This document is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) establishing a professional services contract with Taylor Engineering, Inc. to update a drainage model for the Washington Oaks Gardens project located in Flagler County, Florida. The contract is designated as FDEP Contract Number CN335, Task Assignment Number 04, with Project Number 6M305. The consultant representative is Michael DelCharco, P.E., CFM, and the FDEP Contract Manager is Philip Stone. The project manager is Theresa Carron of the Bureau of Design and Construction.
The scope of work involves updating the Washington Oaks drainage model to incorporate new cross-drain information, with order of magnitude cost estimates, conceptual schedules, and permitting requirements. The contract is structured as a fixed-price agreement totaling $31,418.82 with reimbursable costs of $48.24, for an overall contract value of $31,467.06. The work is organized into four primary tasks: Kickoff and Data Collection (Subtasks 1A-1C); Hydraulic Modeling (Subtasks 2A-2C); Report Preparation (Subtasks 3A-3B); and Meetings and Presentation (Subtasks 4A-4B). Payment will be made upon FDEP approval of deliverables for each subtask. The project is scheduled to begin on or before March 14, 2018, with a completion date of July 1, 2018. All deliverables are to be submitted digitally in PDF format to the BDC project manager. Funding is coded to Project 6M305 under Organization Code 37503014079, Fund 423001, Module U3200, and Object Code 131500.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10151 DEERWOO D P ARK BLVD , B LDG 300 , S U I TE 300 | J ACKS ONV ILLE , F L 32256 | T EL 904 .731 .7040
WWW .TAYLO RENG INEER I NG.COM
March 5, 2018
Theresa R. Carron Preconstruction Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: Consultant Contract Number: CN335-TA4
Update Drainage Model for Washington Oaks, Flagler County
Dear Teri:
Taylor Engineering is pleased to provide a proposal summary and man-hour documentation for the services tasks described below.
We understand the Florida Department of Transportation (FDOT) did not approve the proposed replacement of the Washington Oaks ditch dross-drain beneath A1A as recommended in the Washington Oaks State Park Preliminary Engineering and Drainage Evaluation (Taylor Engineering, June 2017). In addition, FDOT has identified two (2) existing cross-drains - located approximately 28-ft north of Maridian Home Lane and approximately 20-ft south of the existing Washington Oaks ditch culvert. These cross-drains are located within the Washington Oaks drainage model domain but were not included in the model previously since they are both capped and buried beneath A1A. This proposal is aimed at evaluating the effects of establishing conveyance through both cross-drains by incorporating them into the drainage model and comparing computed water levels to existing conditions.
Sincerely, Maurice Vaughan, P.E.
Senior Engineer, Water Resources
Update Drainage Model for Washington Oaks, Flagler County
Update Drainage Model Washington Oaks
CN 335, Task Assignment Number 4
Subtask 1A - 1C: Kickoff and Data Collection
Description:
Subtask 1A Kickoff Meeting The project will start with a kickoff meeting to discuss DEP’s needs and our approach. We will discuss points of contact and schedule. We want to ensure we start the project in full agreement with DEP objectives and goals.
Subtask 1B Desktop Review and Data Collection Next, we will review the Washington Oaks drainage model to determine extent of updated data and detail is needed for inclusion of the cross-drains located near Maridian Home Lane and Washington Oaks ditch. We will review existing survey data to be provided by FDOT and Flagler County for each cross-drain.
Subtask 1C Site Visit:
Taylor Engineering staff will visit the site to evaluate conditions of the existing cross-drains, existing topography, and record general observations of the area prior to updating the model.
The site visit will give modelers greater understanding of possible alternatives to improve conveyance to the cross-drain.
Deliverable:
• 1A Kickoff meeting minutes delivered digitally in PDF format to the BDC project manager
– Due 3/21/18
• 1B Summary memo of additional data collected for incorporation into the drainage model delivered digitally in PDF format to the BDC project manager – Due 3/28/18
• 1C Summary memo of site visit observations delivered digitally in PDF format to the BDC project manager – Due 4/4/18
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1A – Kickoff Meeting
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 1 $162.21
Taylor Engineering Staff Professional $86.40 1 $86.40
Taylor Engineering Administrative $53.58 1 $53.58
Subtask 1B – Desktop Review and Data Collection
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Taylor Engineering Senior Professional $162.21 6 $973.26
Taylor Engineering Staff Professional $86.40 4 $345.60
Taylor Engineering Technician $101.61 4 $406.44
Subtask 1C – Site Visit
Rate
Hours Total Fixed Price Cost
Taylor Engineering Senior Professional $162.21 3 $486.63
Taylor Engineering Staff Professional $86.40 3 $259.20
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage n/a
Printing n/a
Overnight Travel (if applicable) n/a
Mileage (@ $0.445 per mile)
1 trip, 108.4 miles
Reimbursable Total Cost $48.24
Total for Subtask 1A: $503.13 (Fixed Price) Total for Subtask 1B: $1,725.30 (Fixed Price) Total for Subtask 1C: $745.83 (Fixed Price) + $48.24 (Reimbursable) = $3,022.50
Subtask 2A – 2C: Hydraulic Modeling
Description:
Subtask 2A: Update Hydraulic Model We will update the Washington Oaks drainage model (HEC-RAS) to incorporate the existing A1A cross-drains located approximately 28-ft north of Maridian Home Lane and approximately 20-ft south of the Washington Oaks ditch. In addition, the updated model will include all previously modeled drainage improvements described as Alternative-3 in the Washington Oaks Preliminary
Engineering and Drainage Evaluation (Taylor Engineering, June 2017) except for the replacement of the Washington Oaks ditch A1A cross-drain. This subtask will include incorporation all data identified in Subtask 1B and 1C deliverables, any additional refinement of the model and will include simulation of (4) rainfall events: 25-year, 24-hour; 25-year, 72-hour; 100-year, 24-hour;
100-year, 72-hour.
Subtask 2B: Evaluate Proposed Conditions:
After evaluating the simulated results for Subtask 2A, we will evaluate one proposed alternative to improve conveyance through the A1A cross-drains. This evaluation may consider ditch grading/routing to improve flow into and out of either of the modeled cross-drains. This subtask will include any additional refinement of the model and simulation of (4) rainfall events: 25-year, 24-hour; 25-year, 72-hour; 100-year, 24-hour; 100-year, 72-hour.
Subtask 2C: Post-processing of Model Results:
Once the models are run for Subtask 2A and 2B scenarios, we will develop and compare floodplain maps, water level hydrographs and water level profile at key locations within the model domain for each of the simulated rainfall events: 25-year, 24-hour; 25-year, 72-hour; 100-year, 24-hour; 100-year, 72-hour.
Deliverable:
Subtask 2A – Summary memo of updated model input and results delivered digitally in PDF format to the BDC project manager. Due 4/18/18 Subtask 2B – Summary memo of proposed conditions model input and results delivered digitally in PDF format to the BDC project manager. Due 5/2/18 Subtask 2C – Summary memo comparing floodplains, hydrographs, and profiles for each modeled scenario delivered digitally in PDF format to the BDC project manager. Due 5/9/18
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 2A – Update Hydraulic Model
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Taylor Engineering Senior Professional $162.21 30 $4,866.30
Taylor Engineering Staff Professional $86.40 30 $2,592.00
Taylor Engineering Technician $101.61 2 $203.22
Subtask 2B – Evaluate Proposed Conditions
Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 30 $4,866.30
Taylor Engineering Staff Professional $86.40 30 $2,592.00
Subtask 2C – Post-processing of Model Results
Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 8 $1,297.68
Taylor Engineering Staff Professional $86.40 8 $691.20
Reimbursable Cost:
None: deliverables will be electronically transmitted PDF reports.
Total for Subtask 2A: $7,661.52 (Fixed Price) Total for Subtask 2B: $7,862.46(Fixed Price) Total for Subtask 2C: $2,393.04 (Fixed Price)
Subtask 3A – 3B: Report Preparation
Description:
Subtask 3A: Draft Report Taylor Engineering will develop a draft report for review and comment by the FDEP. This report will include details about each task and provide figures and graphics as appropriate. In addition, the report will provide an opinion of probable costs and estimated schedule for construction, design, and permitting. The FDEP will have 1 week to provide comments on the draft report.
Subtask 3B: Final Report Taylor Engineering will edit and modify the report as necessary responding to all of the FDEP’s comments. We will then submit the final version.
Deliverable:
Subtask 3A: Draft Report delivered digitally in PDF format to the BDC project manager. Due 5/23/18 Subtask 3B: Final Report delivered digitally in PDF format to the BDC project manager. Due 6/6/18
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3A – Draft Report
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 24 $3,893.00
Taylor Engineering Staff Professional $86.40 24 $2,073.60
Taylor Engineering Editor $113.85 1 $113.85
Subtask 3B – Final Report
Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 8 $1,297.68
Taylor Engineering Staff Professional $86.40 8 $691.20
Taylor Engineering Editor $113.85 1 $113.85
None: deliverables will be electronically transmitted PDF reports.
Total for Subtask 3A: $6,335.00 (Fixed Price) Total for Subtask 3B: $2,357.25 (Fixed Price)
Subtask 4A – 4B: Meetings and Presentation
Description:
Subtask 4A: Progress Meetings To meet the objectives of the study and to keep the FDEP in formed on progress, we propose
(2) progress meetings (by conference call). These meetings will review progress to date and provide the FDEP with understanding of upcoming work.
Subtask 4B: Presentation We will present the results of the study to a stakeholder group, as determined by the FDEP. We assume this presentation will be via audio or video conference call.
Deliverables:
Subtask 4A: Meeting minutes for progress meetings delivered digitally in PDF format to BDC project manager. Due: 1-day after scheduled meeting
Subtask 4B: Presentation to stakeholders delivered digitally in PDF format to BDC project manager. Due 6/16/18
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 4A – Progress Meetings
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 2 $401.88
Taylor Engineering Senior Professional $162.21 4 $648.84
Taylor Engineering Staff Professional $86.4 2 $172.80
Subtask 4B - Presentation
Rate
Hours Total Fixed Price Cost
Taylor Engineering Principal $200.94 1 $200.94
Taylor Engineering Senior Professional $162.21 2 $324.42
Taylor Engineering Staff Professional $86.4 1 $86.40
None: deliverables will be electronically transmitted PDF reports and presentation via conference call or video call.
Total for Subtask 4A: $1,223.52 (Fixed Price) Total for Subtask 4B: $611.76 (Fixed Price)
TOTAL FOR ALL FIXED AND REIMBERSABLE COSTS: $31,467.06
Project Schedule:
Summary of Fees:
Subtask Subtask Fixed Price Cost
Subtask Reimbursable Cost
Subtask 1A – Kickoff Meeting $503.13
Subtask 1B – Desktop Review and Data Collection $1,725.30
Subtask 1C – Site Visit $745.83 $48.24
Subtask 2A – Update Hydraulic Model $7,661.52
Subtask 2B – Evaluate Proposed Conditions $7,862.46
Subtask 2C – Post-processing of Model Results $2,393.04
Subtask 3A – Draft Report $6,335.10
Subtask 3B – Final Report $2,357.25
Subtask 4A – Progress Meetings $1,223.52
Subtask 4B – Presentation $611.76
Total Fixed Price Cost: $31,418.82
Total Reimbursable Cost: $48.24
Overall Total Cost: $31,467.06
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
TASK DURATION
(business days)
TASK BEGINS
ON OR BEFORE
3/14/18:
- 3/14/2018
Task 1A Kickoff Meeting 5 3/21/2018
Task 1B Data Collection 5 3/28/2018
Task 1C Site Visit 5 4/4/2018
Task 2A Update Hydraulic Model 10 4/18/2018
Task 2B Evaluate Proposed Conditions 10 5/2/2018
Task 2C Post-processing of Model Results 5 5/9/2018
Task 3A Draft Report 10 5/23/2018
Task 3B Final Report 10 6/6/2018
Task 4A Progress Meetings - TBD
Task 4B Presentation - 6/16/2018
PROJECT SCHEDULE
Report Preparation
Meetings and Presentation
SUBTASK
Kickoff and Data Collection
Hydraulic Modeling
Begin Task Assignment