About this file

This document contains a federal contract opportunity and related progress report template. The federal contract opportunity is solicitation number W911S820B0002 for protective coatings services at Joint Base Lewis-McChord in Washington. The contractor will provide all labor, materials, equipment and perform maintenance, repair, and minor protective coatings construction work on real property and supported satellites as identified in individual task orders. Task orders will require various protective coatings applications and may include incidental construction disciplines. The progress report template is for use on the base civil engineer contract and requires the contractor to report on percentage of work completed for preconstruction, mechanical, structural and closeout elements, as well as any modifications.

View the file

Other versions and copies of AF Form 3065

File Revision Posted Attached to
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf Apr 1, 1996 SABER IDIQ
Attachment C - AF Form 3065.pdf Revision not stated Airfield Blast Shield
AF Form 3065.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment G - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 003 AF IMT 3065 Progress Report.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3065.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3065.xlsx Revision not stated Demo B6119
Attachment 5 - AF FORM 3065 Contract Progress Report.pdf Revision not stated Security System Upgrades
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf Revision not stated Nellis AFB Paving IDIQ
Attachment 4_AF IMT 3065_199600401_VI_Progress Report.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 10 - BLANK SAMPLE AF Form 3065.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.8 - AF Form 3065 Progress Report Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Exhibit 7 - AF Form 3065 Contract Progress Report.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
BLANK SAMPLE AF Form 3065.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [AMENDED INVITATION FOR BID]
Atch BLANK SAMPLE AF Form 3065.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
16. AF Form 3065 Contract Progress Report (1 page) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 08 - AF Form 3065 Progress Report.xlsx Revision not stated B9992-Doc Stewart Playgrounds [PRE-SOLICITATION]
Attachment 11 - AF Form 3065.pdf Revision not stated Construct/Repair LOX Canopies
Show all 20

Who attaches AF Form 3065

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix E - Daily Contract Inspection Report.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Appendix D - Eng Form 4025-R.pdf PDF
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Appendix H - Task Order SOW.docx DOCX document
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix J - HJB 229 Instructions.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR#1

CONTRACT PROGRESS REPORT
Contractor:Address:
P.O. Box 4179, JBLM (McChord), WA 98438
Contract No. W911S8-XX-D-____Period Covered:FromTo:
Completion Date:Report #:1
Project #Project Name:
Line NumberWork Element% of Total JobPrevious Completion %Completion % for PeriodCompletion % Cumulative
1Preconstruction activities10.0%0.0%5.0%5.0%
2Mechanical40.0%0.0%15.0%15.0%
3Structural45.0%0.0%10.0%10.0%
4Closeout5.0%0.0%0.0%0.0%
MODS
Total Base Bid100%0.0%30.0%30.0%
Total MOD's0%00.0%0.0%0.0%
Total:100%0.0%30.0%30%
Remarks:
______ Contractor's Report is accepted without further action
______ Contractor's Report is accepted as amended.
______ Contractor's Report is rejected (variance over 5%)
Progress or Completion Statement
The contractor has satisfactorily completed the indicated percentage of the contract in accordance with the contract specifications.
Contractor Submitted byBase Civil Engineer
Typed Name & Title:Signature & Date
_________, Project Manager
Reviewed by Contract Contracting Officer Representative
Typed Name & Title:Signature & Date
Reviewed by Contracting Officer
Typed Name & Title:Signature & Date
Replaces AF Form 3065

File details come from the government source that posted it. Updated .