This is a Task Assignment (TA) document DC010A issued under Contract Number HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (PSI/Intertek-PSI). The Task Assignment was executed on May 6, 2022, with a completion date of October 24, 2022, and authorizes PSI to conduct construction observations at the Haines City Quality Cleaners facility located at 511 Haines City Mall in Haines City, Polk County, Florida. The project is identified as ERIC_5357 under the FDEP Waste Site Cleanup Program. The Department Project Manager is Skylar Murphy, and the Contractor's Project Manager is Nana G. Westmark, a Senior Geologist/Principal Consultant.
The scope of work comprises three subtasks: Project Management, Construction Plan Review and Site Visit, and Construction Observations. The work addresses coordination of a soil vapor extraction (SVE) system at the site while a contractor (Commercial Maintenance Systems, working for Enterprise Car Rental) constructs new parking spaces that require rerouting of SVE lines. The total contract value is fixed at $3,437.20, allocated as $349.99 for Project Management, $1,575.84 for Construction Plan Review due by May 30, 2022, and $1,861.36 for Construction Observation documentation due by July 20, 2022. PSI may invoice upon submittal and FDEP approval of deliverables according to the established schedule. The funding information indicates no specific appropriation category, grant number, or special funding source was designated for this Task Assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW686
DC010A Completion October 24, 2022
This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct construction observations at the Haines City Quality Cleaners in accordance with the PSI scope of work, cost estimate, and schedule received on April 15, 2022.
Skylar Murphy 850-245-8795 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Professional Service Industries, Inc. (Inertek-PSI)
Professional Service Industries, Inc. (Inertek-PSI)
Nana G. Westmark 813-886-1075
ERIC_5357
511 Haines City Mall Haines City, Polk County, Florida
Haines City Quality Cleaners
✔ $ 3,437.20
$ 3,437.20
Scope of Work
Nana Westmark
Senior Geologist / Principal Consultant
5/6/2022
Nana Westmark Digitally signed by Nana Westmark Date: 2022.05.06 11:14:03 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.06 11:01:36 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Construction plan review/ site visit documentation.
05/30/2022
Subtasks 1 & 3: Construction Observation doumentation. Project management.
07/20/2022
Subtask 2: Submittal and FDEP approval of the Construction plan review/ site visit documentation $ 1,575.84
Subtasks 1 & 3: Submittal and FDEP approval of the Construction Observation documentation. Project management. $ 1,861.36
$ 3,437.20
HW686
DC010A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton
Secretary
To: HW686 Contract Negotiation File
Haines City Quality Cleaners
Haines City, Polk County, Florida
ERIC_5357
From: Skylar Murphy, Project Manager
Date: May 4, 2022
Subject: Negotiation Summary
HW686 DC010A
This Task Assignment authorizes PSI to conduct construction observations in accordance with the April 15, 2022, Scope of Work, and Cost Estimate.
PSI confirmed on March 10, 2022, that an Access Agreement with the current real property owner of the Fashion Cleaners (ERIC_5245) site has been executed.
PSI may invoice following the schedule established in the Deliverables and Invoice Schedule
Attachment, which accompanies the Task Assignment Notification Form.
PSI Proposal Number: 0552-371488
April 15, 2022 www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634
Phone: (813) 886-1075 Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Attention: Ms. Skylar L. Murphy, Environmental Specialist II Phone: (850) 245-8705 main, or (850) 245-8795 Email: Skylar.L.Murphy@FloridaDEP.gov
Re: Proposal for Construction Observation Haines City Quality Cleaners
511 Haines City Mall Haines City, Polk County, Florida
ERIC_5357
Dear Ms. Murphy:
Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide for construction observations at the Haines City Quality Cleaners (current Enterprise Car Rental) for the Florida Department of Environmental Protection’s Waste Site Cleanup Program. Included with this proposal is a discussion of proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
The Haines City Quality Cleaners operated at the current tenant space inside the Haines City Mall starting in 1984. The name of the cleaners at that time was Smith Cleaners who has since moved to a separate location in the mall and reportedly within the footprint of the current Publix supermarket.
The name of the drycleaners was changed to Haines City Quality Cleaners in August 1985, which operated until July 1997 when the drycleaning business moved across the street. The tenant space that is designated as Haines City Quality Cleaners in the Drycleaning Solvent Cleanup Program is Suite 1F of the Haines City Mall which is currently is occupied by an Enterprise Car Rental facility and has remained since September 1998.
mailto:Skylar.L.Murphy@FloridaDEP.gov
PSI Proposal No. 0552-371488 FDEP – Haines City Construction Oversight
Site Assessment activities were conducted under the Drycleaning Solvent Cleanup Program by AECOM in 2016, 2017, and 2018 which revealed chlorinated compounds above Groundwater Cleanup Target Levels (GCTLs). The soil assessment indicated that no dry-cleaning chlorinated contaminants of concern were detected above SCTLs in any soil samples collected.
A Modified Active Gas Sampling Study (MAGS) was also conducted as a part of the site assessment which revealed relatively low levels of PCE in the soil. Based on the MAGS tests, the site was suitable for soil vapor extraction technology to address the on-site contaminants. An SVE system was designed and installed by AECOM with system start-up in September 2021. The Operations and Maintenance of the SVE system was transferred to PSI in January 2022 and has been operating since then.
PSI was contacted by Commercial Maintenance Systems, working for Enterprise Car Rental, on April 1, 2022, to discuss their plans for modifying the area behind the rental facility where the existing car wash is located. Their redevelopment plans, which were apparently permitted by the County, consist of adding three (3) parking spaces where the current SVE lines run through. The construction of the new parking spaces would require the SVE lines to be rerouted underground for approximately 10 feet. Conversations with Brad Undestad, Vice President of Commercial Maintenance Systems, are on-going with PSI to facilitate avoiding any damage to the SVE system and SVE lines while preserving the Enterprise Car Rental’s new parking spaces.
Therefore, PSI is proposing to review the parking space construction plans, coordinate with the contractor, Commercial Maintenance Systems, and the FDEP Waste Cleanup Program to select a path forward on how to continue to operate the SVE lines and allow the new parling spaces to be constructed to avoid any damage to the SVE system.
PROPOSED SCOPE OF WORK
The proposal contained herein consists of construction coordination for the Haines City Quality Cleaners SVE system. Specifically, the proposed scope of work consists of the following subtasks:
Subtask 1 - Project Management
This scope is provided for in the template worksheets.
Subtask 2 – Review of Construction Plans, Site Visit
PSI will obtain the development plans of the CMS contractor and conduct a site visit to review current site conditions, as well as take photographs of site conditions.
Subtask 3 – Construction Observation
PSI will provide observations of the CMS construction of the new parking spaces to observe the current SVE lines such that any damage to the SVE system is documented.
PSI Proposal No. 0552-371488 FDEP – Haines City Construction Oversight
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the above described services is shown on the attached Cost Estimate and Level of Effort sheets. PSI services will be conducted in accordance with the terms and conditions contained within the State of Florida Department of Environmental Protection Standard Contract, Contract No. HW686, dated December 21, 2021. We plan to review the construction plans immediately and will conduct a site visit during the next week. Construction observations will occur when the CMS contractors initiate their construction. The deliverable will be a brief letter with photographs, field notes, and contact information for the various parties.
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Michael Rothenburg, PE, CIH Nana Westmark, PG, CHMM Senior Engineer / Department Manager Senior Geologist / Contract Manager
Enclosure: Cost Estimate Level of Effort
Proposed Cost Schedule / Deliverable
SubTask 1 Project Management $349.99 July 20, 2022
SubTask 2 Construction Plan Review, Site Visit $1,575.84 May 1, 2022 Field Notes/ Photos from Site Visit
SubTask 3 Construction Observations $1,511.37 July 20, 2022 Field Notes / Photos from Oversight
Total Estimated Cost $3,437.20 August 15, 2022
Haines City Quality Cleaners, ERIC_5357
Task
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 4/15/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Haines City Quality Cleaners SubTask 2 Construction Plan Review, Site Visit SubTask 7
Activity/Phase: Construction Plans Review SubTask 3 Construction Observations SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$55.84 Project Manager 2 2.3 $0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0
$62.64 Senior Engineer, MR 2 2 0 0 0 0 0 0 0 0 $55.84 Senior Geologist, NW 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $0.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $0.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $0.00 Project Manager 0 0 0 0 0 0 0 0 0 0
$36.06 Project Engineer, MM 0 0 0 0 0 0 0 0 0 0 $38.20 Project Engineer, IK 0 0 0 0 0 0 0 0 0 0 $30.56 Project Engineer, MK 0 0 0 0 0 0 0 0 0 0 $33.99 Project Engineer, SJ 7 6 1 0 0 0 0 0 0 0 $32.44 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.86 Project Scientist, EL 0 0 0 0 0 0 0 0 0 0 $29.62 Project Scientist, RF 0 0 0 0 0 0 0 0 0 0
$0.00 QA Officer 0 0 0 0 0 0 0 0 0 0 $30.59 Remediation Specialist, RH 20 6 14 0 0 0 0 0 0 0 $24.84 GIS / CAD Specialist, CF 0 0 0 0 0 0 0 0 0 0
$0.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Geologist 0 0 0 0 0 0 0 0 0 0
$24.27 Staff Scientist, BW 0 0 0 0 0 0 0 0 0 0 $30.30 Environmental Specialist, CC 0 0 0 0 0 0 0 0 0 0 $21.21 Environmental Specialist, MZ 0 0 0 0 0 0 0 0 0 0 $20.81 Administrative Assistant, BM 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 31 2 14 15 0 0 0 0 0 0 0
Direct Labor $1,101.76 $126.75 $512.76 $462.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 151.02% $1,663.88 $191.42 $774.37 $698.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,765.64 $318.17 $1,287.13 $1,160.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 1
FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)
Date: 4/15/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Haines City Quality Cleaners SubTask 2 Construction Plan Review, Site Visit SubTask 7
Activity/Phase: Construction Plans Review SubTask 3 Construction Observations SubTask 8
Project Manager: Nana Westmark SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel Vehicle Rental $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $75.00 $0.00 $75.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $155.00 $40.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,160.64 $318.17 $1,447.13 $1,395.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $276.56 $31.82 $128.71 $116.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $3,437.20 $349.99 $1,575.84 $1,511.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF Intertek-PSI Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Haines City Quality Cleaners SubTask 2 Construction Plan Review, Site Visit
DATE: 4/15/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer, M Rothenburg Technical oversight 2
Project Engineer, S Jordan Obtain permitted redevelopment plans, review plans 4 Discuss plans with contractor and FDEP 2
Remediation Specialist, R Hanson Travel (round trip) 3 Site visit 3
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 1 $120.00
$0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIE $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
$0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
Expendables $40.00 day 1 $40.00
TOTAL EQUIPME $40.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Haines City Quality Cleaners SubTask 3 Construction Observations
DATE: 4/15/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Engineer, S Jordan Review Field Deliverable 1
Remediation Specialist, R Hanson Travel (round trip) 3 Observations of construction during parking space rebuild by others 8 Provide Field Deliverable 3
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
$0.00
Equipment Van / Truck $120.00 day 1 $120.00
$0.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00 Construction/O&M supplies $75.00 day 1 $75.00
$0.00 $0.00
Expendables $40.00 day 1 $40.00 $0.00 $0.00
TOTAL EQUIPMENT $115.00
FINAL --7/24/96
| HW686 TA DC010A ERIC_5357.pdf |
| Haines City Quality Cleaners NS ERIC_5357.pdf |
| Haines City ERIC_5357 Oversight Prop.pdf |
| COST ESTIMATE AND SCHEDULE |
| Haines City ERIC__5357 Oversight 0552-371488 cost.pdf |
| Cost Estimate |
| Formula Sheet |
| 2 Cons Plan Review, Site visit |
| 3 Construction Oversight |
| Haines City ERIC__5357 Oversight 0552-371488 Schedule (002).pdf |
| Schedule |
File details come from the government source that posted it. Updated .