This document is a Task Assignment Change Order (Change Order No. 01) issued by the Florida Department of Environmental Protection (FDEP) to Weiler Engineering Corporation for the Lignumvitae Key Botanical Repair-Renovate Dock project (FDEP Contract No. CN230, Task Assignment No. 04, Project No. 61175C). The change order was submitted on November 28, 2017, and approved on December 5, 2017, by FDEP's Contract Manager Mae Roth and Project Manager Theresa Carron. The project is located at Lignumvitae Key Botanical and involves dock and building repair services following hurricane damage.
The change order reallocates three engineering hours from Subtask 2B (Building 60% Documents) to create a new Subtask 5 (Cistern Foundation Repair), with no net cost increase to the overall project. Subtask 2B remains valued at $6,310.00 in fixed price costs, while the new Subtask 5 is valued at $360.00 in fixed price costs. The overall task maintains its original cost structure with total reimbursable costs of $5,892.68, total fixed fee costs of $25,873.16, and an overall total cost of $31,765.84. The task execution date remains unchanged at September 30, 2018. Subtask 5 encompasses engineering work to incorporate a detail for the foundation repair of the existing cistern, excluding the cistern roof and paint, with deliverables to be provided electronically to FDEP-BDC incorporating comments from preliminary and 60% design reviews.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
Required Signatures: Adobe Signature
FDEP Contract No.: I Task Assignment No.: Change Order No.: j Project No.:
CN230 04 01 61175C
Project Location: Project Name:
Lignumvitae Key Botanical Repair-Renovate Dock Consultant Name:
Weiler Engineering Corporation Consultant Representative: Phone: Email:
R. Jeff Weiler, P.E. 941-505-1700 wei1er7(@mac.com FDEP Contract Manager: Phone: Email:
Mae Roth, or successor 850-245-2781 mae.roth(@dep.state.tl. us Description and Justification of Change:
Change order dated 11/28/17 (attached) to replace current subtask 2B (reallocate 3 hours to Subtask 5), and describe new Subtask 5 (engineering to direct the repair of the cistern foundation). No cost change .
iangem as Cl • 1i kA mount:
Item Reii:tjbursemeht Fixed:F~e J'6tal
Original Task Amount: $ 5.892.68 $ 25.873.16 $ 31.765.84 Task amount including all previous Change Orders: $ 5.892.68 $ 25.873.16 $ 31.765.84 Net increase/decrease in task amount for this Change Order: $ 0.00 $ 0.00 $ 0.00 Total Amounts with all Change Orders: $ 5.892.68 $ 25.873.16 $ 31.765.84
. 1i kT: iangem as ,me:
Original Task Execution Date: 8/28/17
Original Task End Date: 9/30/18
Present Task End Date: 9/30/18
Net Chan,ge in Days: 0
New Task End Date: 9/30/18
Approval Sig11atures:
Greg Turral Greg Tu rra I Digttally signed by Greg Turral . . Dela: 2017.12.05 11:41:14 --05'00' 12-5-2017
Budget Representative, FDEP
Theresa Carron Project Manager, FDEP
Mae Roth Contract Manager, FDEP
R. Jeff Weiler, P .E.
Consultant
Michael, W. Foster Jr., P.E.
Contract Authority, FDEP
Proiect# Grant# Ore Code
29 Dieit FLAIR Code:
000 -012 (Effective 5-19-2016)
Signature
The C Digitally signed by Theresa Carron resa arron Dale: 2017.12.0512:17:41 -05'00'
Signature
Mae Roth '' DigitallysignedbyMaeRoth ,.: Data: 2017.12.06 13:48:57 -05'00'
Signature
<-. r(~)/ ,; ~eA
1gnature
Date
12/5/2017 Date
12/5/2017 Date
Cat/Year Fund Module ObiectCode EO Amount
Total: $0.00
Lignumvitae Key Botanical Dock/Building Repair
FDEP Project #61175C
CN 230 TA4 CO1 (Request Submitted 11/28/17)
Subtask 2B: Building 60% Documents - (to replace existing CN230 TA4 Subtask 2B) Description: The wooden portion of the dock's professional engineering scope removed from the previous Subtask 2B, and those hours used to create a new Subtask 5: Cistern Foundation Repair.
Design documents (pdf) separate for the building necessary for regulatory approvals and incorporating our findings and recommended repairs. Building repair plans to be completed to 60% incorporating comments from preliminary including:
Deliverable: 60% Plans - Consultant will provide via email to the BDC the digital PDF 60% documents incorporating comments from Preliminary/30% review, and the opinion of probable cost in pdf.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost
Subtask 2B
·· Firm Name Position, Classification
Weiler Engineering Project Manager
Principal in Charge
Registered Professional Engineer
Registered Engineer Intern
Senior Engineering Designer
Engineering Technician
Clerical
Total
Reimbursable Cost: None anticipated
Total for Subtask 2B: $6,310.00
Subtask 5: Cistern Foundation Repair - (New Subtask)
Hourly Hours Total Rate Fixed Price
Cost
145 3 435
195 1 195
145 8 1160
115 23 2645
100 15 1500
80 4 320
55 1 55
Description: Consultant will incorporate a detail for the foundation repair of the existing cistern. The cistern roof and paint are excluded from this task.
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE· SUITE 1306 I PUNTA GORDA I FL 33950 I TEL 941-505 -1700 I FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY I MARATHON I Fl 33050 I TEL 305 -289-4161 I FAX 305 -289-4162
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Deliverable: Consultant will provide design documents for the recommended repairs on the cistern foundation. Cistern repair plans will be delivered electronically to FDEP-BDC Incorporating comments from preliminary, and 60% reviews.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtasks
Firm Name
Weller Engineering
Total for Subtask 5: $360.00
Project Schedule:
Position Classification Hourly Rate
Project Manager 145
Registered Engineer Intern 115
Senior Engineering Designer 100
Total
Actiyify Duration {Calendar Days) .
Begin project
CN230TA4-Subtask 1A & B 30
FDEP Review 15
CN230TA4-Subtask 2A 60% submittal dock 30
CN230TA4-Subtask 2B 60% submittal bldg 30
CN230TA4-Subtask 3A Permit applications 30
FDEP Review 15
CN230TA4-Subtask 3Ba Village approvals 30
CN230TA4-Subtask 3Bb ACOE approvals 90
CN230TA4-Subtask 4A: 100% Plans dock 15
CN230TA4-Subtask 4B: 100% Plans bldg 15
CN230TA4CO1-Subtask 5: Cistern 30
Final Dock plans
Final Building plans
Hours Total Fixed·
Price Cost
1 145
1 115
1 100 start Dates
Novl
Dec 1
Jan 1
Jan 15
Jan 15
Jan 15
Feb 15
Marl
Marl
June 1
April 1
Jan 15
June 15
April 15
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE· SUITE 1306 I PUNTA GORDA I FL 339SO I TEL 941-505 -1700 I FAX 941-505 -1702
MARATHON OFFICE: 6805 OVERSEAS HIGHWAY I MARATHON I FL 33050 I TEL 305-289-4161 I FAX 305 -289-4162
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Summary of Fees:
Subtask Subtask Fixed Price Cost ·subtask Reimbursable
CN230TA4-1A $5440 $464.58
CN230TA4-1B 3663.16 $133.5
CN230TA4-2A 60% submittal dock $3720
CN230TA4-2B 60% submittal building $6310
CN230TA4-3A Permit applications $1940 $4595
CN230TA4-3B Village & FDEP approvals $1505
CN230TA4-3C ACOE approvals $675
CN230TA4-4A: 100% Plans dock $1130 $349.80
CN230TA4-4B: 100% Plans building $1130 $349.80
CN230TA4CO1- Subtask 5: $360 Cistern Foundation Repair
Total Fixed Price Cost: $25,873.16
Total Reimbursable Cost: $5892.68
Overall Total Cost: $31,765.84
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 I PUNTA GORDA I FL 33950 I TEL 941-50S -1700 I FAX 941-505 -1702 MARATHON OFFICE : 6805 OVERSEAS HIGHWAY I MARATHON I FL 33050 I TEL 305 -289 -4161 I FAX 305 -289-4162
WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Roth, Mae
From:
Sent:
To:
Cc:
Subject:
Madden, Philip J.
Thursday, December 7, 2017 8:40 AM Stone, Philip Roth, Mae RE: For Signature: Lignumvitae Repair/Renovate Dock Change Order
Ok. Mae, please pass it along hard copy.
Thanks, Philip 850-245-2630
From: Stone, Philip Sent: Wednesday, December 06, 2017 4:26 PM To: Madden, Philip J.<Philip.J.Madden@dep.state.fl.us> Cc: Roth, Mae <Mae.Roth@dep.state.fl.us> Subject: FW: For Signature: Lignumvitae Repair/Renovate Dock Change Order
Philip, I am good with this TACO. It is the one that Michael wanted to see in advance which we did and he approved and now we are routing for signature.
Thank you, Philip
From: Roth, Mae Sent: Wednesday, December 6, 2017 4:18 PM To: Stone, Philip <Philip.Stone@dep.state.fl.us>
Subject: For Signature: Lignumvitae Repair/Renovate Dock Change Order
Hello Philip, Could you please review and pass up the attached task assignment for Lignumvitae? This is an Irma repair project, let me know if you have questions or need additional information, thanks!
Thank you, Mae Roth Government Operations Consultant II Bureau of Design and Construction Department of Environmental Protection mae.roth@floridadep.gov Office: (850} 245-2781
This communication does not constitute an authorization for any increase in the scope of work, cost, or time for the project being discussed. All changes to services, cost, or time must be accomplished in accordance with the formal process outlined in the contract. The DEP objects to, and shall not be responsible for, any changes to services, costs, or additional time not authorized by an executed Contract Amendment, Task Assignment Change Order, Construction Change Order, or
Construction Change Directive, as appropriate for this contract.
From: Robin Palmer [mailto:rpalmer@weilerengineering.org] Sent: Wednesday, December 6, 2017 4:03 PM To: Roth, Mae <Mae.Roth@dep.state.fl.us> Subject: RE: Lignumvitae Repair/Renovate Dock Change Order
Mae, Here is version with all pages includes in case you need all sheets.
Thanks !
5.fi·~-- ffi..:.1~ Robin Palmer, E.I, E: INIRONMENTAL ENGINE], RjNG
Wtll.ERC NOINC[ RING CORl"ORATION
201 W[;SJ MJUlSON AVENI.II= - sum: 'laoti I PUNJA GOOOA I fl 33950 PH 9'41-601'>-1 ,00 I FX941o01,--1102 I WWW.Wf.lU:R:NOH:EfflNG.ORO r.~~t 6-t.~OINtl S.:INt; ~- Qt [K~LIO( Q"'IL ,1 t..ANt> !;JI VI L()1' 11rw1 t 'WA turt..:-DNT U60~ T& ,I uT,Ji 1E& I 11:J '<•CIPAL OOVE!'-NllEII? I HIWCTUl!.L I lll11<i IMO I OINIP6
From: Robin Palmer [mailto :rpalmer@weilerengineering.org] Sent: Wednesday, December 06, 2017 4:00 PM To: 'mae.roth@floridadep.gov' <mae.roth@floridadep.gov> Cc: 'Carron, Theresa' <Theresa .Carron@dep.state.fl.us>; 'Jeff Weiler' <weiler7@mac.com>;
'ssuggs@weilerengineering.org' <ssuggs@weilerengineering.org> Subject: Lignumvitae Repair/Renovate Dock Change Order
Mae, Please find attached the change order for the Lignumvitae repair project. Please let us know if you need anything else.
Thank you, Of ,,/4, !?1t"» Robjn Palmer, E.I.
EINIRONMENTAl. ~GIIEERING
WlllLERENON:;ERIHOaJRl'ORATION
· ;: ! Ix ~Ilene• in ••1in••ri•1 \·y I · ·· 1 .,J = _J :.__,'
201 w:;sr tu.RION AIIENI.E - SUITE iacMI I PUNTA-GORDA I R...33960 PH9<11-60li-1lWIF1194'f-o00--11WIWNW,Wf.lLffENOH:,ERHIJ.ORO n,.i.,a ~-f t,U)JN~fl<INCl h· I)!', JM;Q.UCl' !)VI~) \»Ill llf-VJ ~(l,i'llltwi, _ nitr~QNT AUCII T~ pJTtl.-'J 1E& Ulco°"iCIPAL Oll\lE"'.NIIEN? I 6 fRUCTU~,1,1. I IIIN IN~ 1191114~6
File details come from the government source that posted it. Updated .