This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN335, Task Assignment 23. The change order involves Taylor Engineering, Inc., a consulting firm serving as the contractor. The project is titled "Sea Level Impact Projection (SLIP) Study Web Hosting and Maintenance" and is located at FDEP-RCP. The contract manager for FDEP is Ralph Perkins, and the consultant representative is Michael DelCharco of Taylor Engineering, Inc.
The change order extends the task end date from December 31, 2024, to February 28, 2025, to allow the consultant to provide additional support for the SLIP web application. The task involves hosting, updating, maintaining, and providing technical support for the pre-existing SLIP web application, including corrective maintenance, preventive maintenance, and discretionary updates. The monthly fixed fee is $9,089.98, which includes labor costs of $8,839.98 and non-labor costs of $250.00 for the Internet Service Provider contract. The net increase to the task amount from this change order is $18,179.96, bringing the total task amount to $72,719.84. Deliverables include a letter verifying ISP contract and service level by July 31, 2024, and monthly maintenance reports submitted by the 10th of each month, with a 5% reduction imposed for each calendar day deliverables are late. The change order was approved and digitally signed on December 2, 2024, by FDEP representative Eddy Bouza.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Signature Date
Signature Date
Project # Contract # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN335 TA23 1 R2402
FDEP-RCP SLIP Study Web Hosting and Maintenance
Taylor Engineering, Inc.
Michael DelCharco 904-731-7040 mdelcharco@taylorengineering.com
Ralph Perkins or Successor 850-245-2460 ralph.perkins@FloridaDEP.gov
The end date must be extended to February 28th, 2025 so that the Consultant can provide additional needed support.
$ 54,539.88 $ 54,539.88 $ 54,539.88 $ 54,539.88 $ 18,179.96 $ 18,179.96 $ 72,719.84 $ 0.00 $ 72,719.84
6/20/2024
12/31/2024
12/31/2024
2/28/2025
Eddy Bouza Digitally signed by Eddy Bouza Date: 2024.12.02 08:30:53 -05'00' 12/2/2024
R2402 CN335 37-53-80-10-010 100777/00 055015 U1672 131300 3E $ 72,719.84
$ 72,719.8437-20-2-055010-37500400-00-100777-25
Signature
Date
12/4/2024
12/4/2024
1 | P a g e
STATE OF FLORIDA
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Contract CN335, Task Assignment 23
Revised Scope of Work
Project Title: Sea Level Impact Projection (Slip) Study Web Hosting And Maintenance
Purpose: This task assignment is to provide hosting, updates, maintenance, and enhancements for the pre-existing SLIP (Sea Level Impact Projection) web application previously created for the Florida Department of Environmental Protection (“Department”). Maintenance activities will be primarily corrective/preventive in nature and will include support the Areas at Risk Due to Sea Level Rise feature. Subject to available man-hours, discretionary maintenance and other updates my also take place as part of maintenance activities. Taylor Engineering, Inc. (“Taylor”) will retain and store all data collected thereby for the duration of the task assignment until migration of SLIP web application to the Department. This task assignment incorporates by reference all provisions of the Agency assigned Contract ID CN335, the continuing services contract under which it is issued. Except and only to the extent not irreconcilably inconsistent with the provisions below, all provisions thereof shall apply.
Definitions:
Corrective Maintenance Addresses the repair of application defects to enable the application to provide the required functionality and service levels.
Data Source Refers to the organization and location of data that is used in the system. The type of source depends on the referenced data but most are in the form of hosted map services or online data to be manually converted to a format usable by the system.
Preventative Maintenance
Refers to the modification needed to prevent potential errors in a software product. Examples include: Inability to commit/insert data, miscellaneous software “bugs”, routine monitoring of batch processes, initiative/monitoring any scheduled data uploads into a Department or other data repository, and other functions are requested.
Discretionary Maintenance/Updates
Addresses minor modifications to the application to improve user experience. Examples include providing new minor functionality improvements, creating/maintaining documentation, modifying verbiage on reports/screens, and other functions as requested.
Summary of Total Task Assignment Fees:
Task Assignment Task 1 $72,719.84 Total Task Assignment Total $72,719.84
2 | P a g e
Task 1: Contract with ISP, Maintain & Host SLIP Web Application, and Technical Support for Areas at Risk Due to Sea Level Rise
Description: Taylor will select and contract with an Internet Service Provider (“ISP”) that meets the Department’s minimum standard for service as described in Attachment A. A preexisting contract may be used if in accordance with minimum standards described in in Attachment A.
Taylor will host the SLIP web application previously created for the Department and perform monthly corrective and/or preventive maintenance activities to ensure functionality and connectivity between data sources. Taylor will coordinate and monitor web hosting services, as per Attachment A. The data sources which the SLIP web application uses will be updated on a quarterly basis by Taylor. Taylor will troubleshoot and remediate system issues as directed by the Department. Taylor will also provide support to the Department as needed for the new Areas at Risk Due to Sea Level Rise feature on the SLIP tool. Taylor does not guarantee the reliability of the servers on which live external data is hosted, such as the Department, NOAA, FEMA, USACE, or other authoritative source. Taylor will contact the external data source to correct issues in a timely manner but cannot guarantee that the data connection will be resolved with the “time to repair” limits stated in Attachment A if the issue is caused by the external data source.
Taylor will add a read-only user account to the SLIP database and provide login information the Department for access to the raw data.
Performance Period: Monthly
Deliverables:
1.1: A letter verifying contract and level of service with ISP, to include a copy of the current contract, submitted by July 31, 2024.
1.2: A Monthly Maintenance Report, submitted by the 10th calendar day of the following month. For the months of September and December Taylor will include instructions to download the latest source code and database backups for the preceding quarter.
Documentation: The letter must be on the Contractor's letterhead and can be delivered via email and must include a copy of the current contract with the ISP. The Monthly Maintenance Report will include a description of any discretionary updates made and the requesting party, the number of errors reported and resolved including a breakdown by priority category according to Attachment A, the total hours o unscheduled outages (if these data are available), a summary of any catastrophic failures or outages experience that month including the response time needed to restore software availability, and a summary of the performance assessment required according to Attachment A; Hosting, Backup, Security and Service Level Agreement (SLA).
Performance Standard: The Department’s Contract Manager will have ten (10) working days to review the documentation to verify that the deliverables have been completed as described above.
3 | P a g e
Payment Request Schedule: For Monthly Maintenance and Support. Taylor shall invoice on a monthly basis at the fixed rate of $9.089.98. Taylor will submit invoices within thirty (30) days after the month of service provision. Upon the Department’s receipt of invoice and all supporting documentation and deliverables, the Department’s Contract Manager will have ten (10) working days to review and approve or deny the payment request.
Consequences for Non-Performance: The Department will reduce the monthly invoice by five percent (5%) for every calendar day that the deliverable(s) are not received. Should a Change Order or Amendment be requested on the date of or after the most current due date, the give percent (5%) reduction will not be imposed until the date of the requested change is received via email by the Department.
Contract Termination due to In-House Migration: Upon migration of the SLIP web application to the Department’s system, the Department and Taylor will coordinate the termination of monthly maintenance costs (Task 1) within thirty (30) days of the successful migration.
Summary of Fixed Price Cost:
Monthly Maintenance Schedule Deliverable-Based Fixed Fee (Labor Cost) July 2024 $8,839.98 August 2024 $8,839.98 September 2024 $8,839.98 October 2024 $8,839.98 November 2024 $8,839.98 December 2024 $8,839.98 January 2025 $8,839.98 February 2025 $8,839.98 Total Cost $70,719.84
TASK 1: Contract with ISP and maintain and Host SLIP Web Application
Labor Hourly Rate ($) Hours Cost ($) Task Totals Senior Advisor/QC 202.53 2 $405.06 Senior Professional 162.21 52 $8,434.92
Total Man-Hours 56.0 Monthly Labor Cost $8,839.98
Non-Labor Unit Cost ($)
1.0 250.00
Total Non-Labor Cost (ISP Contract) $250.00
Monthly Total Task 1 $9,089.98