This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) for engineering services related to the expansion of the Volunteer RV Park at Bill Baggs Cape Florida State Park. The task assignment (CN230, TA82) involves FDEP's Bureau of Design and Construction as the owner/client and Weiler Engineering Corporation as the consultant, with Ralph Perkins serving as the FDEP contract manager and Jeff Weiler as the consultant's representative.
The scope of work encompasses the preparation of plans and documentation necessary to expand the existing RV park by adding four spaces with electric connections and integration to the existing septic system. The project is structured in three main subtasks: Subtask 1 (Preliminary Investigation and Survey) at $11,108.75 fixed price; Subtask 2 (100% Design Plans) at $7,859.75 fixed price including $81.00 in reimbursable costs; and Subtask 3 (Permitting) at $5,339.50 fixed price including $127.00 in reimbursable costs. The total contract amount is $24,308.00 in fixed price costs with $208.00 in reimbursable expenses. The project schedule extends 180 calendar days from contract acceptance through permit approvals, with individual subtasks ranging from 30 to 60 days in duration. Payment is contingent upon FDEP approval of deliverables for each subtask, and the work is funded through Florida account code 61563C (080039/24).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN230 82 FDEP/DRP 61563C
Bill Baggs Cape Florida State Park Volunteer RV Park Expansion
Weiler Engineering
Jeff Weiler 941-628-4732 weiler7@mac.com
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
Expanding the existing RV Park to add four spaces and provide electric and connect to the existing septic system per the attached dated: November 17th, 2023.
Garland Sandel
Execution date $ 24,100.00 4/29/25 $ 208.00
$ 24,308.00
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.12.21 07:58:44 -05'00'
Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.12.21 08:57:04 -05'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.12.21 13:07:43 -05'00'
Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2024.01.04 12:04:43 -05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2024.01.05 10:50:04 -05'00'
61563C 37505000011 080039/24 675002 U3200 131500 XR $ 24,308.00
$ 24,308.00
November 17, 2023
Mr. Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399
RE: Bill Baggs State Park - RV Park Expansion, CN - 230, TA - 80
Dear Mr. Sandel;
Thank you for the opportunity to provide this proposal to prepare the plans and documentation necessary to expand the existing RV Park to add four spaces and provide electric and connect to the existing septic system.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289- 416 2
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Mr. Garland Sandel Bill Baggs State Park RV Expansion
CN 230/TA80
Bill Baggs State Park RV Park Expansion
Contract Number 230, Task Assignment Number 80
Subtask 1: Preliminary
1) A(i) - Preliminary investigation,
a) WEC will conduct one site visit.
b) Consultant will conduct a pre-application meeting with the Water Management District or FDEP and the Local Building Department.
c) Consultant will prepare a preliminary site plan with four new RV spaces and location of proposed utility connections.
1) B – Survey -
a) Consultant will coordinate with Survey Sub-Consultant to prepare a special Purpose Survey with topo including the area for the proposed expansion, the existing spaces and location of the existing utilities.
Deliverable:
1) A - Preliminary investigation, Conceptual Site Plan – Consultant shall deliver 30% plans to the client via digital PDF. Plans will include:
Cover sheet Survey Existing Conditions 30% Site Plan including new spaces and location of proposed services for sewer and electric
1) B - Survey
Completed Survey - Consultant shall deliver a special Purpose Survey via digital PDF, CAD and a Signed and Sealed copy.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Mr. Garland Sandel Bill Baggs State Park
Subtask 1A - Preliminary Investigation
Firm Name Position Classification Hourly Rate Hours Total Fixed Price
Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 8 1160
Registered Engineer Intern 115 24 2760
Senior Engineering Designer 100 16 1600
Engineering Technician 80 16 1280
Clerical 55 2 110
Total
8118.75
Subtask 1B - Survey
Firm Name Position Classification Unit Unit Rate Numbe r Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr 145 2 290
Survey 3 Person Field Crew Hr 121.50 8 972
Survey Technician Hr 54.00 8 432
PSM Manager Hr 162 8 1296
Total Survey 2990
Reimbursable Cost 1 Only: (if applicable)
Descrip(on Number @ Total
Postage
Printing
Overnight Travel
(if applicable)
Mr. Garland Sandel Bill Baggs State Park
Mileage (@ $0.445 per mile)
0.445 0 0
Total 0
Total Subtask 1 11108.75
Subtask 2: 100% documents
Description: Plans completed to 100% incorporating comments from 30%.
Deliverable: Plans consultant shall deliver 100% Plans (digital PDF only) including:
Opinion of Probable Cost;
Cover sheet Existing Conditions Site, Grading and Utilities Plan (One Plan Sheet) Details General Notes
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 2 - 100% Plans
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 8 1160
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 12 1740
Registered Engineer Intern 115 16 1840
Senior Engineering Designer 100 16 1600
Engineering Technician 80 16 1280
Clerical 55 2 110
Total 7778.75
Mr. Garland Sandel Bill Baggs State Park
Total for Subtask 2 100% Plans
7778.75
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Reimbursable Cost:
Descrip(on Number @ Total
Postage 1 35 35
Printing 20 2.30 46
Overnight Travel
(if applicable)
Reimbursable Total Cost
Total for Subtask 2 - 100% Plans
7859.75
Subtask 3: Permitting
Description:
3) A – Permit Applications, Consultant will assist Client and Clients contractor to submit permit applications for Local and State approvals. WEC staff will coordinate with the Client to ensure that desired layout fits to the specific jurisdiction requirements and work with the Client to make changes as may be necessary.
3) B – Permit Approvals, Mr. Garland Sandel Bill Baggs State Park RV Expansion
CN 230/TA80
Consultant will coordinate with agencies and assist Client and Clients contractor to respond to agencies for additional information.
Deliverable:
3) A – Permit Applications, Incorporate Client review comments from 60% plans and deliver five sets of permit applications with 100% plans.
3) B – Permit Approvals, Depends on agencies but anticipate 60 days after submittal. Consultant will respond to agency requests for additional information and copy Client on all responses. Upon approval, Consultant will provide Client with approvals and revised (if necessary) plans and documentation.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3A Permit Applications
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Weiler Engineering Project Manager 145 6 870
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 4 580
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 4 400
Engineering Technician 80 4 320
Clerical 55 2 110
Total 3248.75
Subtask 3B Permit Approvals
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
Mr. Garland Sandel Bill Baggs State Park RV Expansion
CN 230/TA80
Weiler Engineering Project Manager 145 2 290
Principal in Charge 195 .25 48.75
Registered Professional Engineer 145 2 290
Registered Engineer Intern 115 8 920
Senior Engineering Designer 100 2 200
Engineering Technician 80 2 160
Clerical 55 1 55
Total 1963.75
Reimbursable Cost:
Descrip(on Number @ Total
Postage 1 35 35
Printing 40 2.3 92
Reimbursable Total Cost for3A
Total for Subtask 3 - Permits
5339.5
Project Schedule:
Activity Duration (Calendar Days) Days from
Subtask 1A Preliminary 60 60
Subtask 1B Survey 60 60
Subtask 2: 100% plans 30 - includes 7 days for Client review
Subtask 3A: Permit applications 30 – includes 7 days for Client review
Subtask 3B: Permit approvals 60 – includes response for additional information
Mr. Garland Sandel Bill Baggs State Park
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1A Preliminary $8118.75 $0.00
Subtask 1B Survey $2990.00 $0.00
Subtask 2: 100% plans $7778.75 $81.00
Subtask 3A Permit applications $3248.75 $127.00
Subtask 3B Permit approvals $1963.75 $0.00
Total Fixed Price Cost: $24100.00
Total Fixed Price Cost: $208.00
Overall Total Cost: $24308.00
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)