CN-370000-CN230-T4CO2.pdf
PDF 171 KB Posted
- Contract number
- CN230
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a state contract modification. The change order involves FDEP as the client and Weiler Engineering Corporation as the consultant. The contract CN230 TA4 pertains to professional design and engineering services for the Lignumvitae Key Botanical dock and building repair-renovation project located in Florida. The change order, dated January 17, 2018, was prepared by R. Jeff Weiler, P.E. of Weiler Engineering Corporation and approved by FDEP representatives including Philip Stone (Contract Manager) and Michael W. Foster Jr., P.E. (Contract Authority).
The change order modifies the scope of work by removing the Cistern Foundation Repair subtask while adjusting other components of the project. The contract scope includes professional design and structural engineering for dock spall and cracking repair, boat slip raising, building foundation cracking and spall design, and deteriorated pre-cast beam assessment. The modified contract reflects a total fixed fee of $25,873.16 and total reimbursable costs of $5,892.68, for an overall contract value of $31,765.84 with no net increase in cost from the original task assignment. Key deliverables include 60% building design documents and 100% dock and building plans. The project execution period extends from August 28, 2017 through September 30, 2018, with specific subtask completion dates ranging from December 2017 through June 2018.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .