CN-370000-CN335-T8CO5.pdf
PDF 2 MB Posted
- Contract number
- CN335
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 05) issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN 335 related to improvements at Silver Springs State Park. The project involves the FDEP, Taylor Engineering, Inc. as the consultant, and SAVANNAPUB, INC. as a subcontractor. The project location is Silver Springs State Park, and the work pertains to the design, permitting, and bid administration of bathroom facilities and utilities.
The change order authorizes professional architectural redesign of the 60% restroom and bathhouse plans per the proposal dated April 12, 2023. The net increase in task amount for this change order is $4,181.64, bringing the total task amount with all change orders to $410,790.00. The work is composed of fixed fee services provided by Taylor Engineering (Director at $356.04) and SAVANNAPUB, INC. (Senior Architect at $656.00 and Senior Architectural Designer services at $3,168.00). The original task execution date was September 21, 2020, with an original end date of June 30, 2022; the present task end date has been extended to June 29, 2024. Funding is allocated through Project No. 61263C with the 29-digit FLAIR code referencing Org Code 37503000203, Cat/Year 080039/20, Fund 000286, Module U3200, and Object Code 131500. All required FDEP approvals were obtained through digital signatures dated April 17-18, 2023, and May 15, 2023.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN 335 08 05 61263C
Silver Springs State Park New Swim Area
Taylor Engineering, Inc
Terrance Cake, PE 904-731-7040 tcake@taylorengineering.com
Ralph Perkins 850-245-2460 ralph.perkins@Floridadep.gov
Professional architectural redesign of the 60% restroom plans per the attached proposal dated 4/12/2023.
$ 4,595.00 $ 229,658.81 $ 234,253.81 $ 7,618.00 $ 398,990.36 $ 406,608.36
$ 4,181.64 $ 4,181.64 $ 7,618.00 $ 403,172.00 $ 410,790.00
9/21/2020
6/30/2022
6/29/2024 n/a
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.04.17 10:41:26 -04'00'
Theresa Carron T.Carron Digitally signed by T.Carron Date: 2023.04.17 11:02:47 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.04.17 13:23:20 -04'00'
Johnathan Armbruster Digitally signed by Jonathan Armbruster Date: 2023.04.18 09:33:10 -04'00'
Mara Gambineri Mara Gambineri Digitally signed by Mara Gambineri Date: 2023.05.15 10:37:07 -04'00'
61263C 37503000203 080039/20 000286 U3200 131500 AD $ 4,181.64
$ 4,181.64
10199 SO UT HS I D E BL V D , SU I T E 310 | JA CK SO NV I L L E , F L 322 56 | T EL 904 .7 31 .704 0
WW W .TA Y L O RE NG I NEE R I N G . CO M
April 12, 2023
Theresa Carron Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399
RE: FDEP Agreement Number CN335
Silver Springs State Park Improvements Design, Permitting and Bid Administration Task 7 – Design and Permitting of Bathroom Facilities and Utilities
Dear Ms. Carron:
As you know, we received comments to the 90% restroom and bathhouse architectural plans that require significant redesign to address. To appropriately address the comments, we propose a two-step process. The first step will be to redesign the 60% building plan and submit that to FDEP for review.
Upon receiving and addressing comment to the revised 60% plans, we will be able to move forward to provide an estimate to update the 90% plans, including mechanical, electrical and plumbing systems to accommodate the revised building design. This proposal is for the redesign of the 60% building plans. A separate proposal will be prepared to prepare the 90% plans. Please see the attached memo from SAVANNAPUB for additional information.
Subtask 7.E - 60% Design Revisions of Restroom and Bathhouse Facilities
Firm Name Item Unit Rate Quantity Total Fixed Price Cost
Taylor Engineering Director $178.02 2 $356.04 SAVANNAPUB, INC. Senior Architect $164.40 4 $656.00 SAVANNAPUB, INC. Senior Architectural Designer $99.00 32 $3,168.00
Subtotal: $3,023.00 Subtask 7.E Total $4,180.04
Please let me know if you have any questions.
Sincerely, Terence Cake, P.E.
Sr. Engineer
Attachment: Memo from SAVANAPUB, Inc.
Robinson_MS Cross-Out
Robinson_MS Text Box $657.60
Carron_T Text Box $4181.64
Carron_T Rectangle
Carron_T Rectangle
Carron_T Rectangle
April 12, 2023