This is a solicitation for a protective coatings contract at Joint Base Lewis-McChord in Washington. The contract will provide plant, labor, tools, equipment and materials for maintenance, repair and minor protective coatings construction work on real property at JBLM and supported satellites. During the contract period, the Government will identify construction tasks through individual Task Orders and the contractor shall furnish all necessary materials, equipment and personnel to manage and accomplish the work. Task Orders will vary in size and may include incidental disciplines required for various protective coatings applications. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at JBLM.

View the file

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Appendix H - Task Order SOW.docx DOCX document
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix D - Eng Form 4025-R.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Appendix J - HJB 229 Instructions.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix E - Daily Contract Inspection Report.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 09 90 00 Page 1

JOINT BASE LEWIS-MCCHORD DESIGN STANDARDS

SECTION 09 90 00 – PAINTS AND COATINGS

Design Requirements

1. Coordinate painting requirements with environmental issues, i.e. LBP surveys and specifications.

2. Joint Base Lewis-McChord has selected certain standard colors for the exterior and some interior paint work.

3. Include the following note in all specifications: Manufacturers are listed for color, pattern, style or texture reference and are not intended to limit contractor's selection of materials by other manufacturers.

Matching colors, patterns, styles or textures from other manufacturers are acceptable.

4. Exterior Color List:

Downtown Colors Brick base color: Vintage mission - Mutual Materials Main wall color: Balanced Beige - SW 7037 (Approximately Federal Specs 26521, matte finish).

Accent wall color: Chatroom - SW 6171 (Approximately Federal Specs 26408, matte finish) Historic (WWII) trim color: Retreat - SW 6207 (Approximately Federal Specs:

16307, Matte finish) Window Color: Classical White - SW 2829 (Approximately Federal Specs: 17886, semi-gloss finish) Roof/Accent trim color - Match new lodge roof (AEP Span Cool Terra Cotta) Roof Shingles (architectural grade only) Certain Teed Landmark 40 Architectural Grade Shingles color: Burnt Sienna REPLACE/DO NOT USE Colonial Revival Tan - SW 2828

Banana Belt Colors Roof: Cool Weathered Copper (AEP Span) Fascia/Gutters: Cool Weathered Copper (AEP Span) Downspouts - match wall color (Cool Metallic Champagne (AEP Span) Vertical Metal Siding: Cool Metallic Champagne (AEP Span) - Match wall color Soffit Panels - match wall color (Cool Metallic Champagne (AEP Span) Wall Color - Balance Beige - SW 7037, (Approximately Federal Specs: 26521) Window Color: Clear Anodized Aluminum (verify color of windows/doors to remain - repaint to match clear anodized if required)

Related Site Structures

Courtyard enclosure walls, Match Adjacent Building retaining walls, fences, dumpster enclosures

Porch crawl space enclosure Match Adjacent Building

Historic District Buildings, Joint Base Lewis-McChord Coordinate with ENRD Cultural Resources Office Note: Contractor must verify colors of buildings with Contracting Officer prior to painting.

SECTION 09 90 00 Page 2

Notes to Designers on Drawing Content Provide finish schedules showing paint schemes by room or room type, including wall (include color for accent wall if appropriate), ceiling if paint finish, and trim color(s).

SECTION 09 90 00

PAINTS AND COATINGS

PART 1 GENERAL

Criteria and requirements appearing in bold apply to work on Joint Base Lewis-McChord only.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological Exposure Indices

ASME INTERNATIONAL (ASME)

ASME A13.1 (2007) Scheme for the Identification of Piping Systems

ASTM INTERNATIONAL (ASTM)

ASTM C 669 (2000) Glazing Compounds for Back Bedding and Face

Glazing of Metal Sash

ASTM C 920 (2008) Standard Specification for Elastomeric Joint

Sealants

ASTM D 2092 (1995; R 2001e1) Standard Guide for Preparation of

Zinc-Coated (Galvanized) Steel Surfaces for Painting

ASTM D 235 (2002) Mineral Spirits (Petroleum Spirits)

(Hydrocarbon Dry Cleaning Solvent)

ASTM D 2824 (2006) Aluminum-Pigmented Asphalt Roof Coatings, Non-

Fibered, Asbestos Fibered, and Fibered without Asbestos

ASTM D 4214 (2007) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films

ASTM D 4263 (1983; R 2005) Indicating Moisture in Concrete by the

Plastic Sheet Method

SECTION 09 90 00 Page 3

ASTM D 4444 (1992; R 2003) Use and Calibration of Hand-Held Moisture Meters

ASTM D 523 (2008) Standard Test Method for Specular Gloss

ASTM F 1869 (2004) Measuring Moisture Vapor Emission Rate of

Concrete Subfloor Using Anhydrous Calcium Chloride

MASTER PAINTERS INSTITUTE (MPI)

MPI 1 (Jan 2004) Aluminum Paint

MPI 10 (Jan 2004) Exterior Latex, Flat, MPI Gloss Level 1

MPI 101 (Jan 2004) Epoxy Anti-Corrosive Metal Primer

MPI 107 (Jan 2004) Rust Inhibitive Primer (Water-Based)

MPI 108 (Jan 2004) High Build Epoxy Coating, Low Gloss

MPI 11 (Jan 2004) Exterior Latex, Semi-Gloss, MPI Gloss

Level 5

MPI 113 (Jan 2004) Exterior Pigmented Elastomeric Coating

(Water Based)

MPI 116 (Jan 2004) Epoxy Block Filler

MPI 119 (Jan 2004) Exterior Latex, Gloss

MPI 13 (Jan 2004) Exterior Solvent-Based Semi-Transparent

Stain

MPI 134 (Jan 2004) Galvanized Primer (Waterbased)

MPI 138 (Jan 2004) Interior High Performance Latex, MPI Gloss

Level 2

MPI 139 (Jan 2004) Interior High Performance Latex, MPI Gloss

Level 3

MPI 140 (Jan 2004) Interior High Performance Latex, MPI Gloss

Level 4

MPI 141 (Jan 2004) Interior High Performance Latex MPI Gloss

Level 5

MPI 144 (Jan 2004) Institutional Low Odor / VOC Interior

Latex, MPI Gloss Level 2

MPI 145 (Jan 2004) Institutional Low Odor / VOC Interior

Latex, MPI Gloss Level 3

MPI 146 (Jan 2004) Institutional Low Odor/VOC Interior Latex, MPI Gloss Level 4

SECTION 09 90 00 Page 4

MPI 147 (Jan 2004) Institutional Low Odor / VOC Interior Latex, Semi-Gloss, MPI Gloss Level 5

MPI 151 (Jan 2006) Interior W.B. Light Industrial Coating, MPI Gloss Level 3

MPI 153 (Jan 2006) Interior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5

MPI 154 (Jan 2006) Interior W.B. Light Industrial Coating, Gloss, MPI Gloss Level 6

MPI 16 (Jan 2004) Exterior Latex-Based Solid Hide Stain

MPI 161 (Jan 2006) Exterior W.B. Light Industrial Coating, MPI Gloss Level 3

MPI 163 (Jan 2006) Exterior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5

MPI 164 (Jan 2006) Exterior W.B. Light Industrial Coating, Gloss, MPI Gloss Level 6

MPI 19 (Jan 2004) Inorganic Zinc Rich Primer

MPI 2 (Jan 2004) Aluminum Heat Resistant Enamel (up to 427

C and 800 F

MPI 21 (Jan 2004) Heat Resistant Enamel, Gloss (up to 205 degrees C and 400 degrees F), MPI Gloss Level 6

MPI 22 (Jan 2004) Aluminum Paint, High Heat (up to 590 degrees C and 1100 degrees F.

MPI 23 (Jan 2004) Surface Tolerant Metal Primer

MPI 26 (Jan 2004) Cementitious Galvanized Metal Primer

MPI 27 (Jan 2004) Exterior / Interior Alkyd Floor Enamel, Gloss

MPI 31 (Jan 2004) Polyurethane, Moisture Cured, Clear Gloss

MPI 39 (Jan 2004) Interior Latex-Based Wood Primer

MPI 4 (Jan 2004) Interior/Exterior Latex Block Filler

MPI 42 (Jan 2004) Latex Stucco and Masonry Textured Coating

MPI 44 (Jan 2004) Interior Latex, MPI Gloss Level 2

MPI 45 (Jan 2004) Interior Alkyd Primer Sealer

MPI 46 (Jan 2004) Interior Enamel Undercoat

MPI 47 (Jan 2004) Interior Alkyd, Semi-Gloss, MPI Gloss

Level 5

SECTION 09 90 00 Page 5

MPI 48 (Jan 2004) Interior Alkyd, Gloss, MPI Gloss Level 6

MPI 49 (Jan 2004) Interior Alkyd, Flat, MPI Gloss Level 1

MPI 5 (Jan 2004) Exterior Alkyd Wood Primer

MPI 50 (Jan 2004) Interior Latex Primer Sealer

MPI 51 (Jan 2004) Interior Alkyd, Eggshell, MPI Gloss Level

MPI 52 (Jan 2004) Interior Latex, MPI Gloss Level 3

MPI 54 (Jan 2004) Interior Latex, Semi-Gloss, MPI Gloss

Level 5

MPI 56 (Jan 2004) Interior Oil Modified Urethane Clear Gloss

MPI 57 (Jan 2004) Interior Oil Modified Urethane Clear Satin

MPI 59 (Jan 2004) Interior/Exterior Floor Enamel, Low Gloss

MPI 6 (Jan 2004) Exterior Latex Wood Primer

MPI 60 (Jan 2004) Interior/Exterior Latex Floor Paint, Low

Gloss

MPI 68 (Jan 2004) Interior/Exterior Latex Floor Enamel, Gloss

MPI 7 (Jan 2004) Exterior Oil Wood Primer

MPI 71 (Jan 2004) Polyurethane, Moisture Cured, Clear, Flat

MPI 72 (Jan 2004) Polyurethane, Two Component, Pigmented, Gloss

MPI 77 (Jan 2004) Epoxy Gloss

MPI 79 (Jan 2004) Alkyd Anti-Corrosive Metal Primer

MPI 8 (Jan 2004) Exterior Alkyd, Flat, MPI Gloss Level I

MPI 9 (Jan 2004) Exterior Alkyd, Gloss, MPI Gloss Level 6

MPI 90 (Jan 2004) Interior Wood Stain, Semi-Transparent

MPI 94 (Jan 2004) Exterior Alkyd, Semi-Gloss, MPI Gloss

Level 5

MPI 95 (Jan 2004) Quick Drying Primer for Aluminum

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC Guide 6 (2004) Guide for Containing Debris Generated During

Paint Removal Operations

SECTION 09 90 00 Page 6

SSPC Guide 7 (2004; E 2004) Guide for the Disposal of Lead-

Contaminated Surface Preparation Debris

SSPC PA 1 (2000; E 2004) Shop, Field, and Maintenance Painting

SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application

SSPC Paint 18 (1982; E 2004) Paint Specification No. 18 Chlorinated

Rubber Intermediate Coat Paint

SSPC SP 1 (1982; E 2004) Solvent Cleaning

SSPC SP 10 (2007) Near-White Blast Cleaning

SSPC SP 12 (2002) Surface Preparation and Cleaning of Metals by

Waterjetting Prior to Recoating

SSPC SP 2 (1982; E 2004) Hand Tool Cleaning

SSPC SP 3 (2004; E 2004) Power Tool Cleaning

SSPC SP 6 (2000; E 2004) Commercial Blast Cleaning

SSPC SP 7 (2007) Brush-Off Blast Cleaning

SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for

Steel Surfaces Prepared by Dry Abrasive Blast Cleaning

SSPC VIS 3 (2004) Visual Standard for Power-and Hand-Tool

Cleaned Steel

SSPC VIS 4 (1998; E 2000; E 2004) Guide and Reference

Photographs for Steel Surfaces Prepared by Waterjetting

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety and Health Requirements Manual

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA Method 24 (2000) Determination of Volatile Matter Content, Water Content, Density, Volume Solids, and Weight Solids of Surface Coatings

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-313 (Rev D; Am 1) Material Safety Data, Transportation

Data and Disposal Data for Hazardous Materials Furnished to Government Activities

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1000 Air Contaminants

SECTION 09 90 00 Page 7

29 CFR 1910.1001 Asbestos

29 CFR 1910.1025 Lead

29 CFR 1926.62 Lead

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

The current MPI, "Approved Product List" that lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.

Samples of specified materials may be taken and tested for compliance with specification requirements.

SD-02 Shop Drawings

Piping identification

Submit color stencil codes.

SD-03 Product Data

Coating; G

For Latex paint submit manufacturer documentation indicating type of recycled material and the percentage of such material that is postconsumer recycled content. Alternately, submit written justification of non-use per Section 01 62 35 RECYCLED/RECOVERED

MATERIALS.

For Concrete and wood sealers, roof coatings and water tank coatings submit manufacturer documentation demonstrating type and percentage of biobased content or written justification of non-use per Paragraph 2.1.

Manufacturer's Technical Data Sheets Sealant

SD-04 Samples

Color; G

Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated.

SECTION 09 90 00 Page 8

Textured Wall Coating System; G Sample Textured Wall Coating System Mock-Up; G

SD-07 Certificates

Applicator's qualifications Qualification Testing laboratory for coatings; G

SD-08 Manufacturer's Instructions

Application instructions Mixing

Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.

Manufacturer's Material Safety Data Sheets

Submit manufacturer's Material Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in

FED-STD-313.

SD-10 Operation and Maintenance Data

Coatings; G

Preprinted cleaning and maintenance instructions for all coating systems shall be provided.

SD-11 Closeout Submittals

Local/Regional Materials; (LEED)

LEED documentation relative to local/regional materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.

Materials; (LEED)

LEED documentation relative to low emitting materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.

1.3 APPLICATOR'S QUALIFICATIONS

1.3.1 Contractor Qualification

Submit the name, address, telephone number, FAX number, and e-mail address of the contractor that will be performing all surface preparation and coating application. Submit evidence that key personnel have successfully performed surface preparation and application of coatings on a minimum of three similar projects within the past three years. List information by individual and include the following:

a. Name of individual and proposed position for this work.

SECTION 09 90 00 Page 9

b. Information about each previous assignment including:

Position or responsibility;

Employer (if other than the contractor);

Name of facility owner;

Mailing address, telephone number, and telex number (if non-US) of facility owner;

Name of individual in facility owner's organization who can be contacted as a reference;

Location, size and description of structure;

Dates work was carried out;

Description of work carried out on structure;

1.4 QUALITY ASSURANCE

1.4.1 Field Samples and Tests

The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph "Sampling Procedures." Test each chosen product as specified in the paragraph "Testing Procedure." Products that do not conform, shall be removed from the job site and replaced with new products that conform to the referenced specification. Testing of replacement products that failed initial testing shall be at no cost to the Government.

Another required testing is Batch Quality Conformance Testing to prove conformance of the manufacturer's paint to the specified MPI standard. This testing is accomplished before the materials are delivered to the job site.

Provide testing for specified paint products. Test paint products as specified in the paragraph "Testing Procedure".

1.4.1.1 Sampling Procedure

The Contracting Officer will select paint at random from the products that have been delivered to the job site for sample testing. The contractor shall provide one quart samples of the selected paint materials. The samples shall be taken in the presence of the Contracting Officer, and labeled, identifying each sample. Provide labels in accordance with the paragraph "Packaging, Labeling, and Storage" of this specification.

1.4.1.2 Testing Procedure

Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the paragraph "Qualification Testing" laboratory for coatings. The qualification testing lab report shall include the backup data and summary of the test results. The summary shall list all

SECTION 09 90 00 Page 10 of the reference specification requirements and the result of each test.

The summary shall clearly indicate whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.

Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified. If the contractor chooses MPI to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the contractor stating that MPI will perform the testing.

1.4.2 Textured Wall Coating System

Three complete samples of each indicated type, pattern, and color of textured wall coating system applied to a panel of the same material as that where the coating system will be applied in the work. Samples of wall coating systems shall be minimum 5 x 7 inches and of sufficient size to show pattern repeat and texture.

1.4.3 Sample Textured Wall Coating System Mock-Up

After coating samples are approved, and prior to starting installation, a minimum 8 foot x 8 foot mock-up shall be provided for each substrate and for each color and type of textured wall coating, using the actual substrate materials. Once approved the mock-up samples shall be used as a standard of workmanship for installation within the facility. At least 48 hours prior to mock-up installation, the contractor shall submit written notification to the Contracting Officer's Representative.

1.5 REGULATORY REQUIREMENTS

1.5.1 Environmental Protection

In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify Contracting Officer of any paint specified herein that fails to conform.

1.5.2 Lead Content

Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.

1.5.3 Chromate Content

Do not use coatings containing zinc-chromate or strontium-chromate.

1.5.4 Asbestos Content

Materials shall not contain asbestos.

1.5.5 Mercury Content

SECTION 09 90 00 Page 11

Materials shall not contain mercury or mercury compounds.

1.5.6 Silica

Abrasive blast media shall not contain free crystalline silica.

1.5.7 Human Carcinogens

Materials shall not contain ACGIH 0100Doc and ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).

1.6 PACKAGING, LABELING, AND STORAGE

Paints shall be in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 gallons. Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F.

1.7 SAFETY AND HEALTH

Apply coating materials using safety methods and equipment in accordance with the following:

Work shall comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Appendix A of EM 385-1-1. The Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.

1.7.1 Safety Methods Used During Coating Application

Comply with the requirements of SSPC PA Guide 3.

1.7.2 Toxic Materials

To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:

a. The applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation.

b. 29 CFR 1910.1000.

c. ACGIH 0100Doc, threshold limit values.

d. Contact Joint Base Lewis-McChord ENRD for the latest requirements in place for handling of lead based paint residues. The appropriate OSHA standard in 29 CFR 1910.1025 and 29 CFR 1926.62 for surface preparation on painted surfaces containing lead. Removal and disposal of coatings that contain lead is specified in Section 02 83

SECTION 09 90 00 Page 12

19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET HOUSING AND CHILD

OCCUPIED FACILITIES and Section 02 83 13.00 20 LEAD IN CONSTRUCTION.

Additional guidance is given in SSPC Guide 6 and SSPC Guide 7.

Refer to drawings for list of hazardous materials located on this project. Contractor to coordinate paint preparation activities with this specification section. If Toxicity Characteristics Leaching Procedure (TCLP) analysis of paint chip samples of removed paint particles exceeds maximum allowable concentration, all solid materials that could be contaminated with solid particles of paint shall be collected and containerized in a Department of Transportation Specification 1A2 container (open-head, 55-gallon drum). Drums shall be labeled in accordance with WAC 173-303. The Joint Base Lewis-McChord Environmental and Natural Resources Division (ENRD), Phone 967-4786, shall be notified of any such material, storage location, and estimate of total number of drums of waste. The ENRD will help coordinate the disposal of the material with the contractor and Defense Reutilization Management Office (DRMO) or other agency as appropriate. The contractor shall process drums through DEH-ENRD HAZARDOUS WASTE MANAGEMENT SECTION to the DRMO, Building 9673 for projects on Joint Base Lewis-McChord.

e. The appropriate OSHA standards in 29 CFR 1910.1001 for surface preparation of painted surfaces containing asbestos. Removal and disposal of coatings that contain asbestos materials is specified in Section 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES. Refer to drawings for list of hazardous materials located on this project.

Contractor to coordinate paint preparation activities with this specification section.

1.8 ENVIRONMENTAL CONDITIONS

Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation. Isolate area of application from rest of building when applying high-emission paints or coatings.

1.8.1 Coatings

Do not apply coating when air or substrate conditions are:

a. Less than 5 degrees F above dew point;

b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.

Under no circumstances shall application conditions exceed manufacturer recommendations.

1.9 SUSTAINABLE DESIGN REQUIREMENTS

1.9.1 Local/Regional Materials

Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Paint and coating materials may be locally available.

SECTION 09 90 00 Page 13

1.10 COLOR SELECTION

Colors of finish coats shall be as indicated or specified. Where not indicated or specified, colors shall be selected by the Contracting Officer.

Manufacturers are listed for color, pattern, style, or texture reference and are not intended to limit contractor's selection of materials by other manufacturers. Matching colors, patterns, styles, or textures from other manufacturers are acceptable.

Tint each coat progressively darker to enable confirmation of the number of coats.

Color, texture, and pattern of wall coating systems shall be in accordance with Section 09 06 90 COLOR SCHEDULE.

Joint Base Lewis-McChord has selected certain standard colors for exterior and some interior paint work.

For Exterior Colors refer to the Joint Base Lewis-McChord Installation Design Guide for color charts. The color of paint to be used should be based on manufacturer's correspondence to the six-digit Pantone Architecture and Interior number and shall not be predicated on matching a computer-generated sample.

The name provided for the colors is a generic name representing the color range and is not the actual Pantone name for that color. Always use the six-digit Pantone A&I number instead of generic name when referencing the color.

Select colors from the exterior color list (Item 3 under Design Requirements) based upon their appropriateness to the building type, desired appearance, material to be painted and prevailing architectural design and landscape character of the installation. Ease of maintenance, and sustainability should also be considered.

Colors for exterior painting shall generally be as follows (color numbers based on Sherwin Williams paint and Fed. Std. 595) except as otherwise specified:

MATERIALS

a. Downtown Colors

Brick base color: Vintage mission - Mutual Materials Main wall color: Balanced Beige - SW 7037 (Approx Fed Spec: 26521, matte finish) Accent wall color: Chatroom - SW 6171 (Approx Fed Spec: 26408, matte finish) Historic (WWII) trim color: Retreat - SW 6207 (Approx Fed Spec:

16307, matte finish) Window color: Classical White - SW 2829 (Approx Fed Spec: 17886, semi-gloss finish) Roof/accent trim color: Match new lodge roof (AEP Span Cool Terra Cotta) Roof Shingles: (architectural grade only) CertainTeed Landmark 40 Architectural Grade Shingles color: Burnt Sienna

SECTION 09 90 00 Page 14

b. Banana Belt Colors

Roof: Cool Weathered Copper (AEP Span) Fascia/Gutters: Cool Weathered Copper (AEP Span) Downspouts: match wall color (Cool Metallic Champagne (AEP Span)) Vertical Metal Siding: Cool Metallic Champagne (AEP Span) - Match wall color Soffit Panels: match wall color (Cool Metallic Champagne (AEP Span)) Wall Color: match Sherwin Williams SW 7037 - Balanced Beige (Approx Fed Spec: 26521) Trim Color (limited use, window sills and limited trim areas): match Sherwin Williams SW 7039 Virtual Taupe (Approx Fed Spec: 36306, matte finish) Accent Color: Chatroom - SW 6171 (Approx Fed Spec: 26408, matte finish) Window Color: Clear Anodized Aluminum (verify color of windows/doors to remain - repaint to match clear anodized if required - match SW 7015 Repose Gray (Approx Fed Spec: 35622, gloss finish)

c. Deck Gray (porches, ramps and other walking surfaces) Joint Base

Lewis-McChord (except family housing): Gray - No. 35440

d. Painted exhaust fan hoods, flue pipes, vents, chimney cleanout doors, Chimney bracing, lock hasps and metal handrails, basement window guards on brick buildings, Joint Base Lewis-McChord (except family housing): Black - No. 17038

e. Fire Alarm Reporting stations and Bldg. Fire Hose connections (Bibbs shall be red) Joint Base Lewis-McChord: Red Circle - No. 23711 or 21136, with White No. 27875

f. Historical District Bldgs: Coordinate with ENRD Cultural, Joint

Base Lewis-McChord Resources Office

g. For Courtyard enclosure walls, retaining walls, fences, dumpster enclosures and porch crawl space enclosures, match colors with adjacent buildings.

Interior Painting of Buildings:

Building shall be painted the following schemes.

Scheme #1

Main wall: Natural Choice - SW 7011 (eggshell finish) (Approx Fed Spec:

27722, matte finish)

Trim: Tony Taupe - SW 7038 (semi-gloss finish) (Approx Fed Spec: 26521, semi-gloss finish)

Accent: Grassland - SW 6163 (eggshell finish) limited use only. (Approx Fed Spec: 36595, matte finish)

The contractor must verify colors of buildings with Contracting Officer prior to painting.

SECTION 09 90 00 Page 15

1.11 LOCATION AND SURFACE TYPE TO BE PAINTED

1.11.1 Painting Included

Where a space or surface is indicated to be painted, include the following unless indicated otherwise.

a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.

b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.

c. Existing coated surfaces that are damaged during performance of the work.

1.11.1.1 Exterior Painting

Includes new surfaces, existing coated surfaces, and existing uncoated surfaces, of the buildings and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.

1.11.1.2 Interior Painting

Includes new surfaces, existing uncoated surfaces, and existing coated surfaces of the buildings and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.

a. Exposed columns, girders, beams, joists, and metal deck; and

b. Other contiguous surfaces.

1.11.2 Painting Excluded

Do not paint the following unless indicated otherwise.

a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.

b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.

c. Steel to be embedded in concrete.

d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.

e. Hardware, fittings, and other factory finished items.

f. Surfaces indicated shall not be painted.

SECTION 09 90 00 Page 16

1.11.3 Mechanical and Electrical Painting

Includes field coating of interior and exterior new and existing surfaces.

a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.

(1) Exposed piping, conduit, and ductwork;

(2) Supports, hangers, air grilles, and registers;

(3) Miscellaneous metalwork and insulation coverings.

b. Do not paint the following, unless indicated otherwise:

(1) New zinc-coated, aluminum, and copper surfaces under insulation

(2) New aluminum jacket on piping

(3) New interior ferrous piping under insulation.

1.11.3.1 Fire Extinguishing Sprinkler Systems

Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale. Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress. Upon completion of painting, remove protective covering from sprinkler heads. Remove sprinkler heads that have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:

a. Piping in Unfinished Areas: Provide primed surfaces with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of

1.0 mil in attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and spaces where walls or ceiling are not painted or not constructed of a prefinished material. In lieu of red enamel finish coat, provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals.

b. Piping in Finished Areas: Provide primed surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil. Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals throughout the piping systems.

1.11.4 MISCELLANEOUS PAINTING

Lettering Building and Room Number(s).

SECTION 09 90 00 Page 17

Lettering shall be provided as scheduled on the drawings, shall be block Gothic type, and shall be black enamel water-type decalcomania, finished with a protective coating of spar varnish. Samples shall be approved before application. Obstructions To Aviation shall be painted in the pattern and color prescribed by FAA AC 70/7460-1.

1.11.5 Definitions and Abbreviations

1.11.5.1 Qualification Testing

Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.

1.11.5.2 Batch Quality Conformance Testing

Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification.

This testing shall only be accomplished by MPI testing lab.

1.11.5.3 Coating

A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (metals, plastics, wood, paper, leather, cloth, etc.). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.

1.11.5.4 DFT or dft

Dry film thickness, the film thickness of the fully cured, dry paint or coating.

1.11.5.5 DSD

Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.

1.11.5.6 EPP

Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.

1.11.5.7 EXT

MPI short term designation for an exterior coating system.

1.11.5.8 INT

MPI short term designation for an interior coating system.

SECTION 09 90 00 Page 18

1.11.5.9 Micron / microns

The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.

1.11.5.10 mil / mils

The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.

1.11.5.11 mm

The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.

1.11.5.12 MPI Gloss Levels

MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.

Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.

Gloss levels are defined by MPI as follows:

Gloss Description Units Units Level @ 60 degrees @ 85 degrees

G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85 G7 High Gloss

Gloss is tested in accordance with ASTM D 523. Historically, the Government has used Flat (G1/G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).

1.11.5.13 MPI System Number

The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).

The Division number follows the CSI Master Format.

1.11.5.14 Paint

See Coating definition.

1.11.5.15 REX

MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.

1.11.5.16 RIN

SECTION 09 90 00 Page 19

MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.

PART 2 PRODUCTS

2.1 MATERIALS

Conform to the coating specifications and standards referenced in PART 3.

Submit manufacturer's technical data sheets for specified coatings and solvents. Comply with applicable regulations regarding toxic and hazardous materials.

Latex paint shall meet EPA requirements in accordance with Section 01 62 35 RECYCLED/RECOVERED MATERIALS or submit written justification for non-use per Section 01 62 35.

Concrete and wood sealers, roof coatings, and water tank coatings are designated items under the USDA Biopreferred program (2002 Farm Bill).

These products shall comply with biobased content requirements established by the USDA's BioPreferred program unless the designer, requirements generator, or contractor determines that no biobased product can be obtained within the cost, performance, or availability requirements of the contract.

If such determination of non-use is made, the contractor or subcontractor shall complete and submit the Joint Base Lewis-McChord Construction Green Procurement Exception Form. Using this form, the contractor shall specify the reason for exception (unreasonable price, inadequate performance, non-availability) and provide all associated information (including copies of all supporting evidence). This form is available from the Contracting Official or the Joint Base Lewis-McChord Green Procurement Program Coordinator (Building 1210, (253) 966-6466, LEWISPWGreenProcurement@conus.army.mil). The contractor shall submit the completed form via e-mail (with copies of supporting documents included) to the Contracting Officer's Representative. The contractor shall include the following address in the carbon copy ("cc") line of the e-mail:

LEWISPWGreenProcurement@conus.army.mil. The contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with Joint Base Lewis-McChord security. If use of e-mail is not possible, the contractor shall coordinate the submission of these documents with the Contracting Officer's Representative and ask that they forward copies to the Joint Base Lewis-McChord Green Procurement Coordinator (Bldg 1210, 966- 6466). Interior coatings applied to potable water tanks shall comply with all drinking water safety requirements. The biobased requirement does not apply to U.S. Armed Forces tactical equipment. More information can be found at http://www.biopreferred.gov/ProposedAndFinalRegulations.aspx.

PART 3 EXECUTION

3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED

Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, workmen skilled in the trades involved shall reinstall removed items. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.

SECTION 09 90 00 Page 20

3.2 REPUTTYING AND REGLAZING

Remove cracked, loose, and defective putty or glazing compound on glazed sash and provide new putty or glazing compound. Where defective putty or glazing compound constitutes 30 percent or more of the putty at any one light, remove the glass and putty or glazing compound and reset the glass.

Remove putty or glazing compound without damaging sash or glass. Clean rabbets to bare wood or metal and prime prior to reglazing. Putty for wood sash shall be linseed oil putty. Glazing compound for metal sash shall conform to ASTM C 669. Patch surfaces to provide smooth transition between existing and new surfaces. Finish putty or glazing compound to a neat and true bead. Allow glazing compound time to cure, in accordance with manufacturer's recommendation, prior to coating application. Allow putty to set one week prior to coating application.

3.3 RESEALING OF EXISTING EXTERIOR JOINTS

3.3.1 Surface Condition

Surfaces shall be clean, dry to the touch, and free from frost and moisture;

remove grease, oil, wax, lacquer, paint, defective backstop, or other foreign matter that would prevent or impair adhesion. Where adequate grooves have not been provided, clean out to a depth of 1/2 inch and grind to a minimum width of 1/4 inch without damage to adjoining work. Grinding shall not be required on metal surfaces.

3.3.2 Backstops

In joints more than 1/2 inch deep, install glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free of oil or other staining elements as recommended by sealant manufacturer. Backstop material shall be compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.

3.3.3 Primer and Bond Breaker

Install the type recommended by the sealant manufacturer.

3.3.4 Ambient Temperature

Between 38 degrees F and 95 degrees F when applying sealant.

3.3.5 Exterior Sealant

For joints in vertical surfaces, provide ASTM C 920, Type S or M, Grade NS, Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C 920, Type S or M, Grade P, Class 25, Use T. Color(s) shall be selected by the Contracting Officer. Apply the sealant in accordance with the manufacturer's printed instructions. Force sealant into joints with sufficient pressure to fill the joints solidly. Sealant shall be uniformly smooth and free of wrinkles.

3.3.6 Cleaning

Immediately remove fresh sealant from adjacent areas using a solvent recommended by the sealant manufacturer. Upon completion of sealant application, remove remaining smears and stains and leave the work in a

SECTION 09 90 00 Page 21 clean condition. Allow sealant time to cure, in accordance with manufacturer's recommendations, prior to coating.

3.4 SURFACE PREPARATION

Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Oil and grease shall be removed prior to mechanical cleaning. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.

3.4.1 Additional Requirements for Preparation of Surfaces With Existing Coatings

Before application of coatings, perform the following on surfaces covered by soundly-adhered coatings, defined as those that cannot be removed with a putty knife:

a. Test existing finishes for lead before sanding, scraping, or removing. If lead is present, refer to paragraph Toxic Materials.

b. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral spirits, ASTM D 235. Allow surface to dry. Wiping shall immediately precede the application of the first coat of any coating, unless specified otherwise.

c. Sand existing glossy surfaces to be painted to reduce gloss. Brush, and wipe clean with a damp cloth to remove dust.

d. The requirements specified are minimum. Comply also with the application instructions of the paint manufacturer.

e. Previously painted surfaces specified to be repainted or damaged during construction shall be thoroughly cleaned of all grease, dirt, dust or other foreign matter.

f. Blistering, cracking, flaking and peeling or other deteriorated coatings shall be removed.

g. Chalk shall be removed so that when tested in accordance with ASTM D

4214, the chalk resistance rating is no less than 8.

h. Slick surfaces shall be roughened. Damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls shall be repaired with suitable material to match adjacent undamaged areas.

i. Edges of chipped paint shall be feather edged and sanded smooth.

j. Rusty metal surfaces shall be cleaned as per SSPC requirements.

Solvent, mechanical, or chemical cleaning methods shall be used to provide surfaces suitable for painting.

SECTION 09 90 00 Page 22

k. New, proposed coatings shall be compatible with existing coatings.

3.4.2 Existing Coated Surfaces with Minor Defects

Sand, spackle, and treat minor defects to render them smooth. Minor defects are defined as scratches, nicks, cracks, gouges, spalls, alligatoring, chalking, and irregularities due to partial peeling of previous coatings.

Remove chalking by sanding so that when tested in accordance with ASTM D 4214, the chalk rating is not less than 8.

3.4.3 Removal of Existing Coatings

Remove existing coatings from the following surfaces:

a. Surfaces containing large areas of minor defects;

b. Surfaces containing more than 20 percent peeling area; and

c. Surfaces designated by the Contracting Officer, such as surfaces where rust shows through existing coatings.

3.4.4 Substrate Repair

a. Repair substrate surface damaged during coating removal;

b. Sand edges of adjacent soundly-adhered existing coatings so they are tapered as smooth as practical to areas involved with coating removal; and

c. Clean and prime the substrate as specified.

3.5 PREPARATION OF METAL SURFACES

3.5.1 Existing and New Ferrous Surfaces

a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease. Where shop coat is missing or damaged, clean according to SSPC SP 2, SSPC SP 3, SSPC SP 6, or SSPC SP 10. Brush-off blast remaining surface in accordance with SSPC SP 7; Water jetting to SSPC SP 12 WJ-4 may be used to remove loose coating and other loose materials. Use inhibitor as recommended by coating manufacturer to prevent premature rusting. Shop-coated ferrous surfaces shall be protected from corrosion by treating and touching up corroded areas immediately upon detection.

b. Surfaces With More Than 20 Percent Rust, Mill Scale, and Other

Foreign Substances: Clean entire surface in accordance with SSPC SP 6/SSPC SP 12 WJ-3 or SSPC SP 10/SSPC SP 12 WJ-2.

c. Metal Floor Surfaces to Receive Nonslip Coating: Clean in accordance with SSPC SP 10 or SSPC SP 12 WJ-2.

3.5.2 Final Ferrous Surface Condition:

SECTION 09 90 00 Page 23

For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and SSPC SP 3. As a visual reference, cleaned surfaces shall be similar to photographs in SSPC VIS 3.

For abrasive blast cleaned surfaces, the requirements are stated in SSPC SP 7, SSPC SP 6, and SSPC SP 10. As a visual reference, cleaned surfaces shall be similar to photographs in SSPC VIS 1.

For water jet cleaned surfaces, the requirements are stated in SSPC SP 12.

As a visual reference, cleaned surfaces shall be similar to photographs in

SSPC VIS 4.

3.5.3 Galvanized Surfaces

a. New or Existing Galvanized Surfaces With Only Dirt and Zinc Oxidation Products: Clean with solvent, steam, or non-alkaline detergent solution in accordance with SSPC SP 1. If the galvanized metal has been passivated or stabilized, the coating shall be completely removed by brush-off abrasive blast. New galvanized steel to be coated shall not be "passivated" or "stabilized" If the absence of hexavalent stain inhibitors is not documented, test as described in ASTM D 2092, Appendix X2, and remove by one of the methods described therein.

b. Galvanized with Slight Coating Deterioration or with Little or No

Rusting: Water jetting to SSPC SP 12 WJ3 to remove loose coating from surfaces with less than 20 percent coating deterioration and no blistering, peeling, or cracking. Use inhibitor as recommended by the coating manufacturer to prevent rusting.

c. Galvanized With Severe Deteriorated Coating or Severe Rusting: Spot abrasive blast rusted areas as described for steel in SSPC SP 6, and water jet to SSPC SP 12, WJ3 to remove existing coating.

3.5.4 Non-Ferrous Metallic Surfaces

Aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces.

a. Surface Cleaning: Solvent clean in accordance with SSPC SP 1 and wash with mild non-alkaline detergent to remove dirt and water soluble contaminants.

3.5.5 Terne-Coated Metal Surfaces

Solvent clean surfaces with mineral spirits, ASTM D 235. Wipe dry with clean, dry cloths.

3.5.6 Existing Surfaces with a Bituminous or Mastic-Type Coating

Remove chalk, mildew, and other loose material by washing with a solution of 1/2 cup trisodium phosphate, 1/4 cup household detergent, one quart 5 percent sodium hypochlorite solution and 3 quarts of warm water.

3.6 PREPARATION OF CONCRETE AND CEMENTITIOUS SURFACE

SECTION 09 90 00 Page 24

3.6.1 Concrete and Masonry

a. Curing: Concrete, stucco and masonry surfaces shall be allowed to cure at least 30 days before painting, except concrete slab on grade, which shall be allowed to cure 90 days before painting.

b. Surface Cleaning: Remove the following deleterious substances.

(1) Dirt, Chalking, Grease, and Oil: Wash new and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, and 4 quarts of warm water. Then rinse thoroughly with fresh water. Wash existing coated surfaces with a suitable detergent and rinse thoroughly.

For large areas, water blasting may be used.

(2) Fungus and Mold: Wash new, existing coated, and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.

(3) Paint and Loose Particles: Remove by wire brushing.

(4) Efflorescence: Remove by scraping or wire brushing followed by washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid. Do not allow acid to remain on the surface for more than five minutes before rinsing with fresh water. Do not acid clean more than 4 square feet of surface, per workman, at one time.

(5) Removal of Existing Coatings: For surfaces to receive textured coating MPI 42, remove existing coatings including soundly adhered coatings if recommended by textured coating manufacturer.

c. Cosmetic Repair of Minor Defects: Repair or fill mortar joints and minor defects, including but not limited to spalls, in accordance with manufacturer's recommendations and prior to coating application.

d. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not to surfaces with droplets of water. Do not apply epoxies to damp vertical surfaces as determined by ASTM D 4263 or horizontal surfaces that exceed 3 lbs of moisture per 1000 square feet in 24 hours as determined by ASTM F 1869. In all cases follow manufacturer’s recommendations. Allow surfaces to cure a minimum of 30 days before painting.

3.6.2 Gypsum Board, Plaster, and Stucco

a.