Document Summary
This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction, for the Gasparilla Island State Park Shade Structure project. The document represents a task order assignment under FDEP Contract No. CN230 to Weiler Engineering Corporation for design and permitting services. The project is located at Gasparilla Island State Park in Florida and is managed by the Recreation & Parks division with project manager Wayne Thomas and FDEP contract manager Jack Brady.
The task assignment covers comprehensive design and permitting services for a new 32' x 52' shade structure, 15' x 28' stage, concrete sidewalk, and related site improvements at a total cost of $24,972.35. The contract is structured as a fixed-price engagement with reimbursable costs, broken into seven primary subtasks: preliminary design and 30% plans ($4,371.07), topographic survey ($3,223.00), lead and asbestos survey ($1,893.86), 60% design plans ($2,620.00), 100% design plans ($2,210.00), permit applications and approvals ($4,140.00), and construction phase services including pre-construction meeting attendance, contractor submittal review, construction assistance, progress inspections, and final completion certification ($5,449.42). Design and permitting services total $19,522.93 with construction services totaling $5,449.42. The fixed-price cost is $23,956.86 with reimbursable costs of $1,015.49 for printing, postage, mileage, and permit fees. The contract commenced upon execution with a completion date of December 30, 2019.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .