This document is a Task Assignment (TA) under Contract Number HW686 between the State of Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (Intertek-PSI). The task assignment authorizes PSI to conduct groundwater sampling for volatile organic halocarbons (VOHs) and perfluoroalkyl and polyfluoroalkyl substances (PFAS) at the Pure Cleaners facility located at 954 West State Road 434 in Longwood, Seminole County, Florida. The project is identified as ERIC_5494, with Nicole Knutson serving as the FDEP Project Manager and Nana Westmark as PSI's Project Manager.

The total task assignment value is $27,911.39, compensated on a fixed unit rate basis and payable upon FDEP approval of deliverables. Services include four quarters of groundwater sampling from three monitoring wells (MW001, MW019, and MW026), laboratory analysis via EPA Method 8260 for VOHs, PFAS analysis through the FDEP Central Laboratory, and preparation of a Groundwater Monitoring Report or Site Rehabilitation Completion Report. Deliverables are scheduled quarterly with the first quarter due December 2, 2024, and final deliverables and task completion due October 31, 2025, and December 31, 2025, respectively. Invoice amounts range from $3,761.71 to $10,315.43 per subtask, contingent upon FDEP approval of laboratory data, field notes, and supporting documentation. Investigative derived waste (IDW) transportation and disposal are included, with a subcontractor (Erwin Remediation) selected for IDW treatment and disposal services. The contract is governed by the terms and conditions of DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001D.pdf PDF
CN-370000-HW686-DC002A.pdf PDF
CN-370000-HW686-DC002F.pdf PDF
CN-370000-HW686-DC002G.pdf PDF
CN-370000-HW686-DC002H.pdf PDF
CN-370000-HW686-DC003A.pdf PDF
CN-370000-HW686-DC003B.pdf PDF
CN-370000-HW686-DC003E.pdf PDF
CN-370000-HW686-DC003G.pdf PDF
CN-370000-HW686-DC004C.pdf PDF
CN-370000-HW686-DC004E.pdf PDF
CN-370000-HW686-DC007A.pdf PDF
CN-370000-HW686-DC007C.pdf PDF
CN-370000-HW686-DC007D.pdf PDF
CN-370000-HW686-DC009C.pdf PDF
CN-370000-HW686-DC009E.pdf PDF
CN-370000-HW686-DC010C.pdf PDF
CN-370000-HW686-DC011A.pdf PDF
CN-370000-HW686-DC012B.pdf PDF
CN-370000-HW686-DC013A.pdf PDF
CN-370000-HW686-DC014A.pdf PDF
CN-370000-HW686-DC016A.pdf PDF
CN-370000-HW686-DC018A.pdf PDF
CN-370000-HW686-DC019B.pdf PDF
CN-370000-HW686-DC01ACO4.pdf PDF
CN-370000-HW686-DC020C.pdf PDF
CN-370000-HW686-DC023A.pdf PDF
CN-370000-HW686-DC024A.pdf PDF
CN-370000-HW686-DC025A.pdf PDF
CN-370000-HW686-DC026B.pdf PDF
CN-370000-HW686-DC028A.pdf PDF
CN-370000-HW686-DC03DCO2.pdf PDF
CN-370000-HW686-DC04ECO1.pdf PDF
CN-370000-HW686-DC07BCO1.pdf PDF
CN-370000-HW686-DC07BCO3.pdf PDF
CN-370000-HW686-DC09DCO1.pdf PDF
CN-370000-HW686-DC11BCO1.pdf PDF
CN-370000-HW686-DC13BCO1.pdf PDF
CN-370000-HW686-DC14BCO3.pdf PDF
CN-370000-HW686-DC14DCO1.pdf PDF
CN-370000-HW686-DC15BCO1.pdf PDF
CN-370000-HW686-DC15DCO1.pdf PDF
CN-370000-HW686-DC16BCO1.pdf PDF
CN-370000-HW686-DC18CCO1.pdf PDF
CN-370000-HW686-DC21BCO1.pdf PDF
CN-370000-HW686-DC27BCO1.pdf PDF
CN-370000-HW686-FIL10.pdf PDF
CN-370000-HW686-FIL6.pdf PDF
CN-370000-HW686-FIL9.pdf PDF
CN-370000-HW686-HW002A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW686

DC005C December 31, 2025

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct groundwater sampling for VOHs and PFAS in accordance with the scope of work received on August 28, 2024.

Nicole Knutson 850-245-8763 Professional Service Industries, Inc. (Intertek-PSI)

Nana Westmark 813-886-1075

ERIC_5494

954 West State Road 434 Longwood, Seminole County

Pure Cleaners

$ 27,911.39

$ 27,911.39

Scope of Work

Professional Service Industries, Inc. (Intertek-PSI)

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.08.29 10:01:22 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_5494

Pure Cleaners

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW686 DC005C

DATE: August 28, 2024

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct groundwater sampling for VOHs and PFAS in accordance with the scope of work received on August 28, 2024. Erwin Remediation was selected to conduct IDW T&D services.

Total task amount is $27,911.39. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is October 31, 2025. Task completion date is December 31, 2025.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Pure Cleaners ERIC_5494 SubTask 2 1st Qtr Groundwater Sampling, VOH, PFAS DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Event lab kit request, equipment selection 2

Tenant / owner notification 1

Technical oversight 1

Review final deliverable before submittal 1

Total Hours: 5

Project Scientist, S Luth Prepare for field event 1

Travel (5 hour round trip) 5

Obtain DTW from 8 wells 1

Sample 3 shallow wells (1 hr per well) 3

Pickup, drop off samples 2

Stage drum 1

Total Hours: 13

Project Engineer, J Newell Data reduction/evaluation 1.5

Generate letter report with summary of activities/results 8

Total Hours: 9.5

TOTAL LABOR 27.5

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW pickup, tranpoort, dispose 0 $100.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

EPA Method 8260 for Halocarbons $73.00 3 $219.00

$0.00

$0.00

TOTAL LAB $219.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00

55-gallon drum $100.00 each 1 $100.00

390.00$

Expendables $40.00 day 1 $40.00

$0.00

TOTAL EQUIPMENT $430.00

FINAL --7/24/96

Page 4 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

SubTask 3 2nd Qtr Groundwater Sampling, VOH DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson Event lab kit request, equipment selection 2

Tenant / owner notification 1

Technical oversight 1

Review final deliverable before submittal 1

Total Hours: 5

Project Scientist, S Luth Prepare for field event 1

Inventory sample kit 1

Travel (5 hour round trip) 5

Obtain DTW from 8 wells 1

Sample 3 shallow wells (1 hr per well) 3

Pickup, drop off samples 2

Stage drum 1

Total Hours: 14

Project Engineer, J Newell Data reduction/evaluation 1

Generate letter report with summary of activities/results 6

Total Hours: 7

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW pickup, tranpoort, dispose 0 $100.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

EPA Method 8260 for Halocarbons $73.00 3 $219.00

$0.00

$0.00

$0.00

TOTAL LAB $219.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00

55-gallon drum $100.00 each 0 $0.00

290.00$

Expendables $40.00 day 1 $40.00

$0.00

$0.00

TOTAL EQUIPMENT $330.00

Page 5 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

SubTask 4 3rd Qtr Groundwater Sampling, VOH DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson Event lab kit request, equipment selection 2

Tenant / owner notification 1

Technical oversight 1

Review final deliverable before submittal 1

Total Hours: 5

Project Scientist, S Luth Prepare for field event 1

Inventory sample kit 1

Travel (5 hour round trip) 5

Obtain DTW from 8 wells 1

Sample 3 shallow wells (1 hr per well) 3

Pickup, drop off samples 2

Stage drum 1

Total Hours: 14

Project Engineer, J Newell Data reduction/evaluation 1

Generate letter report with summary of activities/results 6

Total Hours: 7

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW pickup, tranpoort, dispose 0 $100.00 $0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

EPA Method 8260 for Halocarbons $73.00 3 $219.00

$0.00

$0.00

$0.00

TOTAL LAB $219.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00

55-gallon drum $100.00 each 0 $0.00

290.00$

Expendables $40.00 day 1 $40.00

$0.00

$0.00

TOTAL EQUIPMENT $330.00

Page 6 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

SubTask 5 4th Qtr Groundwater Sampling, VOH, IDW T&D DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson Event lab kit request, equipment selection 2

Tenant / owner notification 1

Technical oversight 1

Review final deliverable before submittal 1

Total Hours: 5

Project Scientist, S Luth Prepare for field event 1

Inventory sample kit 1

Travel (5 hour round trip) 5

Obtain DTW from 8 wells 1

Sample 3 shallow wells (1 hr per well) 3

Pickup, drop off samples 2

Stage drum 1

Collect IDW sample for waste characterization 1

Total Hours: 15

Project Engineer, J Newell Waste profiling 2

IDW manifest execution T&D oversight 1

Total Hours: 3

TOTAL LABOR 23

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

Petrotech Southeast IDW pickup, tranpoort, dispose 1 $115.00 $115.00

$0.00

TOTAL $115.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

$0.00

$0.00

EPA Method 8260 for Halocarbons $73.00 3 1 $292.00

$0.00

$0.00

TOTAL LAB $292.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

Shallow Groundwater Sampling Kit $290.00 day 1 $290.00

55-gallon drum $100.00 each 0 $0.00

290.00$

Expendables $40.00 day 1 $40.00

$0.00

$0.00

TOTAL EQUIPMENT $330.00

Page 7 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

SubTask 6 Reporting DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Engineer, G Robinson Evaluate final document for accuracy prior to submittal 4

Total Hours: 4

Project Engineer, J Newell Data reduction/evaluation 8

Preparation of draft report 16

Report - Prepare final tables and figures 20

Address final comments/edits - Sign/Seal report 2

Total Hours: 46

GIS/CADD Specialist, D Grove Create and prepare figures 8

Total Hours: 8

TOTAL LABOR 58

VEHICLE TYPE RATE UNIT USEAGE

$0.00

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00

$0.00

$0.00

$0.00

TOTAL EQUIPMENT $0.00

Page 8 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

SubTask 7 PFAS Monitoring DATE: 5/2/2023, Revised 8/28/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities PFAS Sampling

Project Engineer, J Newell Request PFAS sample kit via FDEP Lab Form 1

Data reduction/evaluation 1

Provide evaluation within letter/GWMR/SRCR 4

Report - Prepare final tables and figures 6

Total Hours: 12

Project Scientist, S Luth Additional decontamination for PFAS 1

Documentation of PFAS groundwater sampling 1

Inventory cooler, prepare cooler for shipping to FDEP 1

Total Hours: 3

GIS/CADD Specialist, D Grove Create and prepare figures 2

Total Hours: 2

TOTAL LABOR 17

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$834.20 week 0 $0.00

Deep Groundwater Sampling Kit $415.00 day 0 $0.00

$0.00

Expendables $40.00 day 0 $0.00

55-gallon drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $120.00 day 0 $0.00

$420.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $73.00 0 0 0 $0.00

Shipping, large $104.00 0 $0.00

$0.00

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Petrotech IDW drum pickup 0 $125.00 $0.00

TOTAL $0.00

Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH Page 9 Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH

PSI Proposal: 0552-392390-Rev 4 August 28, 2024

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Ms. Nicole Knutson, Environmental Consultant Telephone: (850) 245-8705, (850) 245-8763 direct Email: Nicole.Knutson@FloridaDEP.gov

Re: Proposal for Groundwater Sampling 4 Quarters, PFAS, SRCR Pure Cleaners (a.k.a. Cleaners 46), 954 West State Road 434 Longwood, Seminole County, Florida FDEP Facility ID No. 59 9601438 / ERIC_5494

Dear Ms. Knutson:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide groundwater monitoring services for four quarters for the Pure Cleaners (a.k.a Cleaners 46) at 954 West State Road 434, Longwood, Florida, for routine Volatile Organic Halocarbons and Perfluoroalkyl and polyfluoroalkyl substances (PFAS) compounds.

Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion. A Site Access Form was signed by the property owner in 2021, and, same property owner is listed as of August 26, 2024.

PROJECT BACKGROUND

Drycleaning operations at Pure Cleaners began in the late 1970s or early 1980s. Based on documented impacts from the drycleaner, the facility was deemed eligible for acceptance into the Florida Drycleaning Solvent Cleanup Program in January 1997, and assessment activities commenced in July through October 1997. Contaminated sediments were excavated from a drainage ditch behind the drycleaners, and remediation was performed with Air Sparge/ Soil Vapor Extraction (AS/ SVE). The AS / SVE system operated for approximately 31 months and was deactivated. The business is still in operation as a drycleaner and the site has been under natural attenuation monitoring (NAM) since October 2002.

The most recent groundwater sampling event occurred in August 2022. The results of the sampling activities indicated concentrations of the contaminants of concern (COC) have steadily decreased since 2011.

FDEP Pure Cleaners (aka Cleaners 46) ERIC_5494

August 28, 2024 www.intertek.com/building

The property owner has indicated that they are amenable to working with the Department to obtain a Conditional Closure, per Chapter 62-780, Florida Administrative Code (FAC) due to the low concentrations of the contaminants of concern and their desire for property redevelopment.

However, the recent results are indicative of conditions that may be quality the site for a clean closure. After discussions with the FDEP, we propose to monitor the site for an additional four quarters in an effort to evaluate if a clean closure is possible.

The FDEP is currently implementing the August 2021 Waste Cleanup Section Dynamic Plan for addressing PFAS which consists of monitoring drycleaning sites. Therefore, the Department requested we conduct groundwater sampling for select wells at the Pure Cleaners to evaluate the potential presence of PFAS compounds, in addition to the routine annual groundwater monitoring. The FDEP has approved the wells selected for PFAS sampling and analysis.

Therefore, we are proposing to monitor the groundwater at the three monitoring wells for VOHs and PFAS compounds. Four quarters of VOH monitoring and one event for PFAS monitoring is included in this proposal. Depending upon the results of the monitoring, a Site Rehabilitation Completion Report or Groundwater Monitoring Report may be developed.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of groundwater monitoring and preparation of a Groundwater Monitoring Report or Site Rehabilitation Completion Report.

1. Project Management

This scope is provided for in the template worksheets.

2. Groundwater Sampling and Analysis First Quarter, VOH, PFAS

PSI recommends groundwater sampling for select monitoring wells on site. Specific components of the groundwater sampling and analysis are as follows:

a. Mobilization to the site.

b. Collect groundwater elevation measurements of 8 monitoring wells.

c. Collect groundwater samples from MW001, MW019, and MW026.

d. Submit groundwater samples to a National Environmental Laboratory

Accreditation Conference (NELAC) approved laboratory for analysis of VOHs via EPA Method 8260. It is our understanding that the Waste Site Cleanup Section no longer requires QA blanks or duplicates.

e. The groundwater samples will also be analyzed by the FDEP Central Laboratory in Tallahassee for PFAS compounds.

f. Containerize investigative derived waste (IDW) in a 55-gallon drum, label appropriately and stage on-site.

g. Prepare a letter report with a one page summary of field events and results, lab report, and field notes/forms.

August 28, 2024 www.intertek.com/building

3. Groundwater Sampling and Analysis Second Quarter, VOH compounds

PSI recommends groundwater sampling for select monitoring wells on site. Specific components of the groundwater sampling and analysis are as follows:

a. Mobilization to the site.

b. Collect groundwater elevation measurements of 8 monitoring wells (MW001, MW009, MW010, MW015, MW016, MW017, MW019, and MW026).

c. Collect groundwater samples from MW001, MW019, and MW026.

d. Submit groundwater samples to a National Environmental Laboratory

Accreditation Conference (NELAC) approved laboratory for analysis of VOHs via EPA Method 8260. It is our understanding that the Waste Site Cleanup Section no longer requires QA blanks or duplicates.

e. The groundwater samples will also be analyzed by the FDEP Central Laboratory in Tallahassee for PFAS compounds. (See subtask 7 below for additional information.

f. Containerize investigative derived waste (IDW) in a 55-gallon drum, label appropriately and stage on-site.

g. Prepare a letter report with a one page summary of field events and results, lab report, and field notes/forms.

4. Groundwater Sampling and Analysis Third Quarter, VOH compounds

The third quarter groundwater sampling event and deliverable will duplicate Subtask 3 as described above.

5. Groundwater Sampling and Analysis Fourth Quarter, VOH compounds

PSI will conduct an additional quarter of groundwater sampling and analysis as follows:

a. Mobilization to the site.

b. Collect groundwater elevation measurements of 8 monitoring wells.

c. Collect groundwater samples from MW001, MW019, and MW026.

d. Submit groundwater samples to a National Environmental Laboratory

Accreditation Conference (NELAC) approved laboratory for analysis of VOHs via EPA Method 8260.

e. Containerize investigative derived waste (IDW) in a 55-gallon drum, label appropriately and stage on-site.

f. A subcontractor will transport and dispose of IDW in an approved facility. A signed manifest will be provided by the waste management company subsequent to pick-up and disposal.

August 28, 2024 www.intertek.com/building

6. Data Evaluation and GWMR / SRCR Development

Evaluate the data and develop a Groundwater Monitoring Report or Site Rehabilitation Completion Report to include the following:

a. Summary of the site assessment and remediation,

b. Affected media,

c. Current and projected use of groundwater,

d. Current and projected use of property,

e. Probability of contaminant migration,

f. Potential receptors,

g. Availability of other water supply resources for site, and

h. Rationale and recommendations for a SRCO With No Conditions, if appropriate.

7. PFAS Groundwater Monitoring and Reporting

PSI will conduct the PFAS Groundwater Monitoring during the same event as the routine VOH monitoring, however, the FDEP Central Laboratory will be used for the analyses of PFAS compounds. The following wells will be sampled for the presence of PFAS compounds.

a. Collect groundwater samples from wells: MW001, MW019, and MW026.

The Level of Effort for Groundwater Monitoring is detailed in Subtask 7 and the results of which will be incorporated into the Subtask 2 and Subtask 6 Deliverables.

The investigative derived waste (IDW) that will be generated during the annual groundwater monitoring includes the purge water from the monitoring wells which will be containerized in a 55-gallon drum(s) for transport and disposal at a licensed facility by an approved subcontractor.

Sampling Standard Operating Procedures Relative to the Collection/Analysis of Quality Control blanks and duplicates.

The Department will no longer require field blanks, duplicates, or travel blanks for Waste Site Cleanup Section sites, unless specifically requested by the FDEP Project Manager.

The intent will be to reduce the number of groundwater samples collected for VOH analysis as each well provides two (2) consecutive quarterly laboratory analytical results with compounds reported below GCTLs. Wells to be included in the following sampling event will be included in the quarterly letter reports and a Task Assignment Change Order will be submitted at the end of the Task Assignment to reduce the costs by the total number of wells not sampled.

August 28, 2024 www.intertek.com/building

The deliverable and invoice schedule are presented as follows.

Pure Cleaners ERIC_5494 - (Provided dates are based on receipt of a Task Assignment prior to September 30, 2024. The Q1 field event is anticipated to occur within 30 days of receipt of the TA. FDEP Central Lab requests 3 weeks to provide a sample kit for PFAS sampling) Task Proposed

Cost Schedule / Deliverable Invoice

Deliverable

SubTask 1 Project Management

$2,868.75 Upon completion of Task Assignment

October 31, SubTask 2 1st Qtr Groundwater Sampling, VOH, PFAS

$4,249.54 December 2, 2024, Lab Data Field Notes, 1-Page Summary of Q1

December 31, 2024

SubTask 3 2nd Qtr Groundwater Sampling, VOH

$3,983.51 March 3, 2025, Lab Data, Field Notes, 1-Page Summary of Q2

March 31, SubTask 4 3nd Qtr Groundwater Sampling, VOH

$3,983.51.66 June 2, 2025, Lab Data, Field Notes, 1-Page Summary of Q3

June 30, SubTask 5 4th Qtr Groundwater Sampling, VOH, IDW T&D

$3,761.71 September 30, 2025, Lab Data, Field Notes, IDW Waste Manifest

October 31, SubTask 6 Reporting $7,446.68 September 30, 2025, Groundwater Monitoring Report (data for 2-4 Qtrs)

October 31, SubTask 7 PFAS $1,617.69 September 30, 2025, Lab Data, Field Notes, Results Summarized in SubTask 6

October 31, Total Estimated Cost $27,911.39 TA Completion Date December 31, 2025

Above described is contingent on Analytical laboratory schedule and availability, and site access.

Field work may be modified in case of inclement weather, or pandemic concerns.

August 28, 2024 www.intertek.com/building

PSI recommended collection from downgradient wells located both north and south of the above referenced wells due to fluctuations in groundwater flow direction in the shallow aquifer (MW009 and MW010) as well as a vertically downgradient well (MW017) however at the request of the FDEP, these wells have been omitted from this proposal.

The estimated cost to perform the groundwater monitoring and reporting is shown on the attached Cost Estimate and Level of Effort sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021.

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Nana Westmark, PG Josh Newell, PE Senior Geologist / Principal Consultant Senior Engineer / Contract Manager

Enclosure: Cost Estimate Level of Effort IDW Quotes

\\Tampa-fs\projects\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-392390 Pure 4 Qtr GW sampling\Revision 4 Proposal August 2024\Rev 4 ERIC_5494 Pure Cleaners 0552-392390 PFAS, VOH.docx

04/24/2024 01:44 PM PAGE 1 OF 7

Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry

4600 BROOKPARK ROAD, CLEVELAND,

OHIO, 44134

(216) 642-1311

(216) 642-1474

QUOTE #: 0042802

DATE: 04/24/2024 PROJECT PROPOSAL

CLIENT

JOSH NEWELL

INTERTEK/PSI - PLANT CITY

607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,

33563

P: (863) 712-4342

E-MAIL:JOSHUA.NEWELL@INTERTEK.COM

PROJECT DESCRIPTION

FDEP DRY CLEANING DRUMS

FDEP

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00

LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00

ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00

DISPOSAL SUBTOTAL: $80.00

JOB ESTIMATE: $180.00

ENVIRONMENTAL FEE: $9.00

TOTAL JOB ESTIMATE: $189.00