CN-370000-CN230-T2CO3.pdf
PDF 218 KB Posted
- Contract number
- CN230
- Issued by
- Florida
About this file
Task Assignment Change Order Form Summary
This document is a Task Assignment Change Order Form (Change Order No. 03) issued by the Florida Department of Environmental Protection (FDEP) for FDEP Contract No. CN230, Task Assignment No. 02. The project, titled "Restroom Replacement," is located at Cayo Costa State Park and involves Weiler Engineering Corporation as the consultant. The project manager is C Hewitt of FDEP's Bureau of Design and Construction, with Jeff Weiler, P.E. serving as the consultant representative. Adam Browne serves as the FDEP Contract Manager. The document was approved on October 23, 2018, with a new task end date of December 31, 2019.
The change order authorizes Weiler Engineering to provide additional permitting services for the Onsite Wastewater Treatment System at the restroom facility. The specific service under this change order is "Subtask 9 - Permit Application Preparation," which involves updating the existing application and soils analysis, incorporating existing building plans, and coordinating with the State Health Department. The subtask carries a fixed price cost of $1,555 for labor (consisting of professional and technical staff hours) and a reimbursable cost of $696.18 for departmental fees, printing, and mileage, totaling $2,251.18. The net increase to the task amount from this change order is $696.13 in reimbursable costs and $555.70 in fixed fees. Payment will be made upon FDEP approval of deliverables, with a 15-day project schedule for completion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .