This document is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) for construction engineering and inspection (CEI) services. The task assignment is issued under FDEP Contract No. CN230, Task Assignment No. 72, with The Weiler Engineering Corporation serving as the consultant. The project is located in Curry Hammock and involves the Mitchell Property Residences. Key personnel include Jeff Weiler, P.E., as the consultant representative, and Ralph Perkins as the FDEP Contract Manager. The task was executed on August 17, 2023, with a completion date of December 30, 2023.
The scope of work encompasses six subtasks: submittal review, response to contractor RFIs, site substantial completion inspection with punchlist, building substantial completion inspection with punchlist, site final completion inspection with certification, and building final completion inspection with certification. The total task amount is $28,867.96, consisting of a fixed price cost of $28,315.00 (upon execution) and cost reimbursement not to exceed $552.96. Reimbursable costs include postage, printing, overnight travel, and mileage at $0.445 per mile. Payment is conditioned upon FDEP approval of deliverables for each subtask. The funding is allocated across two FLAIR codes: $18,647.28 (Object Code QK) and $10,220.68 (Object Code XR).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 TA 72 DRP 61228C
Curry Hammock Mitchell Property Residences
The Weiler Engineering Corporation
Jeff Weiler, P.E. (941) 505-1700 weiler7@mac.com
Ralph Perkins (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Construction Inspection Services for Utility and Structural Certifications and Substantial Completion and Final Completion Inspections as per proposal dated August 3, 2023.
James Post
Upon Execution $ 28,315.00 12/30/2023 $ 552.96
$ 28,867.96
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.08.16 16:35:28 -04'00'
James Post James Post Digitally signed by James Post Date: 2023.08.16 16:43:47 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.08.17 09:02:37 -04'00'
Jeff Weiler, P.E. Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.08.17 10:01:45 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.08.23 10:37:21 -04'00'
61228C 37505000228 080039/21 423001 U3100 131500 QK $ 18,647.28
61228C 37505000228 080039/21 675002 U3100 131500 XR $ 10,220.68
$ 28,867.96
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Mr. James Post Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3 LaCroix Court Key Largo, Florida. 33037
RE: Grassy Key Residences – CEI – CN 230/TA 72
Dear Mr. Post;
Thank you for the opportunity to provide this proposal to provide services during construction for the residences at Grassy Key.
We understand that a significant portion of the project is complete and has been inspected by BDC Staff.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the services tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
August 3, 2023 Mr. James Post Grassy Key Residences
CEI
CN 230/TA72
Grassy Key Residences
CEI Services Contract Number 230, Task Assignment Number 72
Mr. James Post Grassy Key Residences
CEI
CN 230/TA72
WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase (4 Months).
WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.
Mr. James Post Grassy Key Residences
CEI
CN 230/TA72
Mr. James Post Grassy Key Residences
CEI
Mr. James Post Grassy Key Residences
CEI
Mr. James Post Grassy Key Residences
Mr. James Post Grassy Key Residences
Mr. James Post Grassy Key Residences
CEI
CN 230/TA72
Project Schedule:
Summary of Fees:
Activity Duration (Calendar Days) Days from Execution
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 7 - Submittal Review $3550.00 $0.00
Subtask 8 Assistance during construction
$2520.00 $0.00
Subtask 9 Site - Substantial Completion
$5517.50 $138.24
Subtask 10 Buildings - Substantial Completion
$6177.50 $138.24
Subtask 11 Site - Final Completion
$4035.00 $138.24
Subtask 12 Buildings - Final Completion
$6515.00 $138.24
Total during Construction $28315.00 $552.96
Total Fixed Price Cost: $28867.96
Mr. James Post Grassy Key Residences
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)