This document is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for Contract CN335, Change Order No. 4, managing the Lake Talquin Dam Safety Inspections project. The consultant for this contract is Taylor Engineering, Inc., with Ken Craig, PE serving as the consultant representative, and Ralph Perkins as the FDEP Contract Manager. The change order was executed on July 20, 2023, with final approval from Contract Authority Bryan Bradner on August 1, 2023. The project location is Lake Talquin, and the work involves permitting services and construction administration for dam safety repairs.

This change order adds $65,962.44 in fixed fees to the contract, bringing the total task amount from $228,961.61 to $294,924.05. The scope of work includes five subtasks: Natural Resource Survey ($6,790.62), Environmental Permitting Services ($22,148.94), Pre-bid Services ($6,800.01), Underwater Concrete Repairs Construction Administration ($14,273.91), and Tainter Gate Repairs Construction Administration ($15,948.96). Services include wetlands delineation, permit application development and coordination with state and federal regulatory agencies, pre-bid meeting attendance, and construction administration with site visits and as-built certifications. The original task execution date was November 22, 2021, with the original end date of June 5, 2023 extended to January 31, 2025, representing a net increase of 365 days. Payment is contingent upon FDEP approval of deliverables for each subtask, with labor costs structured as fixed-price assignments utilizing hourly billing rates for both Taylor Engineering and Mead & Hunt, Inc. personnel.

View the file

Other files

File Type Posted
CN-370000-CN335-CMC2.pdf PDF
CN-370000-CN335-T12.pdf PDF
CN-370000-CN335-T13.pdf PDF
CN-370000-CN335-T16.pdf PDF
CN-370000-CN335-T17.pdf PDF
CN-370000-CN335-T17CO1.pdf PDF
CN-370000-CN335-T1CO1.pdf PDF
CN-370000-CN335-T2.pdf PDF
CN-370000-CN335-T22.pdf PDF
CN-370000-CN335-T23.pdf PDF
CN-370000-CN335-T24.pdf PDF
CN-370000-CN335-T5CO5.pdf PDF
CN-370000-CN335-T6CO2.pdf PDF
CN-370000-CN335-T8CO6.pdf PDF
CN-370000-CN335-CMC1.pdf PDF
CN-370000-CN335-T10CO2.pdf PDF
CN-370000-CN335-T14.pdf PDF
CN-370000-CN335-T14CO1.pdf PDF
CN-370000-CN335-T14CO3.pdf PDF
CN-370000-CN335-T15.pdf PDF
CN-370000-CN335-T18.pdf PDF
CN-370000-CN335-T20.pdf PDF
CN-370000-CN335-T20CO1.pdf PDF
CN-370000-CN335-T21.pdf PDF
CN-370000-CN335-T21CO3.pdf PDF
CN-370000-CN335-T25.pdf PDF
CN-370000-CN335-T5.pdf PDF
CN-370000-CN335-T5CO1.pdf PDF
CN-370000-CN335-T5CO3.pdf PDF
CN-370000-CN335-T6.pdf PDF
CN-370000-CN335-T6CO4.pdf PDF
CN-370000-CN335-T8.pdf PDF
CN-370000-CN335-TA4.pdf PDF
CN-370000-CN335-TA5 CO4.pdf PDF
CN-370000-CN335-A1.pdf PDF
CN-370000-CN335-CMC5.pdf PDF
CN-370000-CN335-T1.pdf PDF
CN-370000-CN335-T10CO1.pdf PDF
CN-370000-CN335-T11CO2.pdf PDF
CN-370000-CN335-T11CO3.pdf PDF
CN-370000-CN335-T17CO2.pdf PDF
CN-370000-CN335-T17CO3.pdf PDF
CN-370000-CN335-T19CO1.pdf PDF
CN-370000-CN335-T1CO2.pdf PDF
CN-370000-CN335-T21CO1.pdf PDF
CN-370000-CN335-T21CO2.pdf PDF
CN-370000-CN335-T23CO1.pdf PDF
CN-370000-CN335-T6CO1.pdf PDF
CN-370000-CN335-T7.pdf PDF
CN-370000-CN335-T8CO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

(Revised 9-26-2018) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN335 17 04 61259

Lake Talquin Dam Safety Inspections

Taylor Engineering, Inc.

Ken Craig, PE 904.256.1334 kcraig@taylorengineering.com

Ralph Perkins 850.245.2460 ralph.perkins@floridadep.gov

Permitting Services for the toe reinforcement design and Construction Administration for the underwater repairs and the Tainter Gate repairs per the attached proposal dated 5/17/2023.

$ 157,860.04 $ 157,860.04 $ 1,800.00 $ 227,161.61 $ 228,961.61

$ 65,962.44 $ 65,962.44 $ 1,800.00 $ 293,124.05 $ 294,924.05

11/22/2021

6/5/2023

1/31/2024

1/31/2025

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.07.20 10:43:38 -04'00'

Theresa Carron T.Carron Digitally signed by T.Carron Date: 2023.07.20 11:01:42 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.07.20 13:23:22 -04'00'

Ken Craig, PE Digitally signed by Kenneth Craig Date: 2023.07.21 14:34:50 -04'00'

Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2023.08.01 15:28:47 -04'00'

61259 37501004093 080039/24 675002 U3200 131500 XR $ 65,962.44

$ 65,962.44

10 19 9 SO UT HS I DE BLVD , S U IT E 31 0 | J ACK SONV ILLE , F L 3 2 25 6 | TEL 9 0 4 . 73 1 . 70 4 0

WWW .T AYLO RENG INE ER I NG.C OM

May 17, 2023

Theresa R. Carron Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399

RE: Jackson Bluff Dam Environmental Permitting Services

CN335 TA16 – Change Order No. 4 (Taylor Proposal #P2023-083)

Dear Mrs. Carron:

Attached, please find a proposal to provide the permitting and construction administration services for the Jackson Bluff Dam Safety Services project. Please review the attached and let me know if you have any questions or comments.

Sincerely, Kenneth R. Craig, PE Senior Vice President

Williams_BrD Text Box

10 19 9 SO UT HS I DE BLVD , S U IT E 31 0 | J ACK SONV ILLE , F L 3 2 25 6 | TEL 9 0 4 . 73 1 . 70 4 0

WWW .T AYLO RENG INE ER I NG.C OM

Dam Safety Services Jackson Bluff Dam

Contract CN335 TA16 Amendment No. 4

Reason for Amendment The Florida Department of Environmental Protection (FDEP) requested that Taylor Engineering Inc.

(Taylor) and Mead & Hunt, Inc. (Mead & Hunt) provide additional engineering services at the Jackson Bluff Dam (Project). These services include the following:

• Obtaining permits for the toe berm/filter project at the right embankment.

• Attend two pre-bid meetings on-site.

• Provide construction administration (CA) services for upstream and downstream underwater concrete repairs.

• Provide construction administration services for the Tainter gate lifting bracket replacement project.

Scope of Services The Taylor Engineering team will provide the following services:

Subtask 16 – Natural Resource Survey

To support the permit applications, Taylor environmental staff will complete a natural resource assessment of the project area to establish baseline environmental conditions to support regulatory permitting. The natural resource assessment will include wetlands delineation, habitat and vegetation characterization, and listed species assessment. The listed species assessment will generally identify state-and federally listed species that may occur within the project area based on habitat conditions and site observations. The assessment does not include detailed, species-specific surveys.

Deliverables The Taylor Engineering team will provide the following deliverable to the FDEP:

Natural Resource Survey Report ............................................................................ 1 copy via email (PDF file)

Performance Measures The FDEP will review the deliverables to confirm they are complete, accurate, and timely.

Williams_BrD Text Box

Ms. Carron

Fixed Price Labor Cost Subtask 16 – Natural Resource Survey

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Taylor Engineering Principal $200.94 1 $200.94 Taylor Engineering Senior Professional $162.21 32 $5,190.72 Taylor Engineering Project Professional $116.58 12 $1,398.96 Total for Subtask 16 (Amendment No. 4) $6,790.62

Subtask 17 – Environmental Permitting Services

Pre-Application Meetings The proposed work will occur within jurisdictional areas of the FDEP and the Northwest Florida Water Management District (NWFWMD). Under current federal rules, Taylor assumes the proposed work does not require separate authorization directly from the U.S. Army Corps of Engineers and FDEP has assumed the federal Section 404 Clean Water Act (CWA) regulatory authority at the proposed project location.

Taylor will coordinate and lead pre-application meetings with FDEP and NWFWMD. In these meetings, Taylor will present the existing conditions, data collection efforts, project overview, and review proposed application components. Taylor will document the meeting in meeting summaries.

Permit Application Development and Processing Taylor will develop the necessary permit applications for state and federal regulatory authorizations. The NWFWMD will likely lead state agency review. If federal Section 404 CWA authorization is required, the FDEP will lead that effort. The pre-application meeting will define the lead regulatory agency or agencies responsible for reviewing this project. The permit applications will include the information necessary for agencies to perform their technical review and public processes. In support of the application, Taylor will prepare all narratives describing the project design, purpose, and need; project best management practices (BMPs); avoidance and minimization measures; natural resources within the project area and unavoidable impacts; proposed wetland mitigation if required (mitigation bank assumed); property ownership and adjacent property owners; and construction methodology and schedule. Please note this scope of work does not include the preparation of a detailed alternatives analysis for wetland impacts which could be requested by FDEP. If an alternative analysis is required by FDEP, Taylor will submit a revised scope work and fee proposal for the additional work.

Taylor will submit the draft application package to FDEP for review and comment. Following receipt of comments, Taylor will incorporate feasible changes to produce the final permit application packages and submit the packages to the regulatory agencies.

The establishment and maintenance of a clear line of communication between the applicant and the participating agencies represents the single most important activity during the permitting process. To that end, Taylor will actively coordinate with regulatory agencies staff during the application process. These agencies include, but are not limited to, the FDEP, NWFWMD, and Florida Fish and Wildlife Conservation Commission (FWC).

Following submission of the permit application(s), agencies may respond with requests for additional information (RAIs). While Taylor anticipates submittal of a complete and concise permit application package, the project may generate review comments and RAIs from regulatory agencies and the related natural resource agencies that provide comments on permit applications. Such requests typically comprise a series of questions requiring additional explanation or clarification of environmental and engineering issues. As the FDEP’s permitting agent, Taylor will coordinate with FDEP and the lead regulatory agencies to address such RAIs. This scope of work includes budget for development and coordination of two formal RAI responses per agency. Should the regulatory negotiations require additional efforts and fees outside those presented herein, Taylor will contact FDEP to discuss an amendment to the scope of work and fee.

Services to be provided do not include:

• Permit authorization directly from the USACE.

• On-site mitigation planning or design. Proposed wetland mitigation for unavoidable impacts will involve purchase of in-kind mitigation credits from an approved mitigation bank only.

• The payment of permit processing fees.

Deliverables The Taylor Engineering team will provide the following deliverables to the FDEP:

FDEP and NWFWMD Pre-Application Meeting Summaries ................................... 1 copy via email (PDF file) FDEP and NWFWMD Permit Applications ............................................................. 1 copy via email (PDF file) RAI Responses ...................................................................................................... copies via email (PDF files)

Performance Measures The FDEP will review the deliverables to confirm they are complete, accurate, and timely.

Fixed Price Labor Cost

Subtask 17 – Environmental Permitting Services

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Taylor Engineering Principal $200.94 4 $803.76 Taylor Engineering Senior Professional $162.21 62 $10,057.02 Taylor Engineering Project Professional $116.58 62 $7,227.96 Mead & Hunt Project Engineer $203.01 20 $4,060.20 Total for Subtask 17 (Amendment No. 4) $22,148.94

Subtask 18 – Pre-bid Services:

The Taylor Engineering team (M&H) will attend two pre-bid meetings on-site. In addition to attending the meetings, we have budgeted ten hours to answer contractor questions during the bidding phase for all three projects. We will also review contractor bids and provide our review comments to the FDEP.

Deliverables The deliverable will include the pre-bid meeting minutes summarizing contractor questions and our replies.

The FDEP will review deliverables to confirm they are complete, accurate, and timely.

Fixed Price Cost

Subtask 18 – Pre-bid Services

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Taylor Engineering Principal $200.94 3 $602.82 Mead & Hunt Senior Project Engineer $234.00 10 $2,340.00 Mead & Hunt Project Engineer $203.01 19 $3,857.19 Total for Subtask 18 (Amendment No. 4) $ 6,800.01

Subtask 19 - Underwater Concrete Repairs CA:

As requested, the Taylor Engineering team (M&H) will provide construction administration from our Tallahassee office during concrete repairs for the powerhouse, spillway and tailrace walls projects. We will provide the following services:

• Review and reply to Requests for Information (RFI) from the selected general contractor (4 hours budgeted)

• Review of submittals and (6 hours budgeted)

• Four site visits to observe contractor progress. A field summary report will be provided for each site visit.

• Submit the Construction Commencement Notice (Form 62-330.350(1)) to the Northwest Florida

Water Management District (NWFLWMD) within 48 hours of the contractor mobilizing to the project.

• Provide Record Drawings based on the Contractor’s redline drawings and our observations.

• Submit the As-built Certification and Request for Conversion to Operation Phase (Form 62-

330.350(1)) to the NWFLWMD 30 days after completion of the projects.

Deliverables The deliverables will consist of the items referenced above. The As-built Certification and Request for Conversion to Operation Phase will be considered the final submittal for payment.

Fixed Price Cost Subtask 19 – Underwater Concrete Repairs CA

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Taylor Engineering Principal $200.94 7 $1,406.58 Mead & Hunt Senior Project Engineer $234.00 12 $2,808.00 Mead & Hunt Project Engineer $203.01 33 $6,699.33 Mead & Hunt Engineer III $165.00 12 $1,980.00 Mead & Hunt Engineering Tech III $138.00 10 $1,380.00 Total for Subtask 19 (Amendment No. 4) $14,273.91

Subtask 20 – Tainter Gate Repairs Construction Administration

As requested, the Taylor Engineering team (M&H) will provide construction administration from our Tallahassee office during the rehabilitation of the lifting assemblies for the Tainter gates. We will provide the following services:

• Review and reply to Requests for Information (RFI) from the selected general contractor (6 hours budgeted)

• Review of submittals and (8 hours budgeted)

• Five site visits to observe contractor progress. A field summary report will be provided for each site visit.

• Submit the Construction Commencement Notice (Form 62-330.350(1)) to the Northwest Florida

Water Management District (NWFLWMD) within 48 hours of the contractor mobilizing to the project.

• Provide Record Drawings based on the Contractor’s redline drawings and our observations.

• Submit the As-built Certification and Request for Conversion to Operation Phase (Form 62-

330.350(1)) to the NWFLWMD 30 days after completion of the projects.

Deliverables The deliverables will consist of the items referenced above. The As-built Certification and Request for Conversion to Operation Phase will be considered the final submittal for payment.

Fixed Price Cost Subtask 20 – Tainter Gate Repairs CA

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Taylor Engineering Principal $200.94 7 $1,406.58 Mead & Hunt Senior Project Engineer $234.00 12 $2,808.00 Mead & Hunt Project Engineer $203.01 38 $7,714.38 Mead & Hunt Engineer III $165.00 16 $2,640.00 Mead & Hunt Engineering Tech III $138.00 10 $1,380.00 Total for Subtask 20 (Amendment No. 4) $15,948.96

Project Schedule The following table presents the expected duration for each subtask.

Activity Duration (Calendar Days)1

Subtask 16 – Natural Resource Survey 30 Subtask 17 – Environmental Permitting Services 1802 Subtask 18 – Pre-bid Services 303 Subtask 19 – Underwater Concrete Repairs CA 303 Subtask 20 – Tainter Gate Repairs CA 303

1 Days following execution of Change Order No. 4 2 Estimated duration. Taylor Engineering will make every effort to expedite the permitting process;

however, it has no control over regulatory agency review schedules.

3 As-built Certification and Request for Conversion to Operation Phase will be submitted within 30 days after completing each of the three projects.

Summary of Fees The following table is a summary of the proposed fees.

Subtask Subtask Fixed Price Cost Subtask 16 – Natural Resource Survey $6,790.62 Subtask 17 – Environmental Permitting Services $22,148.94 Subtask 18 – Pre-bid Services $6,800.01 Subtask 19 – Underwater Concrete Repairs CA $14,273.91 Subtask 20 – Tainter Gate Repairs CA $15,948.96

TOTAL $65,962.44

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

Attachment: Wage Rates

1424 E. Piedmont Dr., Suite 100 Tallahassee, FL 32308 850-391-4560 meadhunt.com

Mead & Hunt, Inc.

Schedule of Hourly Billing Rates Contract CN335

Position Classification Hourly Rate Weighted Rate Senior Associate $91.00 $273.00 Senior Project Engineer $84.33 $253.00 Project Engineer $72.00 $216.00 Senior Engineer $65.00 $195.00 Scientist III $62.33 $187.00 Engineer III $62.33 $187.00 Engineer II $52.00 $156.00 Engineer I $46.00 $138.00 Engineering Tech III $50.00 $150.00 Administrative Assistant $36.00 $108.00

Note: Direct non-salary expenses such as travel, subsistence and printing are not included.

Hourly Rate 100% General Overhead 179.11%

Combined Overhead Rate 279.11% Profit on Labor & Overhead 7.485%

Total Multiplier 3.0

May 12, 2023
Jackson Bluff Change Order No. 4 v2.pdf
May 17, 2023

File details come from the government source that posted it. Updated .