This is a Task Assignment Notification Form and detailed scope of work proposal for the Myakka River State Park Road and Culvert Repairs project under Florida Department of Environmental Protection (FDEP) Contract CN230. The contract involves Weiler Engineering Corporation as the consultant, with FDEP/Division of Recreation and Parks as the owner. The project is located at Myakka River State Park in Florida, with Ralph Perkins serving as the FDEP Contract Manager and Garland Sandel as the FDEP Project Manager.

The contract authorizes Weiler Engineering to provide design, survey, geotechnical, and construction phase services to overlay the existing roadway and repair associated drainage facilities across two segments of the park road. The scope encompasses six major phases: preliminary design (30% plans), survey work, geotechnical investigations, intermediate design (60% and 100% plans), permitting assistance, pre-bid coordination, and comprehensive construction oversight including eight monthly inspections, submittal reviews, regulatory responses, and final completion certification. The total fixed price cost is $191,717.14 with reimbursable costs of $2,027.20, for an overall total task amount of $193,744.34. The project timeline extends 600 calendar days from execution, with key milestones including 60-day survey and geotechnical phases, 120-day completion of final plans, 180-day permit approval process, and eight consecutive 30-day construction inspection periods. Payment is made upon FDEP approval of deliverables for each subtask, with the contract effective upon execution through June 30, 2024.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC5.pdf PDF
CN-370000-CN230-T1.pdf PDF
CN-370000-CN230-T12.pdf PDF
CN-370000-CN230-T13.pdf PDF
CN-370000-CN230-T14.pdf PDF
CN-370000-CN230-T18.pdf PDF
CN-370000-CN230-T19CO1.pdf PDF
CN-370000-CN230-T19CO2.pdf PDF
CN-370000-CN230-T22.pdf PDF
CN-370000-CN230-T25CO1.pdf PDF
CN-370000-CN230-T25CO3.pdf PDF
CN-370000-CN230-T26.pdf PDF
CN-370000-CN230-T2CO1.pdf PDF
CN-370000-CN230-T37CO2.pdf PDF
CN-370000-CN230-T45CO1.pdf PDF
CN-370000-CN230-T4CO1.pdf PDF
CN-370000-CN230-T52.pdf PDF
CN-370000-CN230-T53.pdf PDF
CN-370000-CN230-T53CO1.pdf PDF
CN-370000-CN230-T57.pdf PDF
CN-370000-CN230-T60.pdf PDF
CN-370000-CN230-T64.pdf PDF
CN-370000-CN230-T66.pdf PDF
CN-370000-CN230-T7.pdf PDF
CN-370000-CN230-T70.pdf PDF
CN-370000-CN230-T72.pdf PDF
CN-370000-CN230-T75.pdf PDF
CN-370000-CN230-T8.pdf PDF
CN-370000-CN230-T80.pdf PDF
CN-370000-CN230-T82CO1.pdf PDF
CN-370000-CN230-T86.pdf PDF
CN-370000-CN230-T87.pdf PDF
CN-370000-CN230-T89.pdf PDF
CN-370000-CN230-T90.pdf PDF
CN-370000-CN230-TA30.pdf PDF
CN-370000-CN230-TA5CO1.pdf PDF
CN-370000-CN230.pdf PDF
CN-370000-CN230-CMC2.pdf PDF
CN-370000-CN230-CMC4.pdf PDF
CN-370000-CN230-T10.pdf PDF
CN-370000-CN230-T18CO1.pdf PDF
CN-370000-CN230-T19.pdf PDF
CN-370000-CN230-T21CO1.pdf PDF
CN-370000-CN230-T23.pdf PDF
CN-370000-CN230-T23CO1.pdf PDF
CN-370000-CN230-T25CO2.pdf PDF
CN-370000-CN230-T26CO1.pdf PDF
CN-370000-CN230-T29.pdf PDF
CN-370000-CN230-T2CO3.pdf PDF
CN-370000-CN230-T34CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN230 59 FDEP/DRP 61519C

Myakka River State Park Road and Culvert Repairs

Weiler Engineering

Jeff Weiler (941) 628-4732 weiler7@mac.com

Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@floridadep.gov

To overlay the existing roadway and repair the associated drainage facilities. See proposal dated 2.14.23

Garland Sandel or Successor

Upon Execution $ 191,717.14

6.30.24 $ 2,027.20

$ 193,744.34

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.03.24 15:56:06 -04'00'

Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.03.24 16:31:05 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.03.27 10:54:30 -04'00'

Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.03.27 13:04:51 -04'00'

Bryan J. Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2023.04.04 14:27:20 -04'00'

61519C 37504000056 080039/23 423001 U3200 134000 QK $ 193,744.34

$ 193,744.34

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702

MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2

WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

Segment I

January 10, 2023 - Rev 4 - 02/14/23 Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Our services will generally include: Survey, design and permitting to overlay the existing roadway in two segments utilizing the existing drainage facilities.

For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:

Please review the attached Proposal Summary and deliverables.

Sincerely, R. Jeff Weiler, P.E.

President

The Weiler Engineering Corporation

Segment II

Mr. Garland Sandel Myakka State Park Overlay Program

Subtask 1: 30% Design

1) A - Design

a) WEC will conduct one site visit.

b) Consultant will conduct a pre-application meeting with the Water Management District or FDEP and the Local Regulatory agency.

c) Consultant will prepare a site plan and typical sections separated into two segments and;

d) Consultant will prepare an opinion of probable cost for each segment

1) B – Surveys

a) Consultant will coordinate with Survey Sub-Consultant to prepare a special Purpose Survey of the existing roadway.

1) C –Geotechnical Reports

a) Consultant will coordinate with Geotechnical Sub-Consultant to conduct core drilling at approximately 1 per 1/2 Mile and prepare a geotechnical Report identifying existing pavement section and LBR’s at every other core.

Deliverable:

1) A - Conceptual Design, Conceptual Site & Structural Plans – Consultant shall deliver 30% Plans to the client via digital PDF. Plans will include:

Cover sheet Survey Existing Conditions Site Plan Typical Sections Opinion of probable cost for two segments

1) B - Surveys

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Completed Survey – Sixty days from execution of Task Assignment, consultant shall deliver a special Purpose Survey via digital PDF, CAD and a Signed and Sealed copy.

1) C –Geotechnical Reports

Geotechnical Report – Sixty days from execution of task assignment, consultant shall deliver a completed geotechnical Report identifying existing pavement, base and subbase at approximately 1 per 2600 feet of roadway & LBR’s each mile via digital PDF.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1A - 30% Plans

Firm Name Position Classification Hourly Rate Hours Total Fixed Price

Cost

Weiler Engineering Project Manager 145 26 3770

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering

Registered Professional Engineer 145 22 3190

Weiler Engineering Registered Engineer Intern 115 36 4140

Weiler Engineering Senior Engineering Designer 100 88 8800

Weiler Engineering Engineering Technician 80 120 9600

Weiler Engineering Clerical 55 10 550

Total 30245

Subtask 1B - Survey

Mr. Garland Sandel Myakka State Park Overlay Program

Reimbursable Cost: (if applicable)

Firm Name Position Classification Unit Unit Rate Numbe r Units

Total Fixed Price Cost

Weiler Engineering Project Manager Hr 145 8 1160

CHW 3 Person Field Crew Hr 177.54 200 35508

CHW Project Surveyor Hr 74.75 120 8970

CHW Senior CAD/GIS Hr 103.13 120 12375.6

CHW Professional Surveyor & Mapper

Hr 163.93 6 983.58

Total Survey 58997.18

Subtask 1C Geotech

Firm Name Position Classification Unit Unit Rate Numbe r Units

Total Fixed Price Cost

Weiler Engineering Project Manager Hr 145 4 580

Geotech

Universal Senior Project Engineer Hr 165.84 24 3980.16

Universal Project Engineer Hr 94.50 24 2268

Universal Staff Engineer Hr 68.46 30 2053.8

Universal CAD Drafting Hr 54.00 12 648

Total Geotech 9529.96

Description Number @ Total

Postage

Printing

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 2: 60% documents

Description: Plans completed to 60% incorporating comments from 30%.

Deliverable: Plans consultant shall deliver 60% Plans (digital PDF only) including:

Opinion of Probable Cost;

Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plans Site Details and General Notes

Overnight Travel

(if applicable)

Mileage (@ $0.445 per mile)

0.445 0

Reimbursable Total Cost 1A

Total Subtask 1 98772.14

Subtask 2 - 60% Plans

Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 26 3770

Weiler Engineering Principal in Charge 195 1 195

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 3: 100% documents

Description: Plans completed to 100%.

Deliverable: Incorporate Client review of 60% plans, Consultant shall deliver one set of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:

Opinion of Probable Cost;

Cover sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plan Site/Drainage Details and General Notes

Specifications

Engineering

Registered Professional Engineer 145 22 3190

Weiler Engineering Registered Engineer Intern 115 35 4025

Weiler Engineering Senior Engineering Designer 100 88 8800

Weiler Engineering Engineering Technician 80 121 9680

Weiler Engineering Clerical 55 7 385

Total 30045

Total for Subtask 2

30045

Subtask 3 - 100% Plans

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Reimbursable Cost:

Subtask 4: Permitting

Description:

Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 18 2610

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering

Registered Professional Engineer 145 14 2030

Weiler Engineering Registered Engineer Intern 115 24 2760

Weiler Engineering Senior Engineering Designer 100 58 5800

Weiler Engineering Engineering Technician 80 80 6400

Weiler Engineering Clerical 55 8 440

Total 20235

Description Number @ Total

Postage 1 35 35

Printing 64 2.30 147.2

Reimbursable Total Cost

182.2

Total for Subtask 3

20417.2

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

4) A – Permit Applications, Consultant will assist Client and Clients contractor to submit permit applications for Local and State approvals. WEC will complete applications for the Water Management District for exemption.

4) B – Permit Approvals, Consultant will coordinate with agencies and assist Client and Clients contractor to respond to agencies for additional information.

Deliverable:

4) A – Permit Applications, Incorporate Client review comments from 60% plans and deliver five sets of permit applications with 100% plans.

4) B – Permit Approvals, Depends on agencies but anticipate 60 days after submittal. Consultant will respond to agency requests for additional information and copy Client on all responses. Upon approval, Consultant will provide Client with approvals and revised (if necessary) plans and documentation

Subtask 4A Permit Applications

Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 18 2610

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering Registered Professional Engineer 145 15 2175

Engineering Registered Engineer Intern 115 23 2645

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Engineering Senior Engineering Designer 100 24 2400

Weiler Engineering Engineering Technician 80 24 1920

Weiler Engineering Clerical 55 7 385

Total 12330

Subtask 4B Permit Approvals

Rate Hours Total Fixed

Price Cost

Weiler Engineering Project Manager 145 8 1160

Weiler Engineering Principal in Charge 195 1 195

Weiler Engineering Registered Professional Engineer 145 6 870

Weiler Engineering Registered Engineer Intern 115 10 1150

Weiler Engineering Senior Engineering Designer 100 16 1600

Weiler Engineering Engineering Technician 80 16 1280

Weiler Engineering Clerical 55 1 55

Total 6310

Description Number @ Total

Postage 1 35 35

Printing 200 2.3 460

Permit application fees estimate

1 1000 1000

Mr. Garland Sandel Myakka State Park Overlay Program

Subtask 5: Attend a Pre-Bid meeting on-site Description: Consultant will attend one pre-bid meeting on site to respond to questions and prepare minutes.

Deliverable: Consultant will provide digital minutes of meeting and responses to contractor questions.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Reimbursable Cost:

Reimbursable Total Cost for 4A

Total for Subtask 4

20135

Subtask 5 - Pre-bid

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 $1160.00

Weiler Engineering Principal in Charge 195 0 $0.00

Weiler Engineering Registered Professional Engineer

145 0 $0.00

Weiler Engineering Registered Engineer Intern 115 8 $920.00

Weiler Engineering Senior Engineering Designer 100 8 $800.00

Weiler Engineering Engineering Technician 80 8 $640.00

Weiler Engineering Clerical 55 0 $0.00

Total $3520.00

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6A - 6N: Construction Phase Services complete, accurate, and timely. (Please do not alter this language)

Subtask 6A: Attend Pre-Construction Meeting

Description: WEC will provide representation at the Pre-Construction Meeting.

Deliverable: Meeting notes within 2 days from meeting date for inclusion by FDEP Project Manager in Meeting Minutes.

Description Number @ Total Postage Not anticipated

Overnight Travel (if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

$0.00

Reimbursable Total Cost $0.00

Total Subtask 5 $3520.00

Subtask 6A - Pre-Construction Mtg

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 1160

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 0 0

Weiler Engineering Registered Engineer Intern 115 8 920

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6B: Review Contractor submittals

Description:WEC will review and comment on Contractor submittal package within 14 days of receipt.

Deliverable:, Stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.

Weiler Engineering Senior Engineering Designer 100 0 0

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 2080

Description Number @ Total

Postage 0

Printing 2.3 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile) 0

Reimbursable Total Cost 0

Total subtask 6A 2080

Subtask 6B - Review Submittals

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290

Weiler Engineering Principal in Charge 195 0 0

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6C: Respond to Building Department comments

Description: WEC will assist Client and/or Client's Contractor in responding to comments from the Building Department, and revise plans accordingly within 14 days of receipt of comments.

Specifically, when WEC's involvement is required for RFI responses, WEC will prepare a draft and send to FDEP Project Manager for review and comment. WEC will then discuss and/or revise accordingly prior to formal submittal of RFI response to Building Department.

Deliverable: RFI response documents submitted to Building Department.

Weiler Engineering Registered Professional Engineer 145 0 0

Weiler Engineering Registered Engineer Intern 115 8 920

Weiler Engineering Senior Engineering Designer 100 12 1200

Weiler Engineering Engineering Technician 80 2 160

Weiler Engineering Clerical 55 2 110

Total 2680

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Total Subtask 6B 2715

Subtask 6C

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6D: Respond to Contractor RFI's

Description: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase.

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 1 145

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 8 800

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 1 55

Total 1980

Description Number @ Total

Postage 35 0

Printing 2.30 0.00

Not anticipated

Mileage (@ $0.445 per mile)

Not anticipated

Reimbursable Total Cost

Total - 6C 1980

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Deliverable: WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.

Subtask 6D- Respond to RFI’s

Cost

Weiler Engineering Project Manager 145 2 290

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 2 290

Weiler Engineering Registered Engineer Intern 115 8 920

Weiler Engineering Senior Engineering Designer 100 8 800

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 4 220

Total 2520

Description Number @ Total

Postage 0

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 0

Total Subtask 6D 2520

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6E: Provide Construction Inspections (Month 1)

Description: WEC will provide a monthly inspection (NLT every 30 days) during construction.

Deliverable: WEC will provide two (2) original signed and sealed reports to the FDEP Project Manager, as well as a digital version in PDF format. The inspection report will be submitted within 3 days of each inspection.

Subtask 6E - Month 1 Inspection

Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 35 0

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6F: Construction Inspection (Month 2)

Total Subtask 6E 1007.5

Subtask 6F

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6G: Construction Inspection (Month 3)

Mileage (@ $0.445 per mile)

0.445 0

Reimbursable Total Cost

Total Subtask 6F 1042.5

Subtask 6G Month 3 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1007.5

Postage 1 35 35

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6H: Construction Inspection (Month 4)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 7G 1042.5

Subtask 6H - Inspection Month 4

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1007.5

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6I: Construction Inspection (Month 5)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

0.445 0

Reimbursable Total Cost 35

Total Subtask 6H 1042.5

Subtask 6I Month 5 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6J: Construction Inspection (Month 6)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6I 1042.5

Subtask 6J Month 6 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6K: Construction Inspection (Month 7)

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6J 1042.5

Subtask 6K Month 7 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Weiler Engineering Registered Engineer Intern 115 6 690

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6L: Construction Inspection (Month 8)

Weiler Engineering Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6K 1042.5

Subtask 6L Month 8 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Weiler Engineering Registered Professional Engineer 145 .5 72.5

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6M: Substantial Completion Walk-Through w/Punchlist

Description: WEC will assist Client with the Substantial Completion inspection and punchlist, with WEC representative attending the Substantial Completion inspection and providing engineer input related to the punchlist.

Deliverable: WEC will provide comments and input on punchlist within one (1) day of Substantial Completion inspection.

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6L 1042.5

Subtask 6M substantial

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 6N: Final Completion w/ Certification

Description: WEC will assist Client with the Final Completion inspection, with WEC representative attending the Final Completion inspection.

Deliverable: WEC will also provide complete the final completion certification form required by FDEP Project Manager.

Weiler Engineering Poject Manager 145 6 870

Weiler Engineering Registered Professional Engineer 145 1 145

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 1 100

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 0 0

Total 1805

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6M 1840

Subtask 6N - Final

Mr. Garland Sandel Myakka State Park Overlay Program

Project Schedule:

Weiler Engineering Poject Manager 145 2 290

Weiler Engineering Principal in Charge 195 0 0

Weiler Engineering Registered Professional Engineer 145 1 145

Weiler Engineering Registered Engineer Intern 115 6 690

Weiler Engineering Senior Engineering Designer 100 2 200

Weiler Engineering Engineering Technician 80 0 0

Weiler Engineering Clerical 55 1 55

Total 1380

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 35

Total Subtask 6N 1415

Activity Duration (Calendar Days) Days from Execution

Subtask 1A ** Preliminary 60 60

Subtask 1B Survey 60 60

Subtask 1C Geotech 60 60

Subtask 2: 60% plans 30 - includes 7 days for Client review

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Subtask 3: 100% plans 30 – includes 7 days for Client review

Subtask 4A: Permit applications 30 – includes 7 days for Client review

Subtask 4B: Permit approvals 60 – includes response for additional information

Subtask 5: Prebid 30 210

Subtask 6A - Pre construction 30 210

Subtask 6B: Review Submittals 30 240

Subtask 6C: Respond to RAI's 60 300

Subtask 6D: Respond to Contractor RFI's

240 (Est max overall calendar days;

RFI's will be responded to within 7 days of receipt from Contractor)

Subtask 6E: Provide Construction Inspections w/ (Month 1)

30 330

Subtask 6F: Provide Construction Inspections w/ Report (Month 2)

30 360

Subtask 6G: Provide Construction Inspections w/ Report (Month 3)

30 390

Subtask 6H: Provide Construction Inspections w/ (Month 4)

30 420

Subtask 6I: Provide Construction Inspections w/ Report (Month 5)

30 450

Subtask 6J: Provide Construction Inspections w/ (Month 6)

30 480

Subtask 6K: Provide Construction Inspections w/ (Month 7)

30 510

Subtask 6L: Provide Construction Inspections w/ (Month 8)

30 540

Subtask 6M: Substantial Completion Walk-Through w/ Punchlist

30 570

Subtask 6N: Final Completion w/ Certification

30 600

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 1A Preliminary $30245.00 $0.00

Subtask 1B Survey $58997.18 $0.00

Subtask 1C Geotech $9529.96 $0.00

Subtask 2: 60% plans $30045.00 $0.00

Subtask 3: 100% plans $20235.00 $182.20

Subtask 4A Permit applications $12330.00 $1495.00

Subtask 4B Permit approvals $6310.00 $0.00

Subtask 5 Pre-Bid $3520.00 $0.00

Total Design & Permitting $171212.14 $1677.20

Subtask 6A - Pre-Construction Meeting

$2080.00 $0.00

Subtask 6B - Submittal Review $2680.00 $35.00

Subtask 6C - Regulatory Response

$1980.00 $0.00

Subtask 6D Assistance during construction

$2520.00 $0.00

Subtask 6E Inspection 1 $1007.50 $0.00

Subtask 6F Inspection 2 $1007.50 $35.00

Subtask 6G Inspection 3 $1007.50 $35.00

Subtask 6H Inspection 4 $1007.50 $35.00

Subtask 6I Inspection 5 $1007.50 $35.00

Subtask 6J Inspection 6 $1007.50 $35.00

Subtask 6K Inspection 7 $1007.50 $35.00

Subtask 6L Inspection 8 $1007.50 $35.00

Subtask 6M Substantial Completion

$1805.00 $35.00

Subtask 6N Final Completion $1380.00 $35.00

Total during Construction $20505.00 $350.00

Mr. Garland Sandel Myakka State Park Overlay Program

CN 230/TA56

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

Total Fixed Price Cost: $191717.14

Total Fixed Price Cost: $2027.20

Overall Total Cost: $193744.34

Mr. Garland Sandel Myakka State Park Overlay Program

Labor Rate Category Base Hourly Rate

(Direct) Audited OH &

Benefits % Direct Cost

FCCM % Operating

Allowance FCW Billing

Rates 100.00% 166.68% 7.89% 2.70% 15.00% 292.27%

2.92

Land Surveying Division Director/Professional Surveyor & Mapper $66.12 $110.21 $5.22 $1.79 $9.92 $193.07

Senior Project Manager $57.35 $95.59 $4.52 $1.55 $8.60 $167.46

Professional Surveyor & Mapper $56.14 $93.57 $4.43 $1.52 $8.42 $163.93

Chief of Surveyors/Project Surveyor $25.60 $42.67 $2.02 $0.69 $3.84 $74.75

2-Man Field Crew $43.91 $73.19 $3.46 $1.19 $6.59 $128.22

3-Man Field Crew $60.80 $101.34 $4.80 $1.64 $9.12 $177.54

GPS Field Operator/Robotics(1 man) $25.23 $42.05 $1.99 $0.68 $3.78 $73.67

Field Technician $21.73 $36.22 $1.71 $0.59 $3.26 $63.45

All Divisions Principals/Vice Presidents $89.96 $149.95 $7.10 $2.43 $13.49 $262.68

Senior CADD/GIS Designer $35.32 $58.87 $2.79 $0.95 $5.30 $103.13

CADD DesignerII/GIS Designer $28.35 $47.25 $2.24 $0.77 $4.25 $82.78

CADD DesignerI/GIS Technician $26.56 $44.27 $2.10 $0.72 $3.98 $77.56

Project Assistant/Administrative Assistant $24.13 $40.22 $1.90 $0.65 $3.62 $70.46

Certified True & Correct

John Howard Vice President of Finance + Operations 2/8/23

Causseaux, Hewett, & Walpole, Inc.

dba CHW Civil Engineering, Planning, Permitting, Surveying and Mapping, Construction Management and Inspection

Total Multiplier 2.92

Mr. Garland Sandel Myakka State Park Overlay Program

TA Form 61519C CN-230, TA 56.pdf
rev 4 021323 Proposal Myakka SP Repaving copy.pdf

File details come from the government source that posted it. Updated .