Contract Summary

This is a Task Assignment (TA) document issued under Contract Number HW686 between the Florida Department of Environmental Protection (FDEP) and Professional Service Industries, Inc. (PSI), an Intertek Company. The TA authorizes PSI to conduct groundwater monitoring and per- and polyfluoroalkyl substances (PFAS) sampling at the Wash Bowl Dry Cleaners site located at 7104 Highway 52, Port Richey, Pasco County, Florida (ERIC_5243). The Department Project Manager is Nicole Varela, and PSI's Project Manager is Nana Westmark. The underlying contract HW686 is part of Florida's Drycleaning Solvent Cleanup Program administered through the FDEP's Hazardous Waste Cleanup Section.

The total Task Assignment value is $18,811.74 on a fixed unit rate basis. The work is divided into three subtasks: Subtask 1 (Project Management) at $1,728.58, Subtask 2 (Groundwater Monitoring and Report) at $16,375.65, and Subtask 3 (PFAS Sampling) at $707.51. All deliverables are due January 31, 2025, with the TA completion date of March 28, 2025. The scope includes groundwater sampling from 15 monitoring wells at three depths, laboratory analysis via EPA Method 8260 for volatile organic compounds, PFAS analysis by the FDEP Chemistry Lab, investigative derived waste characterization and disposal (with PetroTech Southeast selected for IDW disposal at $115.00 per drum), and preparation of a comprehensive groundwater monitoring report with maps and recommendations.

View the file

Other files

File Type Posted
CN-370000-HW686-DC001B.pdf PDF
CN-370000-HW686-DC002B.pdf PDF
CN-370000-HW686-DC002D.pdf PDF
CN-370000-HW686-DC003F.pdf PDF
CN-370000-HW686-DC004D.pdf PDF
CN-370000-HW686-DC005B.pdf PDF
CN-370000-HW686-DC006A.pdf PDF
CN-370000-HW686-DC006D.pdf PDF
CN-370000-HW686-DC007B.pdf PDF
CN-370000-HW686-DC009B.pdf PDF
CN-370000-HW686-DC009D.pdf PDF
CN-370000-HW686-DC010B.pdf PDF
CN-370000-HW686-DC010D.pdf PDF
CN-370000-HW686-DC011B.pdf PDF
CN-370000-HW686-DC014B.pdf PDF
CN-370000-HW686-DC014C.pdf PDF
CN-370000-HW686-DC015C.pdf PDF
CN-370000-HW686-DC016B.pdf PDF
CN-370000-HW686-DC017A.pdf PDF
CN-370000-HW686-DC018B.pdf PDF
CN-370000-HW686-DC018C.pdf PDF
CN-370000-HW686-DC019A.pdf PDF
CN-370000-HW686-DC01ACO2.pdf PDF
CN-370000-HW686-DC020B.pdf PDF
CN-370000-HW686-DC022A.pdf PDF
CN-370000-HW686-DC026A.pdf PDF
CN-370000-HW686-DC027B.pdf PDF
CN-370000-HW686-DC02ACO1.pdf PDF
CN-370000-HW686-DC02HCO1.pdf PDF
CN-370000-HW686-DC04DCO1.pdf PDF
CN-370000-HW686-DC05ACO1.pdf PDF
CN-370000-HW686-DC05CCO3.pdf PDF
CN-370000-HW686-DC06BCO1.pdf PDF
CN-370000-HW686-DC06CC03.pdf PDF
CN-370000-HW686-DC06CCO1.pdf PDF
CN-370000-HW686-DC06CCO2.pdf PDF
CN-370000-HW686-DC09ECO1.pdf PDF
CN-370000-HW686-DC10DCO1.pdf PDF
CN-370000-HW686-DC14BCO2.pdf PDF
CN-370000-HW686-DC14DCO2.pdf PDF
CN-370000-HW686-DC21ACO2.pdf PDF
CN-370000-HW686-DC23ACO1.pdf PDF
CN-370000-HW686-FIL13.pdf PDF
CN-370000-HW686-FIL2.pdf PDF
CN-370000-HW686-FIL8.pdf PDF
CN-370000-HW686-HW001A.pdf PDF
CN-370000-HW686-HW003A.pdf PDF
CN-370000-HW686-HW004A.pdf PDF
CN-370000-HW686-HW005A.pdf PDF
CN-370000-HW686-HW005B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW686

DC020C Completion March 28, 2025

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct groundwater monitoring and PFAs sampling at the Wash Bowl Dry Cleaners site in Port Richey, Florida, in accordance with the scope of work and cost proposal submitted on June 14, 2024.

Nicole Varela 850-245-8959 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Professional Service Industries, Inc.

Professional Service Industries, Inc.

Nana Westmark 813-886-1075

ERIC_5243

7104 Highway 52, Port Richey, Pasco County

Wash Bowl Dry Cleaners

✔ $ 18,811.74

$ 18,811.74

Scope of Work

Digitally signed by Joshua S Newell Date: 2024.09.04 08:24:31-04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.09.03 18:31:48 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2 & 1: Groundwater Monitoring Report + Project Management 01/31/2025

Subtask 3: PFAs Sampling Summary (Section) 01/31/2025

Subtask 2 & 1: Groundwater Monitoring Report + Project Management $ 18,104.23

Subtask 3: PFAs Sampling Summary (Section) $ 707.51

$ 18,811.74

HW686

DC020C

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_5243

Wash Bowl Dry Cleaners

FROM: Nicole Varela, Project Manager

SUBJECT: Negotiation Summary

HW686_DC020C

Groundwater Monitoring

DATE: June 25, 2024

This Task Assignment authorizes Professional Service Industries, Inc. (PSI) to conduct groundwater monitoring activities and PFAs sampling at the Wash Bowl Dry Cleaners site in accordance with the scope of work, cost estimate form, and schedule received on June 14, 2024.

The final deliverable due date will be January 31, 2025.

The completion date for the task assignment will be March 28, 2025.

The final total cost will be $18,811.74.

Specific subtasks are detailed below:

Subtask 1: Project Management PSI is authorized to calculate Project Management costs at 13% of direct labor costs for all tasks associated with project management for groundwater monitoring at the site.

Subtask 2: Groundwater Monitoring PSI will conduct groundwater sampling, analysis, and reporting in accordance with FDEP standard operating procedures (SOPs) and EPA methodology.

Subtask 3: PFAs Sampling PSI will conduct PFAs groundwater sampling, analysis, and reporting in accordance with FDEP SOPs.

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

SubTask 1 Project Management SubTask 6

Date: 6/14/2024

Task #: HW686_DC20C

Site: Washbowl Cleaners ERIC_5243 SubTask 2 Groundwater Monitoring and Report SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 PFAS Sampling SubTask 8

Project Manager: John Daugherty SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$58.41 Project Manager 10.7 10.7 $62.50 Senior Engineer, GR 4.0 4.0 0 0 0 0 0 0 0 0

$58.41 Senior Geologist, NW 22.0 22.0 0 0 0 0 0 0 0 0 $39.42 Project Scientist, SL 30.0 23.5 6.5 0 0 0 0 0 0 0 $40.87 Project Scientist, JD 48.0 48.0 0 0 0 0 0 0 0 0 $34.03 GIS / CAD Specialist, DG 4.0 4.0 0 0 0 0 0 0 0 0

Total Hours 118.7 10.7 101.5 6.5 0 0 0 0 0 0 0

Direct Labor $5,441.52 $626.02 $4,559.27 $256.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 151.02% $8,217.79 $945.42 $6,885.41 $386.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,659.31 $1,571.44 $11,444.68 $643.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF PSI Intertek Page 1

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc. (Intertek-PSI)

SubTask 1 Project Management SubTask 6

Date: 6/14/2024

Task #: HW686_DC20C

Site: Washbowl Cleaners ERIC_5243 SubTask 2 Groundwater Monitoring and Report SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 PFAS Sampling SubTask 8

Project Manager: John Daugherty SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.50 $11.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $126.50 $126.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,465.00 $1,465.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,465.00 $1,465.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,535.00 $1,535.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,715.00 $1,715.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $17,445.81 $1,571.44 $15,231.18 $643.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,365.93 $157.14 $1,144.47 $64.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $18,811.74 $1,728.58 $16,375.65 $707.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF PSI Intertek Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Washbowl Cleaners ERIC_5243 SubTask 2 Groundwater Monitoring and Report

DATE: 6/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Obtain updated site access agreement 2 Attempt to obtain offsite access agreements for east/north properties 8 Event lab kit request, tenant notification 4 Review groundwater monitoring report 4 Generate recommendations for report 4

Total Hours 22

Senior Engineer, G Robinson Sampling oversight and technical support 2 Sign and seal report 2

Total Hours 4

Project Scientist, S Luth Prepare for field event 2 Travel (2 days, 3 hours round-trip) 6 Collect groundwater elevations at subject wells (8) 1 3 shallow wells (1 hr per well) 3 3 intermediate wells (1.5 hr per well) 4.5 2 deep wells (2 hr per well) 4 Stage IDW 1 Pick-up, drop off samples 1 Documentation of groundwater sampling & measurements 1

Total Hours 23.5

Project Scientist, J Daugherty Groundwater Sampling

Travel (2 days, 3 hours round-trip) 6 Collect groundwater elevations at subject wells (7) 1 3 shallow wells (1 hr per well) 3 2 intermediate wells (1.5 hr per well) 3 2 deep wells (2 hr per well) 4 Stage IDW 1 Pick-up, drop off samples 1 Documentation of groundwater sampling & measurements 1

Reporting Prepare tables and draft maps/figures (VOH & PFAS) 12 Data reduction / evaluation, prepare report 16

Total Hours 48

GIS / CAD Specialist, D Grove Create maps, figures 4

TOTAL LABOR 101.5

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (1 scientist to mobilize from Tampa) $120.00 day 2 $240.00 Equipment Van / Truck (1 scientist to mobilize from Plant City $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNITS COST

$0.00

Petrotech Southeast IDW T&D, per drum 1 $115.00 $115.00 $0.00

TOTAL $115.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

Groundwater Sampling $0.00 EPA Method 8260 $73.00 15 $1,095.00

IDW Characterization Halocarbons by EPA Method 8260 $70.00 1 $70.00 Non-Halocarbons by EPA Method 8260 $73.00 1 $73.00 PAH's by EPA Method 8270 $110.00 1 $110.00 Metals (As, Ba, Cd, Cr, Pb, Sg, Ag) by EPA Method 6010 $91.00 1 $91.00 Mercury by EPA Method 7470/7471 $26.00 1 $26.00

TOTAL LAB $1,465.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$0.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Deep Groundwater Sampling Kit $415.00 day 3 $1,245.00 55-gallon drum $100.00 each 1 $100.00

$0.00 Expendables $40.00 day 2 $80.00

$0.00

TOTAL EQUIPMENT $1,715.00

FINAL --7/24/96

Page 3 Wash Bowl ERIC_5243 - GW VOH PFAS 0552-427887

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Washbowl Cleaners ERIC_5243 SubTask 3: PFAS Sampling

DATE: 6/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities PFAS Sampling

Project Scientist, S Luth Additional decontamination for PFAS 3 Documentation of PFAS groundwater sampling 1 Inventory cooler, prepare cooler for shipping to FDEP 2.5

Total Hours: 6.5

TOTAL LABOR 6.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Deep Groundwater Sampling Kit $415.00 day 0 $0.00 $0.00

Expendables $40.00 day 0 $0.00

55--gallon drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $120.00 day 0 $0.00

$420.00 week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $73.00 0 0 0 $0.00 Shipping, large $104.00 0 $0.00

$0.00

TOTAL LAB $0.00

FINAL --7/24/96

Page 4 Wash Bowl ERIC_5243 - GW VOH PFAS 0552-427887

PSI Proposal: 0552-427887 June 14, 2024 www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Mr. Benjamin Grubbs Environmental Manager Email: benjamin.grubbs@floridadep.gov

Re: Proposal for Annual Groundwater Monitoring

Wash Bowl Dry Cleaners

7104 State Road 52 Port Richey, Pasco County, Florida

ERIC_5243

Dear Mr. Grubbs:

Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to provide this proposal for conducting the annual groundwater monitoring at Wash Bowl Dry Cleaners, located at 7104 State Road 52, Port Richey, Pasco County, Florida. Included with this proposal is a brief summary of the project background, proposed scope of work, cost estimate and a proposed schedule for completion. A Site Access form was signed by the “R&R Investments LLC” in July 2019, however the current property owner is “HARMONY SHOPPING PLAZA, LLC” who has contracted “Foresight Property Services LLC” as a registered agent to manage the property. PSI will obtain an updated Site Access Agreement prior to completing any proposed field work at the site.

PROJECT BACKGROUND

The Wash Bowl Dry Cleaners is located at 7104 State Road 52, in the Harmony Plaza Shopping Center on the northeast corner of the plaza facing State Route 52, in Port Richey, Pasco County, Florida. The Harmony Plaza Shopping Center is roughly shaped like a reverse “L” with the cleaners occupying the top right corner of the reverse “L”. The cleaner is in an end tenant space adjacent to what are currently “Amscot” and “Dollar General” storefronts. While the facility has a Port Richey mailing address, the area around the site is also referred to as Bayonet Point and/or Hudson.

The DSCP Application was completed in May 1997 by a former property owner, Bayonet Plaza Partners, Ltd. According to the application, the Wash Bowl facility operated as a dry cleaner from January 1973 through October 1996. The ownership changed in April 1996, the dry-cleaning equipment was removed mailto:benjamin.grubbs@floridadep.gov

FDEP – Wash Bowl Cleaners in October 1996, and the Site continued operations as a laundromat and dry-cleaning drop-off/pick-up facility only. The facility was determined eligible for state-administered cleanup under the DSCP on July 19, 1997, with an initial priority score of 91.

A Work Plan and Site Assessment to evaluate site conditions was conducted by Chastain Skillman, serving as a subconsultant to PSI, for the Florida Department of Environmental Protection (FDEP) Hazardous Waste Cleanup Section under the Drycleaning Solvent Cleanup Program. The Assessment was detailed in a Site Assessment Report (revised) dated June 15, 2022.

Groundwater wells were installed and screened from three depths: 4 to 14 ft bls, 25 to 35 ft bls, and 49 to 60 ft bls (refusal depth). The shallow zone revealed the highest concentrations of VOH (PCE 2000 μg/L at MW001), whereas the highest concentration of PCE in the intermediate zone was 1300 μg/L at DP002.

The highest concentration identified in the deep zone was 560 μg/L cis-DCE at MW011.

Additional groundwater sampling was conducted in October 2021 which revealed levels of PFAS above the Provisional Cleanup Target Level of 70 in MW012 (105 ppt) and MW013 (108 ppt).

The groundwater plume has not been defined due to site access problems. Multiple Permission to Enter Property Agreement (Non-Source) packages were prepared and submitted to private property owners to the north and east of the site, however, to date, site access has been denied.

This proposal consists of conducting groundwater sampling and analysis for VOH parameters and Polyfluoroalkyl substances (PFAS) at select wells for the annual groundwater monitoring event.

The results will be used to evaluate the current groundwater quality conditions at the site.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of conducting groundwater sampling and analysis, along with a report deliverable. The results will be used to confirm current groundwater quality conditions. The sampling procedures will be conducted according to the FDEP Standard Operating Procedures 001/01 and Drycleaning Solvent Cleanup Program protocols. Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Groundwater Sampling and Analysis

Specific components of the groundwater sampling and analysis subtask are as follows:

a. Obtain updated site access agreement

b. Two days of mobilization to the site.

c. Collect groundwater elevation measurements of 15 monitoring wells.

d. Collect groundwater samples from six shallow wells: MW001, MW002, MW003, MW004, MW009, and MW0014, five intermediate wells: MW005, MW007, MW0010, MW0012, MW0015, and four deep wells: MW006, MW008, MW0011, and MW0013.

e. Submit groundwater samples from 15 sampled wells to a National Environmental Laboratory Accreditation Conference (NELAC) approved laboratory for analysis of VOHs via EPA Method 8260. It is our understanding that the Waste Site Cleanup Section no longer requires QA blanks or duplicates.

f. Submit groundwater samples from 5 sampled wells including MW001, MW009, MW0011, MW0012, and MW0013 for PFAS to the DEP Chemistry Lab in Tallahassee, FL.

g. Containerize investigative derived waste (IDW) in 55-gallon drum, label appropriately and stage on-site, pending waste characterization results.

h. Sample IDW for waste characterization analysis.

i. A subcontractor will transport and dispose of IDW in an approved facility. A signed manifest will be provided by the waste management company subsequent to pick-up and disposal.

j. A groundwater monitoring report will be developed which will include groundwater elevation maps, groundwater quality data in tables, and conclusions and recommendations. As we understand, an ADaPT/GIS data package will no longer be required.

k. Attempt to obtain offsite access agreements for properties located to the north and east of the subject property

3. PFAS Groundwater Sampling and Analysis, and Summary Deliverable

The PFAS groundwater sampling event will be conducted concurrently with the routine VOH sampling but will be addressed through Subtask 3.

PSI will collect groundwater samples for analysis by the FDEP Central Laboratory for the presence of per- and polyfluoroalkyl (PFAS) compounds. Groundwater samples will be collected from select monitoring wells in accordance with FDEP SOPs. Two shallow wells (MW001 & MW009) (screen lengths of 4 - 14 feet bls), an intermediate well (MW012) (screen length 25 - 35 feet bls) and two deeper wells (MW011, & MW013) (screen lengths 44-49 feet bls & 47-52 feet bls) have been chosen for this analysis. PFAS sampling includes the following tasks:

a. Collection of groundwater samples per the above table for PFAS analysis.

b. Preparation of sample coolers and ship to the FDEP Central Laboratory in Tallahassee for analyses for PFAS analyses.

c. Evaluation of data to be included in the Groundwater Monitoring Report described above.

The deliverable and invoice schedule are presented below.

Wash Bowl Cleaners ERIC_5243

Deliverables

Deliverables Deliverable Due Date

Subtask 1 Project Management Upon completion of Task Assignment

Subtask 2 Groundwater Monitoring and Report - November 29, 2024

Subtask 3 PFAS Sampling - November 29, 2024

Invoice Schedule

Requirements for Invoice Submittal Amount to be Invoiced

Subtasks 1, 2 & 3 - Submittal of Groundwater Monitoring Report

$18,760.23

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the Annual Groundwater Monitoring is shown on the attached Cost Estimate and Level of Effort sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW 686, Waste Cleanup Program Services, dated December 21, 2021. We anticipate performing the groundwater sampling between August and October 2024 depending on site access and inclement weather, and a report deliverable will be provided in November 2024.

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Josh S. Newell, PE John Daugherty Senior Engineer/Contract Manager Environmental Project Scientist

Enclosure: Cost Estimate Level of Effort

\\Tampa-fs\projects\552-Env\FDEP HW 686 Drycleaning, Main Contract\0552-427887 Proposal Wash Bowl Annual GW Sampling\Proposals

Updated: June 25, 2024

Bids Summary

IDW Disposal Bids – Non-Haz/PFAs Water Subcontractor Rate Unit Enviro-Serve $189.00 Per Drum PetroTech Southeast $115.00 Per Drum GCVT $175.00 Per Drum

04/24/2024 01:44 PM PAGE 1 OF 7

Scope of Work pricing is based on an approved non hazardous facility in to Enviroserve Mulberry

4600 BROOKPARK ROAD, CLEVELAND,

OHIO, 44134

(216) 642-1311

(216) 642-1474

QUOTE #: 0042802

DATE: 04/24/2024 PROJECT PROPOSAL

CLIENT

JOSH NEWELL

INTERTEK/PSI - PLANT CITY

607 SOUTH ALEXANDER ST, SUITE 202, PLANT CITY, FLORIDA,

33563

P: (863) 712-4342

E-MAIL:JOSHUA.NEWELL@INTERTEK.COM

PROJECT DESCRIPTION

FDEP DRY CLEANING DRUMS

FDEP

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION - LTL DRUM (6 - 55 GAL) - 251-400 MILES 1.00 $50.00 DRUM $50.00

LOW STOP FEE (LESS THAN 6 DRUMS) 1.00 $50.00 55 GAL DRUM $50.00

ENERGY SURCHARGE (APPLIES TO TOTAL INVOICE) - $15.00 % -

TRANSPORTATION SUBTOTAL: $100.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GAL DRUM / SOLID 1.00 $80.00 EACH $80.00

DISPOSAL SUBTOTAL: $80.00

JOB ESTIMATE: $180.00

ENVIRONMENTAL FEE: $9.00

TOTAL JOB ESTIMATE: $189.00

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $115.00 $115.00 N/A N/A N/A soil $165.00 $165.00 N/A N/A N/A low volume fee N/A N/A N/A Pick-up fee $0.00 $0.00 N/A N/A N/A

$280.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

2051896 Text Box Petrotech Southeast Quote

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Florida Panhandle water $100.00 $100.00 $100.00 $200.00 $100.00 soil $100.00 $100.00 $100.00 $200.00 $100.00 low volume fee $0.00 $0.00 $0.00 $0.00 $0.00 Pick-up fee $0.00 $0.00 $0.00 $0.00 $0.00

Profile Fee: $50.00. There is one fee per generator that allows multiple locations contigent on the material.

Administration Fee: $25 per Invoice

$200.00 $0.00 $200.00 $400.00 $200.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

2051896 Text Box GCVT Quote

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations

File details come from the government source that posted it. Updated .