CN-370000-CN230-T45CO1.pdf

PDF 473 KB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for the Savannas Preserve State Park Education Center Renovation project. The contract involves FDEP as the client, The Weiler Engineering Corporation as the consultant, and various subcontractors including Universal Engineering, Dagostino Surveying, and other specialized service providers. The contract is identified as Contract Number CN230, Task Assignment Number 45, Change Order Number 1, and Project Number 6A020C.

The change order authorizes The Weiler Engineering Corporation to provide comprehensive engineering services including design and construction administration for the education center renovation. The scope encompasses nine major subtasks: survey work ($5,369), lead and asbestos reporting ($2,726.40), geotechnical investigations ($3,959.68), preparation of plans at 30% completion ($15,535), 60% completion ($21,435), and 100% completion ($9,520), permit applications and approvals ($9,460), and six construction administration tasks including bidding assistance, pre-construction meetings, submittal reviews, construction support, substantial completion inspections, and final completion certification ($11,315). The total contract amount is $80,501.08, comprised of $79,320.08 in fixed fees and $1,181.00 in reimbursable costs. The project schedule extends 570 calendar days from Notice to Proceed, with key milestones including survey completion at 60 days, permit approval by day 300, 100% construction documents by day 330, and construction administration services extending 240 days. Payment is structured upon FDEP approval of deliverables for each subtask.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC2.pdf PDF
CN-370000-CN230-CMC4.pdf PDF
CN-370000-CN230-T10.pdf PDF
CN-370000-CN230-T18CO1.pdf PDF
CN-370000-CN230-T19.pdf PDF
CN-370000-CN230-T21CO1.pdf PDF
CN-370000-CN230-T23.pdf PDF
CN-370000-CN230-T23CO1.pdf PDF
CN-370000-CN230-T25CO2.pdf PDF
CN-370000-CN230-T26CO1.pdf PDF
CN-370000-CN230-T29.pdf PDF
CN-370000-CN230-T2CO3.pdf PDF
CN-370000-CN230-T34CO1.pdf PDF
CN-370000-CN230-T37.pdf PDF
CN-370000-CN230-T37CO1.pdf PDF
CN-370000-CN230-T42CO1.pdf PDF
CN-370000-CN230-T42CO3.pdf PDF
CN-370000-CN230-T43.pdf PDF
CN-370000-CN230-T44.pdf PDF
CN-370000-CN230-T48.pdf PDF
CN-370000-CN230-T51CO2.pdf PDF
CN-370000-CN230-T54CO1.pdf PDF
CN-370000-CN230-T58.pdf PDF
CN-370000-CN230-T63.pdf PDF
CN-370000-CN230-T65.pdf PDF
CN-370000-CN230-T67.pdf PDF
CN-370000-CN230-T6CO1.pdf PDF
CN-370000-CN230-T72CO1.pdf PDF
CN-370000-CN230-T74.pdf PDF
CN-370000-CN230-T81.pdf PDF
CN-370000-CN230-T81CO1.pdf PDF
CN-370000-CN230-T82.pdf PDF
CN-370000-CN230-T83.pdf PDF
CN-370000-CN230-T84.pdf PDF
CN-370000-CN230-T85.pdf PDF
CN-370000-CN230-T88.pdf PDF
CN-370000-CN230-TA31.pdf PDF
CN-370000-CN230-TA5.pdf PDF
PC-370000-CN230.pdf PDF
CN-370000-CN230-CMC5.pdf PDF
CN-370000-CN230-T1.pdf PDF
CN-370000-CN230-T12.pdf PDF
CN-370000-CN230-T13.pdf PDF
CN-370000-CN230-T14.pdf PDF
CN-370000-CN230-T18.pdf PDF
CN-370000-CN230-T19CO1.pdf PDF
CN-370000-CN230-T19CO2.pdf PDF
CN-370000-CN230-T22.pdf PDF
CN-370000-CN230-T25CO1.pdf PDF
CN-370000-CN230-T25CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN230 45 1 6A020C

Savannas Preserve State Park Education Center Renovation

Weiler Engineering Corporation

R. Jeff Weiler 942-505-1700 weiler7@mac.com

Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov

Change to provide engineering services, construction documents, and construction administration for the project per the attached proposal dated 8/15/22.

$ 100.57 $ 9,175.00 $ 9,275.57 $ 100.57 $ 9,175.00 $ 9,275.57

$ 1,181.00 $ 79,320.08 $ 80,501.08 $ 1,281.57 $ 88,495.08 $ 89,776.65

4/15/22

12/31/22

12/31/22

12/31/23

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2022.08.22 09:14:01 -04'00'

Andrew Lippens Andrew Lippens Digitally signed by Andrew Lippens Date: 2022.09.07 08:28:32 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.09.07 08:57:51 -04'00'

R. Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2022.09.13 17:53:25 -04'00'

Michael W. Foster Jr., P.E.

6A020C 37505000130 085154/22 000286 U3200 131500 AD $ 80,501.08

$ 80,501.08

CSFRF

Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2022.09.20 08:25:55 -04'00'

July 19, 2022 - Revision 4 - August 15, 2022

Mr. Andrew Lippens Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399

RE: Learning Center at Savanna’s Preserve State Park - Education Center - Contract 230, TA 45 - Change Order No. 1

Dear Mr. Lippens;

We are pleased to submit this proposal for design and permitting to make the following repairs and modifications to the above referenced facility addressing issues and recommendations outlined in the study completed by WEC generally including:

• Improvements to the stormwater management system to minimize flooding

• Improvements to the exterior of the structure including AC Pedestal, ADA Ramp replacement and replacement of the damaged deck and columns

• Improvements to the floor and foundation and improvements to the attic and ventilation

For your review, following is a man-hour budget and associated fees.

Please feel free to contact me if you have any questions or wish to discuss matters further.

Sincerely, R. Jeff Weiler, P.E.

President The Weiler Engineering Corporation

July 19, 2022 - Rev 4 - 8/15/22 Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Savannas Preserve Education Center Design & Permitting Change Order No. 1

Contract Number 230, Task Assignment Number 45

Subtask 3: Survey

Description: The Weiler Engineering Corporation (Consultant) will coordinate with a Florida Registered Surveyor to prepare a special purpose survey adequate for design and permitting.

Deliverable: Consultant will provide a Signed and Sealed Special Purpose topographic and bathymetric survey of dock and 10’ each side (Not a Boundary Survey) in PDF and AutoCad format via email to the District Project Manager.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3 - Survey

Firm Name Position Classification Unit Unit Rate Number Units

Total Fixed Price Cost

Weiler Engineering Project Manager Hr 145 5 725

Dagostino 3 Person Field Crew Hr 121.50 24 2916

Dagostino Survey Technician Hr 54.00 8 432

Dagostino PSM Manager Hr 162 8 1296

Dagostino Total Survey 5369

Postage

Printing

Overnight Travel

(if applicable) Mileage (@ $0.445 per mile)

Reimbursable Total Cost $0.00

Total Subtask 3

Survey

$5369.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162

Perkins_R Highlight

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TN 45 - CO 1

Subtask 4A: Lead & Asbestos Report

Description: Consultant will coordinate with Universal Engineering to complete lead and asbestos survey/report for the existing bridge and landings.

Deliverable: (These are the payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc)

Written results of asbestos survey will be delivered via email in PDF and AutoCad format via email to the District Project Manager.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Reimbursable Cost: (if applicable)

Subtask 4A - Lead/Asbestos Report

Firm Name Position Classification Rate Hours Total Fixed Price Cost

Weiler Engineering Registered Professional Engineer 145 4 $580.00

Registered Engineer Intern 115 2 $230.00

Universal Engineering Senior Geotechnical Engineer, PE

165.84 8 $1326.72

Sr. Engineering Technician 49.14 12 $589.68

Total Lead/ Asbestos report $2726.40

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Subtask 4B: Geotech

Description: Consultant will coordinate with Universal Engineering to complete borings and evaluation of the subsurface and assist with piling requirements for the bridge and landings.

Deliverable: (These are the payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc)

Written results of the investigation will be delivered via email in PDF and AutoCad format via email to the District Project Manager.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Total for Subtask 4A

- Lead/Asbestos Report

$2726.40

Subtask 4B - Geotech

Firm Name Position Classification Rate Hours Total Fixed Price Cost

Weiler Engineering Registered Professional Engineer 145 2 $290.00

Registered Engineer Intern 115 2 $230.00

Universal Engineering Senior Geotechnical Engineer, PE

165.84 16 $2653.44

Sr. Engineering Technician 49.14 16 $786.24

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Subtask 5: 30% documents

Description: Plans completed to 30%.

Deliverable: Consultant shall deliver 30% Plans in PDF and AutoCad format via email to the District Project Manager including:

Cover Sheet Survey Existing Conditions Site Plan including building, proposed stormwater management facilities locations and access Plans prepared to 30% addressing improvements to AC Pedestal, ADA ramp replacement and replacement of the existing deck and columns Plans prepared to 30% addressing the floor and foundation repairs and replacement Plans prepared to 30% addressing the attic and ventilation

Opinion of Probable Cost

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Total Geotech $3959.68

Total for Subtask 4B

- Geotech

$3959.68

Subtask 5 – 30% Plans

Firm Name Position Classification

Hour ly

Rate Hours

Total Fixed Price Cost

Weiler Engineering Project Manager 145 11 $1595.00

Principal in Charge 195 2 $390.00

Registered Professional Engineer

145 16 $2320.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Subtask 6: 60% documents

Description: Plans completed to 60%.

Deliverable: Consultant shall deliver 60% Plans in PDF and AutoCad format via email to the District Project Manager including:

Cover Sheet Survey Existing Conditions Best Management Plan Demolition Plan Site & Grading Plans & Details Plans prepared to 60% addressing improvements to AC Pedestal, ADA ramp replacement and replacement of the existing deck and columns Plans prepared to 60% addressing the floor and foundation repairs and replacement Plans prepared to 60% addressing the attic and ventilation General & Structural Notes Framing Plan & Details Profiles Specifications

Opinion of Probable Cost

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Registered Engineer Intern

115 24 $2760.00

Senior Engineering Designer

100 42 $4200.00

Engineering Technician

80 52 $4160.00

Clerical 55 2 $110.00

Total $15535.00

Total Subtask 5 30% Plans $15535.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Subtask 7: Permitting

A – Permit Applications, Description: Consultant will submit permit applications for the County and State - Southwest Florida Water Management District permits for site improvements as needed for construction approvals..

Deliverable: Consultant shall deliver five sets of permit applications with 100% plans.

B – Permit Approvals, Description Consultant will respond to regulatory requests for additional information through approval.

Deliverable: Consultant will provide PDF’s via email to the BDC the completed permits required for construction. The selected contractor will be responsible for the building permit if required.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Subtask 6 – 60% Plans

Firm Name Position Classification

Hour ly

Rate Hours

Total Fixed Price Cost

Weiler Engineering Project Manager 145 18 $2610.00

Principal in Charge 195 3 $585.00

Registered Professional Engineer

145 16 $2320.00

Registered Engineer Intern

115 24 $2760.00

Senior Engineering Designer

100 60 $6000.00

Engineering Technician

80 84 $6720.00

Clerical 55 8 $440.00

Total $21435.00

Total Subtask 6 60% Plans $21435.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Fixed Price Cost:

Reimbursable Cost:

Subtask 7A Permit Applications

Firm Name Position Classification Hourly Rate

Hours

Total Fixed Price Cost

Weiler Engineering Project Manager 145 6 $870.00

Principal in Charge 195 1 $195.00

Registered Professional Engineer

145 6 $870.00

Registered Engineer Intern

115 9 $1035.00

Senior Engineering Designer

100 22 $2200.00

Engineering Technician 80 33 $2640.00

Clerical 55 2 $110.00

Total $7920.00

Subtask 7B Permit Approvals

Firm Name Position Classification Hourly Rate

Hours

Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290

Registered Professional Engineer

145 1 $145.00

Registered Engineer Intern

115 2 $230.00

Senior Engineering Designer

100 5 $500.00

Engineering Technician 80 4 $320.00

Clerical 55 1 $55.00

Total $1540.00

Postage

Printing

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Subtask 8: 100% documents

Description: Plans completed to 100%.

Deliverable: Consultant shall deliver one set of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:

Cover Sheet Survey Existing Conditions Best Management Plan Demolition Plan Pedestrian bridge Plans Structural Notes Framing Plan & Details Profiles Specifications

Opinion of Probable Cost

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

County Permits Estimate $1000.00

SFWMD Exemption $100.00

Reimbursable Total Cost $1100.00

Total for Subtask 7 Permits

$10560.00

Subtask 8 - 100 % Plans

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 $1160.00

Principal in Charge 195 2.0 $390.00

Registered Professional Engineer

145 6 $870.00

Registered Engineer Intern

115 10 $1150.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9: Construction Administration

Subtask 9a: Bidding Assistance

Description: Consultant will attend one pre-bid meeting and respond to bidders’ questions and provide clarifications during bidding.

Deliverable: Consultant will provide digital pdf of all responses and communication with bidders.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Senior Engineering Designer

100 28 $2800.00

Engineering Technician

80 38 $3040.00

Clerical 55 2 $110.00

Total $9520.00

Postage 1 Fed-x at $35 35 Printing 20 sheets @ $2.30 per sheet one set

Overnight Travel

(if applicable)

Not anticipated

Reimbursable Total Cost

$81.00

Total for Subtask 8 100% Plans

$9601.00

Subtask 9a - Bidding assistance Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 $290.00

Registered Professional Engineer

145 1 $145.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9b: Attend Pre-Construction Meeting

Description: WEC staff will attend one pre-construction meeting on site, respond to questions and prepare minutes.

Deliverable: WEC will provide representation at the Pre-Construction Meeting and deliver meeting notes within 2 days from meeting date for inclusion by FDEP Project Manager in Meeting Minutes in PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Registered Engineer Intern 115 6 $690.00

Senior Engineering Designer 100 4 $400.00

Clerical 55 1 $55.00

Total $1580.00

Postage Not anticipated

Printing Not anticipated

Overnight Travel

(if applicable)

Not anticipated

Mileage ($0.445 per mile)

Not anticipated

Reimbursable Total Cost

$0.00

Total for Subtask 8a $1580.00

Subtask 9b - Pre-construction Mtg

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9c: Review Contractor submittals

Description: WEC will provide engineering review of Contractor's shop drawing submittals. WEC will prepare an anticipated submittal list and maintain a log.

Deliverable: WEC will review and comment on Contractor submittal package within 7 days of receipt and provide stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Senior Engineering Designer

100 4 $400.00

Engineering Technician 80 4 $320.00

Total $1300.00

Postage Not anticipated

Printing Not anticipated

Overnight Travel (if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

$0

Reimbursable Total Cost

$0.00

Total Subtask 9b $1300.00

Subtask 9c - Submittal Review

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 $290.00

Registered Engineer Intern

115 8 $920.00

Senior Engineering Designer

100 2 $200.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9d: Assistance during construction (3 Months)

Description: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase. WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.

Deliverable: Correspondence with Contractor and regulatory agencies provided via

PDF.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Engineering Technician

80 2 $160.00

Clerical 55 1 $55.00

Total $1625.00

Postage Not anticipated (all deliverables in digital form only)

Printing Not anticipated (all deliverables in digital form only)

Overnight Travel (if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

Not anticipated

Reimbursable Total Cost

$0.00

Total Subtask 9c - Submittals

$1625.00

Subtask 9d

Firm Name Position Classification Hourly Rate

Ho urs

Total Fixed Price Cost

Weiler Engineering Project Manager 145 6 $870.00

Principal in Charge 195 1 $195.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9e: Substantial Completion Walk-Through w/Punchlist

Description: WEC will assist Client with the Substantial Completion inspection and punch list, with WEC representative attending the Substantial Completion inspection and providing engineer input related to the punch list.

Deliverable: WEC will provide comments and input on punch list within one (1) day of Substantial Completion inspection.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Registered Professional Engineer

145 1 $145.00

Registered Engineer Intern

115 4 $460.00

Senior Engineering Designer

100 4 $400.00

Clerical 55 1 $55.00

Total $2125.00

Postage Not anticipated

Printing Not anticipated (all deliverables in digital form only)

Overnight Travel (if applicable) Not anticipated

Mileage (@ $0.445 per mile) Not anticipated

Reimbursable Total Cost $0.00

Total Subtask 9d $2125.00

Subtask 9e - Substantial

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Subtask 9f: Final Completion w/ Certification

Description: WEC will assist Client with the Final Completion inspection of the site with WEC representative attending the Final Completion inspection.

Deliverable: WEC will prepare final certifications necessary for regulatory close out and deliver five sets of record plans and certifications and one PDF set via email.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Principal in Charge 195 1 $195.00

Registered Professional Engineer

145 1 $145.00

Registered Engineer Intern

115 4 $460.00

Senior Engineering Designer

100 1 $100.00

Engineering Technician 80 4 $320.00

Total $1800.00

Postage Not anticipated

Printing Not anticipated

Overnight Travel (if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

$0.00

Reimbursable Total Cost

$0.00

Total Subtask 9e $1800.00

Subtask 9f - Final

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Prroject Manager 145 4 $580.00

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Reimbursable Cost:

Project Schedule:

Summary of Fees:

Registered Professional Engineer

145 2 $290.00

Registered Engineer Intern 115 8 $920.00

Senior Engineering Designer

100 4 $400.00

Engineering Technician 80 8 $640.00

Clerical 55 1 $55.00

Total $2885.00

$0.00 $0.00

Total Subtask 9f $2885.00

Activity Duration (Calendar Days) Days from NTP

Subtask 3 Survey 60 60

Subtask 4A Lead/Asbestos 60 60

Subtask 4B Geotech 60 60

Subtask 5: 30% plans 60 - includes 14 days for Client review

Subtask 6: 60% plans 30 - includes 7 days for Client review

Subtask 7A: Permit applications 30 – includes 7 days for Client review

Subtask 7B: Permit approvals 180 – includes 7 days for Client review

Subtask 8: 100% plans 30 – includes response for additional information

Subtask’s 9a - 9f 240

Subtask Subtask Fixed Price Cost

Subtask Reimbursable

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

Subtask 3 Survey $5369.00 $0.00

Subtask 4A Lead/Asbestos $2726.40 $0.00

Subtask 4B Geotech $3959.68 0.00

Subtask 5: 30% plans $15535.00 $0.00

Subtask 6: 60% plans $21435.00 $0.00

Subtask 7A: Permit applications $7920.00 $1100.00

Subtask 7B: Permit approvals $1540.00 $0.00

Subtask 8: 100% plans $9520.00 $81.00

Total Design & Permitting 69186.08 $68005.08 1181

Subtask 9a: Assistance during bidding

$1580.00 $0.00

Subtask 9b: Attend Pre-Con Mtg $1300.00 $0.00

Subtask 9c: Review Submittals $1625.00 $0.00

Subtask 9d: Assistance during Construction - 3 Months

$2125.00 $0.00

Subtask 9e: Substantial Completion Walk-Through w/ Punchlist

$1800.00 $0.00

Subtask 9f: Final Completion w/ Certification

$2885.00 $0.00

Subtotal Construction Services $11315.00 $11315.00 $0.00

Total Fixed Price $79320.08

Total Reimbursable Cost $1181.00

Total Overall Cost $80501.08

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Labor Rates Surveying - Dagostino Unloaded Labor Benefits

Fringe Profit Rate Loaded

Three-Person Field Crew $45.00 $18.00 $54.00 $4.50 $121.50

Two-Person Field Crew $32.00 $12.80 $38.40 $3.20 $86.40

GIS Technician $22.50 $9.00 $27.00 $2.25 $60.75

Survey Technician $20.00 $8.00 $24.00 $2.00 $54.00

CADD Technician $18.50 $7.40 $22.20 $1.85 $49.95

Professional Surveyor & Mapper Manager $60.00 $24.00 $72.00 $6.00 $162.00

Professional Surveyor & Mapper $33.50 $13.40 $40.20 $3.35 $90.45

Clerical $16.50 $6.60 $19.80 $1.65 $44.55

Fringe Benefit Rate 40.00%

General Overhead Rate 120.00%

Profit Percentage on Labor and Overhead 10.00%

Total Muliplier 2.7

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

Mr. Andrew Lippens Savannas Preserve Ed Center Design & Permitting

CN 230 TA 45 - CO 1

Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702

File details come from the government source that posted it. Updated .