This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a construction inspection project at Bahia Honda State Park. The change order modifies an existing contract (CN230) between FDEP and Weiler Engineering Corporation, a consulting engineering firm. The document updates Task Assignment Number TA23 under Project Number 61501 for the Bathhouse & Restroom Replacement project at the park's Loggerhead/Buttonwood facilities.
The change order authorizes Weiler Engineering Corporation to provide construction inspection services in lieu of county inspections, which are unavailable due to local building jurisdiction constraints. The scope includes twelve inspection subtasks covering final plumbing, final electrical, ground bond, exhaust fans, window framing, shims, rough electric, electrical panel, water heater, emergency lights, railings, and piling inspections. Each subtask requires the consultant to conduct inspections in accordance with county requirements, prepare Affidavits of Inspection, and provide digital documentation to the county. The fixed-price cost for the change order totals $7,800.00 (twelve subtasks at $650.00 each), with reimbursable costs of $149.52 for mileage at $0.445 per mile, bringing the overall total to $7,949.52. The net increase to the task is $7,949.52, extending the task end date from September 1, 2020 to October 3, 2020, with a 60-day extension period. Payment will be made upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
April 6, 2020
Laura Ross Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260A, MS 520 Tallahassee, FL 32399
RE: WEC Number 16045.001 Bahia Honda – Buttonwood/Loggerhead/ Addendum to add inspection in lieu of County Inspections
Dear Ms. Ross;
It is our understanding that the local Building jurisdiction will not be providing inspection services for any projects until further notice. The County has made concessions and will allow Engineers to conduct the inspections, prepare an “Affidavit of Inspection” for each inspection and “Certificate of Inspections Compliance” when the project is complete in lieu of the required inspections by County, City or Village inspectors.
It is our understanding that the following inspections remain:
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the services tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, Code Description
699 Final plumbing
399 Final electrical
305 Ground bond, vent nipples for exhaust fans
150 Window Framing, proof of shims, (photo available)
305 Rough electric, panel relocation, water heater size, emergency lights, 142 Railings, 115 Pilings, need pile log for both buildings
April 6, 2020 Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
R. Jeff Weiler, P.E.
President The Weiler Engineering Corporation
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Restrooms Bahia Honda State Park Loggerhead/Buttonwood
Contract Number 230, Task Assignment Number 24
Although listed in numerical order, inspections will be conducted as needed and may not follow the order below. Each inspection includes one re-inspection if required.
Subtask 1: Final Plumbing
Description: Consultant will conduct a Final Plumbing inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Reimbursable Cost:
Subtask 1 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Skehan_A Cross-Out
Skehan_A Text Box
TA23 CO1
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Subtask 2: Final Electric Description: Consultant will conduct a Final Electric inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 1 Final Plumbing
662.46
Subtask 2 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Subtask 3: Ground Bond
Description: Consultant will conduct a Ground Bond inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language) Fixed Price Cost:
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 2 Final Electric
662.46
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Subtask 4: Exhaust Fans
Description: Consultant will conduct an Exhaust Fan inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Subtask 3 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 3 Ground Bond
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Subtask 5: Window Framing
Description: Consultant will conduct a Window Framing inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Subtask 4 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 4 Exhaust Fans
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Subtask 6: Shim Inspection
Subtask 5 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 5 Window Framing
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Description: Consultant will conduct a shim inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Subtask 6 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Subtask 7: Rough Electric Description: Consultant will conduct a Rough Electric inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Total for Subtask 6 Shims
662.46
Subtask 7 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Subtask 8: Electrical Panel Inspection Description: Consultant will conduct a Panel Inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Reimbursable Cost:
Reimbursable Total Cost
12.46
Total for Subtask 7 Rough Electric
662.46
Subtask 8 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Subtask 9: Water Heater Description: Consultant will conduct a Hot Water Heater Inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 8 Panel
662.46
Subtask 9 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Subtask 10: Emergency Lights Description: Consultant will conduct an Emergency Lights Inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 9 Water Heater
662.46
Subtask 10 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Subtask 11: Railings Description: Consultant will conduct a Railing Inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 10 Emergency Lights
662.46
Subtask 8 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Registered Professional Engineer
145 2 $290.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Subtask 12: Piling Inspection Description: Consultant will conduct a Piling Inspection in accordance with County requirements, complete the necessary documentation and upload to the County website.
Deliverable: Consultant will provide digital pdf of Affidavit of Inspection or requirement for re-inspection with deficiencies.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 11 Railing
662.46
Subtask 12 Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 145 1 $145.00
Principal in Charge 195 0 $0.00
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Reimbursable Cost:
Project Schedule:
Summary of Fees:
Registered Professional Engineer
145 2 $290.00
Engineering Technician
80 2 $160.00
Clerical 55 1 $55.00
Total $650.00
Item Rate Units Cost
Mileage ($0.445 per mile)
.445 28 12.46
Reimbursable Total Cost
12.46
Total for Subtask 12 Pilings
662.46
Activity Duration (Calendar Days) Dates
Subtask 1-12 180 As Needed
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1: Plumbing Final $650.00 $12.46
Subtask 2: Electric Final $650.00 $12.46
Subtask 3: Ground Bond $650.00 $12.46
Subtask 4: Exhaust Fans $650.00 $12.46
Subtask 5: Window Framing $650.00 $12.46
Subtask 6: Shims $650.00 $12.46
Subtask 7: Electric Rough $650.00 $12.46
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
Subtask 8: Panel $650.00 $12.46
Subtask 9: Water Heater $650.00 $12.46
Subtask 10: Emergency Lights $650.00 $12.46
Subtask 11:Railings $650.00 $12.46
Subtask 12: Pilings $650.00 $12.46
Total Fixed Price Cost: $7800.00
Total Reimbursable Cost: $149.52
Overall Total Cost: $7949.52
Ms. Laura Ross Bahia Honda Buttonwood/Loggerhead - Building Inspections
Labor Rates – Angle Right Surveying
Unloaded Labor Benefits
Fringe Profit Rate Loaded
Three-Person Field Crew $45.00 $18.00 $54.00 $4.5
0 $121.50
Two-Person Field Crew $32.00 $12.80 $38.40 $3.2
0 $86.40
GIS Technician $22.50 $9.00 $27.00 $2.2
5 $60.75
Survey Technician $20.00 $8.00 $24.00 $2.0
0 $54.00
CADD Technician $18.50 $7.40 $22.20 $1.8
5 $49.95
Professional Surveyor & Mapper Manager $60.00 $24.00 $72.00
$6.0 0 $162.00
Professional Surveyor & Mapper $33.50 $13.40 $40.20 $3.3
5 $90.45
Clerical $16.50 $6.60 $19.80 $1.6
5 $44.55
Fringe Benefit Rate 40.00%
General Overhead Rate 120.00%
Profit Percentage on Labor and Overhead 10.00%
Total Muliplier 2.7
Ms. Laura Ross
Ms. Laura Ross
Labor Rates – Universal Engineering
File details come from the government source that posted it. Updated .