CN-370000-CN230-TA30.pdf

PDF 889 KB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

Task Assignment Notification and Proposal Summary

This document comprises a Task Assignment Notification Form and associated proposal from the Florida Department of Environmental Protection (FDEP) for work under Contract CN230 at Bahia Honda State Park. The assignment involves Weiler Engineering Corporation, an engineering services firm based in Punta Gorda, Florida, with project management by FDEP's Bureau of Design and Construction. The primary contact for the consultant is Jeff Weiler, P.E., and the FDEP Contract Manager is Alyssa Skehan. The work is designated as Task Assignment Number 30 under projects 6i504 and 6i505 for the Sandspur Campground and Day Use Restoration project.

The scope of work requires revising engineering plans for rip-rap installation along the West Day Use parking lot, beach road curve, and 15 campsites; adding a fence enclosure around above-ground utility connections at the Day Use restroom; and providing a free-standing electrical connection for the Bathhouse Pump Station. The contract is structured in two subtasks: Subtask 1 (90% Plans) with a fixed price cost of $3,055.00 due upon execution, and Subtask 2 (100% Plans) with a fixed price cost of $835.00 and reimbursable costs of $165.60 for printing, due eight days after execution. The total task amount is $4,055.60. Deliverables include digital PDF plan sets for Subtask 1 and two sets of signed and sealed plans (digital PDF and CAD) for Subtask 2. Payment is contingent upon FDEP approval of deliverables for each subtask. The project schedule allocates five calendar days for Subtask 1 and three calendar days for Subtask 2, with all dates based on execution of the task order.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC3.pdf PDF
CN-370000-CN230-T14CO1.pdf PDF
CN-370000-CN230-T14CO2.pdf PDF
CN-370000-CN230-T15.pdf PDF
CN-370000-CN230-T16.pdf PDF
CN-370000-CN230-T1CO1.pdf PDF
CN-370000-CN230-T20.pdf PDF
CN-370000-CN230-T21.pdf PDF
CN-370000-CN230-T24.pdf PDF
CN-370000-CN230-T25.pdf PDF
CN-370000-CN230-T2CO2.pdf PDF
CN-370000-CN230-T3.pdf PDF
CN-370000-CN230-T34CO2.pdf PDF
CN-370000-CN230-T35.pdf PDF
CN-370000-CN230-T36CO1.pdf PDF
CN-370000-CN230-T36CO2.pdf PDF
CN-370000-CN230-T39.pdf PDF
CN-370000-CN230-T3CO1.pdf PDF
CN-370000-CN230-T45.pdf PDF
CN-370000-CN230-T45CO2.pdf PDF
CN-370000-CN230-T49.pdf PDF
CN-370000-CN230-T51.pdf PDF
CN-370000-CN230-T53CO2.pdf PDF
CN-370000-CN230-T56.pdf PDF
CN-370000-CN230-T62.pdf PDF
CN-370000-CN230-T64CO1.pdf PDF
CN-370000-CN230-T76.pdf PDF
CN-370000-CN230-T79.pdf PDF
CN-370000-CN230-T7CO1.pdf PDF
CN-370000-CN230-T9.pdf PDF
CN-370000-CN230-T92.pdf PDF
CN-370000-CN230-TA33.pdf PDF
CN-370000-CN230-CMC2.pdf PDF
CN-370000-CN230-CMC4.pdf PDF
CN-370000-CN230-T10.pdf PDF
CN-370000-CN230-T18CO1.pdf PDF
CN-370000-CN230-T19.pdf PDF
CN-370000-CN230-T21CO1.pdf PDF
CN-370000-CN230-T23.pdf PDF
CN-370000-CN230-T23CO1.pdf PDF
CN-370000-CN230-T25CO2.pdf PDF
CN-370000-CN230-T26CO1.pdf PDF
CN-370000-CN230-T29.pdf PDF
CN-370000-CN230-T2CO3.pdf PDF
CN-370000-CN230-T34CO1.pdf PDF
CN-370000-CN230-T37.pdf PDF
CN-370000-CN230-T37CO1.pdf PDF
CN-370000-CN230-T42CO1.pdf PDF
CN-370000-CN230-T42CO3.pdf PDF
CN-370000-CN230-T43.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Signature Date

Signature Date

Signature Date

Signature Date

Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN230 30 DRP 6i504 & 6i505

Bahia Honda State Park Sandspur Campground & Day Use Restoration

Weiler Engineering Corporation

Jeff Weiler, P.E. 941-505-1702 weiler7@mac.com

Alyssa Skehan 850-245-2781 Alyssa.Skehan@FloridaDEP.gov

Revise plans for Rip-rap installation along West Day Use parking lot, beach road curve, and 15 Campsites; add fence enclosure around above ground utility connections at the Day Use restroom; add free standing electrical connection for Bathhouse Pump Station.

James Post

Upon execution of TA $ 3,890.00 Eight days after execution of TA $ 165.60

$ 4,055.60

Budget Representative, FDEP

Project Manager, FDEP

Contract Manager, FDEP

Consultant

Contract Authority, FDEP

Gregory Turral Digitally signed by Gregory Turral Date: 2021.06.23 14:21:25 -04'00'Greg Turral

James Post

Alyssa Skehan

Jeff Weiler

Michael W. Foster, P.E

, P.E R. Jeff Weiler Digitally signed by R. Jeff Weiler Date: 2021.06.28 14:55:44 -04'00'

Michael W. Foster Jr.

Digitally signed by Michael W.

Foster Jr.

Date: 2021.06.29 14:54:48 -04'00'

File details come from the government source that posted it. Updated .