CN-370000-CN230-T51CO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CN230|5f4ec01f5eb38b1957861cb8292c2183
Contract number
CN230
Issued by
Florida

About this file

This is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP) for the Oscar Scherer State Park Restroom 2 Replacement project. The contract involves the FDEP as the contracting state agency and Weiler Engineering Corporation as the consultant providing construction engineering and inspection (CEI) services. The primary parties responsible for contract management are Ralph Perkins (FDEP Contract Manager) and Jeff Weiler (Consultant Representative).

The change order authorizes a time extension and construction administrative services for the Oscar Scherer campground bathhouse replacement project. The contract adds $24,889.42 in costs, comprising $24,025.00 in fixed fee labor costs and $864.42 in reimbursable expenses. The change order extends the task end date from August 10, 2023, to August 9, 2024—an additional 365 calendar days—to allow sufficient time for construction completion. CEI services include pre-bid meetings, pre-construction coordination, submittal reviews, regulatory response, RFI responses, eight monthly construction inspections, substantial completion walk-through, and final completion certification. The total task amount with all change orders is $75,903.42. Payment is contingent upon FDEP approval of deliverables for each subtask. The contract was executed on July 19, 2023, with digital signatures from all required FDEP and consultant representatives.

View the file

Other files

File Type Posted
CN-370000-CN230-CMC5.pdf PDF
CN-370000-CN230-T1.pdf PDF
CN-370000-CN230-T12.pdf PDF
CN-370000-CN230-T13.pdf PDF
CN-370000-CN230-T14.pdf PDF
CN-370000-CN230-T18.pdf PDF
CN-370000-CN230-T19CO1.pdf PDF
CN-370000-CN230-T19CO2.pdf PDF
CN-370000-CN230-T22.pdf PDF
CN-370000-CN230-T25CO1.pdf PDF
CN-370000-CN230-T25CO3.pdf PDF
CN-370000-CN230-T26.pdf PDF
CN-370000-CN230-T2CO1.pdf PDF
CN-370000-CN230-T37CO2.pdf PDF
CN-370000-CN230-T45CO1.pdf PDF
CN-370000-CN230-T4CO1.pdf PDF
CN-370000-CN230-T52.pdf PDF
CN-370000-CN230-T53.pdf PDF
CN-370000-CN230-T53CO1.pdf PDF
CN-370000-CN230-T57.pdf PDF
CN-370000-CN230-T59.pdf PDF
CN-370000-CN230-T60.pdf PDF
CN-370000-CN230-T64.pdf PDF
CN-370000-CN230-T66.pdf PDF
CN-370000-CN230-T7.pdf PDF
CN-370000-CN230-T70.pdf PDF
CN-370000-CN230-T72.pdf PDF
CN-370000-CN230-T75.pdf PDF
CN-370000-CN230-T8.pdf PDF
CN-370000-CN230-T80.pdf PDF
CN-370000-CN230-T82CO1.pdf PDF
CN-370000-CN230-T86.pdf PDF
CN-370000-CN230-T87.pdf PDF
CN-370000-CN230-T89.pdf PDF
CN-370000-CN230-T90.pdf PDF
CN-370000-CN230-TA30.pdf PDF
CN-370000-CN230-TA5CO1.pdf PDF
CN-370000-CN230.pdf PDF
CN-370000-CN230-CMC2.pdf PDF
CN-370000-CN230-CMC4.pdf PDF
CN-370000-CN230-T10.pdf PDF
CN-370000-CN230-T18CO1.pdf PDF
CN-370000-CN230-T19.pdf PDF
CN-370000-CN230-T21CO1.pdf PDF
CN-370000-CN230-T23.pdf PDF
CN-370000-CN230-T23CO1.pdf PDF
CN-370000-CN230-T25CO2.pdf PDF
CN-370000-CN230-T26CO1.pdf PDF
CN-370000-CN230-T29.pdf PDF
CN-370000-CN230-T2CO3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

(Revised 9-26-2018) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN230 51 1 61183C

Oscar Scherer Replace Campground Bathhouse #2

Weiler Engineering

Jeff Weiler 941.628.4732 weiler7@mac.com

Ralph Perkins or successor 850.245.2460 Ralph.Perkins@FloridaDEP.gov

Time extension and construction administrative services per proposal dated 7/17/2023 and letter dated 7/13/2023.

$ 1,180.00 $ 49,834.00 $ 51,014.00 $ 1,180.00 $ 49,834.00 $ 51,014.00 $ 864.42 $ 24,025.00 $ 24,889.42

$ 2,044.42 $ 73,859.00 $ 75,903.42

8/22/2022

8/10/2023

8/10/2023

8/09/2024

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.07.18 14:36:42 -04'00'

Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.07.19 12:04:21 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.07.19 13:12:11 -04'00'

Jeff Weiler Jeff Weiler Digitally signed by Jeff Weiler Date: 2023.07.19 15:23:46 -04'00'

Bryan Bradner Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2023.07.31 13:11:32 -04'00'

61183C 37504000062 080039/24 675002 U3100 131500 XR $ 24,889.42

$ 24,889.42

Marcil, Richard

From: Robin Palmer <rpalmer@weilerengineering.org> Sent: Thursday, July 13, 2023 9:45 AM To: Sandel, Garland Subject: Oscar Sherer Bathhouse #2 CN230 Task no 51 Project 61183C

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Garland, The current contract for Oscar Scherer Bathhouse #2 expires on August 10, 2023. We are requesƟng a 365 day Ɵme extension for the Oscar Scherer Bathhouse # 2 CN230 Task no 51 Project 61183C in order to have enough Ɵme to complete the construcƟon for the project.

Thanks, Robin Palmer, P.E.

Environmental Engineer

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702

MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289-416 2

WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

June 26, 2023 - Revision 1 - July 17, 2023

Mr. Garland Sandel

Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3800 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

RE: Oscar Scherer Restroom Replacement – Bathhouse 2

Dear Mr. Sandel;

Thank you for the opportunity to provide this proposal to provide services during construction for the above referenced Bathroom 2.

For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:

Please review the attached Proposal Summary and deliverables.

Sincerely, R. Jeff Weiler, P.E.

President The Weiler Engineering Corporation

Subtask 5: Attend a Pre-Bid meeting on-site Description: Consultant will attend one pre-bid meeting on site to respond to questions and prepare minutes.

Deliverable: Consultant will provide digital minutes of meeting and responses to contractor questions.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Reimbursable Cost:

Subtask 5 - Pre-bid

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 $1160.00

Principal in Charge 195 0 $0.00

Registered Professional Engineer

145 0 $0.00

Registered Engineer Intern 115 8 $920.00

Senior Engineering Designer 100 8 $800.00

Engineering Technician 80 8 $640.00

Clerical 55 0 $0.00

Total $3520.00

Subtask 6A - 6N: Construction Phase Services

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)

Subtask 6A: Attend Pre-Construction Meeting

Description: WEC will provide representation at the Pre-Construction Meeting.

Deliverable: Meeting notes within 2 days from meeting date for inclusion by FDEP Project Manager in Meeting Minutes.

Fixed Price Cost:

Description Number @ Total Postage Not anticipated

FWC application fee Not anticipated

Overnight Travel (if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

320 0.445 $142.40

Reimbursable Total Cost $142.40

Total Subtask 5 $3662.40

Subtask 6A - Pre-Construction Mtg

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 8 1160

Principal in Charge 195 0 0

Registered Professional Engineer 145 0 0

Reimbursable Cost:

Subtask 6B: Review Contractor submittals

Description:WEC will review and comment on Contractor submittal package within 14 days of receipt.

Deliverable:, Stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.

Registered Engineer Intern 115 8 920

Senior Engineering Designer 100 0 0

Engineering Technician 80 0 0

Clerical 55 0 0

Total 2080

Description Number @ Total

Postage 0

Printing 2.3 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile) 76 0.445 33.82

Reimbursable Total Cost 33.82

Total subtask 6A 2113.82

Subtask 6B - Review Submittals

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290

Subtask 6C: Respond to Building Department comments

Description: WEC will assist Client and/or Client's Contractor in responding to comments from the Building Department, and revise plans accordingly within 14 days of receipt of comments.

Specifically, when WEC's involvement is required for RFI responses, WEC will prepare a draft and send to FDEP Project Manager for review and comment. WEC will then discuss and/or revise accordingly prior to formal submittal of RFI response to Building Department.

Deliverable: RFI response documents submitted to Building Department.

Registered Professional Engineer 145 0 0

Registered Engineer Intern 115 8 920

Senior Engineering Designer 100 12 1200

Engineering Technician 80 2 160

Clerical 55 2 110

Total 2680

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost

Total Subtask 6B 2715

Subtask 6C

Subtask 6D: Respond to Contractor RFI's

Description: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase (8 Months).

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 2 290

Principal in Charge 195 0 0

Registered Professional Engineer 145 1 145

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 8 800

Engineering Technician 80 0 0

Clerical 55 1 55

Total 1980

Description Number @ Total

Postage 35 0

Printing 2.30 0.00

Overnight Travel

(if applicable)

Not anticipated

Mileage (@ $0.445 per mile)

Not anticipated

Reimbursable Total Cost

Total - 6C 1980

Subtask 6D- Respond to RFI’s

Cost

Weiler Engineering Project Manager 145 2 290

Principal in Charge 195 0 0

Registered Professional Engineer 145 2 290

Registered Engineer Intern 115 8 920

Senior Engineering Designer 100 8 800

Engineering Technician 80 0 0

Clerical 55 4 220

Total 2520

Description Number @ Total

Postage 0

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 0

Total Subtask 6D 2520

June 26, 2023 - Rev 1 - 7/17/23 Mr. Garland Sandel Oscar Scherer State Park CEI Restroom 2 Replacement

CN 230/TA51 CO1

Subtask 6E: Provide Construc3on Inspec3ons (Month 1)

Description: WEC will provide a monthly inspection (NLT every 30 days) during construction.

Deliverable: WEC will provide two (2) original signed and sealed reports to the FDEP Project Manager, as well as a digital version in PDF format. The inspection report will be submitted within 3 days of each inspection.

Subtask 6E - Month 1 Inspection

Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 35 0

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost

33.82

Subtask 6F: Construction Inspection (Month 2)

Total Subtask 6E 1041.32

Subtask 6F

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Subtask 6G: Construction Inspection (Month 3)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost

68.82

Total Subtask 6F 1076.32

Subtask 6G Month 3 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Postage 1 35 35

Subtask 6H: Construction Inspection (Month 4)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 7G 1076.32

Subtask 6H - Inspection Month 4

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Subtask 6I: Construction Inspection (Month 5)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6H 1076.32

Subtask 6I Month 5 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Subtask 6J: Construction Inspection (Month 6)

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6I 1076.32

Subtask 6J Month 6 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Subtask 6K: Construction Inspection (Month 7)

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6J 1076.32

Subtask 6K Month 7 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Principal in Charge 195 0 0

Registered Professional Engineer 145 .5 72.5

Registered Engineer Intern 115 6 690

Subtask 6L: Construction Inspection (Month 8)

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6K 1076.32

Subtask 6L Month 8 Inspection

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Weiler Engineering Project Manager 145 1 145

Registered Professional Engineer 145 .5 72.5

Subtask 6M: Substantial Completion Walk-Through w/Punchlist

Description: WEC will assist Client with the Substantial Completion inspection and punchlist, with WEC representative attending the Substantial Completion inspection and providing engineer input related to the punchlist.

Deliverable: WEC will provide comments and input on punchlist within one (1) day of Substantial Completion inspection.

Registered Engineer Intern 115 6 690

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1007.5

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6L 1076.32

Subtask 6N: Final Completion w/ Certification

Description: WEC will assist Client with the Final Completion inspection, with WEC representative attending the Final Completion inspection.

Deliverable: WEC will also provide complete the final completion certification form required by FDEP Project Manager.

Subtask 6M substantial

Cost

Weiler Engineering Poject Manager 145 6 870

Principal in Charge 195 0 0

Registered Professional Engineer 145 1 145

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 1 100

Engineering Technician 80 0 0

Clerical 55 0 0

Total 1805

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6M 1873.82

Project Schedule:

Subtask 6N - Final

Cost

Weiler Engineering Poject Manager 145 2 290

Principal in Charge 195 0 0

Registered Professional Engineer 145 1 145

Registered Engineer Intern 115 6 690

Senior Engineering Designer 100 2 200

Engineering Technician 80 0 0

Clerical 55 1 55

Total 1380

Description Number @ Total

Postage 1 35 35

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

76 0.445 33.82

Reimbursable Total Cost 68.82

Total Subtask 6N 1448.82

Activity Duration (Calendar Days) Days from NTP

Subtask 5: Prebid 30 30

Subtask 6A - Pre construction 30 60

Subtask 6B: Review Submittals 30 90

Summary of Fees:

Subtask 6C: Respond to RAI's 60 150

Subtask 6D: Respond to Contractor RFI's

240 (Est max overall calendar days;

RFI's will be responded to within 7 days of receipt from Contractor)

Subtask 6E: Provide Construction Inspections w/ (Month 1)

30 180

Subtask 6F: Provide Construction Inspections w/ Report (Month 2)

30 210

Subtask 6G: Provide Construction Inspections w/ Report (Month 3)

30 230

Subtask 6H: Provide Construction Inspections w/ (Month 4)

30 260

Subtask 6I: Provide Construction Inspections w/ Report (Month 5)

30 290

Subtask 6J: Provide Construction Inspections w/ (Month 6)

30 320

Subtask 6K: Provide Construction Inspections w/ (Month 7)

30 350

Subtask 6L: Provide Construction Inspections w/ (Month 8)

30 380

Subtask 6M: Substantial Completion Walk-Through w/ Punchlist

30 410

Subtask 6N: Final Completion w/ Certification

30 440

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 5 Pre-Bid $3520.00 $142.40

Subtask 6A - Pre-Construction Meeting

$2080.00 $33.82

Subtask 6B - Submittal Review $2680.00 $35.00

Subtask 6C - Regulatory Response

$1980.00 $0.00

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

Subtask 6D Assistance during construction

$2520.00 $0.00

Subtask 6E Inspection 1 $1007.50 $33.82

Subtask 6F Inspection 2 $1007.50 $68.82

Subtask 6G Inspection 3 $1007.50 $68.82

Subtask 6H Inspection 4 $1007.50 $68.82

Subtask 6I Inspection 5 $1007.50 $68.82

Subtask 6J Inspection 6 $1007.50 $68.82

Subtask 6K Inspection 7 $1007.50 $68.82

Subtask 6L Inspection 8 $1007.50 $68.82

Subtask 6M Substantial Completion

$1805.00 $68.82

Subtask 6N Final Completion $1380.00 $68.82

Total during Construction $24025.00 $864.42

Total Fixed Price Cost: $24889.42

CN230 TA51 CO1 CEI.pdf
Time extension letter to 2024.pdf
rev 1 071723 Proposal Cei Oscar Scherer SP copy.pdf

File details come from the government source that posted it. Updated .