CN-370000-CN230-T82CO1.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

This is a Task Assignment Change Order Form (Change Order No. 01) issued by the Florida Department of Environmental Protection (FDEP) for Contract CN230, Task Assignment 82, related to the Bill Baggs Cape Florida State Park Volunteer RV Sites project located in Bill Baggs Cape Florida State Park. The consultant performing the work is The Weiler Engineering Corporation, represented by Jeff Weiler, P.E. The FDEP Contract Manager is Ralph Perkins, and the Project Manager is Joel Pollock from the Bureau of Design and Construction.

The change order adds Construction Administrative services to the existing task assignment, effective June 14, 2024. The scope of work includes six subtasks: Subtask 4 (Review Contractor Submittals) at $2,830.00; Subtask 5 (Assistance During Construction) at $2,520.00; Subtask 6a (Site Visit Month 1 Inspection) at $2,935.00; Subtask 6b (Site Visit Month 2 Substantial Completion) at $2,935.00; Subtask 6c (Site Visit Month 3 Final Completion) at $2,935.00; and Subtask 6d (Sanitary Hot Tap Inspection) at $1,725.00. The net increase to the task amount is $15,880.00 in fixed fees with no reimbursable costs anticipated. The task execution date remains January 5, 2024, with the task end date of April 29, 2025 remaining unchanged. Payment will be made upon FDEP approval of deliverables for each subtask in the amounts specified.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC2.pdf PDF
CN-370000-CN230-CMC4.pdf PDF
CN-370000-CN230-T10.pdf PDF
CN-370000-CN230-T18CO1.pdf PDF
CN-370000-CN230-T19.pdf PDF
CN-370000-CN230-T21CO1.pdf PDF
CN-370000-CN230-T23.pdf PDF
CN-370000-CN230-T23CO1.pdf PDF
CN-370000-CN230-T25CO2.pdf PDF
CN-370000-CN230-T26CO1.pdf PDF
CN-370000-CN230-T29.pdf PDF
CN-370000-CN230-T2CO3.pdf PDF
CN-370000-CN230-T34CO1.pdf PDF
CN-370000-CN230-T37.pdf PDF
CN-370000-CN230-T37CO1.pdf PDF
CN-370000-CN230-T42CO1.pdf PDF
CN-370000-CN230-T42CO3.pdf PDF
CN-370000-CN230-T43.pdf PDF
CN-370000-CN230-T44.pdf PDF
CN-370000-CN230-T48.pdf PDF
CN-370000-CN230-T51CO2.pdf PDF
CN-370000-CN230-T54CO1.pdf PDF
CN-370000-CN230-T58.pdf PDF
CN-370000-CN230-T63.pdf PDF
CN-370000-CN230-T65.pdf PDF
CN-370000-CN230-T67.pdf PDF
CN-370000-CN230-T6CO1.pdf PDF
CN-370000-CN230-T72CO1.pdf PDF
CN-370000-CN230-T74.pdf PDF
CN-370000-CN230-T81.pdf PDF
CN-370000-CN230-T81CO1.pdf PDF
CN-370000-CN230-T82.pdf PDF
CN-370000-CN230-T83.pdf PDF
CN-370000-CN230-T84.pdf PDF
CN-370000-CN230-T85.pdf PDF
CN-370000-CN230-T88.pdf PDF
CN-370000-CN230-TA31.pdf PDF
CN-370000-CN230-TA5.pdf PDF
PC-370000-CN230.pdf PDF
CN-370000-CN230-CMC5.pdf PDF
CN-370000-CN230-T1.pdf PDF
CN-370000-CN230-T12.pdf PDF
CN-370000-CN230-T13.pdf PDF
CN-370000-CN230-T14.pdf PDF
CN-370000-CN230-T18.pdf PDF
CN-370000-CN230-T19CO1.pdf PDF
CN-370000-CN230-T19CO2.pdf PDF
CN-370000-CN230-T22.pdf PDF
CN-370000-CN230-T25CO1.pdf PDF
CN-370000-CN230-T25CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN230 82 01 61563C

Bill Baggs Cape Florida State Park Volunteer RV Sites

The Weiler Engineering Corporation

Jeff Weiler 941-628-4732 weiler7@mac.com

Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov

Adding Construction Administrative services to the existing task assignment per the attached change order dated: June 14, 2024.

$ 208.00 $ 24,100.00 $ 24,308.00 $ 0.00 $ 24,308.00 $ 24,308.00 $ 0.00 $ 15,880.00 $ 15,880.00 $ 0.00 $ 40,188.00 $ 40,188.00

01/05/2024

04/29/2025

04/29/2025

04/29/2025

Tamika Bass

Joel Pollock

Ralph Perkins

Jeff Weiler

Michael W. Foster Jr., P.E.

61563C 37505000011 080039/24 675002 U3200 131500 XR $ 15,880.00

$ 15,880.00

June 14, 2024

Joel Pollock Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

RE: Bill Baggs State Park Volunteer RV Park Expansion, CN - 230, TA 82, CO 1: Construction Assistance Services

Dear Mr. Pollock, It is our understanding that the Department would like to proceed with construction of the Volunteer RV Sites and would like WEC to provide services during construction.

For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:

Please review the attached Proposal Summary and deliverables.

Sincerely, R. Jeff Weiler, P.E.

President The Weiler Engineering Corporation

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289- 416 2 WE INVITE

YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

Mr. Joel Pollock Bill Baggs State Park Volunteer RV Sites

CN 230/TA82

Bill Baggs State Park Volunteer RV Park Expansion

Contract Number 230, Task Assignment Number 82- CO 1 Construction Administration

Subtask 4: Review Contractor Submittals

Description: WEC will provide engineering review of Contractor's shop drawing submittals. WEC will prepare an anticipated submittal list and maintain a log.

Deliverable: WEC will review and comment on Contractor submittal package within 7 days of receipt and provide stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Fixed Price Cost:

Subtask 4 - Submittal Review

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Registered Engineer Intern

115 12 $1380.00

Senior Engineering Designer

100 6 $600.00

Engineering Technician

80 2 $160.00

Clerical 55 2 $110.00

Total $2,830.00

Reimbursable Cost:

Postage Not anticipated (all deliverables in digital form only)

Printing

Overnight Travel (if applicable) Mileage (@ $0.445 per mile) Reimbursable Total Cost

Not anticipated (all deliverables

Not anticipated

$0.00

Total Subtask 4:

Submittals

$2,830.00

Mr. Joel Pollock Bill Baggs State Park

Subtask 5: Assistance During Construction

Description: from Contractor within 7 days throughout the course of the construction phase. WEC will provide copies of all RFI responses to the FDEP Project Manager in PDF format.

Deliverable: RFI responses in PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 5 Assistance During Construction

Firm Name Position Classification Hourly Rate Hours

Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290.00

Registered Professional Engineer 145 2 290.00

Registered Engineer Intern 115 8 920.00

Senior Engineering Designer 100 8 800.00

Clerical 55 4 220.00

Total

2,520.00

Postage Not anticipated (all deliverables

Overnight Travel (if applicable) Mileage (@ $0.445 per mile) Reimbursable Total Cost

Not anticipated (all deliverables

$0.00

Total Subtask 5:

Submittals

$2,520.00

Mr. Joel Pollock Bill Baggs State Park

Subtask 6a-6d On-Site Observation

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, Subtask 6a: Site Visit Month #1

Description: WEC will provide a monthly inspection during construction.

Deliverable: Monthly progress reports provided via PDF.

Subtask 6a: Inspection (Month 1)

Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Registered Professional Engineer

145 2 $290.00

Registered Engineer Intern 115 14 $1610.00

Senior Engineering Designer 100 4 $400.00

Clerical 55 1 $55.00

Total $2,935.00

Postage

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Not anticipated

Not anticipated (all deliverables in digital form only)

$0.00

Total Subtask 6a $2,935.00

Mr. Joel Pollock Bill Baggs State Park

Subtask 6b: Site Visit Month #2 (Substantial Completion)

Description: WEC will provide a monthly inspection during construction and provide a punch list.

Deliverable: Progress reports provided via PDF.

Subtask 6b: Inspection (Month 2) Substantial Completion

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Registered Professional Engineer

145 2 $290.00

Registered Engineer Intern 115 14 $1610.00

Senior Engineering Designer 100 4 $400.00

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Not anticipated

Not anticipated (all

Total Subtask 6b $2,935.00

Mr. Joel Pollock Bill Baggs State Park

Subtask 6c: Site Visit Month #3 (Final Completion)

Description: Utilizing photos and reports from BDC inspector and weekly visits by a WEC inspector, WEC will provide on-site observation during installation of the sewer.

Deliverable: Progress reports provided via PDF.

Subtask 6C: Inspection (Month 3) Final Completion

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 4 $580.00

Registered Professional Engineer

145 2 $290.00

Registered Engineer Intern 115 14 $1610.00

Senior Engineering Designer 100 4 $400.00

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Not anticipated

Not anticipated (all

Total Subtask 6c $2,935.00

Mr. Joel Pollock Bill Baggs State Park

Subtask 6d: Sanitary Hot Tap Inspection

Description: WEC will attend the sanitary hot tap.

Deliverable: Progress report provided via PDF.

Subtask 6d: Hot Tap

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 $145.00

Registered Professional Engineer

145 1 $145.00

Registered Engineer Intern 115 12 $1380.00

Total $1,725.00

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Not anticipated

Not anticipated (all

Total Subtask 5d $1,725.00

Mr. Joel Pollock Bill Baggs State Park

Project Schedule:

Activity Duration (Calendar Days) Days from Contract Acceptance

Subtask 4: Submittal Review 90 90

Subtask 5: Assistance During Construction

90 90

Subtask 6a: Inspection (Month 1) 30 30

Subtask 6b: Substantial Completion (Month 2)

30 60

Subtask 6c: Final Completion (Month 3)

30 90

Subtask 6d: Hot Tap 30 90

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 4: Assistance During Construction

$2,830.00 $0.00

Subtask 5: Assistance During Construction

$2,520.00 $0.00

Subtask 6a: Inspection (Month 1) $2,935.00 $0.00

Subtask 6b: Substantial Completion (Month 2

$2,935.00 $0.00

Subtask 6c: Final Completion (Month 3)

$2,935.00 $0.00

Subtask 6d: Hot Tap $1,725.00 $0.00

Total Fixed Price Cost: $15,880.00

Total Fixed Price Cost: $0.00

Overall Total Cost: $15,880.00

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)