CN-370000-CN335-T11CO3.pdf
PDF 378 KB Posted
- Contract number
- CN335
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for contract CN335, Task Assignment 11. The change order involves Taylor Engineering, Inc., serving as the consultant, with the project located in the City of Destin, Okaloosa County, Florida. The project, titled Norriego Point Shoreline Stabilization and Recreation, focuses on construction engineering services related to the extension of Gulf Beach. Key FDEP personnel include Project Manager Pearce Barrett, P.E., and Contract Manager Ralph Perkins, while Taylor Engineering is represented by Jonathan Armbruster, P.E.
The change order extends the task completion date from July 14, 2024, to July 28, 2026—a net increase of 744 days. The modification includes a reimbursement increase of $12,421.64 while maintaining the fixed fee of $348,822.46, resulting in a total task amount of $361,244.10. No net change is applied to the total task cost under this change order. The extension was necessitated by delays in the City's roadway construction schedule that are beyond the control of both FDEP and Taylor Engineering. The new end date aligns the task assignment expiration with the Master Contract (CN335 AM1) expiration of July 28, 2026. The change order was approved and digitally signed by all required parties on October 3-7, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
( ) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN335 11 3 N2603
City of Destin, Okaloosa County Norriego Point Shoreline Stabilization and Recreation F
Taylor Engineering, Inc.
Jonathan Armbruster, P.E. 904-710-4309 jarmbruster@taylorengineering.com
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
This change order is to allow Taylor Eng. to assist the DEP project manager in coordinating with City of Destin and developer of adjacent property during the design and construction of the extension of Gulf Beach
$ 0.00 $ 282,338.94 $ 282,338.94 $ 12,421.64 $ 348,822.46 $ 361,244.10
$ 0.00 $ 0.00 $ 0.00 $ 12,421.64 $ 348,822.46 $ 361,244.10
December 22, 2020
July 14, 2021
July 14, 2024
July 28, 2026
Jessica Madden Jessica Madden Digitally signed by Jessica Madden Date: 2024.10.04 10:17:17 -04'00'
Pearce Barrett, P.E. Pearce Barrett Digitally signed by Pearce Barrett Date: 2024.10.03 16:31:57 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.10.04 10:57:35 -04'00'
Jonathan Armbruster, P.E.
Digitally signed by Jonathan Armbruster Date: 2024.10.04 21:58:33 -04'00'
Angela Knecht Digitally signed by Angela Knecht Date: 2024.10.07 10:39:26 -04'00'
$ 0.00
4300 L EGEN D ARY DR IVE , SU ITE C24 6 | DEST IN , F L 32541 | T EL 850 .46 0 .7040
WWW.TAYLORENG INE ER ING .COM
Via Electronic Mail
October 3, 2024
Pearce Barrett III, P.E., FCCM Department of Environmental Protection Division of Water Restoration Assistance NRDA Project Coordinator / DWH Program 3900 Commonwealth Blvd.
Tallahassee, FL 32399-6515 Pearce.Barrett@floridadep.gov
RE: Extension Request for CN335 TA11 – Norriego Point Recreation Construction Engineering Services
Mr. Barrett:
As you are aware, the Norriego Point Recreation Construction Engineering Services (CN335-TA11) schedule will extend beyond the completion date of the Task Assignment. The schedule delays, similar to those experienced in 2021, result from delays in the City’s roadway construction schedule which have direct implications for the project. These delays experienced are beyond the control of both the Department and Taylor Engineering.
This letter is to request an extension of the Task Assignment expiration, to be concurrent with the Master Contract (CN335 AM1), expiring July 28, 2026.
Please let me know how we can assist the Department to complete this extension.
Respectfully, Duncan Greer, P.E.
Senior Engineer and Project Manager