This Task Assignment (TA) is issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW686 to Professional Service Industries, Inc. (Intertek-PSI) for environmental assessment and remediation services at Elite Fashion Care, located at 849 South Orlando Avenue, Winter Park, Orange County, Florida. The engagement involves the Department Project Manager Benjamin Grubbs and the Contractor's Project Manager Nana G. Westmark. This task assignment authorizes PSI to conduct supplemental site assessment and groundwater monitoring activities in accordance with the April 25, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

The scope of work encompasses six subtasks: project management, MAGS well installation, MAGS field testing, annual VOH groundwater monitoring, PFAS groundwater monitoring and analysis, and data evaluation with deliverable report generation. The total task assignment value is $42,514.09 on a fixed unit rate basis, with 228.6 total labor hours budgeted. The work is scheduled for completion by March 31, 2025, with deliverables including a Supplemental Site Assessment Report (SSAR) due January 31, 2025. Invoice payments are structured in two components: $41,806.58 upon submittal and FDEP approval of the SSAR for Subtasks 1-4 and 6, and $707.51 upon submittal and approval of the PFAS Monitoring Deliverable for Subtask 5. The cost estimate includes direct labor ($25,599.63), overhead (151.02%), travel ($960.00), subcontractor services ($6,935.50), laboratory analysis ($3,644.00), field expenses ($2,815.00), and a completion fee ($2,559.96).

View the file

Other files

File Type Posted
CN-370000-HW686-DC003C.pdf PDF
CN-370000-HW686-DC004A.pdf PDF
CN-370000-HW686-DC004B.pdf PDF
CN-370000-HW686-DC006B.pdf PDF
CN-370000-HW686-DC006C.pdf PDF
CN-370000-HW686-DC008A.pdf PDF
CN-370000-HW686-DC008C.pdf PDF
CN-370000-HW686-DC009A.pdf PDF
CN-370000-HW686-DC010E.pdf PDF
CN-370000-HW686-DC011C.pdf PDF
CN-370000-HW686-DC012A.pdf PDF
CN-370000-HW686-DC013B.pdf PDF
CN-370000-HW686-DC013C.pdf PDF
CN-370000-HW686-DC01ACO5.pdf PDF
CN-370000-HW686-DC020A.pdf PDF
CN-370000-HW686-DC027A.pdf PDF
CN-370000-HW686-DC029A.pdf PDF
CN-370000-HW686-DC02ECO1.pdf PDF
CN-370000-HW686-DC02ECO2.pdf PDF
CN-370000-HW686-DC030A.pdf PDF
CN-370000-HW686-DC03ACO1.pdf PDF
CN-370000-HW686-DC03DCO1.pdf PDF
CN-370000-HW686-DC04ACO1.pdf PDF
CN-370000-HW686-DC05CCO1.pdf PDF
CN-370000-HW686-DC05CCO2.pdf PDF
CN-370000-HW686-DC07BCO2.pdf PDF
CN-370000-HW686-DC07ECO1.pdf PDF
CN-370000-HW686-DC10ACO1.pdf PDF
CN-370000-HW686-DC11ACO1.pdf PDF
CN-370000-HW686-DC14BCO1.pdf PDF
CN-370000-HW686-DC19BCO1.pdf PDF
CN-370000-HW686-DC21BCO2.pdf PDF
CN-370000-HW686-DC21BCO3.pdf PDF
CN-370000-HW686-DC22ACO1.pdf PDF
CN-370000-HW686-DCO24B.pdf PDF
CN-370000-HW686-FIL11.pdf PDF
CN-370000-HW686-FIL4.pdf PDF
CN-370000-HW686-FIL5.pdf PDF
CN-370000-HW686-FIL7.pdf PDF
CN-370000-HW686-HW006A.pdf PDF
CN-370000-HW686-HW007A.pdf PDF
CN-370000-HW686-HW010A.pdf PDF
CN-370000-HW686-SA253.pdf PDF
CN-370000-HW686-SA253CO1.pdf PDF
CN-370000-HW686-DC001A.pdf PDF
CN-370000-HW686-DC001C.pdf PDF
CN-370000-HW686-DC001E.pdf PDF
CN-370000-HW686-DC002C.pdf PDF
CN-370000-HW686-DC002E.pdf PDF
CN-370000-HW686-DC003D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW686

DC017B Completion March 31, 2025

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct a Supplemental Site Assessment / Groundwater Monitoring at Elite Fashion Care in accordance with the April 25, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Benjamin Grubbs 850-245-8992 Contractor Professional Service Industries, Inc. (Intertek-PSI) Contractor

Contractor Nana G. Westmark Contractor 813-886-1075

ERIC_5055

849 South Orlando Avenue, Winter Park, Orange County, Florida

Elite Fashion Care

Contractor Contractor

✔ $ 42,514.09

$ 42,514.09

Scope of Work

Professional Service Industries, Inc. (Intertek-PSI) Contractor

Joshua S Newell

2024.06.10 14:45:15-04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.06.10 13:33:22 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 1-4, 6: Supplemental Site Assessment Report (SSAR) 01/31/2025

Subtask 5: PFAS Monitoring Deliverable 01/31/2025

Subtask 1-4, 6: Submittal and FDEP Approval of Supplemental Site Assessment Report (SSAR) $ 41,806.58

Subtask 5: Submittal and FDEP Approval of PFAS Monitoring Deliverable $ 707.51

$ 42,514.09

HW686

DC017B

Printed on recycled paper.

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

SShawnn Hamiltonn Secretary

To:

From:

Date:

Subject:

HW686 Contract Negotiation File Elite Fashion Cleaners Winter Park, Orange County

ERIC_5055

, Project Manager , 202

Negotiation Summary

HW686

This Task Assignment authorizes PSI to conduct groundwater monitoring activities in accordance with the 202 , Scope of Work, and Cost Estimate.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $$ with labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

F D E P

C O S T

E S T I M A T E

C on tr ac to r:

P ro fe ss io na l S er vi ce In du st rie s, In c.

In te rt ek -P

S I) at e:

4/

/2

T as k ub T as k

P ro je ct M an ag em en t S ub T as k

D at a

E va lu at io n

/ R ep or t

S ite

E lit e

F as hi on

C ar e E

R

IC

_5

T as k

M A

G S

W el l I ns ta lla tio n

S ub

T as k

A ct iv ity

/P ha se

S ite

A ss es sm en t

T as k

M

A G

S T es t

S ub

T as k

P ro je ct

M an ag er

N an a

W es tm ar

T as k

G ro un dw at er

S am pl in g an d A na ly si s

S ub

T as k

S ub

T as k

P F

A S

G ro un dw at er

S am pl in g an d A na ly si s

S ub

T as k

TT

o ta ls

L ab o r

R at e C at eg o ry

$5 8.

P ro je ct M an ag er

.1

.1

$6 4.

P rin ci pa l C on su lta nt

, D C

0.

0.

0.

0.

0.

$6

0.

S en io r

E ng in ee r, M

R 0.

0.

0.

0.

0.

$5 8.

S en io r G eo lo gi st

, N W

6.

3.

1.

2.

0.

$6

2.

S en io r

E ng in ee r, G

R

.0 3.

3.

3.

0.

$4 8.

P ro je ct E ng in ee r, J N

.5

0.

.5

0.

0.

$3

3.

P ro je ct

S ci en tis t, S

B

.5 0.

.5 0.

0.

$4 0.

P ro je ct S ci en tis t, JD

.5

.5

.5

.5 0.

$3 9.

P ro je ct S ci en tis t, S L

.0

0.

.5

.0

6.

$3

4.

G

IS

C

A D

S pe ci al is t, D G

.0

0.

0.

0.

0.

$3

0.

E nv iro nm en ta l S pe ci al is t, C C

0.

0.

0.

0.

0.

$2

8.

E nv iro nm en ta l S pe ci al is t, D K

0.

0.

0.

0.

0.

$2

0.

A dm in is tr at iv e

A ss is ta nt , B

M 4.

0.

0.

0.

0.

T o ta l H o ur s

8.

.1

.5

.0

.5

6.

D ire ct L ab or

$1

0, 8.

$1 ,1

.2

$1

,4

.7

$2 ,4

.0

$2

,0

.7

$2

.2

$2 ,8

.2

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

1.

$1

5, 1.

$1 ,7

.8

$2

,1

.4

$3 ,6

.0

$3

,0

.5

$3

.9

$4 ,3

.6

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

F rin ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

TT

o ta l L ab o r $2

5, 9.

$2 ,9

.0

$3

,6

.2

$6 ,0

.0

$5

,1

.2

$6

.1

$7 ,2

.8

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

P S I

I n t e r t e k

P a g e

E P

C O S T

E S T I M A T E

C on tr ac r:

ro fe ss io na l S er vi ce In du st rie s, In c.

In te rt ek -P

I) at e:

4/

/2

T

T as k

P ro je ct M an ag em en t S ub T as k

D at a

E va lu at io n

/ R ep or t

S ite

E lit e

F as hi on

C ar e E

R

IC

_5

T as k

M A

G S

W el l I ns ta lla tio n

S ub

T as k

A ct iv ity

/P ha se

S ite

A ss es sm t

T as k

M

A G

S T es t

S ub

T as k

P ro je ct

M an ag er

N an a

W es tm ar

T as k

G ro un dw at er

S am pl in g an d A na ly si s

S ub

T as k

S ub

T as k

P F

A S

G ro un dw at er

S am pl in g an d A na ly si s

S ub

T as k

TT

o ta ls

TT

ra ve l

V eh ic le

R en ta l

$9

.0

$2

.0

$2

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir F ar e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

T ra ve l

$ $9

.0

$2

.0

$2

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct o r

((E q ui p m en t P ro cu re m t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T o ta l S ub co nt ra ct o r C o st

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct o r

((S er vi ce s P ro cu re m t) ril lin g

(C on ve nt io na

l) $5

,9

.0

$5 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0 na

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$4

.0

$3

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $6

,3

.0

$6 ,2

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g F ee $6

.5

$6

.5

$0

.0

$1 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l S ub co nt ra ct o r

C o st $6

,9

.5

$6 ,8

.5

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

L ab o ra ry

A na ly tic al C os ts

$3 ,4

.0

$1

,9

.0

$6

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F as t T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l L ab o ra to ry

$3 ,6

.0

$1

,9

.0

$8

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

F ie ld E xp en se s er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $2

.0

$8

0.

$4 0.

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al r el at ed

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W r el at ed

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$2 ,0

.0

$0

.0

$6

.0

$1 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l F ie ld E xp en se s

$2 ,8

.0

$4

.0

$7

.0

$1

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $3

9, 4.

$2 ,9

.0

$1

3, 3.

$7 ,8

.0

$8

,2

.2

$6

.1

$7 ,2

.8

$0

.0

$0 .0

$0

.0

$0 .0

C o m p le ti o n F ee $2

,5

.9

$2

.5

$3

.9

$6

.7

$5

.0

$6 4.

$7

.4

$0

.0

$0 .0

$0

.0

$0 .0

T o ta l E st im at ed

C o st $4

2, 4.

$3 ,2

.6

$1

3, 6.

$8 ,4

.7

$8

,8

.2

$7

.5

$7 ,9

.3

$0

.0

$0 .0

$0

.0

$0 .0

R E V

C E F

P S I

I n t e r t e k

P a g

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Elite Fashion Care ERIC_5055 SubTask 2 MAGS Well Installation

DATE: 4/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Tenant, owner notification 1 Profile Waste for Disposal 1 Utility locate 1

Total Hours: 3

MAGS Well Installation Senior Engineer, G Robinson Technical Oversight 3

Hours: 3

Project Scientist, J Daugherty Field Event Preparation 1 Travel, (4.5 hr per roundtrip) 4.5 Tailgate safety meeting, set-up and calibrate equipment 1 Sawcut locations and clear utilities w/ hand auger (0.5 hrs/well x 4 wells) 2 Collect soil samples (0.5 hrs/well x 4 wells) 2 Install MAGS well with HSA (1 hr/well x 3 wells) 3

Project Scientist, J Daugherty (day 2) Travel, (4.5 hr per roundtrip) 4.5 Tailgate safety meeting, set-up and calibrate equipment 1 Sawcut locations and clear utilities w/ hand auger (0.5 hrs/well x 2 wells) 1 Collect soil samples (0.5 hrs/well x 2 wells) 1 Install MAGS well with HSA (1 hr/well x 3 wells) 3 Cleanup site and remove safety cones following concrete setup. 2 Drop-off soil samples at lab 0.5

Hours: 26.5

TOTAL LABOR 32.5

VEHICLE TYPE RATE UNIT USEAGE

MAGS Well Installation Equipment Van / Truck 1 person, 1 day $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USEAGE

$0.00

NET Construct MAGS Wells $5,905.00 LS 1 $5,905.00

Gulf Coast Vac Truck IDW Transport & Disposal $100.00 Drum 3 $300.00

TOTAL $6,205.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

Halocarbons by EPA Method 8260 $73.00 18 $1,314.00

TCLP Metals $135.00 1 $135.00

TCLP Volatile Organics by GC/MS $210.00 1 $210.00

TCLP Semi-volatile Organics by GC/MS $260.00 1 $260.00

TOTAL LAB $1,919.00

RATE COSTING UNIT USEAGE TOTALS

Disposal Supplies Metal Open-top 55 gallon Drum $100.00 each 3 $300.00

TOTAL EQUIPMENT PROCUREMENT $300.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

MAGS Well Installation Soil Assessment Kit $175.00 day 2 $350.00 Expendables $40.00 day 2 $80.00

TOTAL EQUIPMENT $430.00

EQUIPMENT PROCUREMENT

FINAL --7/24/96

Page 4 Elite Fashion Care ERIC_5055 SA 0552-424051 NW

2 s

SubTask 3 MAGS Test

DATE: 4/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist Tenant, owner notification 1 Total Hours: 1

MAGS Testing Senior Engineer, G Robinson Technical Assistance 3

Hours: 3

Project Scientist, J Daugherty Field Event Preparation 1 Travel (4.5 hour round trip) 4.5 Tailgate safety meeting, set up system for MAGS 1 Well head assembly set-up 1 Data collection during MAGS event (2 hrs/well x 3 Wells) 6 Dismantle MAGS equipment and demobilize 1

Hours: 14.5

Project Scientist, S Luth Travel (4.5 hour round trip) 4.5 Tailgate safety meeting, set up system for MAGS 1 Data collection during MAGS event (2 hrs/well x 3 Wells) 6 Demobilize and drop Summa canisters for delivery 1

Hours: 12.5

Project Engineer, J Newell Travel (4.5 hour round trip) 4.5 Tailgate safety meeting, set up system for MAGS 1 Data collection and technical review during MAGS event (2 hrs/well x 3 Wells) 6

Upload field notes and MAGS forms to project folder 1 Hours: 13.5

Project Scientist, S Barnes Travel (4.5 hour round trip) 4.5 Tailgate safety meeting, set up system for MAGS 1 System Operation (2 hrs/well x 3 Wells) 6

Hours: 12.5

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

MAGS Testing Equipment Van / Truck 4 persons, 1 day $120.00 day 2 $240.00 (2 people per truck)

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE UNIT USEAGE

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TO-15 (VOCs) $200.00 3 $600.00

Summa Canisters $33.00 3 $99.00

Shipping, large, overnight $150.00 1 $150.00

TOTAL LAB $849.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 MAGS Testing MAGS Investigation Kit Pilot Test Kit $500.00 day 1 $500.00 GPS $175.00 day 1 $175.00 Expendables $40.00 day 1 $40.00

$0.00

TOTAL EQUIPMENT $715.00

Equipment area breakdown and cleanup will occur following completed tasks (including decon areas, removal of traffic barricades, backfill of all open voids occurring from soil borings with clean sand; patching of concrete and asphalt locations leaving the site in as close to the original condition as possible.)

Equipment area breakdown and cleanup will occur following completed tasks (including decon areas, removal of traffic barricades, backfill of all open voids occurring from soil borings with clean sand; patching of concrete and asphalt locations leaving the site in as close to the original condition as possible.)

Equipment area breakdown and cleanup will occur following completed tasks (including decon areas, removal of traffic barricades, backfill of all open voids occurring from soil borings with clean sand; patching of concrete and asphalt locations leaving the site in as close to the original condition as possible.)

FINAL --7/24/96

Page 5 Elite Fashion Care ERIC_5055 SA 0552-424051 NW

SubTask 4 Groundwater Sampling and Analysis

DATE: 4/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist, N Westmark Tenant notification 1 Profile Waste for Disposal 1

Hours 2

Senior Engineer, G Robinson Technical Oversight 3 Hours: 3

Environmental Specialist, S Luth Field Event Preparation 1 Travel (4.5 hour round trip x 2 days) 9 Collect groundwater elevations (13 wells) (10 minutes per well) 2 Collect groundwater samples (12 wells total) 5 shallow wells @ 1 hour per well 5 2 intermediate wells @ 1.5 hour per well 3 Stage IDW 1

Hours 21

Project Scientist, J Daugherty Travel (4.5 hour round trip x 2 days) 9 Collect groundwater elevations (12 wells) (10 minutes per well) 2 Collect groundwater samples 4 deep wells @ 2 hrs per well 8 1 intermediate wells @ 1.5 hour per well 1.5 Pick-up, drop off samples 2

Hours 22.5

TOTAL LABOR 48.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit $290.00 day 2 $580.00 $834.20 week 0 $0.00

Deep Groundwater Sampling Kit $415.00 day 2 $830.00 $1,410.00

Expendables $40.00 day 4 $160.00

55-gallon drum $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,670.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $120.00 day 4 $480.00

$420.00 week 0 $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $73.00 12 0 0 $876.00 Shipping, large $104.00 0 $0.00

$0.00

TOTAL LAB $876.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Gulf Coast Vac Truck IDW drum pickup 1 $100.00 $100.00

TOTAL $100.00

Elite Fashion Care ERIC_5055 SA 0552-424051 NW

SubTask 5 PFAS Groundwater Sampling and Analysis

DATE: 4/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities PFAS Sampling

Environmental Specialist, S Luth Additional decontamination for PFAS 2 Documentation of PFAS groundwater sampling 2 Inventory cooler, prepare cooler for shipping to FDEP 2.5

Total Hours: 6.5

TOTAL LABOR 6.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$834.20 week 0 $0.00

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

$420.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $73.00 0 0 0 $0.00 Shipping, large $104.00 0 $0.00

$0.00

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Petrotech IDW drum pickup 0 $125.00 $0.00

TOTAL $0.00

Elite Fashion Care ERIC_5055 SA 0552-424051 NW

SubTask 6 Data Evaluation / Report

DATE: 4/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson Evaluate Data in report text, raw data, tables, figures 2 Provide Evaluation and edits to report 4 Prepare recommendations 2

Sign and seal documents 1 Total Hours: 9

Project Engineer, J Newell Data reduction/evaluation 12 Preparation and development of report 8 Prepare tables, develop MAGS results 4 Provide data for map development 3 Report - Prepare final tables 8

Total hours: 35

GIS/CADD Specialist, D Grove Developing drawings for evaluation and reporting 16 Total hours: 16

Administrative Assistant, B Meynardie Compile documents for report 4 Total hours: 4

TOTAL LABOR 64

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 $0.00 $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

Page 8 Elite Fashion Care ERIC_5055 SA 0552-424051 NW

PSI Proposal Number: 0552-424051 FDEP – Elite Fashion Care

April 25, 2024 www.intertek.com/building

PROPOSED SCOPE OF WORK

The proposal contained herein consists of well construction of three (3) soil vapor extraction (SVE) wells and three (3) vapor monitor point (VMP) wells, a modified active gas survey (MAGS), investigation derived waste (IDW) transport and disposal, groundwater monitoring for VOH and PFAS, and a Supplemental Site Assessment Report deliverable. The sampling procedures will be conducted according to the FDEP Standard Operating Procedures 001/01 and Department Drycleaning Solvent Cleanup Program protocols.

Specifically, the proposed scope of work consists of the following subtasks:

1.0 PROJECT MANAGEMENT

This scope is provided for in the template worksheets.

2.0 MAGS WELL INSTALLATION

PSI will perform the following in order to complete MAGS well installation activities:

2.1 Notification - The tenant and/or owner of the property will be notified of the planned field activities.

2.2 Utility locates - Utility locates will be called in using 811 Sunshine.

2.3 Well Installation – Six (6) soil borings will be installed outside the building. Four (4) within the western alley behind the building and two (2) in the parking lot directly south of the building. Of the six (6) total wells installed, three (3) will be used as MAGS wells and the remaining three (3) will be utilized as Vapor Monitoring Points.

Sample depth intervals will follow FDEP protocols and include 0.5 - 2 feet, 2-4 feet, and 4-6 feet bls. Soil samples will be analyzed for VOHs by EPA Method 8260.

The MAGS/VMP wells will be installed approximately 1-foot above the groundwater table. Each MAGS well will be installed to approximately 6 feet bls and constructed with 2-inch diameter 5-foot lengths of screen (0.02-inch slot size) and 1 foot of casing. The wells will be installed for potential future use as an SVE well and completed at the surface with an 8-inch manway and a 1 ft by 1 ft concrete pad.

2.4 Investigative Derived Waste (IDW) – All soil cuttings will be containerized in 55-gallon drums, labeled, and staged on-site for characterization. Once the analytical results are received, the waste will be characterized, and drums will be transported for disposal / treatment at an approved facility. It is estimated that a total of three (3) drums will be required for well installations. Toxicity Characteristic Leachability Procedure (TCLP) will be used to extract a leachate sample from the Samples IDW. The leachate will then be analyzed for Volatile Organic Compounds (VOCs) via EPA

April 25, 2024 www.intertek.com/building

Method 8260, Semi-volatile Organic Compounds via EPA Method 8270, and Resource Conservation and Recovery Act (RCRA) 8 metals.

The Level of Effort is detailed in Subtask 2.

3.0 MAGS FIELD EVENT

A well head assembly will be constructed to allow for measurements to be collected from each MAGS / VMP well being reviewed. During each MAGS point test, flow rate, well-head vacuum, and vacuum influence (measured from other MAGS points and vacuum monitoring points) will be measured approximately every 5-minute interval. The vacuum will be varied at the well head, starting from a low applied vacuum and incrementally increasing the vacuum. During each applied vacuum, the vapor flow rate will be measured for the purpose of determining the relationship of applied vacuum to flow rate.

During this test, at each vacuum level, the vacuum influence will be measured from the nearby MAGs points or vapor monitoring points to assess the Radius of Influence (ROI). This test will also provide an indication of the maximum well head vacuum without excessive water entrainment. Vapor samples will be collected using SUMMA® canisters for analysis of volatile organic compounds using EPA Method TO-

15. It is anticipated that one vapor sample will be collected for each of the three (3) new MAGS well head tests. Samples will be collected at the end of each test.

The Level of Effort is detailed in Subtask 3.

4.0 ANNUAL VOH GROUNDWATER MONITORING

Annual groundwater sampling was last performed in September 2022. To monitor current groundwater conditions, PSI will perform annual groundwater sampling and analysis which will consist of the following activities:

a. Mobilization to the site.

b. Collect groundwater elevation measurements from 25 monitor wells.

c. Collect groundwater samples from the following monitor wells:

i. Shallow zone: MW001S, MW002S, MW006S, MW007S and MW008S.

ii. Intermediate zone: MW006I, MW010I and MW011I.

iii. Deep zone: MW008D, MW010D, MW012D and MW010DD.

d. Submit groundwater samples to a National Environmental Laboratory Accreditation

Conference (NELAC) approved laboratory for analysis of VOHs via EPA Method 8260.

e. Containerize investigative derived waste (IDW) in 55-gallon drums, label appropriately and stage on-site, pending waste characterization results.

f. Arrange for a subcontractor to transport and dispose of IDW at an approved facility.

g. Provide a signed manifest for the IDW.

The Level of Effort is detailed in Subtask 4.

April 25, 2024 www.intertek.com/building

5.0 PFAS GROUNDWATER MONITORING AND REPORT

a. PSI will collect groundwater samples for PFAS compounds during the same mobilization as the routine VOH monitoring.

i. Shallow wells: MW006, MW007, MW008, MW009, and MW010.

b. Collected groundwater samples will be laboratory analyzed for per- and polyfluoroalkyl

(PFAS) compounds PFAS by FDEP Method DEP SOP:LC-001-3. The analysis will be performed using the FDEP Central Laboratory in Tallahassee, a National Environmental Laboratory Accreditation Conference (NELAC) approved laboratory.

c. The investigative derived waste (IDW) will be containerized in a 55-gallon drum for later removal to an approved facility for treatment / disposal.

d. The PFAS data will be incorporate into the Supplemental Site Assessment.

The Level of Effort is detailed in Subtask 5.

6.0 DATA EVALUATION

A Supplemental Site Assessment Report will be generated to document the MAGS well installation and testing event as well as the field activities and results associated with annual VOH and PFAS groundwater monitoring. The MAGS data generated from the above described services will be tabulated and inserted onto maps for each specific test point. Updated Figures and Tables will be generated summarizing the data collected from each MAGS well and monitoring well. The report will include engineering conclusions and recommendations for the next appropriate action.

The Subtask 6 Deliverable (Supplemental Site Assessment Report) will be the only deliverable documenting activities performed under Subtasks 2 through 5 to be submitted to the FDEP upon completion of the above described subtasks and at a minimum will include:

• Field notes, boring logs and well construction, groundwater sampling, and calibration logs.

• Laboratory analytical reports with Chains of Custody for vapor and groundwater samples.

• Investigative Derived Wastes (IDW) manifests.

Quality Assurance / Quality Control – All field work will be performed in accordance with the most current version of the FDEP Standard Operating Procedures guidelines. In addition, an FDEP approved and NELAP certified laboratory will perform all analyses associated with the horizontal and vertical extents of the associated potential impacts at the subject site. According to 2022 Waste Site Cleanup Section guidelines, no field blanks, equipment blanks, or duplicates will be collected or analyzed.

Health and Safety – Drilling and sampling operations will be directed by a PSI field supervisor, and field personnel will be OSHA trained in accordance with 29 CFR 1910.120. Prior to subsurface drilling activities, PSI will submit a Sunshine 811 utility locate ticket in accordance with local practices.

The Level of Effort is detailed in Subtask 6.

April 25, 2024 www.intertek.com/building

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the above-described Supplemental Site Assessment is shown on the attached Cost Estimate and Level of Effort sheets, which includes well install, MAGS test, groundwater sampling, waste characterization analysis, transport and disposal, and the report deliverable. The deliverable and invoice schedule is presented as follows:

Elite Fashion Care ERIC_5055

Deliverables Deliverable Description Deliverable Due Date

SubTasks 1 through 6 Supplemental Site Assessment Report January 31, 2025 Invoice Schedule

Requirements for Invoice Submittal Amount to be Invoiced

SubTasks 1 through 6 - Submittal & Approval of SSAR $42,514.09

All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW686, Bureau of Waste Cleanup, dated December 21, 2021.

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Joshua S. Newell, PE Nana Westmark, PG Senior Engineer / Contract Manager Senior Geologist / Principal Consultant

Enclosure: Cost Estimate Level of Effort

\\Tampa-fs\projects\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552----- Elite Fashion Care SA\Final Elite ERIC_5055 0552-424051.docx

B en ja m in C en te r D riv e, S ui te

FI

G

U R

E N o.

D

JG

PR

O

J.

N

O

D R

AW

N

B Y

D

AT

E R

EV

IS

ED

SC

AL

E:

0'

M

AG

S A

IR

A

N

AL

YT

IC

AL

S

U M

M

AR

Y (A

U G

U

ST

, 2

6)

EL

IT

E

FA

SH

IO

N

C

AR

E

SO

U

TH

O R

LA

N

D O

A

VE

N U

E W

IN

TE

R P

AR

K, O R

AN

G

E C

O U

N

TY

, F

LO

R

ID

A

FD

EP

ID

N o.

Ta m pa , F lo rid a

(8

) 8

-1

(8

) 2

-4 fa x

9/

/1

TM

Pr op os ed

VM

P0

Pr op os ed

VM

P0

Pr op os ed

V

MP

Lo ca tio n

B en jaaaaaa m in C mmm in

C m in C m in

C m in C mm in

C mm in C m in

CCCCCCCCCCCC

en te r nt e nt er nt erte r tetette r teeee reeeerrrrr D riv

DD

riv

DD

riv

DDDDDDDDD

,e, S u e, Suu iteite iite te

1e

212121121212112122222222222 Ta m pa

Ta m pa Ta m pa

Ta m pa Ta m pa

Ta m p Ta m pa

Ta m pa Ta m pa

TTa m pa Ta m p am paapapapaaaaa

, F lo

, F lo

, F looo rid a rrrid a rririiidddd ada

(8

6-868868868688686868886666

--1

(8

) 2

-4 fa x

-4

/2

2/

Pr op os ed

MA

G0

Pr op os ed

MA

G0

Pr op os ed

MA

G0

Pr op os ed

M

AG

S W ell s

R

O

PO

SE

D

W

EL

L C

O N

ST

R

U C

TI

O

N L

O C

AT

IO

N S

El ite

C le an er s

So ut h

O rla nd o

Av e.

W in te r P ar k, O ra ng e

C ou nt y, L

EP

F ac ilit y

ID

: 4

Pr op os ed

VM

P0

PR

O

J.

N

O

C R

EA

TE

D B

Y

D

AT

E R

EV

IS

ED

-4

JS

N

/2

2/

B en ja m in C en te r D riv e, Su ite

Ta m pa

, F lo rid a

(8

) 8

-1

(8

) 2

-4 fa x

N O

T

TO

S C

AL

E

PR

O

PO

SE

D W

EL

L

C O

N

ST

R U

C

TI

O N

D

ET

AI

LS

EL

IT

E C

LE

AN

ER

S

So ut h O rla nd o Av e.

W in te r P ar k, O ra ng e C ou nt y, F lo rid a

FD

EP

F

AC

IL

IT

Y

ID

: 4

FI

G

U R

E

LO

C

KI

N

G W

EL

L

PL

U

G 8"

M

AN

H O

LE

EX

IS

TI

N

G G

R

AD

E

C

EM

EN

T

G R

O U

T

2" Ø

S C

H . 4

PV

C P

IP

E

6/

S

IL

IC

A

SA

N

D

2" Ø

S C

H . 4

PV

C 0.

0-

IN

C

H S

LO

TT

ED

W

EL

L

SC

R

EE

N

0.

5'

BL

1'

6'

V M

P#

M

AG

LO

C

KI

N

G W

EL

L

PL

U

G 8"

M

AN

H O

LE

EX

IS

TI

N

G G

R

AD

E

C

EM

EN

T

G R

O U

T

2" Ø

S C

H . 4

PV

C P

IP

E

6/

S

IL

IC

A

SA

N

D

2" Ø

S C

H . 4

PV

C 0.

0-

IN

C

H S

LO

TT

ED

W

EL

L

SC

R

EE

N

0.

5'

1'

6'

PS

I -

In te rt ek

R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te

(I D

W ) I

D W

P ic k-up

, t ra ns po rt , D is po sa l a nd T re at m en t

PR

O

JE

C

T B

ID

T

AB

U

LA

TI

O N

S

ID

W

Fa ci lit y

N am e Va rio us

D ry cl ea ni ng

S ite s un de r F

D

EP

D ry cl ea ni ng

S ol ve nt

C le an up

P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us

Fa ci lit y

ID

Va rio us

D es cr ip tio n of S er vi ce

Ta m pa A re a

O rla nd o

- C en tr al

Fl id a Ja ck so nv ill e Ar ea

N or th F lo rid a

So ut h Fl or id a (M ia m i, Fo rt ye rs , N ap le

s) Fl or id a Pa nh an dl e w at er $1

.0

$1

.0

$1

.0

$2

.0

$1

.0 so il $1

.0

$1

.0

$1

.0

$2

.0

$1

.0 lo w v ol um e fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pi ck

-u p fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr of ile F ee

.0

0.

T he re is o ne fe e pe r g en er at or th at a llo w s m ul tip le lo ca tio ns c on tig en t o n th e m at er ia l.

Ad m in is tra tio n Fe e:

p er In vo ic e

$2

.0

$0 .0

$2

.0

$4

.0

$2

.0

1.

P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt

, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.

2.

PS

I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te

5.

W as te is c on si de re d no t h az ar do us

6.

An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N

EL

AP

-a pp ro ve d la bo ra to ry

7.

A

PS

I P ur ch as e

O rd er re fe re nc in g Te rm s

C on di tio ns

(a tta ch ed

) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck

-u p.

es cr ip tio n

-G al lo n D ru m

P ic k-up

Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.

St at e of

F lo rid a

3.

W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo rid a cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e

FD

EP

Th

G en er at or is th e

Fl or id a

D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir

St on e R oa d, T al la ha ss ee

, F L

M S o r 4

5.

4.

PS

I i s un de r c on tr ac t w ith F

D

EP

fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of

F D

EP

, B ur ea u of

W as te C le an up ,H az ar do us

W as te C le an up S ec tio n.

in ni ng

B id

Tr an sp or t a nd

D is po sa l I

In te rt ek

R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te

(I D

W ) I

D W

P ic k-up

, t ra ns po rt , D is po sa l a nd T re at m en t

PR

O

JE

C

T B

ID

T

AB

U

LA

TI

O N

S lit y

N am e Va rio us

D ry cl ea ni ng

S ite s un de r F

D

EP

D ry cl ea ni ng

S ol ve nt

C le an up

P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us

Fa ci lit y

ID

Va rio us

D es cr ip tio n of S er vi ce

Ta m pa A re a

O rla nd o

- C en id a Ja ck so nv ill e Ar ea

N or th F lo rid a

So ut h Fl or id a (M ia m i, rs , N ap le

s) Fl or id a Pa nh an dl e w at er $1

.0

$1

.0

$1

.0

$1

.0 so il $1

.0

$1

.0

$1

.0

$1

.0 lo w v ol um e fe e d ru m

s) $5

0.

$5 0.

$5

0.

$5 0.

Pi ck -u p fe e Pe r d ie m

Pr ic e Pe r 5 5-ga llo n dr um W at er

$1

.0

$1

.0

$1

.0

$1

.0

So il

$1

.0

$1

.0

$1

.0

$1

.0

1.

P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt, fu el c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.

2.

PS

I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te

5.

W as te is c on si de re d no t h az ar do us

6.

An al yt ic al re su lts o f w as te w ill be p ro vi de d by a

N

EL

AP

-a pp ro ve d la bo ra to ry

7.

A

PS

I P ur ch as e O rd er re fe re nc in g

Te rm s

C on di tio ns (a tta ch ed ) w ill be is su ed a nd m us t b e si gn ed p rio r t o pi ck

4.

PS

I i s un de r c on tra ct w ith F

D

EP

fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f o f F

D

EP

, B ur ea u of te C le an up ,H az ar do us

W as te C le an up S ec pr ic e up on re qu es t

En vi ro n-

Se rv e (fo rm er ly C la rk

E nv iro nm en ta

l) M ul be rr y, F L

D es cr ip tio n

-G al lo n D ru m

P ic k-up

Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.

St at e of

F lo rid a

3.

W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e

FD

G en er at or is th e

Fl or id a

D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, Bl ai r S to ne

R oa d, T al la ha ss ee , F

L

M

S o r 4

5.

04/24/2024 01:44 PM PAGE 1 OF 7

Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry

4600 BROOKPARK ROAD, CLEVELAND,

OHIO, 44134

(216) 642-1311

(216) 642-1474

QUOTE #: 0042802

DATE: 04/24/2024 PROJECT PROPOSAL

CLIENT

JOSH NEWELL

INTERTEK/PSI - PLANT CITY

607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,

33563 P: (863) 712-4342

E-MAIL:JOSHUA.NEWELL@INTERTEK.COM

PROJECT DESCRIPTION

FDEP DRY CLEANING DRUMS

FDEP

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00

LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00

ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00

DISPOSAL SUBTOTAL: $80.00

JOB ESTIMATE: $180.00

ENVIRONMENTAL FEE: $9.00

TOTAL JOB ESTIMATE: $189.00

04/24/2024 01:44 PM PAGE 2 OF 7

Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.

Time and Material Rates shall be charged portal to portal.

Please note that surcharges shall apply for off specification materials.

Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.

Transportation Fuel Surcharges shall apply based on DOE Highway Average Fuel Index. (Varies weekly - Currently 33%)

Durations and Quantities are estimated only, actual fees shall be charged as incurred.

Minimum disposal amounts may apply to bulk disposal.

Tolls are not included in transportation rates

E-manifest fees will apply to hazardous waste manifests

Demurrage charged after one hour loading & unloading

Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.

Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.

The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.

Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.

EnviroServe - Mulberry, FL facility: Energy Surcharge shall be applied to entire bill. (Currently 10%)

A 5% Environmental Fee will be applied to entire bill.

In te rt ek

R eq ue st fo r A nn ua l I nv es tig at iv e D er iv ed W as te

(I D

W ) I

D W

P ic k-up

, t ra ns po rt , D is po sa l a nd T re at m en t

PR

O

JE

C

T B

ID

T

AB

U

LA

TI

O N

S lit y

N am e Va rio us

D ry cl ea ni ng

S ite s un de r F

D

EP

D ry cl ea ni ng

S ol ve nt

C le an up

P ro gr am in F lo rid a Fa ci lit y Lo ca tio n Va rio us

Fa ci lit y

ID

Va rio us

D es cr ip tio n of S er vi ce

Ta m pa A re a

O rla nd o

- C en id a Ja ck so nv ill e Ar ea

N or th F lo rid a

So ut h Fl or id a (M ia m i, rs , N ap le

s) Fl or id a Pa nh an dl e w at er $1

.0

$1

.0

N

/A N

/A N

/A so il $1

.0

$1

.0

N

/A N

/A N

/A lo w v ol um e fe e N

/A N

/A N

/A Pi ck -u p fe e $0

.0

$0 .0

N

/A N

/A N

/A

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

1.

P le as e in cl ud e al l c os ts fo r p ic k-up , t ra ns po rt

, f ue l c os ts , s to pp ag e fe e, d is po sa l, ba se d on p er d ru m c os t.

2.

PS

I i s ne ith er th e ge ne ra to r n or tr an sp or te r f or h az ar do us o r n on -h az ar do us w as te

5.

W as te is c on si de re d no t h az ar do us

6.

An al yt ic al re su lts o f w as te w ill b e pr ov id ed b y a N

EL

AP

-a pp ro ve d la bo ra to ry

7.

A

PS

I P ur ch as e

O rd er re fe re nc in g Te rm s

C on di tio ns

(a tta ch ed

) w ill b e is su ed a nd m us t b e si gn ed p rio r t o pi ck es cr ip tio n

-G al lo n D ru m

P ic k-up

Tr an sp or t, D is po sa l a t a n ap pr ov ed fa ci lit y.

St at e of

F lo rid a

3.

W as te g en er at ed is fr om a ss es sm en t / re m ed ia tio n of d ry cl ea ne r s ite s un de r t he S ta te o f F lo cl ea ni ng S ol ve nt C le an up P ro gr am w ith fu nd in g pr ov id ed b y th e

FD

G en er at or is th e

Fl or id a

D ep ar tm en t o f E nv iro nm en ta l P ro te ct io n, B la ir

St on e R oa d, T al la ha ss ee

, F L

M S o r 4

5.

4.

PS

I i s un de r c on tr ac t w ith F

D

EP

fo r t he a ss es sm en t a nd re m ed ia tio n of d ry cl ea ne r p ro je ct s, a nd h en ce s ig ns p ro fil es a nd m an ife st s on b eh al f of

F D

EP

, B ur ea u of

W as te C le an up ,H az ar do us

W as te C le an up S ec

Winning Bid Driller

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 4/23/24 FAC ID#: ERIC_5055

Unit Unit Rate Number of Units Extended Price whole day $1,875.00 1 1,875.00$ half day $1,475.00 1 1,475.00$ per foot $25.00 36 900.00$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $125.00 6 750.00$ roundtrip $650.00 1 650.00$ per crew / per night $550.00 1 550.00$ each $70.00 3 210.00$ per day $100.00 -$ each $55.00 3 165.00$

TOTAL QUOTE PRICE $6,575.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 4/23/24

Days to Complete Scope of Work: 1.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Other (specify)

Other (specify)

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

Site Name and Location: Elite Cleaners

Consultant Name: Intertek-PSI

PROPOSED SCOPE OF WORK:

(3) 2" x 6' SVE wells with 5' .020 screen, 6/20 sand pack, soil sampling as needed, drum cuttings, pad and 8" manhole

(3) 2" x 6' VMP wells with 5' .020 screen, 6/20 sand pack, soil sampling as needed, drum cuttings, pad and 8" manhole

849 S Orlando Ave, Winter Park, Orange County, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day as Park, FL 33782

DATE: 04/22/24

CONTRACTOR NAME: Intertek-PSI

SITE NAME & LOCATION: Former Elite Cleaners - Winter Park

PROJECT NO:

PROPOSED SCOPE OF WORK:

6) 2" x 6' SVE/VMP Wells, 5' .020 and 8" BD Manhol/Pad

UNIT UNIT RATE QUANTITY EXT. PRICE

DIRECT PUSH/DRILLING Rig & Labor FULL DAY $2,550.00 1.0 $2,550.00

DIRECT PUSH HALF-DAY RATE HALF DAY $1,933.00 1.0 $1,933.00

AUGER ATTACHMENT, 2" WELL INSTALL PER FOOT $0.00 0.0 $0.00

PRE-PACKED WELL SCREEN 1"x5' pre-pack screen EACH $0.00 0.0 $0.00

SLOTTED PVC WELL SCREEN 2"x10' EACH $0.00 0.0 $0.00

2" WELL MATERIAL EACH $0.00 0.0 $0.00

WELL COMPLETION 8" BD Manhole/Pad EACH $107.00 6.0 $642.00

MOBILIZATION ROUNDTRIP $400.00 1.0 $400.00

PER DIEM PER CREW $370.00 1.0 $370.00

55-GAL DRUM* EACH $68.90 3.0 $206.70

CUT/PATCH* EACH $0.00 0.0 $0.00

GROUT* EACH $0.00 0.0 $0.00

SAMPLE LINERS* EACH $6.57 0.0 $0.00

SAMPLE POINTS* Water Samples exp. Points EACH $8.75 0.0 $0.00

TUBING* (DEVELOPMENT) EACH $0.52 0.0 $0.00

PERMITS EACH $54.00 0.0 $0.00

OTHER 2"x6' Well Material EACH $145.59 6.0 $873.54

OTHER LUMP SUM $0.00 0.0 $0.00

OTHER EACH $0.00 0.0 $0.00

TOTAL ALL WELLS $6,975.24

DAYS TO COMPLETE SCOPE OF WORK: 1.5 Days

INVOICE SETTLEMENT IS NET 60 DAYS

100 KID ELLIS ROAD, MULBERRY, FL 33860

(863) 425-9600 FAX: (863) 425-9620 TOLL FREE: 800-532-5008

DIRECT PUSH TECHNOLOGY QUOTE FORM

DIRECT PUSH TECHNOLOGY

Equipment Type: Geoprobe 7822

MISCELLANEOUS