CN-370000-CN230-T63.pdf
PDF 3 MB Posted
- Contract number
- CN230
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. CN230, Task Assignment No. 63, for the Gasparilla Island State Park Sea Grape Restroom project located in Gasparilla Island State Park. The consultant performing the work is Weiler Engineering Corporation (WEC), with R. Jeff Weiler, P.E., as the consultant representative. The FDEP Contract Manager is Ralph Perkins. The project owner is FDEP-BDC, with project manager Theresa Carron overseeing the assignment from execution through the completion date of March 17, 2025.
The scope of work encompasses professional survey, geotechnical, structural engineering, architectural and civil design, permitting, and construction administration services for constructing a new day-use restroom at the Sea Grape Parking area. Services are divided into multiple subtasks: Subtask 1 includes 30 percent plans, special purpose surveys, and geotechnical reports (total $30,204.01); Subtask 2 covers 60 percent plans ($16,350); Subtask 3 includes 100 percent plans and specifications ($9,982); Subtask 4 addresses permit applications and approvals ($14,285); Subtask 5 covers pre-bid meeting attendance ($3,662.40); and Subtasks 6A through 6N provide construction phase services including pre-construction meetings, submittal reviews, regulatory responses, RFI responses, eight monthly construction inspections, substantial completion walk-through, and final completion certification (total $22,421.40). The total task amount is $96,904.81, consisting of $93,844.64 in fixed price costs and $3,060.17 in reimbursable costs not to exceed. Payment will be made upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 63 FDEP-BDC 6G932
Gasparilla Island State Park Sea Grape Restroom
Weiler Engineering Corp (WEC)
R. Jeff Weiler, P.E. (941) 505-1700 weiler7@mac.com
Ralph Perkins (850) 245-2640 Ralph.Perkins@FloridaDEP.gov
Professional survey, geotech, structural engineering, architectural & civil design, permitting, and construction administration to provide a new day-use restroom at the Sea Grape Parking area per the attached proposal dated 3/8/2023.
Theresa Carron
Upon Execution $ 93,844.64 3/17/2025 $ 3,060.17
$ 96,904.81
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.03.28 09:45:39 -04'00'
Theresa Carron T.Carron Digitally signed by T.Carron Date: 2023.03.28 09:49:50 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.03.28 10:29:07 -04'00'
R. Jeff Weiler, P.E. Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.03.28 10:57:54 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.03.31 15:17:33 -04'00'
6G932 37504003191 088137/21 339074 U3100 134000 MG $ 96,904.81
$ 96,904.81
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702
MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
A. Civil Engineering Civil Engineering includes providing all site design necessary to permit the restroom through both local government and Water Management District for an exemption (or Florida Department of Environmental Protection (FDEP), where appropriate). WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.
B. Building Design/Structural Engineering WEC will utilize the design for “Building Plan 12” for concept layout and style to develop plans and documentation necessary for this specific location and current codes.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
Subtask 1: Preliminary
1) A - 30 % plans,
a) WEC will conduct one site visit.
b) Consultant will conduct a pre-application meeting with the Water Management District or FDEP and the Local Building and Utility Departments.
c) Consultant will prepare a preliminary site plan with building, utility and ramp locations.
1) B – Surveys
a) Consultant will coordinate with Survey Sub-Consultant to prepare a special Purpose Survey with topo extending 25 feet outside of the building envelope.
1) C –Geotechnical Reports
a) Consultant will coordinate with Geotechnical Sub-Consultant to prepare a geotechnical Report recommending piling depths and seasonal high water elevation for the building.
Two Standard Penetration Test borings to a depth of 15’ will be completed the building.
Deliverable:
1) A - 30% Plans, Conceptual Site & Building Floor Plans – Consultant shall deliver 30% plans to the client via digital PDF. Plans will include:
Cover sheet Survey Existing Conditions incl. location of water & sewer Site Plan w/Water and sewer connecting to adjacent utilities Floor Plan Front and Rear Elevations
1) B - Surveys
Completed Survey – Sixty days from execution of Task Assignment, consultant shall deliver a special Purpose Survey via digital PDF, CAD and a Signed and Sealed copy.
1) C –Geotechnical Reports
Geotechnical Report – Sixty days from execution of task assignment, consultant shall deliver a completed geotechnical Report recommending piling depths and seasonal high water elevation for each site via digital PDF.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1A - 30% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
Weiler Engineering Project Manager 145 16 2320
Principal in Charge 195 4 780
Registered Professional Engineer 145 16 2320
Registered Engineer Intern 115 20 2300
Senior Engineering Designer 100 60 6000
Engineering Technician 80 60 4800
Clerical 55 8 440
Total 18960
Subtask 1B - Survey
Firm Name Position Classification Unit Unit Rate Numbe r Units
Total Fixed Price Cost
Reimbursable Cost 1A Only: (if applicable)
Weiler Engineering Project Manager Hr 145 4 580
Survey CHW 3 Person Field Crew Hr 177.54 16 2840.64
CHW Senior CAD/GIS Designer Hr 103.13 10 1031.3
CHW PSM Manager Hr 163.93 6 983.58
Total Survey 5435.52
Subtask 1C Geotech
Firm Name Position Classification Unit Unit Rate Numbe r Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr 145 4 580
Geotech Universal
Senior Project Engineer Hr 165.84 12 1990.08
Project Engineer Hr 94.50 12 1134
Staff Engineer Hr 68.46 24 1643.04
CAD Drafting Hr 54.00 8 432
Total Geotech 5779.12
Description Number @ Total
Postage
Printing
Overnight Travel
(if applicable)
Mileage (@ $0.445 per mile)
0.445 66 29.37
Reimbursable Total Cost 1A
29.37
Subtask 2: 60% documents
Description: Plans completed to 60% incorporating comments from 30%.
Deliverable: Plans consultant shall deliver 60% Plans (digital PDF only) including:
Opinion of Probable Cost;
Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Utility Plan Pump Station Plans & Details Site Details and General Notes Foundation/Piling Plans and details;
Beam schedules;
Plumbing fixture location plan Floor Plan;
Window & Door schedules;
Interior Finish Schedules;
Electrical Plans & Details Plumbing Plans & Details Exterior Elevations;
Building Cross sections and details;
ADA Ramp Plan with sections & details;
Total Subtask 1 30204.01
Subtask 2 - 60% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed
Subtask 3: 100% documents
Description: Plans completed to 100%.
Deliverable: Incorporate Client review of 60% plans, Consultant shall deliver one set of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:
Opinion of Probable Cost;
Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Utility Plan Pump Station Plans & Details Site Details and General Notes Foundation/Piling Plans and details;
Beam schedules;
Plumbing fixture location plan Floor Plan;
Window & Door schedules;
Interior Finish Schedules;
Weiler Engineering Project Manager 145 16 2320
Principal in Charge 195 3 585
Registered Professional Engineer 145 17 2465
Registered Engineer Intern 115 20 2300
Senior Engineering Designer 100 44 4400
Engineering Technician 80 48 3840
Clerical 55 8 440
Total 16350
Total for Subtask 2
16350
March 8, 2023 Ms. Theresa Carron Gasparilla State Park Seagrape Day Use Restroom
CN 230/TA63
Electrical Plans & Details Plumbing Plans & Details Exterior Elevations;
Building Cross sections and details;
ADA Ramp Plan with sections & details;
Specifications
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Reimbursable Cost:
Subtask 3 - 100% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 2 390
Registered Professional Engineer 145 8 1160
Registered Engineer Intern 115 12 1380
Senior Engineering Designer 100 24 2400
Engineering Technician 80 40 3200
Clerical 55 3 165
Total 9855
Description Number @ Total
Postage 1 35 35
Printing 40 2.30 92
Reimbursable Total Cost
Subtask 4: Permitting
Description:
4) A – Permit Applications, Consultant will assist Client and Clients contractor to submit permit applications for Local and State approvals. WEC will complete applications for the Water Management District for exemption, the Department of Environmental Protection for wastewater pump station, the State Fire Marshall, Building for site development approval. WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.
4) B – Permit Approvals, Consultant will coordinate with agencies and assist Client and Clients contractor to respond to agencies for additional information.
Deliverable:
4) A – Permit Applications, Incorporate Client review comments from 60% plans and deliver five sets of permit applications with 100% plans.
4) B – Permit Approvals, Depends on agencies but anticipate 60 days after submittal. Consultant will respond to agency requests for additional information and copy Client on all responses. Upon approval, Consultant will provide Client with approvals and revised (if necessary) plans and documentation
Total for Subtask 3
Subtask 4A Permit Applications
Firm Name Position Classification Hourly Rate Hours Total Fixed
Weiler Engineering Project Manager 145 12 1740
Principal in Charge 195 2 390
Registered Professional Engineer 145 6 870
Registered Engineer Intern 115 26 2990
Senior Engineering Designer 100 18 1800
Engineering Technician 80 24 1920
Clerical 55 4 220
Total 9930
Subtask 4B Permit Approvals
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 1 195
Registered Professional Engineer 145 2 290
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 8 800
Engineering Technician 80 12 960
Clerical 55 1 55
Total 3510
Description Number @ Total
Postage 1 35 35
Printing 200 2.3 460
Lee Co. LDO 1 350 350
Reimbursable Total Cost for 4A
Subtask 5: Attend a Pre-Bid meeting on-site Description: Consultant will attend one pre-bid meeting on site to respond to questions and prepare minutes.
Deliverable: Consultant will provide digital minutes of meeting and responses to contractor questions.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Reimbursable Cost:
Total for Subtask 4
14285
Subtask 5 - Pre-bid
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 8 $1160.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 0 $0.00
Registered Engineer Intern 115 8 $920.00
Senior Engineering Designer 100 8 $800.00
Engineering Technician 80 8 $640.00
Clerical 55 0 $0.00
Total $3520.00
Description Number @ Total Postage Not anticipated
Subtask 6A - 6N: Construction Phase Services complete, accurate, and timely. (Please do not alter this language)
Subtask 6A: Attend Pre-Construction Meeting
Description: WEC will provide representation at the Pre-Construction Meeting.
Deliverable: Meeting notes within 2 days from meeting date for inclusion by FDEP Project Manager in Meeting Minutes.
FWC application fee Not anticipated
(if applicable)
Not anticipated
Mileage (@ $0.445 per mile)
320 0.445 $142.40
Reimbursable Total Cost $142.40
Total Subtask 5 $3662.40
Subtask 6B: Review Contractor submittals
Description:WEC will review and comment on Contractor submittal package within 14 days of receipt.
Deliverable:, Stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.
Subtask 6A - Pre-Construction Mtg
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 0 0
Registered Professional Engineer 145 0 0
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 0 0
Engineering Technician 80 0 0
Clerical 55 0 0
Total 2080
Description Number @ Total
Postage 0
Printing 2.3 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile) 320 0.445 142.4
Reimbursable Total Cost 142.4
Total subtask 6A 2222.4
Subtask 6C: Respond to Building Department comments
Description: WEC will assist Client and/or Client's Contractor in responding to comments from the Building Department, and revise plans accordingly within 14 days of receipt of comments.
Specifically, when WEC's involvement is required for RFI responses, WEC will prepare a draft and
Subtask 6B - Review Submittals
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 0 0
Registered Professional Engineer 145 0 0
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 12 1200
Engineering Technician 80 2 160
Clerical 55 2 110
Total 2680
Description Number @ Total
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
Reimbursable Total Cost
Total Subtask 6B 2715
Deliverable: RFI response documents submitted to Building Department.
Subtask 6C
Cost
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 0 0
Registered Professional Engineer 145 1 145
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 8 800
Engineering Technician 80 0 0
Clerical 55 1 55
Total 1980
Description Number @ Total
Postage 35 0
Printing 2.30 0.00
Not anticipated
Mileage (@ $0.445 per mile)
Not anticipated
Reimbursable Total Cost
Total - 6C 1980
Description: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase.
Deliverable: WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.
Subtask 6D- Respond to RFI’s
Cost
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 0 0
Registered Professional Engineer 145 2 290
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 8 800
Engineering Technician 80 0 0
Clerical 55 4 220
Total 2520
Description Number @ Total
Postage 0
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
Subtask 6E: Provide Construction Inspections (Month 1)
Description: WEC will provide a monthly inspection (NLT every 30 days) during construction.
Deliverable: WEC will provide two (2) original signed and sealed reports to the FDEP Project Manager, as well as a digital version in PDF format. The inspection report will be submitted within 3 days of each inspection.
Reimbursable Total Cost 0
Total Subtask 6D 2520
Subtask 6E - Month 1 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Clerical 55 0 0
Total 1007.5
Description Number @ Total
Postage 35 0
Printing 0
Overnight Travel (if applicable)
Subtask 6F: Construction Inspection (Month 2)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost
142.4
Total Subtask 6E 1149.9
Subtask 6F
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Clerical 55 0 0
Total 1007.5
Postage 1 35 35
Subtask 6G: Construction Inspection (Month 3)
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost
177.4
Total Subtask 6F 1184.9
Subtask 6G Month 3 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Clerical 55 0 0
Total 1007.5
Subtask 6H: Construction Inspection (Month 4)
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 7G 1184.9
Subtask 6H - Inspection Month 4
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Subtask 6I: Construction Inspection (Month 5)
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6H 1184.9
Subtask 6I Month 5 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Subtask 6J: Construction Inspection (Month 6)
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6I 1184.9
Subtask 6J Month 6 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Engineering Technician 80 0 0
Subtask 6K: Construction Inspection (Month 7)
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6J 1184.9
Subtask 6K Month 7 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Senior Engineering Designer 100 1 100
Subtask 6L: Construction Inspection (Month 8)
Description Number @ Total
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6K 1184.9
Subtask 6L Month 8 Inspection
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 145
Principal in Charge 195 0 0
Registered Professional Engineer 145 .5 72.5
Registered Engineer Intern 115 6 690
Subtask 6M: Substantial Completion Walk-Through w/Punchlist
Description: WEC will assist Client with the Substantial Completion inspection and punchlist, with WEC representative attending the Substantial Completion inspection and providing engineer input related to the punchlist.
Deliverable: WEC will provide comments and input on punchlist within one (1) day of Substantial Completion inspection.
Total 1007.5
Description Number @ Total
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6L 1184.9
Subtask 6M substantial
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 6 870
Principal in Charge 195 0 0
Registered Professional Engineer 145 1 145
Subtask 6N: Final Completion w/ Certification
Description: WEC will assist Client with the Final Completion inspection, with WEC representative attending the Final Completion inspection.
Deliverable: WEC will also provide complete the final completion certification form required by FDEP Project Manager.
Engineering Technician 80 0 0
Clerical 55 0 0
Total 1805
Description Number @ Total
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6M 1982.4
Subtask 6N - Final
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Weiler Engineering Poject Manager 145 2 290
Principal in Charge 195 0 0
Carron_T Text Box Project Manager
Project Schedule:
Registered Professional Engineer 145 1 145
Senior Engineering Designer 100 2 200
Engineering Technician 80 0 0
Clerical 55 1 55
Total 1380
Description Number @ Total
Postage 1 35 35
Printing 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
320 0.445 142.4
Reimbursable Total Cost 177.4
Total Subtask 6N 1557.4
Activity Duration (Calendar Days) Days from NTP
Subtask 1A 30% Plans 60 60
Subtask 1B Survey 60 60
Subtask 1C Geotech 60 60
Subtask 2: 60% plans 30 - includes 7 days for Client review
Subtask 3: 100% plans 30 – includes 7 days for Client review
Subtask 4A: Permit applications 30 – includes 7 days for Client review
Subtask 4B: Permit approvals 60 – includes response for additional information
Carron_T Text Box Days from Start
Summary of Fees:
Subtask 5: Prebid 30 210
Subtask 6A - Pre construction 60 270
Subtask 6B: Review Submittals 30 300
Subtask 6C: Respond to RAI's 60 360
Subtask 6D: Respond to Contractor RFI's
240 (Est max overall calendar days;
RFI's will be responded to within 7 days of receipt from Contractor)
Subtask 6E: Provide Construction Inspections w/ (Month 1)
30 360
Subtask 6F: Provide Construction Inspections w/ Report (Month 2)
30 390
Subtask 6G: Provide Construction Inspections w/ Report (Month 3)
30 420
Subtask 6H: Provide Construction Inspections w/ (Month 4)
30 450
Subtask 6I: Provide Construction Inspections w/ Report (Month 5)
30 480
Subtask 6J: Provide Construction Inspections w/ (Month 6)
30 510
Subtask 6K: Provide Construction Inspections w/ (Month 7)
30 540
Subtask 6L: Provide Construction Inspections w/ (Month 8)
30 570
Subtask 6M: Substantial Completion Walk-Through w/ Punchlist
30 600
Subtask 6N: Final Completion w/ Certification
30 630
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1A 30 % Plans 18960 29.37
Subtask 1B Survey 5435.52 $0.00
Subtask 1C Geotech 5779.12 $0.00
Subtask 2: 60% plans 16350 $0.00
Subtask 3: 100% plans 9855 127
Subtask 4A Permit applications 9930 845
Subtask 4B Permit approvals 3510 $0.00
Subtask 5 Pre-Bid $3520.00 $142.40
Total Design & Permitting $73339.64 $1143.77
Subtask 6A - Pre-Construction Meeting
2080 142.4
Subtask 6B - Submittal Review 2680 35
Subtask 6C - Regulatory Response
1980 0
Subtask 6D Assistance during construction
2520 0
Subtask 6E Inspection 1 1007.5 142.4
Subtask 6F Inspection 2 1007.5 177.4
Subtask 6G Inspection 3 1007.5 177.4
Subtask 6H Inspection 4 1007.5 177.4
Subtask 6I Inspection 5 1007.5 177.4
Subtask 6J Inspection 6 1007.5 177.4
Subtask 6K Inspection 7 1007.5 177.4
Subtask 6L Inspection 8 1007.5 177.4
Subtask 6M Substantial Completion
1805 177.4
Subtask 6N Final Completion 1380 177.4
Total during Construction $20505.00 $1916.40
Total Fixed Price Cost: $93844.64
Total Fixed Price Cost: $3060.17
Overall Total Cost: $96904.81
File details come from the government source that posted it. Updated .