Appendix C - DA Form 5479 - CDR.pdf

Department of the Army Form PDF 38 KB Posted

Attached to
Protective Coatings
Solicitation number
W911S820B0002
Issued by

About this file

This document contains a federal contract opportunity solicitation and a contract discrepancy report form. The solicitation seeks proposals to provide protective coatings services at Joint Base Lewis-McChord in Washington and supported satellites. The contractor will be responsible for furnishing all materials, equipment, and personnel to manage and complete a variety of protective coatings applications and construction tasks through individual task orders issued by the government over the contract period. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command. The contract discrepancy report form is a template used to document any problems or discrepancies with contractor performance and corrective actions under a federal contract.

View the file

Other versions and copies of DA Form 5479

File Revision Posted Attached to
PWS_Attachment_5_-_Contract_Discrepancy_Report_DA_Form_5479.pdf Same revision and size as this file Revision not stated Building and Grounds Maintenance Services at Tionesta Lake
DA_FORM_5479_CONTRACT_DISCREPANCY_REPORT.pdf Same revision and size as this file Revision not stated CARPETING
MCoE_DRAFT_RFP_Attachment 8_DA_Form_5479.pdf Revision not stated Maneuver Center of Excellence (MCoE)
Attachment 8 DA Form 5479.xfdl Revision not stated The Maneuver Center Of Excellence (MCoE)

Who attaches DA Form 5479

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix E - Daily Contract Inspection Report.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Appendix D - Eng Form 4025-R.pdf PDF
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Appendix H - Task Order SOW.docx DOCX document
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix J - HJB 229 Instructions.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6.

2. 3.

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPANCY OR PROBLEM (Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER

7.

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

1. CONTRACT NUMBER

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment deduction, cure notice, show cause, other.)

CONTRACT DISCREPANCY REPORT

For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.

TO: (Contractor and Manager Name)

DATES

CLOSE OUT

CONTRACTOR

NOTIFIED

NAME AND TITLE SIGNATURE DATE

QAE

CONTRACTING

OFFICER

CONTINUATION SHEET IF NECESSARY. (Cite applicable Q.A. program procedures or new A.W. procedures.)

DA FORM 5479, MAR 2008 APD LC v1.01ES

FROM: (Name of QAE)

TO: (Contracting Officer) FROM: (Contractor)

PREVIOUS EDITIONS ARE OBSOLETE.

6.

2.

3.

PREPARED

ORAL NOTIFICATION

RETURNED BY CONTRACTOR

ACTION COMPLETE

4. DISCREPANCY OR PROBLEM

(Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER

7.

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

1. CONTRACT NUMBER

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE

10. DATE

11. GOVERNMENT EVALUATION

(Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS

(Payment deduction, cure notice, show cause, other.)

CONTRACT DISCREPANCY REPORT

For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.

TO:

(Contractor and Manager Name)

DATES

CLOSE OUT

CONTRACTOR

NOTIFIED

NAME AND TITLE

SIGNATURE

DATE

QAE

CONTRACTING

OFFICER

CONTINUATION SHEET IF NECESSARY.

(Cite applicable Q.A. program procedures or new A.W. procedures.)

DA FORM 5479, MAR 2008

APD LC v1.01ES

FROM:

(Name of QAE)

TO:

(Contracting Officer)

FROM:

(Contractor)

PREVIOUS EDITIONS ARE OBSOLETE.

1.01

DA FORM 5479, MAR 2008

CONTRACT DISCREPANCY REPORT

APD

CONTRACT:
TO_A:
FROM_A:
PREPARED:
ORALNOTE:
RETURN:
ACTION:
PROBLEM:
SIGN_A:
signature_BUTTON1:
TO_B:
FROM_B:
CONTRACTR:
SIGN_B:
signature_BUTTON2:
DATE_A:
GOVERNMNT:
GOVMTACTN:
NAME_A:
signature_BUTTON3:
SIGN_C:
DATE_B:
NAME_B:
signature_BUTTON4:
SIGN_D:
DATE_C:
NAME_C:
signature_BUTTON5:
SIGN_E:
DATE_D:

File details come from the government source that posted it. Updated .