CN-370000-CN230-T48.pdf
PDF 4 MB Posted
- Contract number
- CN230
- Issued by
- Florida
About this file
Task Assignment Notification – Bahia Honda State Park Sandspur Pavilions Replacement
This document is a Task Assignment Notification Form (Task Assignment No. 48) issued by the Florida Department of Environmental Protection (FDEP) under Contract CN230 to Weiler Engineering Corporation for construction engineering and inspection (CEI) services related to the Sandspur Pavilions Replacement project at Bahia Honda State Park. The project is located in the DRP (Division of Recreation and Parks) and involves consultant Jeff Weiler, P.E., serving as the consultant representative, with Ralph Perkins designated as the FDEP Contract Manager and James Post as the Project Manager.
The contract encompasses bidding and construction phase CEI services with a completion date of December 31, 2023, structured across six subtasks: assistance during bidding ($1,980.00), pre-construction meeting attendance ($2,600.00 fixed cost plus $251.87 reimbursable), contractor submittal review ($2,280.00), construction phase assistance for three months ($3,045.00), substantial completion walk-through with punchlists ($2,640.00 fixed cost plus $30.26 reimbursable), and final completion with certification ($3,285.00 fixed cost plus $30.26 reimbursable). The total task amount is $16,142.39, consisting of $15,830.00 in fixed price cost and $312.39 in cost reimbursement. Payment will be made upon FDEP approval of deliverables for each subtask, with all deliverables to be provided in digital PDF format where applicable.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 TA 48 DRP 6I509
Bahia Honda State Park Sandspur Pavilions Replacement
Weiler Engineering
Jeff Weiler, P.E. 941-505-1700 weiler7@mac.com
Ralph Perkins or successor 850-245-2460 Ralph.Perkins@FloridaDEP.gov
Bidding and Construction phase CEI services including response to bid questions, Pre-Con attendance, on-site inspection services, and Certifications.
James Post or sucessor
Upon Execution of TA $ 15,830.00 12-31-2023 $ 312.39
$ 16,142.39
Diane Langston
James Post
Ralph Perkins
Jeff Weiler, P.E.
Michael W. Foster Jr., P.E.
6I509 FD073 37505000005 088130/20 408001 U3200 131500 PF $ 16,142.39
$ 16,142.39
Per attached dated 6/23/2022.
Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.07.27 09:42:40 -04'00'
| CN230 TA48 Bahia Honda Sandspur Pavilions Replacement.pdf |
| backup.pdf |
File details come from the government source that posted it. Updated .