Excel spreadsheet of equipment on site.
b. Photos of equipment when received.
c. Maintain chain of custody (equipment transfer forms) to be provided by FDEP for removal or receiving equipment and submit to FDEP.
12. Trailer license tags (if present) are to remain with equipment.
13. Signage on existing equipment remains with equipment (store in trailer, if possible).
PROPOSED SCOPE OF WORK
This proposal consists of annual management for the equipment storage family. Specifically, the proposed scope of work consists of the following subtasks:
Subtask 1 - Project Management
This scope is provided for in the template worksheets.
Subtask 2 - Quarter 2 (April, May, June 2024), Equipment Storage Facility Oversight
PSI will coordinate remediation equipment transfers into and out of the Lakeland facility with other contractors. This will include providing a flexible schedule for routine equipment deliveries, providing personnel to visit the site for system inspection and testing, and providing directions for the parking system to minimize site disruption. Five days per quarter are proposed.
PSI will also open the motors of incoming remediation systems to provide documentation of system conditions prior to entry into the equipment facility.
The deliverable for the Quarter consists of a current equipment availability spreadsheet to include:
• Equipment delivery dates,
• Contractors visiting facility,
• Remediation system equipment components,
• Photographs of incoming equipment.
Subtask 3 - Quarter 3 (July, August, September 2024), Equipment Storage Facility Oversight
PSI will provide similar services as described above in Subtask 2.
Subtask 4 - Quarter 4 (October, November December 2024), Equipment Storage Facility Oversight
PSI will provide similar services as described above in Subtask 2.
Subtask 5 - Quarter 1 (January, February, March 2025), Equipment Storage Facility Oversight
PSI will provide similar services as described above in Subtask2.
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the above-described services is shown on the attached Cost Estimate and Level of Effort sheets. PSI services will be conducted in accordance with the terms and conditions contained within the State of Florida Department of Environmental Protection Standard Contract, Contract No. HW686, dated December 21, 2021.
The deliverable and invoice schedule are presented below.
Equipment Storage Facility
Deliverables
Deliverable Due Date
SubTask 1 Project Management Upon completion of Task Assignment
SubTask 2 Qtr 2 - Equipment Storage Management July 20, 2024 - 2nd Qtr Equipment List
SubTask 3 Qtr 3 - Equipment Storage Management October 20, 2024 - 3rd Qtr Equipment List
SubTask 4 Qtr 4 - Equipment Storage Management January 20, 2025 - 4th Qtr Equipment List
SubTask 5 Qtr 1 - Equipment Storage Management April 20, 2025 - 1st Qtr Equipment List
Invoice Requirements Amount to be Invoiced
SubTask 1 Approval of Project Management $2,332.46
SubTask 2 Approval of Deliverable $10,761.99
SubTask 3 Approval of Deliverable $10,786.74
SubTask 4 Approval of Deliverable $10,786.74
SubTask 5 Approval of Deliverable $10,786.74
Total Estimated Cost: $45,454.67
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075 or (813) 267-2519.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Douglas Coleman, PMP, CHMM, REM Nana Westmark, PG, CHMM Department Manager, Environmental Services Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Z:\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-3734 Equip Storage, Lakeland 2023- 24\Proposals\2024 - 2025\PSI Equipment Storage 0552-418094.docx
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |